AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT AND MEDIA RELEASE

==> picture [124 x 57] intentionally omitted <==

10 June 2021

NEW STRONG NICKEL SULPHIDE INTERCEPTS IN STEP-OUT DRILLING HIGHLIGHT OUTSTANDING GROWTH OUTLOOK AT JAGUAR

Significant new intersections to drive Q4 Resource update as drilling accelerates with eight rigs on site by end of June

  • Step-out drilling at the Jaguar South and Jaguar Central Deposits returns multiple intersections of semimassive and massive nickel sulphide mineralisation, highlighting the strong growth potential at Jaguar.

  • Drill hole JAG-DD-21-151[1] at Jaguar South has also intersected more than 20m of semi-massive to massive nickel sulphides below the current pit design.

  • Four diamond rigs on site drilling double-shift, with three additional diamond rigs planned to arrive in the coming weeks to support the 65,000m of drilling planned for 2021.

  • One RC rig is on site drilling the Leão Prospect, the first of an extensive pipeline of greenfields targets.

  • Positive Value-Add Scoping Study delivered in May 2021 with the Centaurus Board moving the Project directly to a Definitive Feasibility Study (DFS).

  • Strong cash position of A$21 million to drive ongoing drilling and DFS activities.

Centaurus Metals (ASX Code: CTM ) is pleased to advise that ongoing resource development and extensional drilling at its 100%-owned Jaguar Nickel Sulphide Project in the Carajás Mineral Province of northern Brazil has delivered more encouraging high-grade intersections, demonstrating the outstanding potential for further growth in its Resource inventory.

Figure 1 – Core from drill hole JAG-DD-21-151 (Jaguar South); Semi-massive and massive sulphides (metallic bronze/yellow colour), predominantly pyrite, millerite and pentlandite, hosted in an altered dacite.

==> picture [442 x 187] intentionally omitted <==

1 Visual estimates are uncertain in nature and hence in no way are intended to be a substitute for analytical results. All intervals have been sampled and the analytical results will be reported to the market when the Company receives them.

Australian Office Brazilian Office ASX: CTM Centaurus Metals Limited Centaurus Brasil Mineração Ltda ACN 009 468 099 Level 2, 1 Ord Street Avenida Barão Homem de Melo, 4391 [email protected] West Perth WA 6005 Salas 606 e 607 - Estoril T: +61 8 6424 8420 AUSTRALIA CEP: 30.494.275, Belo Horizonte MG BRAZIL

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Drill-hole JAG-DD-21-151, completed on section 478040mE at Jaguar South, intersected 22.4m of semi-massive and massive nickel sulphide mineralisation from 208.5m down-hole within a broader +40m mineralised zone (Figure 2). This intersection is immediately below the current pit limits and the grade and thickness has the potential to push the current open pit design even deeper (Figure 3).

Figure 2 – Core photo from drill hole JAG-DD-21-151 (Jaguar South); 208.5m to 230.4m down-hole: Disseminated, stringer to semimassive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in altered dacite.

==> picture [420 x 293] intentionally omitted <==

==> picture [422 x 318] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 1 – Visual estimates of intersected mineralisation in drill hole JAG-DD-20-151.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
JAG-DD-20-151
JAG-DD-20-151
JAG-DD-20-151
JAG-DD-20-151
JAG-DD-20-151
JAG-DD-20-151
JAG-DD-20-151
39.5
158.4
188.0
208.0
230.4
241.2
260.0
42.7
162.6
197.3
230.4
232.0
260.0
260.7
3.2
4.2
9.3
22.4
1.6
18.9
0.7
Stringer and semi-massive
5-20% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive
10-30% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive
10-20% sulphides comprising py, mlr, pn, sp, cp, po
Total down hole width of mineralisation:
60.3
m(including 26.3m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

Visual observations from site, such as those seen in recent hole JAG-DD-21-151, will drive the Q4 2021 Mineral Resource upgrade and underpin the DFS which is set for completion by the end of 2022.

Centaurus’ Managing Director, Mr Darren Gordon, said the latest drilling provided further evidence of the enormous growth potential across multiple deposits at Jaguar, with the results to be incorporated in the next Resource update due in the December quarter.

“Importantly, our recent drilling is providing an outstanding foundation to further increase the already impressive resource base of 58.9Mt at 0.96% Ni for 562,600 tonnes of contained nickel at Jaguar – already one of the largest nickel sulphide resource inventories held outside of the major producers,” he said.

“Our recently completed Value-Add Scoping Study demonstrated that underground operations are economically viable across four of our deposits, which gives us the confidence that the step-out drilling will not only add resource tonnes, but more importantly add tonnes that can become part of future underground operations and build on the current 13-year mine life at Jaguar.

“By the end of the month we expect to have seven diamond rigs and one RC rig on site drilling around the clock to further drive the upgrade of the current resources to Indicated and Measured status for the DFS as well as build on the current global resource and make new greenfields discoveries.

“We look forward to keeping our shareholders up-to-date with results from one of the biggest nickel sulphide exploration programs underway in the world today”.

A technical description of the visual drill intersections from the Jaguar South and Jaguar Central Deposits is provided below:

Jaguar South Deposit

Jaguar South is currently the biggest deposit at the Jaguar Project, contributing 18.7Mt at 0.97% Ni for more than 180kt of contained nickel , including an Indicated component of 7.4Mt at 1.19% Ni for 87kt of contained nickel .

Recent Scoping Study outcomes from Jaguar have also demonstrated that the mineralisation below the current pit limits is technically and economically feasible for underground operations. As such, the Company has been active in advancing its step-out drill program at key deposits like Jaguar South, within the broader Jaguar Project.

Step-out drilling is ongoing and has consistently intersected mineralisation below the current pit and stope limits. This is expected to increase the resource confidence of these zones and potentially add new resource tonnes.

Hosted in a Sub-Volcanic Porphyritic Dacite, the Jaguar South Deposit extends over a strike length of more than 650m and comprises continuous sub-vertical veins and semi-massive to massive breccia zones that can be up to 20m wide and extend from surface to more than 300m depth with the mineralisation remaining open at depth and along strike in both directions (see Figures 3 and 6).

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 3 – The Jaguar South Deposit: Cross-Sections 478040mE (left) 478210mE (right) showing significant drill intersections in yellow, DHEM conductor plates in dark blue and FLEM conductor plates in light blue.

==> picture [245 x 352] intentionally omitted <==

==> picture [245 x 352] intentionally omitted <==

Step-out drilling at Jaguar South has consistently intersected the mineralised domains in line with the DHEM conductor plates, current geological model interpretations and the developing structural model. This bodes well for deeper drilling that is planned both to identify additional resource tonnes as well as lift existing underground resources into the higher resource categories required for future Ore Reserve Estimation and DFS work.

Complementing the positive visual intercepts seen in drill hole JAG-DD-21-151, recent drill-hole JAG-DD-21-164 (on section 478210mE) and located 170m to the east, has delivered a further impressive visual result, demonstrating that the strong mineralisation continues both along strike and at depth.

Hole JAG-DD-21-164 is the deepest drill hole Centaurus has completed to date (544m) and has intersected 12.7m of semi-massive and massive sulphides within a broader +40m zone located more than 60m below the Company’s previously deepest hole on that section, JAG-DD-20-112, which intersected 10.5m at 1.75% Ni from 346.5m, including 6.0m at 2.16% Ni from 347.3m down-hole (see core photos in Figure 8).

The Jaguar South Deposit remains open at depth on all sections and step-out drilling is ongoing across the +650m strike length of the deposit targeting DHEM conductor plates that continue to extend below the deepest drilling.

One rig is dedicated to the Jaguar South Deposit undertaking additional step-out drilling to continue to test potential down-dip extensions of the high-grade mineralisation within the main zones.

The results from the Jaguar South holes referred to above will form part of the Q4 2021 JORC MRE upgrade.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

The Jaguar Central Deposit

Jaguar Central Deposit is currently the second biggest deposit at the Jaguar Project, contributing 10.2Mt at 1.00% Ni for more than 100kt of contained nickel , including an Indicated component of 8.4Mt at 0.99% Ni for 83kt of contained nickel .

Hosted in a Sub-Volcanic Porphyritic Dacite, the Jaguar Central Deposit extends over a strike length of more than 500m and comprises continuous sub-vertical veins and semi-massive to massive breccia zones that can be up to 70m wide and extend from surface to more than 300m depth, with the mineralisation remaining open at depth and along strike in both directions (see Figures 4 and 7).

Drilling has identified a thick, shallow high-grade mineralised shoot that that starts at surface at the western end of the deposit and plunges sub-horizontally to the east across nine drill sections and more than 500m of strike. The mineralised shoot is up to 70m wide and over 100m deep on some sections.

Nickel grades previously reported within the mineralised shoot are consistently over 1.0% nickel[2] with outstanding continuous down-hole intersections such as 30.8m at 3.30% Ni (JAG-DD-20-104 – see Figure 4), 33.7m at 2.23% Ni (JAG-DD-20-056), 31.4m at 2.47% Ni (PKS-JAGU-DH00030) and 67.3m at 1.20% Ni (JAG-DD-20-047).

Figure 4 – The Jaguar Central Deposit: Cross-Section 477180mE showing the drill intersections with DHEM conductor plates in dark blue and FLEM plates in light blue.

==> picture [217 x 314] intentionally omitted <==

==> picture [217 x 313] intentionally omitted <==

Step-out drilling is continuing along the length of the Jaguar Central Deposit with a focus on the eastern portion where the high-grade shoot plunges below the currently defined pit limit. In-fill and extensional drilling is also continuing to increase resource confidence within the current pit.

2 Refer to ASX Announcements 21 December 2020, 12 October 2020, 11 June 2020, 6 August 2020, 20 April 2021 for CTM drill intersections results and 6 August 2019 for historical drill intersections results.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

The Value-Add Scoping Study demonstrated that underground operations are viable at the Jaguar Central Deposit. The new step-out drilling, not included in the March 2021 MRE and targeting the easterly plunge of the high-grade shoot, has consistently intersected thick zones of high-grade mineralisation with the potential to extend the existing pit deeper and/or establish additional resources for the future underground operation.

Drill hole JAG-DD-21-142, on section 477180mE, intersected more than 60m of stringer to semi-massive and massive nickel sulphides (see Figure 5 below). The visual estimates of the sulphides in JAG-DD-21-142 are outlined in Table 2 and photos of the +30m intersection of stringer to semi-massive and massive sulphide drill core can be found in Figure 5.

This excellent intersection is over 60m below the current pit limits and the previous deepest drill hole on section 477180mE (JAG-DD-20-101), which intersected 20.2m at 1.00% Ni from 153.3m. Again, the new intersection has the potential to drive the existing pit deeper or support future underground operations.

Furthermore, drill hole JAG-DD-21-133 located on section 477230mE, a further 50m to the east of JAG-DD-21-142, intersected over 35m of nickel sulphide mineralisation from 249m down-hole. The drill-hole location can be seen on Figure 7 and visual estimates of the sulphides in JAG-DD-21-133 are outlined in Table 5 with photos of the stringer to semi-massive and massive sulphide drill core in Figures 9-11.

The Jaguar Central high-grade shoot remains open at depth, down-plunge and along strike to the east where FLEM conductor plates indicate that it continues well beyond current pit limits.

One rig remains dedicated to the Jaguar Central Deposit with step-out drilling focusing on testing the easterly plunging high-grade shoot and associated deeper electromagnetic conductor plates.

Figure 5 – Core photo from drill hole JAG-DD-21-142 (Jaguar Central); 236.2m to 251.3m down-hole: Disseminated, stringer to semimassive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in altered dacite.

==> picture [428 x 347] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 5 (continued) – Core photo from drill hole JAG-DD-20-142 (Jaguar Central); 251.3m to 268.0m down-hole.

==> picture [431 x 302] intentionally omitted <==

Table 2 – Visual estimates of intersected mineralisation in drill hole JAG-DD-20-142.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
JAG-DD-20-142
JAG-DD-20-142
JAG-DD-20-142
JAG-DD-20-142
JAG-DD-20-142
216.3
225.0
228.1
236.4
268.0
225.0
228.1
236.4
268.0
281.5
8.8
3.1
8.3
31.6
13.5
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
5-10% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive 10-30% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-5% sulphides comprising py,mlr, pn,sp,po
Total down hole width of mineralisation:
65.2
m(including 31.6m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

The results from the Jaguar Central holes outlined above will form part of the Q4 2021 JORC MRE upgrade.

Jaguar West and Jaguar Central North Deposits

Drilling at the Jaguar West and Jaguar Central North Deposits is continuing. Both deposits currently host Inferred Resources only. As such, the focus of the drilling at these deposits is to upgrade existing in-pit resources to the Indicated category ahead of the next JORC Resource estimate. Drilling has progressed well with the current mineralisation resource domains being consistently verified and locally extended.

First results from the Jaguar West and Jaguar Central North drilling are expected in the coming weeks.

RC Rig

The new RC rig is on site and has already completed 12 drill holes at the Leão Prospect. The RC rig has a pipeline of greenfields exploration drilling on key prospect areas, as well as sterilisation drilling for major project infrastructure sites outlined in the recently released Jaguar Value-Add Scoping Study.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Additional Diamond Rigs

A fifth diamond rig from the current drill contractor (Servdrill) has been contracted and is expected to arrive on site in the coming weeks. Additionally, the Company has signed a new contract with Geosol (Brazil’s largest drill contractor) to provide an additional two diamond rigs that are set to arrive in the second half of June. By the end of June, it is expected that there will be seven diamond rigs on site working double-shift.

Assay turnaround times

During the first half of 2021, assay turnaround times from ALS Global were impacted by the COVID-19 pandemic. The sample preparation laboratory in Belo Horizonte and the South American analytical hub in Lima (Peru) have been shut intermittently due to lock-down restrictions and the lack of availability of consumables (oxygen).

Samples have also been sent to ALS Vancouver to expedite results, although turnaround times in Vancouver are also impacted. Currently, both South American laboratories have resumed normal operations and turnaround times are expected to improve.

ALS Global have indicated to the Company that lab turn-around times will be back to 20-25 days by August 2021.

-ENDS-

For further enquiries please contact: Authorised for Release by the Centaurus Board Nicholas Read Darren Gordon Read Corporate Managing Director M: +61 419 929 046 Centaurus Metals Ltd T: +61 8 9388 1474 T: +61 8 6424 8420

Competent Persons Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy. Mr Fitzhardinge is a permanent employee and shareholder of Centaurus Metals Limited. Mr Fitzhardinge has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Fitzhardinge consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to the new March 2021 Jaguar Mineral Resource is based on information compiled by Mr Lauritz Barnes (consultant with Trepanier Pty Ltd) and Mr Roger Fitzhardinge (a permanent employee and shareholder of Centaurus Metals Limited). Mr Barnes and Mr Fitzhardinge are both members of the Australasian Institute of Mining and Metallurgy. Mr Barnes and Mr Fitzhardinge have sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Specifically, Mr Fitzhardinge is the Competent Person for the database (including all drilling information), the geological and mineralisation models plus completed the site visits. Mr Barnes is the Competent Person for the construction of the 3-D geology / mineralisation model plus the estimation. Mr Barnes and Mr Fitzhardinge consent to the inclusion in this report of the matters based on their information in the form and context in which they appear.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 3 – Jaguar Nickel Sulphide Project – Drill Collar locations for the current outstanding drill-hole results.

Hole ID Target Easting Northing mRL Azi Dip EOH Depth
JAG-DD-21-116 Jaguar Central 477230 9283021 305 180 -55 235.70
JAG-DD-21-118 Jaguar Central 477095 9282828 268 0 -55 301.15
JAG-DD-21-119 Jaguar West 475945 9283264 274 180 -60 78.95
JAG-DD-21-120 Jaguar Central North 477180 9283144 316 0 -55 210.85
JAG-DD-21-121 Jaguar South 477885 9282367 338 0 -55 329.30
JAG-DD-21-122 Jaguar West 475990 9283286 267 180 -55 87.50
JAG-DD-21-123 Jaguar Central North 477180 9283188 319 0 -55 172.20
JAG-DD-21-124 Jaguar West 475990 9283327 263 180 -55 143.05
JAG-DD-21-125 Jaguar South 477990 9282623 310 180 -55 458.65
JAG-DD-21-126 Jaguar Central North 477080 9283153 310 0 -55 184.45
JAG-DD-21-127 Jaguar West 476040 9283291 270 180 -60 120.10
JAG-DD-21-128 Jaguar West 476090 9283264 285 180 -55 107.90
JAG-DD-21-129 Jaguar West 476185 9283241 297 180 -55 119.65
JAG-DD-21-130 Jaguar Central North 476995 9283151 299 0 -55 150.00
JAG-DD-21-131 Jaguar South 477780 9282393 306 180 -55 193.85
JAG-DD-21-132 Jaguar West 476140 9283289 278 180 -55 134.80
JAG-DD-21-133 Jaguar Central 477230 9283107 305 180 -58 346.55
JAG-DD-21-134 Jaguar West 476185 9283276 286 180 -55 140.50
JAG-DD-21-135 Jaguar South 477722 9282383 326 180 -55 122.20
JAG-DD-21-136 Jaguar West 476290 9283281 277 180 -55 138.65
JAG-DD-21-137 Jaguar South 477725 9282357 335 180 -55 71.25
JAG-DD-21-138 Jaguar Central North 477135 9283260 290 180 -55 138.90
JAG-DD-21-139 Jaguar South 477695 9282392 336 0 -55 224.05
JAG-DD-21-140 Jaguar West 476340 9283283 273 180 -55 167.05
JAG-DD-21-141 Jaguar Central North 477130 9283286 278 180 -55 190.35
JAG-DD-21-142 Jaguar Central 477180 9282821 286 0 -55 289.10
JAG-DD-21-143 Jaguar South 477885 9282335 339 0 -55 272.10
JAG-DD-21-144 Jaguar West 476385 9283271 272 180 -55 132.85
JAG-DD-21-145 Jaguar Central North 476830 9283247 252 180 -55 292.30
JAG-DD-21-146 Jaguar South 477885 9282148 384 0 -55 350.00
JAG-DD-21-147 Jaguar Central North 476770 9283184 263 0 -58 100.10
JAG-DD-21-148 Jaguar Central 477290 9283077 291 180 -55 365.00
JAG-DD-21-149 Jaguar West 476385 9283303 270 180 -55 190.00
JAG-DD-21-150 Jaguar Central North 477030 9283361 255 180 -55 290.00
JAG-DD-21-151 Jaguar South 478040 9282568 308 180 -55 290.40
JAG-DD-21-152 Jaguar Central 477290 9283116 299 180 -58 406.05
JAG-DD-21-153 Jaguar West 476435 9283252 272 180 -55 131.70
JAG-DD-21-154 Jaguar West 476480 9283255 269 180 -55 169.90
JAG-DD-21-155 Jaguar South 478140 9282359 346 180 -55 130.85
JAG-DD-21-156 Jaguar Central North 477030 9283363 255 180 -55 297.55
JAG-DD-21-157 Jaguar South 478140 9282485 317 180 -61 467.50
JAG-DD-21-158 Jaguar West 476525 9283262 266 180 -55 201.85
JAG-DD-21-159 Jaguar Central 477130 9283160 317 180 -57 360.10
JAG-DD-21-160 Jaguar Central North 477030 9283286 280 180 -55 186.75
JAG-DD-21-161 Jaguar West 476290 9283247 283 180 -55 145.20
JAG-DD-21-162 Jaguar West 476385 9283338 267 180 -55 252.20
JAG-DD-21-163 Jaguar Central 477030 9283195 293 180 -55 379.00
JAG-DD-21-164 Jaguar South 478210 9282535 382 180 -58 544.25

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 6 – The Jaguar South Deposit with DHEM conductor plates (blue) overlaid on the Ground Magnetics Survey results (RTP)

==> picture [437 x 341] intentionally omitted <==

Figure 7 – The Jaguar Central Deposit with DHEM conductor plates (blue) overlaid on the Ground Magnetics Survey results (RTP)

==> picture [456 x 341] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 8 – Core photo from drill hole JAG-DD-21-164 (Jaguar South); 363.7m to 379.1m down-hole: Disseminated, stringer to semimassive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in altered dacite.

==> picture [431 x 518] intentionally omitted <==

Table 4 – Visual estimates of intersected mineralisation in drill hole JAG-DD-21-164.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
Jagaur South
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
JAG-DD-20-164
243.0
256.3
344.8
366.4
368.2
395.8
405.6
452.7
244.0
257.3
366.4
368.2
379.1
398.1
407.6
453.6
1.0
1.0
21.7
1.8
11.0
2.4
2.0
1.0
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive
10-30% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to semi-massive 5-15% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-10% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5%sulphides comprising py,mlr, pn,sp,po
Total down hole width of mineralisation:
41.7
m(including 12.7m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 9 – Core photo from drill hole JAG-DD-21-133 (Jaguar Central); 249.3m to 258.0m down-hole: Disseminated, stringer to semimassive sulphides (metallic bronze/yellow colour) with magnetite (black colour) mineralisation hosted in altered dacite.

==> picture [398 x 267] intentionally omitted <==

Figure 10 – Core photo from drill hole JAG-DD-21-133 (Jaguar Central); 249.3m to 288.9m down-hole.

==> picture [398 x 163] intentionally omitted <==

Figure 11 – Core photo from drill hole JAG-DD-21-133 (Jaguar Central); 298.8m to 305.0m down-hole.

==> picture [398 x 205] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Table 5 – Visual estimates of intersected mineralisation in drill hole JAG-DD-21-133.

Deposit Drill hole From(m) To(m) Interval Description of Sulphide Mineralisation*
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
Jagaur Central
JAG-DD-20-133
JAG-DD-20-133
JAG-DD-20-133
JAG-DD-20-133
JAG-DD-20-133
JAG-DD-20-133
JAG-DD-20-133
249.3
263.0
281.7
283.9
288.9
292.0
298.8
258.0
267.8
283.9
288.9
292.0
298.8
305.0
8.7
4.8
2.2
5.0
3.1
6.8
6.3
Stringer and semi-massive 5-20% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive 5-20% sulphides comprising py, mlr, pn, sp, cp, po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Disseminated to Stringer
2-5% sulphides comprising py, mlr, pn, sp,po
Stringer and semi-massive 5-20% sulphides comprising py, mlr, pn, sp, cp, po
Total down hole width of mineralisation:
36.8
m(including 20.0m of stringer to semi-massive)

*pyrite (py), milerite (mlr), pentalndite (pn), chalcopyrite (cp), pyrhotite (po), sphalerite (sp)

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

APPENDIX A – Compliance Statements for the Jaguar Project

The following Tables are provided for compliance with the JORC Code (2012 Edition) requirements for the reporting of Exploration Results and Mineral Resources at the Jaguar Project.

SECTION 1 - SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections).

Criteria Commentary
Sampling techniques
Historical soil sampling was completed by Vale. Samples were taken at 50m intervals along 200m
spaced north-south grid lines.

Surface material was first removed, and sample holes were dug to roughly 20cm depth. A 5kg
sample was taken from the subsoil. The sample was placed in a plastic sample bag with a sample
tag before being sent to the lab.

Surface rock chip/soil samples were collected from in situ outcrops and rolled boulders and
submitted for chemical analysis.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections.

Core was cut and ¼ core sampled and sent to commercial laboratories for physical preparation and
chemical assay.

At the laboratories, samples were dried (up to 105°C), crushed to 95% less than 4mm,
homogenized, split and pulverized to 0.105mm. A pulverized aliquot was separated for analytical
procedure.

Sample length along core varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done
according to lithological contacts and generally by 1m intervals within the alteration zones and 2m
intervals along waste rock.

Current drilling is being completed on spacing of 100m x 50m or 50m x 50m. Sample length along
core varies between 0.5 to 1.5m

Core is cut and ¼ core sampled and sent to accredited independent laboratory (ALS).

For metallurgical test work continuous downhole composites are selected to represent the
metallurgical domain and ¼ core is sampled and sent to ALS Metallurgy,Balcatta,Perth.
Drilling techniques
Historical drilling was carried out between 2006 to 2010 by multiple drilling companies (Rede and
Geosol), using wire-line hydraulic diamond rigs, drilling NQ and HQ core.

Vale drilled 169 drill holes for a total of 56,592m of drilling in the resource area. All drill holes were
drilled at 55⁰-60⁰ towards either 180⁰ or 360⁰. The resource considers 49 drill holes completed by
Centaurus for a total of 17,941m of drilling. All drill holes were drilled at 55⁰-75⁰ towards either
180⁰ or 360⁰.

Current drillingis a combination of HQand NQcore(Servdrill).
Drill sample recovery
Diamond Drilling recovery rates are being calculated at each drilling run.

For all diamond drilling, core recoveries were logged and recorded in the database for all historical
and current diamond holes. To date overall recoveries are >98% and there are no core loss issues
or significant sample recovery problems.

To ensure adequate sample recovery and representativity a Centaurus geologist or field technician
is present during drilling and monitors the sampling process.

No relationship between sample recovery and grade has been demonstrated. No bias to material
size has been demonstrated.
Logging
Historical outcrop and soil sample points were registered and logged in the Vale geological mapping
point database.

All drill holes have been logged geologically and geotechnically by Vale or Centaurus geologists.

Drill samples are logged for lithology, weathering, structure, mineralisation and alteration among
other features. Logging is carried out to industry standard and is audited by Centaurus CP.

Logging for drilling is qualitative and quantitative in nature.

All historical and new diamond core has beenphotographed.
Sub-sampling techniques and
sample preparation

Diamond Core (HQ/NQ) was cut using a core saw, ¼ core was sampled. Sample length along core
varies between 0.3 to 4.0m, with an average of 1.48m; sampling was done according to lithological
contacts and generally by 1m intervals within the alteration zones and 2m intervals along the waste
rock.

There is no non-core sample within the historical drill database.

QAQC: Standards (multiple standards are used on a rotating basis) are inserted every 20 samples.
Blanks have been inserted every 20 samples. Field duplicates are completed every 30 samples.
Additionally, there are laboratory standards and duplicates that have been inserted.

Centaurus has adopted the same sampling QAQC procedures which are in line with industry
standards and Centaurus’s current operating procedures.

Sample sizes are appropriate for the nature of the mineralisation.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

All historical geological samples were received and prepared by SGS Geosol or ALS Laboratories as
0.5-5.0kg samples. They were dried at 105°C until the sample was completely dry (6-12hrs), crushed
to 90% passing 4mm and reduced to 400g. The samples were pulverised to 95% passing 150µm and
split further to 50g aliquots for chemical analysis.

New samples are being sent to ALS Laboratories. The samples are dried, crushed and pulverised to
85% passing 75µm and split further to 250g aliquots for chemical analysis.

During the preparation process grain size control was completed by the laboratories (1 per 20
samples).

Metallurgical samples are crushed to 3.35mm and homogenised. Samples are then split to 1kg sub-
samples. Sub-samples areground to specific sizes fractions(53-106µm)for flotation testwork.
Quality of assay data and
laboratory tests

Chemical analysis for drill core and soil samples was completed by multi element using Inductively
Coupled Plasma ICPAES (multi-acid digestion); ore grade analysis was completed with Atomic
Absorption (multi-acid digestion); sulphur analysis was completed with Leco, and Au and PGEs
completed via Fire Assay.

New samples are being analysed for 48 elements by multi element using ME-MS61 (multi-acid
digestion) at ALS Laboratories; ore grade analysis was completed with ICP-AES (multi-acid
digestion); sulphur analysis was completed with Leco, and Au and PGEs completed via Fire Assay.

ALS Laboratories insert their own standards at set frequencies and monitor the precision of the
analysis. The results reported are well within the specified standard deviations of the mean grades
for the main elements. Additionally, ALS perform repeat analyses of sample pulps at a rate of 1:20
(5% of all samples). These compare very closely with the original analysis for all elements.

Vale inserted standard samples every 20 samples (representing 5%). Mean grades of the standard
samples are well within the specified 2 standard deviations.

All laboratory procedures are in line with industry standards. Analysis of field duplicates and lab
pulp duplicates have returned an average correlation coefficient of over 0.98 confirming that the
precision of the samples is within acceptable limits.

Vale QAQC procedures and results are to industry standard and are of acceptable quality.

All metallurgical chemical analysis is completed byALS laboratories
Verification of sampling and
assaying

All historical samples were collected by Vale field geologists. All assay results were verified by
alternative Vale personnel. The Centaurus CP has verified the historical significant intersections.

Centaurus Exploration Manager and Senior Geologist verify all new results and visually confirm
significant intersections.

No twin holes have been completed.

All primary data is now stored in the Centaurus Exploration office in Brazil. All new data is collected
on Excel Spreadsheet, validated and then sent to independent database administrator (MRG) for
storage (DataShed).

No adjustments have been made to the assaydata.
Location of data points
All historical collars were picked up using DGPS or Total Station units. Centaurus has checked
multiple collars in the field and has confirmed their location. All field sample and mapping points
were collected using a Garmin handheld GPS.

An aerial survey was completed by Esteio Topografia and has produced a detailed surface DTM at
(1:1000 scale).

The survey grid system used is SAD-69 22S. This is in line with Brazilian Mines Department
requirements.

New drill holes are sighted with handheld GPS and after completion picked-up by an independent
survey consultant periodically. Downhole survey for all the historical drill holes and Centaurus hole
up to JAG-DD-19-012 used Maxibor equipment. All new drill holes are being downhole surveyed
usingReflex digital down-hole tool,with readings everymetre.
Data spacing and
distribution

Soil samples were collected on 40m spacing on section with distance between sections of 200m
and 400m depending on location.

Sample spacing was deemed appropriate for geochemical studies.

The historical drilling is all diamond drilling. Drill sections are spaced 100m apart and generally there
is 50 to 100m spacing between drill holes on sections. Centaurus is in the process of closing the drill
spacing to 100m x 50m or 50m x 50m.

No sample compositing was applied to the drilling.

Metallurgical samples to date have been taken from Jaguar South, Jaguar Central, Jaguar North and
Onça Preta.
Orientation of data in
relation to geological
structure

Historical drilling was oriented at 55⁰-60⁰ to either 180⁰ or 360⁰. This orientation is generally
perpendicular to the main geological sequence along which broad scale mineralisation exists.

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.
Sample security
All historical and current samples are placed in pre-numbered plastic sample bags and then a
sample ticket wasplaced within the bagas a check. Bags are sealed and then transported bycourier

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary
to the ALS laboratories in Vespasiano, MG.

All remnant Vale diamond core has now been relocated to the Company’s own core storage facility
in Tucumã,PA.
Audits or reviews
The Company is not aware of any audit or review that has been conducted on the project to date.

SECTION 2 - REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding Section also apply to this section).

Criteria Commentary
Mineral tenement and land
tenure status

The Jaguar project includes one exploration licence (856392/1996) for a total of circa 30km2. A
Mining Lease Application has been lodged that allows for ongoing exploration and project
development ahead of project implementation.

The tenement is part of a Sale & Purchase Agreement (SPA) with Vale SA. Two deferred consideration
payments totalling US$6.75M (US$1.75 million on commencement of BFS or 3 years and US$5
million on commencement of commercial production) and a production royalty of 0.75% are to
follow. Centaurus has taken on the original obligation of Vale to BNDES for 1.8% Net Operating
Revenue royalty.

Mining projects in Brazil are subject to a CFEM royalty, a government royalty of 2% on base metal
revenue.

Landowner royalty is 50% of the CFEM royalty.

Centaurus has secured possession rights to two properties over the Jaguar Project with other
agreements currently being negotiated. This first agreements remove exposure to the landowner
royalty over the properties secured.

The project is covered by a mix of cleared farmland and natural vegetation.

The project is not located within any environmental protection zones and exploration and mining is
permitted with appropriate environmental licences.
Exploration done by other
parties

Historically the Jaguar Project was explored for nickel sulphides by Vale from 2005 to 2010.
Geology
Jaguar Nickel Sulphide is a hydrothermal nickel sulphide deposit located near Tucumã in the Carajás
Mineral Province of Brazil.

Jaguar is located at the intersection of the WSW-trending Canaã Fault and the ENE-trending
McCandless Fault, immediately south of the NeoArchean Puma Layered Mafic-Ultramafic Complex.

Iron rich fluids were drawn up the mylonite zone causing alteration of the host felsic volcanic and
granite units and generating hydrothermal mineral assemblage. Late-stage brittle-ductile conditions
triggered renewed hydrothermal fluid ingress and resulted in local formation of high-grade nickel
sulphide zones within the mylonite and as tabular bodies within thegranite.
Drill hole Information
Refer to previous ASX Announcements for significant intersections from Centaurus drilling.

Refer to ASX Announcement of 6 August 2019 for all significant intersections from historical drilling.
Data aggregation methods
Continuous sample intervals are calculated via weighted average using a 0.3 % Ni cut-off grade with
3m minimum intercept width.

There are no metal equivalents reported.
Relationship between
mineralisation widths and
intercept lengths

Mineralisation is sub-vertical; the majority of the drilling is at low angle (55-60⁰) in order to achieve
intersections at the most optimal angle.

The historical drilling results in ASX Announcement 6 August 2019 reflect individual down hole
sample intervals and no mineralised widths were assumed or stated.
Diagrams
Refer to Figures 1 to 11 of this announcement.

Refer to previous ASX Announcements for maps and sections from Centaurus drilling included in the
resource estimate.
Balanced reporting
All exploration results received by the Company to date are included in this or previous releases to
the ASX.

For the current resource, a revised 0.3% Ni cut-off grade has been applied to material less than 200m
vertical depth from surface in the estimation of the Global MRE with this being consistent with
mineralisation domain modellingand reported significant intersection cut-offgrades.
Other substantive
exploration data

The Company has received geophysical data from Vale that is being processed by an independent
consultant Southern Geoscience. Refer to ASX Announcements for geophysical information.
Further work
Electro-magnetic (EM) geophysical surveys (DHEM and FLEM) are ongoing.

In-fill and extensional drilling within the known deposits to test the continuity of high-grade zones is
ongoing. Resource samples are continuously being sent in batches of 150-300 samples and will be
reported once the batches are completed.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Metallurgical testwork is ongoing.

Geotechnical and hydrological studies for the proposed tailings facility and waste deposits have
started.

SECTION 3 - ESTIMATION AND REPORTING OF MINERAL RESOURCES

(Criteria listed in Section 1, and where relevant in Section 2, also apply to this Section.)

Criteria Commentary
Database integrity
The drilling database was originally held by Vale and received from them as csv exports.

The drilling data have been imported into a relational SQL server database using DatashedTM
(Industry standard drill hole database management software) by Mitchell River Group.

All of the available drilling data has been imported into 3D mining and modelling software packages
(SurpacTMand LeapfrogTM), which allow visual interrogation of the data integrity and continuity.
All of the resource interpretations have been carried out using these software packages. During
the interpretation process it is possible to highlight drilling data that does not conform to the
geological interpretation for further validation.

Data validation checks were completed on import to the SQL database.

Data validation has been carried out by visually checking the positions and orientations of drill
holes.
Site visits
The Competent Person responsible for Sampling Techniques and Data and Exploration Results, Mr
Roger Fitzhardinge, has visited the site multiple times and overseen exploration activity and
assumes responsibility for the sampling and data management procedures.

No visits to the Jaguar site have been undertaken by the Competent Person responsible for the
Mineral Resource Estimate(MRE),Mr Lauritz Barnes,due to travel restrictions(COVID-19).
Geological interpretation
Sufficient drilling has been conducted to reasonably interpret the geology and the mineralisation.
The mineralisation is traceable between multiple drill holes and drill sections.

Interpretation of the deposit was based on the current understanding of the deposit geology.
Centaurus field geologist supplied an interpretation that was validated and revised by the
independent resource geologist.

Drill hole data, including assays, geological logging, structural logging, lithochemistry, core photos
and geophysics have been used to guide the geological interpretation.

Extrapolation of mineralisation beyond the deepest drilling has been assumed up to a maximum of
100m where the mineralisation is open.

Alternative interpretations could materially impact on the Mineral Resource estimate on a local,
but not global basis. No alternative interpretations were adopted at this stage of the project.

Geological logging in conjunction with assays has been used to interpret the mineralisation. The
interpretation honoured modelled fault planes and interpretation of the main geological
structures.

Mineralization at Jaguar occurs as veins and breccia bodies set in extensively altered and sheared
host rocks. Continuity of the alteration and sulphide mineralisation zones is good, continuity of
local zones of semi-massive to massive sulphide is not always apparent.

Mineralization at the Onça Preta and Onça Rosa deposits predominantly forms tabular semi-
continuous to continuous bodies both along strike and down dip.

Post-mineralisation faulting may offset mineralisation at a smaller scale than that which can be
reliably modelled using the current drill hole data.
Dimensions
Jaguar South (primary mineralisation) covers an area of 1,200m strike length by 400m wide by
500m deep in strike length trending ESE-WNW. Individual domains dip sub-vertically with widths
up to 20-30m.

Jaguar Central (primary mineralisation) covers an area of 800m strike length by 250m wide by 420m
deep trending ESE-WNW. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar North (primary mineralisation) has a strike length of 600m by up to 25m wide by 300m deep,
trending SE-NW.

Jaguar Central North (primary mineralisation) covers an area of 700m strike length by 100m wide
by 500m deep, trending E-W. Individual domains dip sub-vertically with widths up to 20-30m.

Jaguar Northeast (primary mineralisation) covers an area of 1,000m strike length by 300m wide by
420m deep, trending ESE-WNW. Individual domains dip sub-vertically with widths up to 10-15m.

Jaguar West (primary mineralisation) has a strike length of 1,000m by up to 80m wide by 350m
deep, trending E-W. Individual domains dip sub-vertically with widths up to 10m.

Onça Preta (primary mineralisation) has a strike length of 400m by up to 15m wide by 375m deep,
trendingE-W.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Onça Rosa (primary mineralisation) has a strike length of 500m by up to 10m wide by 250m deep,
trendingESE-WNW
Estimation and modelling
techniques

Grade estimation using Ordinary Kriging (OK) was completed using Geovia Surpac™ software for
Ni, Cu, Co, Fe, Mg, Zn and As.

Drill hole samples were flagged with wire framed domain codes. Sample data were composited to
1m using a using fixed length option and a low percentage inclusion threshold to include all
samples. Most samples (80%) are around 1m intervals in the raw assay data.

Top-cuts were decided by completing an outlier analysis using a combination of methods including
grade histograms, log probability plots and other statistical tools. Based on this statistical analysis
of the data population, no top-cuts were applied.

Directional variograms were modelled by domain using traditional variograms. Nugget values are
low to moderate (around 15-25%) and structure ranges up to 200 in the primary zones. Variograms
for domains with lesser numbers of samples were poorly formed and hence variography was
applied from the higher sampled domains.

Block model was constructed with parent blocks for 10m (E) by 2m (N) by 10m (RL). All estimation
was completed to the parent cell size.

Three estimation passes were used. The first pass had a limit of 75m, the second pass 150m and
the third pass searching a large distance to fill the blocks within the wire framed zones. Each pass
used a maximum of 12 samples, a minimum of 6 samples and maximum per hole of 4 samples.

Search ellipse sizes were based primarily on a combination of the variography and the trends of
the wire framed mineralized zones. Hard boundaries were applied between all estimation domains.

Validation of the block model included a volumetric comparison of the resource wireframes to the
block model volumes. Validation of the grade estimate included comparison of block model grades
to the declustered input composite grades plus swath plot comparison by easting and elevation.
Visual comparisons of input compositegrades vs. block modelgrades were also completed.
Moisture
The tonnages were estimated on an in-situ dry bulk density basis which includes natural moisture.
Moisture content was not estimated but is assumed to be low as the core is not visibly porous.
Cut-off parameters
Potential mining methods include a combination of open pit and underground. A revised 0.3% Ni
cut-off grade has been applied to material less than 200m vertical depth from surface in the
estimation of the Global MRE with this being consistent with mineralisation domain modelling and
reported significant intersection cut-off grades. A Ni cut-off grade of 1.0% Ni was maintained below
200m from surface to reflect higher cut-offs expected with potential underground mining.
Mining factors or
assumptions

It is assumed that the Jaguar deposits will be mined by a combination of open pit and underground
mining methods.

Conceptual pit optimisation studies have been completed by Entech to ensure that there are
reasonable prospects for the eventual economic extraction of the mineralisation by these
methods.

Input parameters were benchmarked from similar base-metal operations in Brazil and Australia.
Metallurgical factors or
assumptions

Metallurgical test work has been undertaken on multiple composite samples sourced from the
Jaguar South and Onça Preta deposits. Material selection for test work was focused on providing a
good spatial representation of mineralisation for the deposits.

Bench scale test work to date has demonstrated that a conventional crushing, grinding and
flotation circuit will produce good concentrate grades and metal recoveries, see ASX
Announcements of 18 February 2020 and 31 March 2020 for more detail.
Environmental factors or
assumptions

Tailings analysis and acid drainages tests have been completed which underpin the preliminary
tailing storage facility design (TSF), which is in progress.

Waste rock will be stockpiled into waste dumps adjacent to the mining operation.

The TSF and waste dumps will include containment requirements for the management of
contaminated waters and sediment generation in line with Brazilian environmental regulations.
Bulk density
On the new drilling, bulk densities were determined on 15 to 30 cm drill core pieces every 1m in
ore and every 10m in waste. On the historical drilling the bulk densities were determined on drill
core at each sample submitted for chemical analysis.

Bulk density determinations adopted the weight in air /weight in water method using a suspended
or hanging scale.

The mineralized material is not significantly porous, nor is the waste rock.

A total of 39,313 bulk density measurements have been completed.

Of these, 4,040 were included in the analysis and are within the defined mineralised domains – and
4,031 are from fresh or transitional material leaving only 9 measurements from saprolite or oxide
material.

Oxide and saprolite material are excluded from the reported resource.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Criteria Commentary

Fresh and transitional measurements from within the mineralised domains we analysed
statistically by domain and depth from surface and compared to Ni, Fe and S. A reasonable
correlation was defined against Fe due to the magnetite in the system.

The bulk density values assigned the mineralised domains by oxidation were as follows:

Oxide: 2.0

Saprolite: 2.3

Transition: 2.6

Fresh: by regression against estimated Fe using: BD = (fe_ok*(0.0323)) + 2.6276
Classification
The Mineral Resource has been classified on the basis of confidence in the geological model,
continuity of mineralised zones, drilling density, confidence in the underlying database, a
combination of search volume and number of data used for the estimation plus availability of bulk
density information.

Indicated Mineral Resources are defined nominally on 50mE x 40mN spaced drilling and Inferred
Mineral Resources nominally 100mE x 100mN with consideration given for the confidence of the
continuity of geology and mineralisation.

Oxide and saprolite material are excluded from the Mineral Resource.

The Jaguar Mineral Resource in part has been classified as Indicated with the remainder as Inferred
according to JORC 2012.
Audits or reviews
This is the second Mineral Resource estimate completed by the Company. The current model was
reviewed by Entech as part of their independent mining study.
Discussion of relative
accuracy/ confidence

The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral
Resource as per the guidelines of the 2012 JORC Code.

The statement relates to global estimates of tonnes and grade.