Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CENTAURUS METALS LIMITED Capital/Financing Update 2022

May 15, 2022

64715_rns_2022-05-15_d0fe6866-d3cc-42f3-b1ad-92cbdc327016.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT AND MEDIA RELEASE

==> picture [124 x 57] intentionally omitted <==

16 May 2022

JAGUAR RESOURCE DEFINITION DRILLING DELIVERS OUTSTANDING NEW RESULTS OF UP TO 46.0m at 2.17% NICKEL

Successful in-fill drilling continues to de-risk the Project by increasing confidence in the shallow open pit mineralisation that will underpin early payback of the planned mining operation

  • Significant shallow results received from ongoing in-fill drilling at the Jaguar Central (JC), Jaguar South (JS) and Jaguar Northeast (JNE) deposits, demonstrating the continuity of the mineralisation within the current Mineral Resource model. New assay results include:

  • 46.0m at 2.17% Ni from 128.0m including 23.2m at 2.82% Ni from 148.0m in JAG-DD-22-274 (JC)

  • 49.3m at 1.20% Ni from 31.9m including 13.2m at 2.37% Ni from 53.5m in JAG-DD-22-262 (JC)

  • 38.3m at 1.16% Ni from 87.7m in JAG-DD-22-246 (JS)

  • 15.2m at 2.12% Ni from 187.8m including 2.6m at 9.14% Ni from 200.4m in JAG-DD-22-260 (JS)

  • 33.3m at 0.89% Ni from 136.3m in JAG-DD-22-282 (JC)

  • 26.9m at 0.93% Ni from 91.6m in JAG-DD-22-265 (JC)

  • 22.5m at 1.01% Ni from 116.5m including 6.0m at 2.29% Ni from 133.0m in JAG-DD-22-272 (JC)

  • 15.0m at 1.42% Ni from 122.0m including 5.5m at 2.82% Ni from 126.0m in JAG-DD-22-260 (JS)

  • 20.3m at 0.93% Ni from 62.5m in JAG-DD-22-265 (JC)

  • 13.1m at 1.40% Ni from 116.2m in JAG-DD-22-271 (JS)

  • 14.9m at 1.22% Ni from 90.4m in JAG-DD-22-277 (JS)

  • 9.3m at 1.51% Ni from 183.5m including 3.5m at 2.86% Ni from 183.5m in JAG-DD-22-282 (JC)

  • 14.0m at 0.86% Ni from 40.2m in JAG-DD-22-259 (JS)

  • 13.2m at 0.94% Ni from 162.0m in JAG-DD-22-260 (JS)

  • 12.6m at 1.05% Ni from 28.4m in JAG-DD-22-265 (JC)

  • 11.7m at 0.93% Ni from 88.0m in JAG-DD-22-259 (JS)

  • The Jaguar December 2021 Mineral Resource Estimate (MRE), comprising 80.6Mt @ 0.91% Ni for 730,700 tonnes of contained nickel, is already one of the largest nickel sulphide resources held by an ASX-listed company and the largest outside of the majors.

  • The next Mineral Resource update scheduled for Q3 2022 will underpin the Definitive Feasibility Study (DFS) and the Project’s first Ore Reserve estimate.

  • There are currently 15 rigs on site (13 diamond and two RC) drilling double-shift with the drilling currently focused on upgrading as much of the MRE into the Measured and Indicated categories as possible.

  • Centaurus is well-funded with cash reserves of approximately $65 million.

Centaurus Metals (ASX Code: CTM ) is pleased to report outstanding new results from ongoing resource development drilling at its 100%-owned Jaguar Nickel Sulphide Project in the Carajás Mineral Province of northern Brazil. The results are expected to further increase confidence in the Mineral Resource before delivery of the Definitive Feasibility Study (DFS) and initial Ore Reserve estimate due by the end of calendar 2022.

The resource definition drilling program currently underway is expected to upgrade more of the Jaguar MRE into the Measured and Indicated categories in advance of Ore Reserve estimation as part of the DFS.

Australian Office Brazilian Office ASX: CTM Centaurus Metals Limited Centaurus Brasil Mineração Ltda ACN 009 468 099 Level 2, 1 Ord Street Avenida Barão Homem de Melo, 4391 [email protected] West Perth WA 6005 Salas 606 e 607 - Estoril T: +61 8 6424 8420 AUSTRALIA CEP: 30.494.275, Belo Horizonte MG BRAZIL

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Centaurus’ Managing Director, Mr Darren Gordon, said: “We are extremely pleased with how the resource definition drilling program is progressing, with the ongoing drilling continuing to de-risk the project by demonstrating the continuity of the mineralisation within the cornerstone Jaguar deposits.

“Seeing high-grade, shallow intersections like 46.0m at 2.17% Ni within a constrained US$22,000/t nickel price pit shell gives us a lot of confidence that the early stages of a future mining operation at Jaguar can support robust capital payback on the project.

“The target pit we are using for the in-fill drilling has expanded considerably since the Scoping Study was delivered, and this has resulted in most of the diamond rigs on site now being swung onto in-fill drilling so we can deliver the planned MRE upgrade by the end of Q3 2022. This updated MRE will, in turn, underpin the initial Ore Reserve for the DFS.

“In-fill drilling is a clear focus of our drilling effort right now. We expect a steady flow of results from this work over the next couple of months as reflected in the number of drill holes currently in the laboratory for assay. We currently have a total of 15 rigs operating on-site, with two rigs currently continuing to focus on resource growth step-out drilling and the balance currently dedicated to in-fill drilling. Once the MRE upgrade is complete, we will swing most of the rigs back to resource growth and discovery drilling.”

Resource Development In-fill Drilling

The December 2021 Mineral Resource Estimate (MRE) comprised 80.6Mt @ 0.91% Ni for 730,700t of contained nickel (Table 2), with an Indicated component of the Resource being 43.4Mt @ 0.92% Ni for 397,000t of contained nickel , representing 54% of the Global MRE. The total MRE at Jaguar has increased by 30% since the Scoping Study Resource Estimate was announced in March 2021 and more than 40% since the Company’s maiden Resource was announced in June 2020 (Figure 1).

The focus of drilling during the first half of 2022 has shifted to resource development in-fill drilling at all of the Jaguar Deposits. In-fill drilling is designed to upgrade all resources within a constrained US$22,000/t nickel price pit shell limit into the Measured and Indicated categories.

The US$22,000/t pit shell limit is considerably bigger than the shell used for the Scoping Study, which was generated using a US$13,800/t nickel price. The Company is targeting more than 500,000t of contained nickel in the Measured and Indicated categories of the next MRE based on the extensive in-fill drill currently being undertaken and the MRE already in place.

Figure 1 – The Jaguar JORC Mineral Resource Estimate (MRE) Growth

==> picture [365 x 224] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

The MRE planned for the end of Q3 2022 will underpin the Jaguar Project Definitive Feasibility Study (DFS) and initial Ore Reserve estimate. The current resource definition in-fill drilling is important as it will ensure that as much of the in-pit Resource as possible will be upgraded to the higher-confidence Indicated category, which in turn increases the potential production target and anticipated conversion of Resource to Ore Reserves.

Additional in-fill drilling to upgrade Indicated Resources into Measured is also being undertaken inside a constrained US$22,000/t nickel price pit shell, to cover the estimated project capital payback period. The in-fill drill results continue to demonstrate the continuity of the mineralisation both down-dip and along strike both within the current Scoping Study pit limits as well as within the larger US$22,000/t pit shell.

Jaguar Central

In-fill drilling at Jaguar Central is currently focused on upgrading as much of the mineralisation into the Measured Resource category to support project capital payback period.

The new shallow results, including 46.0m at 2.17% Ni from 128.0m in JAG-DD-22-274 and 49.3m at 1.20% Ni from 31.9m in JAG-DD-22-262 (Figure 2), continue to demonstrate that the Jaguar Central high-grade shoot consistently returns over 1.0% nickel with intersections up to 70m wide, extending over a strike length of more than 500m and plunging shallowly to the east.

Figure 2 – The Jaguar Central Deposit: Cross-Sections 477005mE (left) and 477055mE (right) showing existing drilling, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [252 x 363] intentionally omitted <==

==> picture [252 x 363] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

With its favourable geometry, the flat-lying high-grade shoot that forms part of the Jaguar Central mineralisation lends itself extremely well to extraction via a low-strip ratio starter pit. An optimum scheduling scenario has the potential to deliver low-cost, high-grade mineralisation to the plant during the project payback period.

Highlights of new assay results from in-fill drilling at the Jaguar Central Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 3):

Hole JAG-DD-22-244

  • 7.7m at 1.09% Ni, 0.03% Zn, 0.07% Cu and 0.02% Co from 238.7m

Hole JAG-DD-22-250

  • 3.0m at 1.88% Ni, 0.02% Zn, 0.25% Cu and 0.07% Co from 176.0m

  • 2.0m at 2.47% Ni, 0.02% Zn, 0.27% Cu and 0.11% Co from 197.5m

Hole JAG-DD-22-262

  • 49.3m at 1.20% Ni, 2.74% Zn, 0.08% Cu and 0.02% Co from 31.9m, including: o 13.2m at 2.37% Ni, 6.41% Zn, 0.16% Cu and 0.05% Co from 53.5m

  • 7.5m at 0.59% Ni, 0.54% Zn, 0.02% Cu and 0.01% Co from 89.5m

  • 4.9m at 0.59% Ni, 0.24% Zn, 0.03% Cu and 0.01% Co from 123.3m

Hole JAG-DD-22-265

  • 12.6m at 1.05% Ni, 0.39% Zn, 0.01% Cu and 0.09% Co from 28.4m, including: o 6.3m at 1.62% Ni, 0.54% Zn, 0.02% Cu and 0.14% Co from 28.4m

  • 20.3m at 0.93% Ni, 1.05% Zn, 0.07% Cu and 0.02% Co from 62.5m

  • 26.9m at 0.93% Ni, 0.72% Zn, 0.08% Cu and 0.02% Co from 91.6m, including:

  • 6.0m at 1.27% Ni, 1.21% Zn, 0.17% Cu and 0.03% Co from 95.5m

  • 3.6m at 1.71% Ni, 0.53% Zn, 0.12% Cu and 0.04% Co from 111.2m

  • 9.3m at 0.81% Ni, 0.04% Zn, 0.07% Cu and 0.02% Co from 150.1m

Hole JAG-DD-22-272

  • 22.5m at 1.01% Ni, 0.16% Zn, 0.04% Cu and 0.03% Co from 116.5m, including: o 6.0m at 2.29% Ni, 0.08% Zn, 0.13% Cu and 0.04% Co from 133.0m

Hole JAG-DD-22-274

  • 6.2m at 0.92% Ni, 0.05% Zn, 0.03% Cu and 0.05% Co from 71.1m

  • 6.1m at 0.69% Ni, 0.05% Zn, 0.01% Cu and 0.04% Co from 112.3m

  • 46.0m at 2.17% Ni, 0.08% Zn, 0.16% Cu and 0.04% Co from 128.0m, including:

  • 23.2m at 2.82% Ni, 0.11% Zn, 0.17% Cu and 0.06% Co from 148.0m

  • 7.5m at 1.58% Ni, 0.06% Zn, 0.11% Cu and 0.05% Co from 211.0m

Hole JAG-DD-22-282

  • 7.9m at 0.49% Ni, 0.59% Zn, 0.04% Cu and 0.02% Co from 116.3m

  • 33.3m at 0.89% Ni, 1.15% Zn, 0.05% Cu and 0.03% Co from 136.3m

  • 9.3m at 1.51% Ni, 0.28% Zn, 0.05% Cu and 0.04% Co from 183.5m, including: o 3.5m at 2.86% Ni, 0.08% Zn, 0.07% Cu and 0.05% Co from 183.5m

The success of the Company’s in-fill drilling strategy at Jaguar Central has further de-risked the Project by increasing confidence in the shallow open pit mineralisation that will underpin early capital payback in any future mining operation at Jaguar.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 3 – The Jaguar Central Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal).

==> picture [482 x 341] intentionally omitted <==

Jaguar South and Jaguar North-east Deposits

In-fill drilling at the Jaguar South and Jaguar North-east Deposits continues to be successful in confirming the December 2021 Mineral Resource model. Highlights of new assay results from in-fill drilling at the Jaguar South Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 4):

Hole JAG-DD-22-246

  • 38.3m at 1.16% Ni, 0.49% Zn, 0.03% Cu and 0.02% Co from 87.7m, including: o 4.9m at 1.78% Ni, 0.08% Zn, 0.07% Cu and 0.04% Co from 108.0m

  • 3.0m at 1.15% Ni, 0.04% Zn, 0.04% Cu and 0.02% Co from 143.5m

  • 4.0m at 1.04% Ni, 0.04% Zn, 0.02% Cu and 0.03% Co from 156.0m

  • 2.0m at 2.67% Ni, 0.02% Zn, 0.10% Cu and 0.05% Co from 194.5m

  • 4.3m at 1.29% Ni, 0.02% Zn, 0.15% Cu and 0.04% Co from 201.0m

Hole JAG-DD-22-259

  • 14.0m at 0.86% Ni, 0.02% Zn, 0.08% Cu and 0.02% Co from 40.2m

  • 3.0m at 2.04% Ni, 0.01% Zn, 0.15% Cu and 0.05% Co from 72.0m

  • 11.7m at 0.93% Ni, 0.01% Zn, 0.03% Cu and 0.01% Co from 88.0m

Hole JAG-DD-22-260

  • 4.0m at 0.64% Ni, 0.02% Zn, 0.03% Cu and 0.02% Co from 109.0m

  • 15.0m at 1.42% Ni, 0.13% Zn, 0.07% Cu and 0.03% Co from 122.0m, including: o 5.5m at 2.82% Ni, 0.22% Zn, 0.13% Cu and 0.05% Co from 126.0m

  • 3.5m at 1.29% Ni, 1.80% Zn, 0.08% Cu and 0.02% Co from 145.5m

  • 13.2m at 0.94% Ni, 0.09% Zn, 0.07% Cu and 0.02% Co from 162.0m

  • 15.2m at 2.12% Ni, 0.05% Zn, 0.07% Cu and 0.04% Co from 187.8m, including: o 2.6m at 9.14% Ni, 0.01% Zn, 0.26% Cu and 0.16% Co from 200.4m

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Hole JAG-DD-22-271

  • 10.5m at 0.65% Ni, 0.02% Zn, 0.03% Cu and 0.01% Co from 30.0m

  • 8.8m at 0.37% Ni, 0.06% Zn, 0.01% Cu and 0.01% Co from 46.5m

  • 13.1m at 1.40% Ni, 0.19% Zn, 0.08% Cu and 0.03% Co from 116.2m

Hole JAG-DD-22-277

  • 14.9m at 1.22% Ni, 0.01% Zn, 0.23% Cu and 0.03% Co from 90.4m

Figure 4 – The Jaguar South Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal).

==> picture [469 x 342] intentionally omitted <==

  • Highlights of new assay results from in-fill drilling at the Jaguar North east Deposit include the following down-hole intervals (see Table 1 for complete results and plan map in Figure 5):

Hole JAG-DD-22-257

  • 7.6m at 1.40% Ni, 0.61% Zn, 0.04% Cu and 0.07% Co from 181.0m

  • 4.6m at 0.81% Ni, 0.04% Zn, 0.01% Cu and 0.05% Co from 204.5m

Hole JAG-DD-22-261

  • 7.0m at 1.31% Ni, 1.63% Zn, 0.10% Cu and 0.04% Co from 28.0m

  • 6.0m at 0.93% Ni, 1.01% Zn, 0.07% Cu and 0.01% Co from 94.0m

  • 4.0m at 0.54% Ni, 1.67% Zn, 0.06% Cu and 0.01% Co from 104.0m

Hole JAG-DD-22-269

  • 4.2m at 1.99% Ni, 2.49% Zn, 0.11% Cu and 0.07% Co from 35.3m

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 5 – The Jaguar Northeast Deposit with DHEM (darker blue) and FLEM (lighter blue) conductor plates overlaid on the Ground Magnetics Survey results (Analytic Signal).

==> picture [482 x 341] intentionally omitted <==

The consistency of results across all deposits strongly supports the potential to upgrade existing Resources into the higher-confidence Resource categories, which will underpin the DFS and initial JORC Reserve estimate.

Resource growth step-out drilling

Two diamond rigs remain focused on step-out drilling at the Jaguar South and Onça Preta Deposits. Step-out drilling is part of a push to extend the high-grade underground Resources at depth with the support of the new Down-Hole Electromagnetic (DHEM) probe, which has the capacity to survey down to a depth of 750m down-hole.

Once resource definition drilling is completed so that mineralisation within the US22,000/t nickel price pit shell has been upgraded to at least the Indicated Resource category, the drill rigs will be moved onto resource growth (extensional and step-out) and greenfields discovery drilling. This is expected to happen towards the end of Q3 2022.

RC Drilling

There are two Reverse Circulation (RC) drill rigs on site. Both rigs have been drilling sterilisation programs over the Jaguar processing plant area and proposed mine infrastructure areas (tailings dam sites, waste deposit, etc). Sterilisation drilling is critical for the delivery of the DFS as well as for project licensing.

The sterilisation programs have recently been completed and the RC rigs are moving onto resource development in-fill drilling at the Onca Preta and Onca Rosa Deposits. This drilling is also critical to ensure that the Onça Deposit Resources are in at least the Indicated Resource category and available for the DFS and Ore Reserve Estimation.

Once this drilling is complete, the RC rigs will return to greenfields exploration drilling.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

-ENDS-

For further enquiries please contact: Authorised for Release by Nicholas Read Darren Gordon Read Corporate Managing Director M: +61 419 929 046 Centaurus Metals Ltd T: +61 8 9388 1474 T: +61 8 6424 8420

Competent Persons’ Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy. Mr Fitzhardinge is a permanent employee and shareholder of Centaurus Metals Limited. Mr Fitzhardinge has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fitzhardinge consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the Jaguar Mineral Resource is based on information compiled by Mr Lauritz Barnes (consultant with Trepanier Pty Ltd) and Mr Roger Fitzhardinge (a permanent employee and shareholder of Centaurus Metals Limited). Mr Barnes and Mr Fitzhardinge are both members of the Australasian Institute of Mining and Metallurgy. Mr Barnes and Mr Fitzhardinge have sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Specifically, Mr Fitzhardinge is the Competent Person for the database (including all drilling information), the geological and mineralisation models plus completed the site visits. Mr Barnes is the Competent Person for the construction of the 3-D geology / mineralisation model plus the estimation. Mr Barnes and Mr Fitzhardinge consent to the inclusion in this report of the matters based on their information in the form and context in which they appear.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 1 – Jaguar Nickel Sulphide Project – Recent Results and Collar Locations. * Oxide intersection

Hole ID Deposit / Prospect Easting Northing mRL Azi Dip EOH Depth From (m) To (m) Interval (m) Ni % Cu % Co % Zn %
JAG-DD-21-244 Jaguar Central 477139 9283125 317 225 -55 308.30 201.00
238.70
205.00
246.36
4.00
7.66
0.60
1.09
0.05
0.07
0.01
0.02
0.03
0.03
JAG-DD-21-246 Jaguar South 478025 9282390 340 135 -55 250.00
Including
And
And
87.70
87.70
100.20
108.00
131.00
143.50
156.00
182.00
194.50
201.00
126.00
90.80
104.00
112.85
134.00
146.50
160.00
187.00
196.50
205.30
38.30
3.10
3.80
4.85
3.00
3.00
4.00
5.00
2.00
4.30
1.16
1.55
1.55
1.78
0.42
1.15
1.04
0.63
2.67
1.29
0.03
0.05
0.04
0.07
0.02
0.04
0.02
0.03
0.10
0.15
0.02
0.03
0.03
0.04
0.01
0.02
0.03
0.02
0.05
0.04
0.49
3.38
0.09
0.08
0.05
0.04
0.04
0.05
0.02
0.02
JAG-DD-21-247 Onça Preta 476820 9284842 257 135 -55 150.00 Geotech Drill Hole
JAG-DD-21-249 Jaguar Northeast 478484 9282788 354 0 -55 170.05 106.80 109.50 2.70 1.15 0.02 0.12 0.02
JAG-DD-21-250 Jaguar Central 476920 9283153 289 135 -55 250.90 112.20 116.40 4.20 0.44 0.03 0.02 0.02
176.00
197.50
179.00
199.50
3.00
2.00
1.88
2.47
0.25
0.27
0.07
0.11
0.02
0.02
JAG-DD-21-252 Onça Preta 476845 9284831 255 225 -55 200.35 Geotech Drill Hole
JAG-DD-22-254 Onça Preta 477035 9284961 257 180 -60 482.15 398.00
417.50
404.00
422.75
6.00
5.25
0.57
0.67
0.06
0.04
0.03
0.07
0.06
0.01
JAG-DD-22-256 Jaguar Central 476770 9283021 264 0 -55 311.45 171.30
265.00
177.50
268.50
6.20
3.50
0.61
0.44
0.05
0.04
0.02
0.03
0.72
0.05
JAG-DD-22-257 Jaguar Northeast 478299 9282602 398 0 -57 181.00
204.45
188.60
209.00
7.60
4.55
1.40
0.81
0.04
0.01
0.07
0.05
0.61
0.04
JAG-DD-22-259 Jaguar South 478370 9282323 448 0 -55 200.50 40.15
72.00
87.95
54.15
75.00
99.65
14.00
3.00
11.70
0.86
2.04
0.93
0.08
0.15
0.03
0.02
0.05
0.01
0.02
0.01
0.01
JAG-DD-22-260 Jaguar South 478276 9282400 392 135 -55 211.05
Including
Including
Including
109.00
122.00
126.00
145.50
162.00
173.25
187.82
200.40
113.00
137.00
131.50
149.00
175.20
175.20
203.00
203.00
4.00
15.00
5.50
3.50
13.20
1.95
15.18
2.60
0.64
1.42
2.82
1.29
0.94
2.21
2.12
9.14
0.03
0.07
0.13
0.08
0.07
0.14
0.07
0.26
0.02
0.03
0.05
0.02
0.02
0.04
0.04
0.16
0.02
0.13
0.22
1.80
0.09
0.23
0.05
0.01
JAG-DD-22-261 Jaguar Northeast 478140 9282891 331 0 -55 153.15 18.00
28.00
94.00
104.00
22.10
35.00
100.00
108.00
4.10*
7.00
6.00
4.00
0.37
1.31
0.93
0.54
0.01
0.10
0.07
0.06
0.02
0.04
0.01
0.01
0.09
1.63
1.01
1.67
JAG-DD-22-262 Jaguar Central 477005 9283036 329 180 -55 170.35 0.00
31.90
21.00
81.20
21.00*
49.30
0.69
1.20
0.05
0.08
0.02
0.02
0.67
2.74
Including 53.45
89.45
123.25
66.60
96.95
128.15
13.15
7.50
4.90
2.37
0.59
0.59
0.16
0.02
0.03
0.05
0.01
0.01
6.41
0.54
0.24
JAG-DD-22-263 Onça Preta 476885 9284929 263 180 -68 Assays Pending
JAG-DD-22-264 Jaguar Northeast 478434 9282767 374 0 -60 246.85 11.50
24.50
54.90
20.00
28.00
57.20
8.50
3.50

2.30
0.43
0.37
0.73
0.14
0.14
0.03
0.02
0.01
0.03
0.19
0.27
0.88
JAG-DD-22-265 Jaguar Central 477005 9283069 324 180 -55 215.5
Including
Including
And
0.00
22.35
28.35
28.35
46.55
62.45
91.60
95.50
111.15
135.20
150.10
13.75
27.35
40.90
34.60
54.50
82.75
118.45
101.50
114.75
143.50
159.40
13.75
5.00

12.55
6.25
7.95
20.30
26.85
6.00
3.60
8.30
9.30
0.47
0.40
1.05
1.62
0.47
0.93
0.93
1.27
1.71
0.46
0.81
0.03
0.01
0.01
0.02
0.01
0.07
0.08
0.17
0.12
0.03
0.07
0.02
0.02
0.09
0.14
0.02
0.02
0.02
0.03
0.04
0.02
0.02
0.16
0.37
0.39
0.54
0.19
1.05
0.72
1.21
0.53
0.03
0.04
JAG-DD-22-266 Jaguar Central 477130 9283173 317 180 -59 440.25 Assays Pending
JAG-DD-22-267 Onça Preta 476790 9285022 272 180 -64 496.55 Assays Pending
JAG-DD-22-268 Jaguar Central North 477130 9283410 278 180 -58 426.05 Assays Pending
JAG-DD-22-269 Jaguar Northeast 478140 9282776 322 0 -55 326.15 35.30 39.50 4.20 1.99 0.11 0.07 2.49
JAG-DD-22-270 Jaguar South 478370 9282255 478 0 -55 276.15 Assays Pending
JAG-DD-22-271 Jaguar South 478325 9282372 424 0 -55 150.00 30.00
46.50
116.15
40.50
55.30
129.25
10.50
8.80
13.10
0.65
0.37
1.40
0.03
0.01
0.08
0.01
0.01
0.03
0.02
0.06
0.19
JAG-DD-22-272 Jaguar Central 477005 9283111 311 180 -57 219.30
including
116.50
133.00
139.00
139.00
22.50
6.00
1.01
2.29
0.04
0.13
0.03
0.04
0.16
0.08
JAG-DD-22-273 Jaguar Central 476756 9283190 258 180 -55 169.80 0.00 9.90 9.90* 0.56 0.06 0.02 0.08
JAG-DD-22-274 Jaguar Central 477055 9283089 322 180 -60 281.00
including
71.10
86.25
112.32
128.00
148.00
181.25
202.10
211.00
77.30
89.00
118.40
174.00
171.15
186.00
205.25
218.50
6.20
2.75
6.08
46.00
23.15
4.75
3.15
7.50
0.92
0.90
0.69
2.17
2.82
0.56
0.63
1.58
0.03
0.01
0.01
0.16
0.17
0.03
0.03
0.11
0.05
0.08
0.04
0.04
0.06
0.02
0.01
0.05
0.05
0.04
0.05
0.08
0.11
1.68
1.76
0.06

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 1 (continued) – Jaguar Nickel Sulphide Project – Recent Results and Collar Locations.

Hole ID Deposit / Prospect Easting Northing mRL Azi Dip EOH Depth From (m) To (m) Interval (m) Ni % Cu % Co % Zn %
JAG-DD-22-275 Jaguar Northeast 478390 9282802 354 0 -55 193.15 Assays Pending
JAG-DD-22-276 Jaguar Central 476755 9283221 253 180 -55 240.75 46.00
208.90
49.90
212.60
3.90
3.70
0.95
0.78
0.04
0.02
0.02
0.02
0.05
0.20
JAG-DD-22-277 Jaguar South 478325 9282208 460 0 -55 159.90 90.35 105.25 14.90 1.22 0.23 0.03 0.01
JAG-DD-22-278 Jaguar Northeast 478350 9282834 332 0 -55 197.85 Assays Pending
JAG-DD-22-279 Miscelaneous Pit 477380 9282772 327 180 -58 175.45 74.10 85.75 11.65 0.38 0.01 0.01 0.04
JAG-DD-22-280 Jaguar Northeast 478210 9282633 376 0 -55 280.00 Assays Pending
JAG-DD-22-281 Jaguar Central 476958 9283146 298 180 -55 239.95 Assays Pending
JAG-DD-22-282 Jaguar Central 477105 9283086 324.705 180 -55 239.50 106.00 111.10 5.10 0.43 0.04 0.01 0.08
Including
Including
116.30
136.25
152.45
183.50
183.50
225.00
124.15
169.50
157.00
192.80
187.00
229.00
7.85
33.25
4.55
9.30
3.50
4.00
0.49
0.89
1.54
1.51
2.86
0.53
0.04
0.05
0.09
0.05
0.07
0.02
0.02
0.03
0.04
0.04
0.05
0.01
0.59
1.15
2.74
0.28
0.08
0.02
JAG-DD-22-283 Jaguar Central 476755 9283162 265 180 -55 143.35 Assays Pending
JAG-DD-22-284 Onça Preta 476835 9284968 276 180 -69 490.00 Assays Pending
JAG-DD-22-285 Jaguar South 477590 9282431 336 180 -55 100.00 Assays Pending
JAG-DD-22-286 Jaguar Central 476645 9283212 251 180 -55 170.00 Assays Pending
JAG-DD-22-287 Jaguar South 477980 9282639 320 180 -61 600.00 Assays Pending
JAG-DD-22-288 Jaguar South 477580 9282714 297 180 -55 230.00 Assays Pending
JAG-DD-22-289 Jaguar Central 477105 9283041 328 180 -58 180.00 Assays Pending
JAG-DD-22-290 Jaguar Central 476957 9283113 309 180 -55 211.40 Assays Pending
JAG-DD-22-291 Jaguar Central North 477230 9283390 311 180 -59 492.25 Assays Pending
JAG-DD-22-292 Jaguar South 477695 9282493 312 0 -58 280.65 Assays Pending
JAG-DD-22-293 Jaguar Northeast 478041 9282813 303 0 -63 350.95 Assays Pending
JAG-DD-22-294 Jaguar Northeast 478300 9282857 339 0 -60 140.65 Assays Pending
JAG-DD-22-295 Jaguar Central 477155 9283019 316 180 -55 234.70 Assays Pending
JAG-DD-22-296 Jaguar Central 476908 9283103 307 150 -55 157.15 Assays Pending
JAG-DD-22-297 Jaguar Central 477105 9283005 318 150 -55 188.35 Assays Pending
JAG-DD-22-298 Jaguar Central 476645 9283314 254 180 -59 382.00 Assays Pending
JAG-DD-22-299 Jaguar Northeast 477885 9283045 278 180 -55 239.70 Assays Pending
JAG-DD-22-300 Onça Preta 476740 9284909 268 180 -60 362.35 Assays Pending
JAG-DD-22-301 Jaguar South 477580 9282668 294 180 -55 167.35 Assays Pending
JAG-DD-22-302 Jaguar Central 476908 9283139 291 180 -55 182.45 Assays Pending
JAG-DD-22-303 Jaguar Central North 477290 9283364 306 180 -59 496.10 Assays Pending
JAG-DD-22-304 Jaguar South 477635 9282338 360 0 -55 586.05 Assays Pending
JAG-DD-22-305 Jaguar South 478370 9282193 476 0 -55 194.10 Assays Pending
JAG-DD-22-306 Jaguar Central 476800 9283101 282 180 -55 106.10 Assays Pending
JAG-DD-22-307 Jaguar Northeast 478090 9282784 316 0 -61 369.30 Assays Pending
JAG-DD-22-308 Jaguar Northeast 477885 9282873 294 180 -55 88.40 Assays Pending
JAG-DD-22-309 Jaguar South 478435 9282195 486 0 -63 180.90 Assays Pending
JAG-DD-22-310 Jaguar Central 476800 9283144 281 180 -55 150.30 Assays Pending
JAG-DD-22-311 Jaguar South 477290 9282782 318 180 -55 114.85 Assays Pending
JAG-DD-22-312 Jaguar South 478140 9282553 348 180 -58 559.55 Assays Pending
JAG-DD-22-313 Onça Preta 476685 9284890 260 180 -62 310.25 Assays Pending
JAG-DD-22-314 Jaguar Central 476690 9283131 256 180 -55 80.80 Assays Pending
JAG-DD-22-315 Jaguar South 478460 9282220 466 0 -55 160.95 Assays Pending
JAG-DD-22-316 Jaguar Central 476645 9283263 255 180 -59 269.60 Assays Pending
JAG-DD-22-317 Onça Preta 476595 9284738 245 180 -55 51.00 Assays Pending
JAG-DD-22-318 Jaguar Northeast 478800 9282667 319 180 -55 140.45 Assays Pending
JAG-DD-22-319 Jaguar Central 476715 9283080 257 0 -55 94.10 Assays Pending
JAG-DD-22-320 Jaguar Central North 476980 9283279 276 180 -55 176.05 Assays Pending
JAG-DD-22-321 Miscelaneous Pit 477240 9282829 316 180 -55 162.85 Assays Pending
JAG-DD-22-322 Jaguar Northeast 477780 9282840 275 0 -55 49.60 Assays Pending
JAG-DD-22-323 Jaguar South 478325 9282300 456 0 -55 260.70 Assays Pending
JAG-DD-22-324 Jaguar Central 477155 9282940 302 180 -57 178.65 Assays Pending
JAG-DD-22-325 Jaguar Central North 477290 9283223 322 180 -55 110.05 Assays Pending
JAG-DD-22-326 Jaguar Northeast 478800 9282718 301 180 -55 195.30 Assays Pending
JAG-DD-22-327 Jaguar Central 476755 9283110 265 180 -55 97.20 Assays Pending
JAG-DD-22-328 Onça Preta 476635 9284731 249 180 -60 42.25 Assays Pending
JAG-DD-22-329 Jaguar West 476575 9283283 261 180 -57 235.45 Assays Pending
JAG-DD-22-330 Jaguar Central 477130 9282937 298 180 -57 149.15 Assays Pending
JAG-DD-22-331 Jaguar Central North 477290 9283270 316 180 -55 220.00 Assays Pending
JAG-DD-22-332 Onça Preta 476635 9284773 245 180 -60 110.00 Assays Pending
JAG-DD-22-333 Onça Preta 476790 9284986 275 180 -70 600.00 Drilling
JAG-DD-22-334 Miscelaneous Pit 477330 9282710 334 180 -55 90.00 Assays Pending
JAG-DD-22-335 Jaguar Central 476908 9283218 264 180 -55 300.00 Assays Pending
JAG-DD-22-336 Jaguar Central 477105 9282938 297 180 -57 130.00 Assays Pending
JAG-DD-22-337 Jaguar South 478390 9282286 462 180 -55 80.00 Assays Pending
JAG-DD-22-338 Miscelaneous Pit 477440 9282773 314 180 -60 160.00 Assays Pending
JAG-DD-22-339 Jaguar Northeast 478540 9282854 311 180 -55 150.00 Assays Pending
JAG-DD-22-340 Jaguar South 477580 9282747 293 180 -56 280.00 Assays Pending
JAG-DD-22-341 Jaguar South 478210 9282593 380 180 -60 600.00 Drilling
JAG-DD-22-342 Jaguar Northeast 478040 9282913 314 0 -60 140.00 Assays Pending
JAG-DD-22-343 Jaguar South 478460 9282362 402 0 -55 90.00 Assays Pending
JAG-DD-22-344 Jaguar Northeast 477800 9283006 267 180 -56 130.00 Assays Pending
JAG-DD-22-345 Jaguar West 476575 9283190 261 180 -55 120.00 Drilling
JAG-DD-22-346 Jaguar Central 477260 9282989 305 180 -55 170.00 Drilling
JAG-DD-22-347 Jaguar South 477725 9282509 310 180 -58 280.00 Drilling
JAG-DD-22-348 Jaguar South 478413 9282452 412 180 -55 200.00 Drilling
JAG-DD-22-349 Jaguar Central 476755 9283264 251 180 -55 70.00 Drilling
JAG-DD-22-350 Miscelaneous Pit 477380 9282696 325 180 -55 70.00 Drilling
JAG-DD-22-351 Jaguar Northeast 478090 9282898 324 0 -55 130.00 Drilling
JAG-DD-22-352 Jaguar Central North 477290 9283302 311 180 -56 350.30 Drilling
JAG-DD-22-353 Jaguar Northeast 478850 9282689 314 180 -55 160.00 Drilling

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 2 – The Jaguar JORC Mineral Resource Estimate by Deposit – December 2021

Deposit Classification
Mt
Ni %
Cu %
Coppm
Zn %
Ni
Cu
Co
Zn
Grade
Contained Metal
Jaguar South Indicated
13.9
1.01
0.05
220
0.18
139,800

6,900

3,100

25,200
Inferred
13.7
0.86
0.04
195
0.13
118,000

6,200
2,700
17,600
Total
27.6
0.93
0.05
208
0.15
257,800
13,100
5,700
42,700
Jaguar Central Indicated
10.2
0.92
0.06
262
0.51
94,000
6,100
2,700
52,300
Inferred
1.9
0.79
0.05
244
0.27
15,100
1,000
500
5,200
Total
12.1
0.90
0.06
259
0.48
109,100
7,100
3,100
57,500
Jaguar North Indicated
2.2
1.09
0.14
352
1.32
24,000
3,100
800
29,000
Inferred
1.0
1.16
0.29
360
1.09
11,400
2,900
400
10,700
Total
3.2
1.12
0.19
354
1.25
35,400
6,000
1,100
39,700
Jaguar Central North Indicated
7.7
0.63
0.03
188
0.65
48,500
2,600
1,400
50,200
Inferred
4.3
0.64
0.04
184
0.53
27,500
1,600
800
22,800
Total
12.0
0.63
0.04
186
0.61
76,000
4,200
2,200
73,000
Jaguar Northeast Indicated
-
-
-
-
-
-
-
-
-
Inferred
9.1
0.84
0.10
278
0.51
76,700
9,200
2,500
46,900
Total
9.1
0.84
0.10
278
0.51
76,700
9,200
2,500
46,900
Jaguar West Indicated
5.6
0.73
0.03
165
0.11
40,800
1,700
900
6,100
Inferred
1.7
0.77
0.04
158
0.10
13,200
700
300
1,700
Total
7.3
0.74
0.03
163
0.11
54,000
2,400
1,200
7,800
Jaguar Deposits Indicated
39.5
0.88
0.05
224
0.41
347,100
20,400
8,900
162,800
Inferred
31.8
0.82
0.07
223
0.33
262,000
21,600
7,100
104,900
Total
71.4
0.85
0.06
224
0.38
609,100
42,000
16,000
267,700
Onça Preta Indicated
3.0
1.43
0.10
711
0.50
42,900
2,900
2,100
15,100
Inferred
2.2
1.64
0.08
548
0.44
35,900
1,800
1,200
9,600
Total
5.2
1.52
0.09
642
0.48
78,800
4,700
3,300
24,700
Onça Rosa Indicated
-
-
-
-
-
-
-
-
-
Inferred
2.1
1.28
0.09
353
0.05
26,600
1,900
700
1,000
Total
2.1
1.28
0.09
353
0.05
26,600
1,900
700
1,000
Tigre Indicated
0.8
0.86
0.09
307
0.04
7,000
700
300
300
Inferred
1.2
0.79
0.07
289
0.02
9,200
800
300
200
Total
2.0
0.82
0.08
296
0.03
16,200
1,500
600
500
Jaguar MRE Indicated
43.4
0.92
0.06
259
0.41
397,000
24,000
11,300
178,200
Inferred
37.2
0.90
0.07
251
0.31
333,700
26,100
9,400
115,700
Total
80.6
0.91
0.06
256
0.36
730,700
50,100
20,600
293,900
* Within pit limits cut-off grade 0
waste and therefore not reported
.3% Ni; below pit limits cut-off grade 0.7% Ni; Totals are rounded to reflect acceptable precision, subtotals may not reflect global totals. All oxide material is considered as
as Resources.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

APPENDIX A – Compliance Statements for the Jaguar Project

The following Tables are provided for compliance with the JORC Code (2012 Edition) requirements for the reporting of Exploration Results and Mineral Resources at the Jaguar Project.

SECTION 1 - SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections).

Criteria Commentary
Sampling techniques
Historical soil sampling was completed by Vale. Samples were taken at 50m intervals along 200m
spaced north-south grid lines.

Surface material was first removed, and sample holes were dug to roughly 20cm depth. A 5kg
sample was taken from the subsoil. The sample was placed in a plastic sample bag with a sample
tag before being sent to the lab.

Surface rock chip/soil samples were collected from in situ outcrops and rolled boulders and
submitted for chemical analysis.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections.

Core was cut and ¼ core sampled and sent to commercial laboratories for physical preparation and
chemical assay.

At the laboratories, samples were dried (up to 105°C), crushed to 95% less than 4mm,
homogenized, split and pulverized to 0.105mm. A pulverized aliquot was separated for analytical
procedure.

Sample length along core varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done
according to lithological contacts and generally by 1m intervals within the alteration zones and 2m
intervals along waste rock.

Current drilling is being completed on spacing of 100m x 50m or 50m x 50m. Sample length along
core varies between 0.5 to 1.5m

Core is cut and ¼ core sampled and sent to accredited independent laboratory (ALS).

For metallurgical test work continuous downhole composites are selected to represent the
metallurgical domain and ¼ core is sampled and sent to ALS Metallurgy, Balcatta, Perth.

Samples from RC drilling are split to make 3-5kg samples. The sample is placed in a plastic sample
bagwith a sample tagbefore beingsent to the laboratory.
Drilling techniques
Historical drilling was carried out between 2006 to 2010 by multiple drilling companies (Rede and
Geosol), using wire-line hydraulic diamond rigs, drilling NQ and HQ core.

Vale drilled 169 drill holes for a total of 56,592m of drilling in the resource area. All drill holes were
drilled at 55⁰-60⁰ towards either 180⁰ or 360⁰. The resource considers 229 drill holes completed by
Centaurus for a total of 47,917m of drilling. All drill holes were drilled at 55⁰-75⁰ towards either
180⁰ or 360⁰.

Current drilling is a combination of HQ and NQ core (Servdrill).

The current RC drilling is completed by Geosenda Sondagem using a face sampling hammer (4.5”).
Sample is collected from the sample cyclone in large plastic sample bags. Samples are then split
either by riffle splitters or manually (fish bone method) where there is high moisture content.

All RC holes were sampled on 1m intervals. Sample size, sample recovery estimate and conditions
were recorded.
Drill sample recovery
Diamond Drilling recovery rates are being calculated at each drilling run.

For all diamond drilling, core recoveries were logged and recorded in the database for all historical
and current diamond holes. To date overall recoveries are >98% and there are no core loss issues
or significant sample recovery problems.

To ensure adequate sample recovery and representativity a Centaurus geologist or field technician
is present during drilling and monitors the sampling process.

No relationship between sample recovery and grade has been demonstrated. No bias to material
size has been demonstrated.

RC sample weights are taken for all samples and a recovery estimate are made where the sample
is not wet. Where the sample is wet a visual estimate of the sample recovery is made. The estimated
recovery is approximately 90%, which is considered acceptable for the deposit type.

To ensure the representative nature of the sample, the cyclone and sample hoses are cleaned after
each metre of drilling, the rig has two cyclones to facilitate the process. Additionally, extra care is
taken when drilling through the water table or other zones of difficult ground conditions.

Noquantitative twinned drillinganalysis has been undertaken at theproject to date.
Logging
Historical outcrop and soil sample points were registered and logged in the Vale geological mapping
point database.

All drill holes have been logged geologically and geotechnically by Vale or Centaurus geologists.

Drill samples are logged for lithology,weathering,structure,mineralisation and alteration among

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
other features. Logging is carried out to industry standard and is audited by Centaurus CP.

Logging for drilling is qualitative and quantitative in nature.

All historical and new diamond core has been photographed.

Geologists complete a visual log of the RC samples on 1m intervals at the time of drilling. Logging
captures colour, rock-type, mineralogy, alteration and mineralisation style. Logging is both
qualitative and quantitative.

Chiptrays have been collected, photographed and stored for all drill holes to-date.
Sub-sampling techniques and
sample preparation

Diamond Core (HQ/NQ) was cut using a core saw, ¼ core was sampled. Sample length along core
varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done according to lithological
contacts and generally by 1m intervals within the alteration zones and 2m intervals along the waste
rock.

There is no non-core sample within the historical drill database.

For RC sampling 1m samples are taken from the cyclone and then split by rifle splitter (if dry) or
manually (if wet) using the fish-bone technique. Sample weight is between 3-5kg.

QAQC: Standards (multiple standards are used on a rotating basis) are inserted every 20 samples.
Blanks have been inserted every 20 samples. Field duplicates are completed every 30 samples.
Additionally, there are laboratory standards and duplicates that have been inserted.

Centaurus has adopted the same sampling QAQC procedures which are in line with industry
standards and Centaurus’s current operating procedures.

Sample sizes are appropriate for the nature of the mineralisation.

All historical geological samples were received and prepared by SGS Geosol or ALS Laboratories as
0.5-5.0kg samples. They were dried at 105°C until the sample was completely dry (6-12hrs), crushed
to 90% passing 4mm and reduced to 400g. The samples were pulverised to 95% passing 150µm and
split further to 50g aliquots for chemical analysis.

New samples are being sent to ALS Laboratories. The samples are dried, crushed and pulverised to
85% passing 75µm and split further to 250g aliquots for chemical analysis.

During the preparation process grain size control was completed by the laboratories (1 per 20
samples).

Metallurgical samples are crushed to 3.35mm and homogenised. Samples are then split to 1kg sub-
samples. Sub-samples areground to specific sizes fractions(53-106µm)for flotation testwork.
Quality of assay data and
laboratory tests

Chemical analysis for drill core and soil samples was completed by multi element using Inductively
Coupled Plasma ICPAES (multi-acid digestion); ore grade analysis was completed with Atomic
Absorption (multi-acid digestion); sulphur analysis was completed with Leco, and Au and PGEs
completed via Fire Assay.

New samples are being analysed for 48 elements by multi element using ME-MS61 (multi-acid
digestion) at ALS Laboratories; ore grade analysis was completed with ICP-AES (multi-acid
digestion); sulphur analysis was completed with Leco, and Au and PGEs completed via Fire Assay.

ALS Laboratories insert their own standards at set frequencies and monitor the precision of the
analysis. The results reported are well within the specified standard deviations of the mean grades
for the main elements. Additionally, ALS perform repeat analyses of sample pulps at a rate of 1:20
(5% of all samples). These compare very closely with the original analysis for all elements.

Vale inserted standard samples every 20 samples (representing 5%). Mean grades of the standard
samples are well within the specified 2 standard deviations.

All laboratory procedures are in line with industry standards. Analysis of field duplicates and lab
pulp duplicates have returned an average correlation coefficient of over 0.98 confirming that the
precision of the samples is within acceptable limits.

Vale QAQC procedures and results are to industry standard and are of acceptable quality.

All metallurgical chemical analysis is completed byALS laboratories
Verification of sampling and
assaying

All historical samples were collected by Vale field geologists. All assay results were verified by
alternative Vale personnel. The Centaurus CP has verified the historical significant intersections.

Centaurus Exploration Manager and Senior Geologist verify all new results and visually confirm
significant intersections.

No twin holes have been completed.

All primary data is now stored in the Centaurus Exploration office in Brazil. All new data is collected
on Excel Spreadsheet, validated and then sent to independent database administrator (MRG) for
storage (DataShed).

No adjustments have been made to the assaydata.
Location of data points
All historical collars were picked up using DGPS or Total Station units. Centaurus has checked
multiple collars in the field and has confirmed their location. All field sample and mapping points
were collected using a Garmin handheld GPS.

An aerial survey was completed by Esteio Topografia and has produced a detailed surface DTM at
(1:1000 scale).

The survey grid system used is SAD-69 22S. This is in line with Brazilian Mines Department

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
requirements.

New drill holes are sighted with handheld GPS and after completion picked-up by an independent
survey consultant periodically. Downhole survey for all the historical drill holes and Centaurus hole
up to JAG-DD-19-012 used Maxibor equipment. All new drill holes are being downhole surveyed
usingReflex digital down-hole tool,with readings everymetre.
Data spacing and
distribution

Soil samples were collected on 40m spacing on section with distance between sections of 200m
and 400m depending on location.

Sample spacing was deemed appropriate for geochemical studies.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections. Centaurus is in the process of closing the drill
spacing to 100m x 50m or 50m x 50m.

No sample compositing was applied to the drilling.

Metallurgical samples to date have been taken from Jaguar South, Jaguar Central, Jaguar North and
Onça Preta.
Orientation of data in
relation to geological
structure

Historical drilling was oriented at 55⁰-60⁰ to either 180⁰ or 360⁰. This orientation is generally
perpendicular to the main geological sequence along which broad scale mineralisation exists.

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.
Sample security
All historical and current samples are placed in pre-numbered plastic sample bags and then a
sample ticket was placed within the bag as a check. Bags are sealed and then transported by courier
to the ALS laboratories in Vespasiano, MG.

All remnant Vale diamond core has now been relocated to the Company’s own core storage facility
in Tucumã,PA.
Audits or reviews
The Company is not aware of any audit or review that has been conducted on the project to date.

SECTION 2 - REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding Section also apply to this section).

Criteria Commentary
Mineral tenement and land
tenure status

The Jaguar project includes one exploration licence (856392/1996) for a total of circa 30km2. A
Mining Lease Application has been lodged that allows for ongoing exploration and project
development ahead of project implementation.

The tenement is part of a Sale & Purchase Agreement (SPA) with Vale SA. One final deferred
consideration payment totalling US$5.0M (on commencement of commercial production) and a
production royalty of 0.75% are to follow. Centaurus has taken on the original obligation of Vale to
BNDES for 1.8% Net Operating Revenue royalty.

Mining projects in Brazil are subject to a CFEM royalty, a government royalty of 2% on base metal
revenue.

Landowner royalty is 50% of the CFEM royalty.

Centaurus has secured possession rights to three properties over the Jaguar Project. The
agreements remove exposure to the landowner royalty over the properties secured.

The project is covered by a mix of cleared farmland and natural vegetation.

The project is not located within any environmental protection zones and exploration and mining is
permitted with appropriate environmental licences.
Exploration done by other
parties

Historically the Jaguar Project was explored for nickel sulphides by Vale from 2005 to 2010.
Geology
Jaguar Nickel Sulphide is a hydrothermal nickel sulphide deposit located near Tucumã in the Carajás
Mineral Province of Brazil.

Jaguar is located at the intersection of the WSW-trending Canaã Fault and the ENE-trending
McCandless Fault, immediately south of the NeoArchean Puma Layered Mafic-Ultramafic Complex.

Iron rich fluids were drawn up the mylonite zone causing alteration of the host felsic volcanic and
granite units and generating hydrothermal mineral assemblage. Late-stage brittle-ductile conditions
triggered renewed hydrothermal fluid ingress and resulted in local formation of high-grade nickel
sulphide zones within the mylonite and as tabular bodies within thegranite.
Drill hole Information
Refer Table 1 as well as Figures 2-5

Refer to previous ASX Announcements for significant intersections from Centaurus drilling.

Refer to ASX Announcement of 6 August 2019 for all significant intersections from historical drilling.
Data aggregation methods
Continuous sample intervals are calculated via weighted average using a 0.3 % Ni cut-off grade with
2m minimum intercept width.

There are no metal equivalents reported.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
Relationship between
mineralisation widths and
intercept lengths

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.

The historical drilling results in ASX Announcement 6 August 2019 reflect individual down hole
sample intervals and no mineralised widths were assumed or stated.
Diagrams
Refer to Figures 1 to 5 of this announcement.

Refer to previous ASX Announcements for maps and sections from Centaurus drilling included in the
resource estimate.
Balanced reporting
All exploration results received by the Company to date are included in this or previous releases to
the ASX.

For the current resource, a revised 0.3% Ni cut-off grade has been applied to material less than 200m
vertical depth from surface in the estimation of the Global MRE with this being consistent with
mineralisation domain modellingand reported significant intersection cut-offgrades.
Other substantive
exploration data

The Company has received geophysical data from Vale that is being processed by an independent
consultant Southern Geoscience. Refer to ASX Announcements for geophysical information.
Further work
Electro-magnetic (EM) geophysical surveys (DHEM and FLEM) are ongoing.

In-fill and extensional drilling within the known deposits to test the continuity of high-grade zones is
ongoing. Resource samples are continuously being sent in batches of 150-300 samples and will be
reported once the batches are completed.

Metallurgical testwork is ongoing.

Geotechnical and hydrological studies for the proposed tailings facility and waste deposits have
started.

SECTION 3 - ESTIMATION AND REPORTING OF MINERAL RESOURCES

(Criteria listed in Section 1, and where relevant in Section 2, also apply to this Section.)

Criteria Commentary
Database integrity
The drilling database was originally held by Vale and received from them as csv exports.

The drilling data have been imported into a relational SQL server database using DatashedTM
(Industry standard drill hole database management software) by Mitchell River Group.

All of the available drilling data has been imported into 3D mining and modelling software packages
(SurpacTMand LeapfrogTM), which allow visual interrogation of the data integrity and continuity.
All of the resource interpretations have been carried out using these software packages. During
the interpretation process it is possible to highlight drilling data that does not conform to the
geological interpretation for further validation.

Data validation checks were completed on import to the SQL database.

Data validation has been carried out by visually checking the positions and orientations of drill
holes.
Site visits
The Competent Person responsible for Sampling Techniques and Data and Exploration Results, Mr
Roger Fitzhardinge, has visited the site multiple times and overseen exploration activity and
assumes responsibility for the sampling and data management procedures.

No visits to the Jaguar site have been undertaken by the Competent Person responsible for the
Mineral Resource Estimate(MRE),Mr Lauritz Barnes,due to travel restrictions(COVID-19).
Geological interpretation
Sufficient drilling has been conducted to reasonably interpret the geology and the mineralisation.
The mineralisation is traceable between multiple drill holes and drill sections.

Interpretation of the deposit was based on the current understanding of the deposit geology.
Centaurus field geologist supplied an interpretation that was validated and revised by the
independent resource geologist.

Drill hole data, including assays, geological logging, structural logging, lithochemistry, core photos
and geophysics have been used to guide the geological interpretation.

Extrapolation of mineralisation beyond the deepest drilling has been assumed up to a maximum of
100m where the mineralisation is open.

Alternative interpretations could materially impact on the Mineral Resource estimate on a local,
but not global basis. No alternative interpretations were adopted at this stage of the project.

Geological logging in conjunction with assays has been used to interpret the mineralisation. The
interpretation honoured modelled fault planes and interpretation of the main geological
structures.

Mineralisation at Jaguar occurs as veins and breccia bodies set in extensively altered and sheared
host rocks. Continuity of the alteration and sulphide mineralisation zones is good, continuity of
local zones of semi-massive to massive sulphide is not always apparent.

Mineralisation at the Onça Preta and Onça Rosa deposits plus the Tigre deposit predominantly
forms tabular semi-continuous to continuous bodies both alongstrike and down dip.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Post-mineralisation faulting may offset mineralisation at a smaller scale than that which can be
reliably modelled using the current drill hole data.
Dimensions
Jaguar South (primary mineralisation) covers an area of 1,250m strike length by 400m wide by
530m deep in strike length trending ESE-WNW. Individual domains dip sub-vertically with widths
ranging from a few metres up to 20-30m thick.

Jaguar Central (primary mineralisation) covers an area of 800m strike length by 250m wide by 420m
deep trending ESE-WNW. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar North (primary mineralisation) has a strike length of 600m by up to 25m wide by 300m deep,
trending SE-NW.

Jaguar Central North (primary mineralisation) covers an area of 720m strike length by 100m wide
by 500m deep, trending E-W. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar Northeast (primary mineralisation) covers an area of 1,200m strike length by 300m wide by
500m deep, trending ESE-WNW. Individual domains dip sub-vertically with widths up to 10-15m.

Jaguar West (primary mineralisation) has a strike length of 1,000m by up to 80m wide by 350m
deep, trending E-W. Individual domains dip sub-vertically with widths up to 10m.

Leao East (primary mineralisation) has a strike length of 275m by up to 10m wide by 130m deep,
trending ESE-WNW.

Onça Preta (primary mineralisation) has a strike length of 400m by up to 15m wide by 375m deep,
trending E-W.

Onça Rosa (primary mineralisation) has a strike length of 500m by up to 10m wide by 250m deep,
trending ESE-WNW

Tigre (primary mineralisation) has a strike length of 500m by up to 10m wide by 250m deep,
trendingESE-WNW.
Estimation and modelling
techniques

Grade estimation using Ordinary Kriging (OK) was completed using Geovia Surpac™ software for
Ni, Cu, Co, Fe, Mg, Zn and As.

Drill hole samples were flagged with wire framed domain codes. Sample data were composited to
1m using a using fixed length option and a low percentage inclusion threshold to include all
samples. Most samples (80%) are around 1m intervals in the raw assay data.

Top-cuts were decided by completing an outlier analysis using a combination of methods including
grade histograms, log probability plots and other statistical tools. Based on this statistical analysis
of the data population, no top-cuts were applied.

Directional variograms were modelled by domain using traditional variograms. Nugget values are
low to moderate (around 15-25%) and structure ranges up to 200 in the primary zones. Variograms
for domains with lesser numbers of samples were poorly formed and hence variography was
applied from the higher sampled domains.

Block model was constructed with parent blocks for 10m (E) by 2m (N) by 10m (RL). All estimation
was completed to the parent cell size.

Three estimation passes were used. The first pass had a limit of 75m, the second pass 150m and
the third pass searching a large distance to fill the blocks within the wire framed zones. Each pass
used a maximum of 12 samples, a minimum of 6 samples and maximum per hole of 4 samples.

Search ellipse sizes were based primarily on a combination of the variography and the trends of
the wire framed mineralized zones. Hard boundaries were applied between all estimation domains.

Validation of the block model included a volumetric comparison of the resource wireframes to the
block model volumes. Validation of the grade estimate included comparison of block model grades
to the declustered input composite grades plus swath plot comparison by easting and elevation.
Visual comparisons of input compositegrades vs. block modelgrades were also completed.
Moisture
The tonnages were estimated on an in-situ dry bulk density basis which includes natural moisture.
Moisture content was not estimated but is assumed to be low as the core is not visibly porous.
Cut-off parameters
Potential mining methods include a combination of open pit and underground. The new Jaguar
MRE has been reported within a pit shell using modifying factors determined in the Jaguar Value-
Add Scoping Study and metal prices of US$20,000/t Ni, US$44,000/t Co and US$2,900/t Zn. Within
the pit, a 0.3% Ni cut-off grade has been maintained. A higher grade 0.7% Ni cut-off grade has been
used for resources below the pit shell reflective of the cut-off grade that was determined for the
underground operations developed in the Scoping Study.
Mining factors or
assumptions

It is assumed that the Jaguar deposits will be mined by a combination of open pit and underground
mining methods.

Conceptual pit optimisation studies have been completed by Entech to ensure that there are
reasonable prospects for the eventual economic extraction of the mineralisation by these
methods.

Input parameters were benchmarked from similar base-metal operations in Brazil and Australia.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
Metallurgical factors or
assumptions

Metallurgical test work has been undertaken on multiple composite samples sourced from the
Jaguar South, Jaguar Central, Jaguar West, Jaguar North, Jaguar Central North, Onça Rosa and Onça
Preta deposits. Material selection for test work was focused on providing a good spatial
representation of mineralisation for the deposits to date. Bench scale test work to date has
demonstrated that a conventional crushing, grinding and flotation circuit will produce concentrate
grades (10-15% Ni) and nickel sulphide recoveries (+95%)).

Pressure leach testing has identified that 97-98% nickel extraction from concentrate into solution
is reproducible. Metallurgical test work remains ongoing.

See ASX Announcements of 18 February 2020, 17 March 2020, 31 March 2020 and 8 December
2021 for metallurgical test results
Environmental factors or
assumptions

Tailings analysis and acid drainages tests have been completed which underpin the preliminary
tailing storage facility design (TSF), which is in progress.

Waste rock will be stockpiled into waste dumps adjacent to the mining operation.

The TSF and waste dumps will include containment requirements for the management of
contaminated waters and sediment generation in line with Brazilian environmental regulations.
Bulk density
On the new drilling, bulk densities were determined on 15 to 30 cm drill core pieces every 1m in
ore and every 10m in waste. On the historical drilling the bulk densities were determined on drill
core at each sample submitted for chemical analysis.

Bulk density determinations adopted the weight in air /weight in water method using a suspended
or hanging scale.

The mineralized material is not significantly porous, nor is the waste rock.

A total of 43,571 bulk density measurements have been completed.

Of these, 4,040 were included in the analysis and are within the defined mineralised domains – and
4,031 are from fresh or transitional material leaving only 9 measurements from saprolite or oxide
material.

Oxide and saprolite material are excluded from the reported resource.

Fresh and transitional measurements from within the mineralised domains we analysed
statistically by domain and depth from surface and compared to Ni, Fe and S. A reasonable
correlation was defined against Fe due to the magnetite in the system.

The bulk density values assigned the mineralised domains by oxidation were as follows:

Oxide: 2.0

Saprolite: 2.3

Transition: 2.6

Fresh: by regression against estimated Fe using: BD = (fe_ok*(0.0323)) + 2.6276

Work is in progress to further refine the relationships between bulk density and mineralised
domains, and updates will be applied to the next iteration of the resource model.
Classification
The Mineral Resource has been classified on the basis of confidence in the geological model,
continuity of mineralised zones, drilling density, confidence in the underlying database, a
combination of search volume and number of data used for the estimation plus availability of bulk
density information.

Indicated Mineral Resources are defined nominally on 50mE x 40mN spaced drilling and Inferred
Mineral Resources nominally 100mE x 100mN with consideration given for the confidence of the
continuity of geology and mineralisation.

Oxide and saprolite material are excluded from the Mineral Resource.

The Jaguar Mineral Resource in part has been classified as Indicated with the remainder as Inferred
according to JORC 2012.
Audits or reviews
This is the third Mineral Resource estimate completed by the Company. The current model was
reviewed by Entech as part of the MREEE assessment.
Discussion of relative
accuracy/ confidence

The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral
Resource as per the guidelines of the 2012 JORC Code.

The statement relates to global estimates of tonnes and grade.