CENTAURUS METALS LIMITED Capital/Financing Update 2012

Apr 16, 2012

64715_rns_2012-04-16_31947892-d0cb-439f-8272-71634a947b61.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

17 April 2012

==> picture [143 x 70] intentionally omitted <==

STRONG DRILLING RESULTS TO UNDERPIN FEASIBILITY STUDY ON JAMBREIRO IRON ORE PROJECT

RESOURCE UPGRADE DUE NEXT MONTH AS CENTAURUS PUSHES TOWARDS FIRST PRODUCTION IN LATE 2013

International iron ore company Centaurus Metals Limited (ASX Code: CTM ) is pleased to report that the Bankable Feasibility Study on its 100 per cent-owned Jambreiro Iron Ore Project in Brazil has been strengthened by outstanding results from the recently completed RC in-fill drilling campaign.

The results, which are the first received from the in-fill program, highlight the quality and consistency of the key Tigre and Cruzeiro deposits. These deposits will be the basis of Jambreiro’s initial development ahead of production at the end of next year.

The current JORC Resource estimate at Jambreiro stands at 116.5 million tonnes grading 26.8% Fe (Measured, Indicated and Inferred). The in-fill program has strengthened the Company’s confidence in the resource and will lead to an up-grade of the resource by the end of May. This upgrade will focus primarily on upgrading the respective categories of the resource, rather than increasing the overall quantity.

This revised resource will form the basis of the Bankable Feasibility Study (BFS), which is underway.

Recently completed pilot plant testwork has shown that the friable itabirite ore, with a head grade consistent with the overall Resource base, can be upgraded to a 65.6% Fe product with low impurities (2.8% SiO2, 0.9% Al2O3 and 0.01% P) using a simple magnetic separation process.

The first results from the in-fill program include a continuous interval of 106.0 metres at 30.7% Fe from 27.0 metres in drill hole JBR-RC-12-0114. This intersection represents the widest continuous interval recorded to date at the project.

The in-fill drilling program focussed on the mineralisation which will underpin the first four years of production from the Tigre and Cruzeiro Deposits.

The Tigre Deposit

Highlights of the recent results from the Tigre Deposit (Figure 1) include the following continuous intervals ( see attached Appendix A for a full list of recent drilling intersections from the Tigre Deposit ):

  • 106.0 metres @ 30.7% Fe, 3.6% Al2O3 and 0.03% P from 27.0 metres in Hole JBR-RC-12-0114

  • 87.0 metres @ 32.3% Fe, 4.3% Al2O3 and 0.04% P from 23.0 metres in Hole JBR-RC-12-0118

  • 59.0 metres @ 32.9% Fe, 3.8% Al2O3 and 0.03% P from 15.0 metres in Hole JBR-RC-12-0121

  • 55.0 metres @ 34.2% Fe, 1.9% Al2O3 and 0.03% P from surface in Hole JBR-RC-12-0120

  • 53.0 metres @ 32.7% Fe, 4.0% Al2O3 and 0.03% P from 49.0 metres in Hole JBR-RC-12-0122

  • 45.0 metres @ 35.5% Fe, 2.8% Al2O3 and 0.04% P from 15.0 metres in Hole JBR-RC-12-0137

  • 38.0 metres @ 36.9% Fe, 3.5% Al2O3 and 0.02% P from surface in Hole JBR-RC-12-0138

  • 33.0 metres @ 39.6% Fe, 2.9% Al2O3 and 0.05% P from 24.0 metres in Hole JBR-RC-12-0123

  • 30.0 metres @ 38.5% Fe, 2.6% Al2O3 and 0.04% P from 7.0 metres in Hole JBR-RC-12-0140

  • 22.0 metres @ 38.8% Fe, 3.2% Al2O3 and 0.03% P from surface in Hole JBR-RC-12-0136

==> picture [508 x 75] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [63 x 48] intentionally omitted <==

Many holes contain particularly wide intersections of a higher grade nature than seen in previous drilling. Drill holes JBR-RC-12-0114 (106.0m at 30.7% Fe) and JBR-RC-12-0118 (87.0m at 32.3% Fe) in particular demonstrate excellent continuity of wide and relatively high-grade friable ore from near surface in the heart of the Tigre Deposit.

The southern extension of the Tigre Deposit continues to deliver higher grade friable mineralisation from surface, demonstrated in drill holes JBR-RC-12-0138 (38.0m at 36.9% Fe) and JBR-RC-12-0136 (22.0m at 38.8% Fe). This zone continues to present the best start up option for mining, with higher grades of ore at or near surface with favourable strip ratios.

The Cruzeiro Deposit

Highlights of the recent results from the Cruzeiro Deposit (Figure 1) include the following continuous intervals ( see attached Appendix B for a full list of recent drilling intersections from the Cruzeiro Deposit ):

  • 30.0 metres @ 33.9% Fe, 2.3% Al2O3 and 0.02% P from surface in Hole JBR-RC-12-0127

  • 27.0 metres @ 36.0% Fe, 3.3% Al2O3 and 0.03% P from 4.0 metres in Hole JBR-RC-12-0128  24.0 metres @ 33.3% Fe, 5.1% Al2O3 and 0.07% P from 6.0 metres in Hole JBR-RC-12-0125  22.0 metres @ 32.7% Fe, 1.5% Al2O3 and 0.01% P from surface in Hole JBR-RC-12-0126

Results from the Cruzeiro Deposit continue to highlight the shallow, relatively high-grade nature of the deposit. The mineralisation at Cruzeiro dips sub-parallel to the natural surface and when combined with the southern extension of the Tigre Deposit will provide excellent low strip ratio material for the planned startup of mining.

Resource and BFS Study Up-date

All resource drilling at the Jambreiro Project was completed in March. The drilling will convert the majority of the mineralisation earmarked for the first four years of production into JORC Measured Resources, comprehensively covering the estimated two-year project payback period.

All drill samples have now been submitted to the Intertek laboratory with results expected by early May. The Company is well advanced in the data validation and geological interpretation of the deposits at Jambreiro and the new JORC Resource estimate is on schedule to be completed by the end of May.

A comprehensive program of metallurgical sampling was undertaken at the start of the year with samples covering the quarter-by-quarter current mining sequence for the first four years of production. Following the successful initial pilot plant program referred to above, a significantly larger sample of Jambreiro ore is now being prepared for an extended pilot plant test work program.

The new JORC Resource base will form the platform for a new JORC Ore Reserve estimate and mine planning that will feed into the Jambreiro BFS which is underway and due for completion in September 2012.

A diamond rig has been mobilized to the Jambreiro Project to start the geotechnical drill program required as part of the BFS. Centaurus has engaged WALM Engenharia e Tecnologia Ambiental Ltda to supervise the geotechnical drilling and provide input into the BFS on geotechnical, water and waste management matters. WALM is a Brazilian based engineering group with extensive experience in engineering, design and execution studies of several mines in the Iron Quadrangle region of Brazil that have similar characteristics to the Jambreiro project.

==> picture [508 x 69] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [63 x 48] intentionally omitted <==

Centaurus’ Managing Director, Mr Darren Gordon, said the latest results were outstanding and would further strengthen the economics of the Jambreiro Project.

The widths and grade of mineralisation coming from the friable ore are particularly encouraging and provide great confidence that we have a resource base that will form the foundation of a long life mining operation,” Mr Gordon said.

“The pilot plant work has shown that we can produce a high-grade sinter product from the Jambreiro ore that will be highly sought after in the domestic steel industry in Brazil. The BFS that is underway is expected to confirm the strong economics that were delivered in the Pre-Feasibility completed in November last year.”

-ENDS-

Released By: Paul Armstrong Read Corporate Mb: (+61) 421 619 084 Tel: (+61-8) 9388 1474

On behalf of:

Mr Darren Gordon Managing Director Centaurus Metals Ltd Tel: (+61-8) 9420 4000

Competent Person’s Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy and Volodymyr Myadzel who is a Member of Australian Institute of Geoscientists. Roger Fitzhardinge is a permanent employee of Centaurus Metals Limited and Volodymyr Myadzel is the Senior Resource Geologist of BNA Consultoria e Sistemas Limited, independent resource consultants engaged by Centaurus Metals.

Roger Fitzhardinge and Volodymyr Myadzel have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve’. Roger Fitzhardinge and Volodymyr Myadzel consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

==> picture [508 x 69] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Figure 1 – Jambreiro Prospect Map with Recent Results

==> picture [464 x 656] intentionally omitted <==

==> picture [508 x 69] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Appendix A – Jambreiro Iron Ore Project – Tigre Deposit - New RC Hole Results – April 2012

DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- TIGRE DEPOSIT- JAMBREIRO- RC
Hole ID SAD East SAD **North ** mRL Dip Azi Final
Depth(m)
From (m) To (m) Downhole
width(m)
Fe% SiO2% Al2O3% P%
JBR-RC-12-000109
JBR-RC-12-000109 722021 794 5328 865 -60 30 110 NO SIGNIFICANT INTERSECTION
JBR-RC-12-000110 12.00 23.00 11.00 34.11 48.99 1.81 0.04
JBR-RC-12-000110 36.00 50.00 14.00 35.68 46.65 1.50 0.05
JBR-RC-12-000110 721998 794 5287 867 -60 30 50 Downhole composite 25.00 34.99 47.68 1.64 0.05
JBR-RC-12-000111
JBR-RC-12-000111 721975 794 5246 866 -60 30 50 NO SIGNIFICANT INTERSECTION
JBR-RC-12-000112 6.00 18.00 12.00 28.05 52.58 4.74 0.03
JBR-RC-12-000112 722102 794 5066 894 -60 30 50 Downhole composite 12.00 28.05 52.58 4.74 0.03
JBR-RC-12-000113 1.00 22.00 21.00 25.66 56.95 4.07 0.03
JBR-RC-12-000113 722076 794 5024 891 -60 30 30 Downhole composite 21.00 25.66 56.95 4.07 0.03
JBR-RC-12-000114 0.00
7.00
7.00 28.84 48.79 5.91 0.04
JBR-RC-12-000114 27.00 133.00 106.00 30.73 50.42 3.63 0.03
JBR-RC-12-000114 722153 794 5151 901 -60 30 140 Downhole composite 113.00 30.62 50.32 3.77 0.03
JBR-RC-12-000115
JBR-RC-12-000115 722179 794 5194 901 -60 30 30 NO SIGNIFICANT INTERSECTION
JBR-RC-12-000116 0.00 18.00 18.00 33.05 46.56 3.66 0.04
JBR-RC-12-000116 722127 794 5109 899 -60 30 30 Downhole composite 18.00 33.05 46.56 3.66 0.04
JBR-RC-12-000117
JBR-RC-12-000117
JBR-RC-12-000117
0.00
8.00
10.00
18.00
19.00
29.00
8.00
8.00
10.00
24.80
30.88
22.29
54.42
53.75
60.26
6.02
1.65
5.41
0.04
0.02
0.02
JBR-RC-12-000117 722050 794 4981 887 -60 30 45 Downhole composite 26.00 25.70 56.46 4.44 0.03
JBR-RC-12-000118 23.00 110.00 87.00 32.29 46.46 4.30 0.04
JBR-RC-12-000118 722321 794 5059 935 -60 40 110 Downhole composite 87.00 32.29 46.46 4.30 0.04
JBR-RC-12-000119
JBR-RC-12-000119
0.00
4.00
18.00
23.00
4.00
5.00
30.65
21.58
45.12
61.80
7.25
5.04
0.03
0.02
JBR-RC-12-000119 722345 794 5105 929 -60 40 40 Downhole composite 9.00 25.61 54.39 6.02 0.02
JBR-RC-12-000120 0.00 55.00 55.00 34.18 48.40 1.88 0.03
JBR-RC-12-000120 722520 794 4990 957 -60 30 55 Downhole composite 55.00 34.18 48.40 1.88 0.03
JBR-RC-12-000121
JBR-RC-12-000121
JBR-RC-12-000121
15.00
74.00
77.00
81.00
85.00
98.00
59.00
4.00
13.00
32.95
29.84
35.62
47.54
54.10
40.25
3.78
1.97
5.60
0.03
0.04
0.05
JBR-RC-12-000121 722488 794 4949 972 -70 35 100 Downhole composite 76.00 33.25 46.63 3.99 0.04
JBR-RC-12-000122
JBR-RC-12-000122
JBR-RC-12-000122
JBR-RC-12-000122
23.00
26.00
30.00
43.00
49.00
102.00
108.00
112.00
3.00
13.00
53.00
4.00
26.01
30.53
32.66
24.47
61.16
52.40
47.93
55.95
1.59
3.04
4.01
6.16
0.01
0.02
0.03
0.07
JBR-RC-12-000122 722588 794 4783 1013 -60 50 120 Downhole composite 73.00 31.56 49.71 3.85 0.03
JBR-RC-12-000123
JBR-RC-12-000123
0.00
16.00
24.00
57.00
16.00
33.00
32.39
39.60
46.82
38.90
4.77
2.94
0.02
0.05
JBR-RC-12-000123 722625 794 4816 1004 -60 50 90 Downhole composite 49.00 37.25 41.49 3.54 0.04
JBR-RC-12-000135 25.00
30.00
5.00 26.98 54.42 4.84 0.03
JBR-RC-12-000135 721939 794 5181 864 -60 30 45 Downhole composite 5.00 26.98 54.42 4.84 0.03
JBR-RC-12-000136 0.00
22.00
22.00 38.76 39.74 3.19 0.03
JBR-RC-12-000136 722760 794 4589 1008 -60 60 50 Downhole composite 22.00 38.76 39.74 3.19 0.03
JBR-RC-12-000137
JBR-RC-12-000137
0.00
3.00
15.00
60.00
3.00
45.00
21.77
35.55
56.82
45.35
8.15
2.78
0.04
0.04
JBR-RC-12-000137 722690 794 4560 984 -60 60 75 Downhole composite 48.00 34.69 46.06 3.12 0.04
JBR-RC-12-000138 0.00
38.00
38.00 36.86 42.57 3.53 0.02
JBR-RC-12-000138 722795 794 4463 987 -60 60 50 Downhole composite 38.00 36.86 42.57 3.53 0.02
JBR-RC-12-000140
JBR-RC-12-000140
JBR-RC-12-000140
0.00
3.00
7.00
37.00
43.00
50.00
3.00
30.00
7.00
31.04
38.52
24.36
50.30
40.56
60.55
3.47
2.56
3.63
0.08
0.04
0.01
JBR-RC-12-000140 722751 794 4441 962 -60 60 60 Downhole composite 40.00 35.48 44.79 2.81 0.04

==> picture [508 x 69] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Appendix B – Jambreiro Iron Ore Project – Cruzeiro Deposit - New RC Hole Results – April 2012

DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- CRUZEIRO DEPOSIT- JAMBREIRO- RC
Hole ID SAD East SA **D North ** mRL Dip Azi Final
Depth(m)
From (m) To (m) Downhole
width(m)
Fe% SiO2% Al2O3% P%
JBR-RC-12-000124
JBR-RC-12-000124
0.00
16.00
24.00
27.00
16.00
3.00
34.58
30.55
48.55
51.98
1.50
3.07
0.02
0.04
JBR-RC-12-000124 723056 79 44903 964 -80 70 40 Downhole composite 19.00 33.95 49.09 1.75 0.02
JBR-RC-12-000125
JBR-RC-12-000125
6.00
30.00
34.00
49.00
24.00
15.00
33.31
29.92
43.82
52.59
5.06
2.96
0.07
0.04
JBR-RC-12-000125 723010 79 44885 952 -80 70 65 Downhole composite 39.00 32.01 47.19 4.25 0.06
JBR-RC-12-000126
JBR-RC-12-000126
0.00
22.00
36.00
40.00
22.00
4.00
32.73
20.77
51.23
35.00
1.54
21.72
0.01
0.10
JBR-RC-12-000126 723017 79 45027 951 -60 75 50 Downhole composite 26.00 30.89 48.73 4.65 0.03
JBR-RC-12-000127 0.00
30.00
30.00 33.92 48.35 2.31 0.02
JBR-RC-12-000127 722969 79 45016 945 -60 75 50 Downhole composite 30.00 33.92 48.35 2.31 0.02
JBR-RC-12-000128
JBR-RC-12-000128
4.00
31.00
39.00
44.00
27.00
5.00
36.00
24.24
42.66
52.25
3.34
5.29
0.03
0.03
JBR-RC-12-000128 722918 79 45004 927 -60 75 65 Downhole composite 32.00 34.16 44.15 3.65 0.03
JBR-RC-12-000129
JBR-RC-12-000129 723018 79 45165 927 -60 75 20 NO SIGNIFICANT INTERSECTION
JBR-RC-12-000130 0.00
6.00
6.00 28.55 55.58 2.58 0.02
JBR-RC-12-000130 722970 79 45151 923 -60 75 30 Downhole composite 6.00 28.55 55.58 2.58 0.02
JBR-RC-12-000131 0.00
15.00
15.00 31.33 52.53 1.93 0.03
JBR-RC-12-000131 722920 79 45137 915 -60 75 45 Downhole composite 15.00 31.33 52.53 1.93 0.03
JBR-RC-12-000132 8.00
21.00
13.00 31.25 53.28 1.40 0.02
JBR-RC-12-000132 722872 79 45123 901 -60 75 35 Downhole composite 13.00 31.25 53.28 1.40 0.02
JBR-RC-12-000133
JBR-RC-12-000133 722936 79 45266 890 -90 0 13 NO SIGNIFICANT INTERSECTION
JBR-RC-12-000134
JBR-RC-12-000134 722890 79 45252 883 -90 0 15 NO SIGNIFICANT INTERSECTION

Intervals calculated using a 20% Fe cut-off grade with 3 metre minimum mining width All samples were analysed using an XRF fusion method with LOI at 1000[0] C