Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CENTAURUS METALS LIMITED Capital/Financing Update 2013

May 30, 2013

64715_rns_2013-05-30_3dc050f8-e5df-4acb-9c39-ab91d83c21d3.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [125 x 57] intentionally omitted <==

31 May 2013

CENTAURUS LAYS NEW GROWTH FOUNDATIONS WITH MAIDEN 27.6Mt JORC RESOURCE FOR CANAVIAL PROJECT

Emerging project located 10km from flagship Jambreiro Project lifts Guanhães Region resource inventory to +150Mt and company‐wide resources to +200Mt

International iron ore company Centaurus Metals Ltd (ASX Code: CTM ) is pleased to advise that it has established a strong foundation for the future growth and expansion of its flagship Jambreiro Project in Brazil after delivering a maiden JORC Mineral Resource for the Canavial Project , a key satellite deposit located 10km to the south‐west of Jambreiro ( Figure 1 ).

The maiden Mineral Resource estimate, of 27.6 million tonnes at an average grade of 30.5% Fe, has boosted the Company’s JORC compliant resource inventory in the Guanhães region of south‐eastern Brazil to over 152 million tonnes and the Company’s total resource inventory in south‐east Brazil to over 201 million tonnes .

Importantly, the new Canavial Resource estimate includes 15.8 million tonnes grading 33.2% Fe of friable itabirite mineralisation , of which 6.1 million tonnes grading 34.1% Fe has already been converted to Indicated Resources.

With the addition of this friable itabirite Resource at Canavial to that of the Jambreiro Project, the friable component of the Company’s Guanhães regional footprint now stands at 81.5 million tonnes grading 28.8% Fe with over 70% of this resource base falling into the Measured and Indicated categories.

Mineral characterization and process testwork is underway focusing on the friable itabirite material at Canavial. Results of this testwork are due by the end of August 2013. The Company expects to be able to achieve similar beneficiation results to those achieved at Jambreiro, such that a high grade, low impurity concentrate can be produced.

The Canavial Project is advantageously located in an area predominantly covered by a eucalypt plantation, which means that environmental licensing for potential future project development will be relatively simple, as was the case with Jambreiro.

The maiden Canavial JORC Mineral Resource estimate is set out in Table 1 below, with additional technical details of the Resource provided in Appendix A attached:

Table 1 – Canavial Project JORC Mineral Resource Estimate by Resource Category – May 2013

Project JORC Category Million Tonnes Fe % SiO2 %
Al2O3 %
P % LOI %
Canavial
Indicated
6.5 33.6 33.6 7.1 0.10 7.9
Inferred 21.1 29.6 38.0 5.7 0.07 5.9
TOTAL 27.6 30.5 37.0 6.0 0.07 6.4
20% Fe Cut‐off

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

The delivery of the Canavial Resource increases the Company’s overall JORC compliant resource inventory in south‐east Brazil to 201.7 million tonnes grading 28.6% Fe , including 152.7 million tonnes grading 27.4% Fe in the Guanhães Region, within 10km of the proposed Jambreiro plant site (see Table 2 below).

Table 2 – Total Mineral Resource Inventory for Centaurus in South East Brazil

Project
Million Tonnes
Fe %
SiO2 %
Al2O3 %
P %
LOI %
Canavial*
27.6
30.5
37.0
6.0
0.07
6.4
Jambreiro*
125.2
26.7
50.2
4.4
0.05
1.5
Guanhães Region
152.7
27.4
47.8
4.7
0.05
2.4
Passabém**
39.0
31.0
53.6
0.8
0.07
0.1
Itambé***
10.0
36.6
39.1
4.0
0.05
2.4
TOTAL
201.7
28.6
48.5
3.9
0.06
2.0
* 20% Fe cut‐off grade applied; ** 27% Fe cut‐off grade applied; *** 25%Fe cut‐off grade applied

* 20% Fe cut‐off grade applied; ** 27% Fe cut‐off grade applied; *** 25%Fe cut‐off grade applied

Table 3 below sets out the different mineralisation types at the Canavial Project, by resource category:

Table 3 – Canavial Mineral Resource Estimate by Mineralisation Type – May 2013

Material
JORC Category
Million
Tonnes
Fe %
SiO2 %
Al2O3 %
P %
LOI %
Friable Itabirite
Indicated
6.1
34.1
32.6
7.2
0.10
8.0
Inferred
9.7
32.6
34.5
8.4
0.07
7.1
TOTAL
15.8
33.2
33.8
7.9
0.08
7.5
Compact Itabirite
Indicated
0.4
26.3
47.1
6.0
0.13
6.5
Inferred
3.0
29.0
43.4
6.1
0.10
5.2
TOTAL
3.4
28.7
43.9
6.1
0.10
5.3
Amphibolitic Itabirite
Indicated
Inferred
8.4
26.3
40.1
2.5
0.05
4.7
TOTAL
8.4
26.3
40.1
2.5
0.05
4.7
Grand Total
Indicated
6.5
33.6
33.6
7.1
0.10
7.9
Inferred
21.1
29.6
38.0
5.7
0.07
5.9
TOTAL
27.6
30.5
37.0
6.0
0.07
6.4
20% Fe Cut‐off

Canavial’s Link to the Jambreiro Project

Given its location just 10km from the Jambreiro Project, Canavial has the potential to provide an additional source of friable itabirite to the Jambreiro Project. Jambreiro itself has a JORC Mineral Resource estimate (combined Measured, Indicated and Inferred) of 125.2 million tonnes grading 26.7% Fe including an Ore Reserve of 48.5 million tonnes grading 28.1% Fe of friable ore .

Recent drilling at Jambreiro has been targeting the conversion of the friable material currently in the Inferred Resource category. The results from this drilling are imminent and an updated resource is expected before the end of June.

Centaurus has commenced detailed engineering works on the Jambreiro Project and recently received the key Installation Licence (LI) for the Project, allowing on‐site construction activity to commence. As outlined earlier this week, Centaurus is targeting production of first iron ore concentrates at Jambreiro by mid‐2014 as it completes potential life‐of‐mine off‐take negotiations with domestic steel customers in Brazil in the coming months.

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

About the Canavial Project

The mineralisation at Canavial is divided into two zones; the Central Zone and the Southern Zone ( see Figure 2 ). The Central Zone mineralisation strikes in a NW‐SE orientation and has a strike extent of approximately 1,000m, dipping between 20 and 45⁰ to the north‐east.

The shallow zones of friable itabirite mineralisation are between 15 to 35m thick and extend over 100m down‐ dip between holes on section (s ee Sections 4 and 5 in Figures 3 and 4 ). The geometry and material characteristics of the Central Zone mineralisation is expected to lend itself to a low strip ratio and has the potential to support a low‐cost open cut operation.

The Southern Zone is a NW‐SE zone with a strike extent of around 700m where the mineralisation is sub‐ vertical ( see Section 10 in Figure 5 ). The change in dip angle is due to the proximity of the nose of a large‐scale fold in the south eastern limit of the tenement area. The zones of friable itabirite mineralisation are between 10 to 20m thick and vertical to sub‐vertical.

The mineral assemblage of the Canavial friable itabirite mineralisation is similar to that of the Jambreiro Project with hematite (probably martite) and magnetite being the dominant iron oxides with quartz and some clay minerals. The main difference to the Jambreiro ore is the higher percentage of goethite and limonite present in the mineralisation. Locally, some shallow mineralised intervals have elevated levels of Al2O3 and P due to the clay minerals.

It is expected that these gangue minerals will clean up in the beneficiation process to produce a high iron, low impurity iron product similar to that which is to be produced at Jambreiro.

Commenting on the maiden resource at Canavial, Centaurus’ Managing Director, Mr Darren Gordon, said: “This is a great result from a standing start at Canavial, with drilling delivering a solid maiden JORC resource which has a significant component of friable itabirite mineralisation similar to what we have 10km down the road at Jambreiro.

“While we still have to complete metallurgical testwork and other studies to progress this Project, all the indications are that it could develop very quickly as a low‐cost bolt‐on growth opportunity for the main processing operation at Jambreiro.

“This highlights the significant exploration upside within the Guanhães region and the opportunities to continue to grow our resource inventory. We have a maiden resource for our other key satellite project in this region, Candonga, due within a month or so and there are many other untested exploration targets within our broader regional tenement holding. We plan to test these in the future, once we have a fully‐fledged mining operation up and running at Jambreiro.”

‐ENDS‐

Released By:

Nicholas Read Read Corporate Mb: (+61) 419 929 046 Tel: (+61‐8) 9388 1474

On behalf of:

Mr Darren Gordon Managing Director Centaurus Metals Ltd Tel: (+61‐8) 9420 4000

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Competent Person’s Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy and Volodymyr Myadzel who is a Member of Australian Institute of Geoscientists. Roger Fitzhardinge is a permanent employee of Centaurus Metals Limited and Volodymyr Myadzel is the Senior Resource Geologist of BNA Consultoria e Sistemas Limited, independent resource consultants engaged by Centaurus Metals.

Roger Fitzhardinge and Volodymyr Myadzel have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve’. Roger Fitzhardinge and Volodymyr Myadzel consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

The information in this report that relates to Ore Reserves is based on information compiled by Beck Nader who is a professional Mining Engineer and a Member of Australian Institute of Geoscientists. Beck Nader is the Managing Director of BNA Consultoria e Sistemas Ltda and is a consultant to Centaurus.

Beck Nader has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve’. Beck Nader consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 1 – Canavial Project Location Map

==> picture [511 x 646] intentionally omitted <==

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 2 – Canavial Iron Ore Project Map – Analytical Signal Mag Image and Drill Results

==> picture [463 x 670] intentionally omitted <==

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 3 – Canavial Iron Ore Project – Schematic Cross Section 4

==> picture [450 x 297] intentionally omitted <==

Figure 4 – Canavial Iron Ore Project – Schematic Cross Section 5

==> picture [450 x 297] intentionally omitted <==

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Figure 5 – Canavial Iron Ore Project – Schematic Cross Section 10

==> picture [461 x 304] intentionally omitted <==

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Appendix A – Details of the Canavial Resource Estimate – May, 2013

Appendix A – Details of the Canavial Resource Estimate – May, 2013
General Information
Project Name Canavial Iron Ore Project
Location Located approximately 170 Km NE of Belo Horizonte and 17Km North of
Guanhães in Minas Gerais, Brazil. Located 10km south west of the
Jambreiro Iron Ore Project.
Geological Description The Canavial Project is located within the Guanhães Group of the
Mantiqueira Complex. The region is structurally complex with duplex fault
systems and complex folding ranging from micro folding in outcrop to large
scale regional deformation.
The Itabirite unit is part of an iron formation including ferruginous
quartzites and quartzites hosted within a metasedimentry sequence. This
sequence is emplaced in regionalgneissic basement.
The Itabirite mineralisation comprises concentrations of medium ‐ coarse
grained friable and compact material that have undergone enrichment.
The mineralisation is composed of quartz, hematite, magnetite, goethite,
limonite, with minor amphibole (Grunerite), Mica (muscovite) and clay
minerals.
Itabirite thicknesses vary from 5m to up to 35m thick within the Central
Zone. Itabirite has been intersected at depths upto 120m.
Spatial Limits of
Resource: Total Resource
Area
714362.5mE to 717387.5mE
7935317.5mN 7938057.5mN
670.0mRL to 952.5mRL(surface)
Resource Base Max depth of 100m from base of drilling.
Responsibilities
Data Collection Centaurus Metals
Data Management Centaurus Metals and BNA Micromine Consultoria
Data Validation Centaurus Metals and BNA Micromine Consultoria
Geological Interpretation Centaurus Metals
Resource Modelling BNA Micromine Consultoria
Geological Interpretation
Geological Software Micromine 12.5
Lithological Boundaries Boundaries defined through Geological loggingand chemical analysis
Mineralisation
Boundaries
Boundaries defined through Geological logging and chemical analysis
Material Type Boundaries Material types defined through Geotechnical logging. In particular, friability
tests.

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

& MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Bulk Density Measurements Bulk Density Measurements Bulk Density Measurements Bulk Density Measurements Bulk Density Measurements
Method The bulk density for the resource estimation is assumed based
on the knowledge of the regional geology and the similarity to
the mineralisation seen at the Jambreiro Project. No bulk
densitymeasurements were taken as all drillingwas RC.
Bulk Density Values(t/m3)
**Material Type ** Itabirite Itabirite Amphibolitic
Compact 3.0 3.0
Friable 2.3 2.3
Semi Friable 2.6 2.6
Colluvium 2.3
Drilling
Holes Metres
RC 35 3,195
Total 35 3,195
Survey
Grid System SAD_69 23S
Collar Survey Total surveycollars for all drill holes
DH Survey No down hole surveys have been completed
Sampling
Type and Method 1m samples for RC
RC One metre samples. Samples homogenised after leaving cyclone and split.
Sample Preparation and Chemical Analysis
Laboratory Samplepreparation carried out at Intertek's samplepreparation lab in BH
Analysis ofpulps carried out in Intertek's analysis lab in Sao Paulo
Physical Sample Prep
RC Drying, Crushing, Pulverising, Splitting
Analytical Method Metal Oxide determination through X‐RAY Florescence (XR21L) Oxide and
elemental analyses including Fe, SiO2, Al2O3,P, Mn, TiO2, CaO, MgO, K2O, Na2O
and Cr2O3. FeO by a Volumetric Determination (VL3) and LOI using Loss
Determination by Gravity
Elements Fe, SiO2, Al2O3,P, Mn, TiO2, CaO, MgO, K2O, Na2O, Cr2O3and FeO
QAQC At total of 190 control samples were used including 106 Duplicate, 84
Standards. Standards inserted every 50 samples, duplicates every 20.

==> picture [510 x 79] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [52 x 33] intentionally omitted <==

Block Model Parameters Block Model Parameters Block Model Parameters Block Model Parameters
Estimation Method Inverse distance squared(ID2)
Y X Z
Parent Block Sizes 50m 50m 10m
Sub Block Sizes 5m 5m 5m
Attributes:
Rock_code (Itb_F,Itb_C and Waste)
OB Model Name
Fe% Fe Grade,ID2
**SiO2% ** SiO2% Grade,ID2
**Al2O3% ** Al2O3% Grade,ID2
P% P% Grade,ID2
Mn% Mn% Grade,ID2
TiO2% TiO2% Grade,ID2
CaO% CaO% Grade,ID2
MgO% MgO% Grade,ID2
K2O% K2O% Grade,ID2
Cr2O3% Cr2O3% Grade,ID2
LOI% LOI,ID2
FeO% FeO% Grade,ID2
CLASS Resource Classification Class
Density Bulk Densityof Itb_C, Itb_F and waste

==> picture [510 x 79] intentionally omitted <==