AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

16 September 2011

==> picture [143 x 70] intentionally omitted <==

CENTAURUS ON TRACK FOR JAMBREIRO RESOURCE UPGRADE FOLLOWING FURTHER STRONG DRILL RESULTS

ALL RESULTS RECEIVED FROM RECENT DRILLING – RESOURCE UPGRADE EXPECTED BY END OF SEPTEMBER

International iron ore company Centaurus Metals Limited (ASX Code: CTM ) is pleased to report that the final batch of results from recently completed drilling at its flagship Jambreiro Iron Ore Project have provided further support for the quality and consistency of mineralisation, paving the way for a resource upgrade and advancement of a future mining operation.

Resource estimation work is well underway with an upgrade of the current JORC Resource estimate (combined Measured, Indicated and Inferred) of 70.6 million tonnes at an average grade 28.0% Fe on track to be completed by the end of September 2011.

The Tigre Deposit

Highlights of the recent results from the Tigre Deposit ( Figure 1 ) include the following continuous intervals ( see attached Appendices A & B for a full list of recent drilling intersections from the Jambreiro Project ):

  • 45.5 metres @ 27.9% Fe, 1.6% Al2O3 and 0.05% P from 89.1 metres in Hole JBR-DD-11-0050

  • 53.8 metres @ 29.1% Fe, 1.4% Al2O3 and 0.04% P from 78.6 metres in Hole JBR-DD-11-0051  54.1 metres @ 26.2% Fe, 2.3% Al2O3 and 0.06% P from 121.2 metres in Hole JBR-DD-11-0052

These results will allow some of the existing resource, currently classified as Inferred but within the current pit design, to be upgraded to the Indicated category ahead of the completion of Pre-Feasibility Study work.

The South East Extension Zone

Highlights of the recent results from the South East Extension Zone of the Tigre Deposit ( Figure 1 ) include the following continuous intervals:

  • 43.0 metres @ 30.4% Fe, 0.7% Al2O3 and 0.06% P from 37.0 metres in Hole JBR-DD-11-0045

  • 11.2 metres @ 41.1% Fe, 3.8% Al2O3 and 0.03% P from surface in Hole JBR-DD-11-0049  36.0 metres @ 29.8% Fe, 2.3% Al2O3 and 0.05% P from 44.0 metres in Hole JBR-RC-11-0098  17.0 metres @ 34.5% Fe, 4.4% Al2O3 and 0.05% P from 10.0 metres in Hole JBR-RC-11-0099  13.0 metres @ 42.8% Fe, 3.9% Al2O3 and 0.03% P from surface in Hole JBR-RC-11-0100

These new results further confirm the friable nature of the mineralisation in the South East Extension Zone and clearly demonstrate the extension of the Tigre Resource into this Zone. The results also provide further support for the South East Extension Zone Exploration Target[1 ] of 20-30 million tonnes at a grade of 28-33% Fe , which is expected to be converted to resource and added to the existing Tigre Resource estimate (Measured, Indicated and Inferred Resource of 61.2Mt grading 27.7% Fe ) by the end of September 2011.

1 Note: It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information above relating to the exploration target should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resources have not been used in this context. The potential quantity and grade range is conceptual in nature, since there has been insufficient exploration to define a Mineral Resource. It is uncertain if further exploration will result in the determination of a Mineral Resource.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [63 x 48] intentionally omitted <==

Existing beneficiation test work results on friable itabirite mineralisation of similar grade to the Exploration Target has shown that a high grade (+65% Fe) hematite product can be produced at a mass recovery of approximately 45% to 50%.

The mineralised zone in the South East Extension Zone is generally of a higher grade nature when compared to the main Tigre Deposit and dips sub-parallel to the natural surface making it an ideal area for the start of future mining activities.

The Cruzeiro, Galo & Coelho Prospects

Drilling of the Cruzeiro, Galo and Coelho Prospects at Jambreiro is also now complete. Highlights of the final results include the following continuous intervals:

Cruzeiro Prospect

  • 27.8 metres @ 32.8% Fe, 1.43% Al2O3 and 0.03% P from 23.8 metres in Hole JBR-DD-11-0040

  • 34.1 metres @ 33.4% Fe, 3.4% Al2O3 and 0.05% P from 6.9 metres in Hole JBR-DD-11-0042

  • 28.5 metres @ 28.8% Fe, 0.8% Al2O3 and 0.05% P from 32.4 metres in Hole JBR-DD-11-0046

Galo Prospect

  • 15.0 metres @ 34.5% Fe, 2.9% Al2O3 and 0.01% P from 11.0 metres in Hole JBR-RC-11-0094

  • 37.0 metres @ 29.5% Fe, 7.0% Al2O3 and 0.06% P from 13.0 metres in Hole JBR-RC-11-0095

Coelho Prospect

  • 16.0 metres @ 31.8% Fe, 1.6% Al2O3 and 0.02% P from surface in Hole JBR-RC-11-0074

New results continue to confirm the continuity of friable mineralisation at the Cruzeiro Prospect with consistent widths of 30-35 metres in the main zone of the Prospect. The Galo Prospect returned an exciting intersection with one of the final drill holes delivering 37 metres at a grade of 29.5% Fe. The mineralisation of both the Cruzeiro and Galo Prospects dip sub-parallel to the natural surface and is friable from surface, which allows both prospects to be considered as shallow open pit options in a future mining operation.

Resource & Pre-Feasibility Study Up-date

As all final assay data has now been received and Centaurus is well advanced with the process of data validation and geological interpretation, the JORC Resource estimate is on schedule to be completed by the end of September.

Based on the assay results from the South East Extension Zone, it is expected that the Company will be able to significantly increase the overall Resource base at Jambreiro with this new resource forming the platform for the Pre-Feasibility study which is due in November.

Centaurus’ Managing Director Mr Darren Gordon, said: “ With the receipt of all outstanding assay data for the Project, we can now progress the finalisation of the Resource upgrade ahead of new pit optimisation and mine scheduling work for the Pre-Feasibility Study to be delivered by mid-November. All of the Prospects at Jambreiro host a large proportion of friable mineralisation, which will provide the Project with significant operational benefits at the start of future mining activities due to low operating costs”.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [63 x 48] intentionally omitted <==

-ENDS-

Released By: Nicholas Read Read Corporate Mb: (+61) 419 929 046 Tel: (+61-8) 9388 1474

On behalf of:

Mr Darren Gordon Managing Director Centaurus Metals Ltd Tel: (+61-8) 9420 4000

Competent Person’s Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Roger Fitzhardinge who is a Member of the Australasia Institute of Mining and Metallurgy and Volodymyr Myadzel who is a Member of Australian Institute of Geoscientists. Roger Fitzhardinge is a permanent employee of Centaurus Metals Limited and Volodymyr Myadzel is the Senior Resource Geologist of BNA Consultoria e Sistemas Limited, independent resource consultants engaged by Centaurus Metals.

Roger Fitzhardinge and Volodymyr Myadzel have sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve’. Roger Fitzhardinge and Volodymyr Myadzel consent to the inclusion in the report of the matters based on their information in the form and context in which it appears.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Figure 1 – Jambreiro Prospect Map with Recent Results

==> picture [471 x 665] intentionally omitted <==

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Appendix A – Jambreiro Iron Ore Project - New Diamond Drill Hole Results – September 2011

DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH DOWN-HOLE INTERSECTIONS- JAMBREIRO- DDH
Hole ID SAD East SAD North mRL Dip Azi Final
Depth(m)
From (m) To (m) Downhole
width(m)
Fe% SiO2% Al2O3% P%
JBR-DD-11-00037
JBR-DD-11-00037
0.00
47.00
10.00
58.00
10.00
11.00
29.35
30.60
48.88
54.21
5.80
1.40
0.02
0.02
JBR-DD-11-00037 722315 7944003 906 -70 60 76.20 Downhole composite 21.00 30.00 51.67 3.50 0.02
JBR-DD-11-00038 67.00 76.85 9.85 24.17 57.24 3.03 0.13
JBR-DD-11-00038 722959 7944757 966 -70 56 110.00 Downhole composite 9.85 24.17 57.24 3.03 0.13
JBR-DD-11-00039 30.00 43.25 13.25 33.72 40.66 6.30 0.05
JBR-DD-11-00039 722653 7945718 925 -70 50 60.20 Downhole composite 13.25 33.72 40.66 6.30 0.05
JBR-DD-11-00040 23.80 51.65 27.85 32.82 49.95 1.43 0.03
JBR-DD-11-00040 722914 7944945 926 -60 75 64.25 Downhole composite 27.85 32.82 49.95 1.43 0.03
JBR-DD-11-00041 21.35 25.30 3.95 28.25 47.77 7.16 0.04
JBR-DD-11-00041 722009 7945100 884 -60 30 95.95 Downhole composite 3.95 28.25 47.77 7.16 0.04
JBR-DD-11-00042 6.95 41.00 34.05 33.43 46.36 3.36 0.05
JBR-DD-11-00042 722978 7944955 955 -60 75 85.00 Downhole composite 34.05 33.43 46.36 3.36 0.05
JBR-DD-11-00044
JBR-DD-11-00044
3.10
22.16
12.97
25.72
9.87
3.56
26.59
24.58
50.61
33.46
6.69
6.76
0.03
0.02
JBR-DD-11-00044 722860 7945190 894 -60 75 71.15 Downhole composite 13.43 26.06 46.07 6.71 0.03
JBR-DD-11-00045 37.00 80.00 43.00 30.39 49.42 0.74 0.06
JBR-DD-11-00045 722821 7944156 947 -80 60 112.95 Downhole composite 43.00 30.39 49.42 0.74 0.06
JBR-DD-11-00046 32.41 60.94 28.53 28.78 56.25 0.77 0.05
JBR-DD-11-00046 722852 7945053 906 -70 75 73.70 Downhole composite 28.53 28.78 56.25 0.77 0.05
JBR-DD-11-00047
JBR-DD-11-00047
0.00
125.00
5.00
128.00
5.00
3.00
20.27
27.01
49.05
51.13
13.13
1.33
0.06
0.06
JBR-DD-11-00047 722720 7944293 918 -80 60 163.70 Downhole composite 8.00 22.80 49.83 8.70 0.06
JBR-DD-11-00048 123.45 147.21 23.76 29.77 51.77 1.19 0.05
JBR-DD-11-00048 722334 7944875 943 -60 30 170.00 Downhole composite 23.76 29.77 51.77 1.19 0.05
JBR-DD-11-00049 0.00 11.20 11.20 41.07 34.33 3.79 0.03
JBR-DD-11-00049 722881 7944077 920 -80 60 40.20 Downhole composite 11.20 41.07 34.33 3.79 0.03
JBR-DD-11-00050 89.12 134.60 45.48 27.88 48.36 1.56 0.05
JBR-DD-11-00050 722567 7944659 1008 -70 30 161.40 Downhole composite 45.48 27.88 48.36 1.56 0.05
JBR-DD-11-00051 78.55 132.37 53.82 29.08 48.81 1.37 0.04
JBR-DD-11-00051 722623 7944581 999 -70 60 150.00 Downhole composite 53.82 29.08 48.81 1.37 0.04
JBR-DD-11-00052¹
JBR-DD-11-00052¹
121.20
180.12
175.30
187.80
54.10
7.68
26.22
24.76
49.51
58.18
2.34
3.82
0.06
0.05
JBR-DD-11-00052¹ 722335 7944877 943 -70 30 200.80 Downhole composite 61.78 26.04 50.58 2.53 0.06

Intervals calculated using a 20% Fe cut-off grade with 3 metre minimum mining width All samples were analysed using an XRF fusion method with LOI at 1000[0] C 1 Drill hole JBR-DD-11-00052 is a re-drill of drill hole JBR-DD-11-00048.

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT & MEDIA RELEASE

==> picture [63 x 48] intentionally omitted <==

Appendix B – Jambreiro Iron Ore Project - New RC Drill Hole Results – September 2011

DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC
Hole ID SAD East **SAD North ** mRL Dip Azi Final
Depth(m)
From (m) To (m) Downhole
width(m)
Fe% SiO2% Al2O3% P%
JBR-RC-11-00072 29.00 37.00 8.00 29.10 39.58 10.52 0.06
JBR-RC-11-00072 721972 7946388 931 -70 50 60.00 Downhole composite 8.00 29.10 39.58 10.52 0.06
JBR-RC-11-00073 0.00 19.00 19.00 31.16 65.89 5.10 0.03
JBR-RC-11-00073 722168 7944979 905 -60 30 50.00 Downhole composite 19.00 31.16 65.89 5.10 0.03
JBR-RC-11-00074 0.00 16.00 16.00 31.78 51.67 1.65 0.02
JBR-RC-11-00074 722465 7943893 919 -60 60 60.00 Downhole composite 16.00 31.78 51.67 1.65 0.02
JBR-RC-11-00075 722152 7944366 852 -90 0 20.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00076 0.00 13.00 13.00 25.11 53.48 6.12 0.02
JBR-RC-11-00076 722040 7946462 958 -70 50 30.00 Downhole composite 13.00 25.11 53.48 6.12 0.02
JBR-RC-11-00077 1.00 14.00 13.00 30.40 46.86 5.60 0.02
JBR-RC-11-00077 722082 7946493 969 -90 0 30.00 Downhole composite 13.00 30.40 46.86 5.60 0.02
JBR-RC-11-00078 721845 7945220 850 -60 30 100.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00079
JBR-RC-11-00079
16.00
26.00
23.00
36.00
7.00
10.00
28.09
24.20
54.08
56.89
3.42
5.56
0.03
0.02
JBR-RC-11-00079 721980 7945060 881 -70 30 80.00 Downhole composite 17.00 25.80 55.73 4.68 0.02
JBR-RC-11-00080 722066 7944657 1000 -90 0 100.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00081 0.00 13.00 13.00 24.65 60.49 3.13 0.03
JBR-RC-11-00081 722245 7944575 918 -90 0 140.00 Downhole composite 13.00 24.65 60.49 3.13 0.03
JBR-RC-11-00082 0.00 9.00 9.00 24.02 48.10 10.78 0.03
JBR-RC-11-00082 722840 7944866 946 -70 50 60.00 Downhole composite 9.00 24.02 48.10 10.78 0.03
JBR-RC-11-00083 0.00 15.00 15.00 30.40 53.23 2.16 0.02
JBR-RC-11-00083 722992 7945094 943 -70 75 80.00 Downhole composite 15.00 30.40 53.23 2.16 0.02
JBR-RC-11-00093 74.00
86.00
12.00 23.91 54.17 5.39 0.06
JBR-RC-11-00093 722810 7945030 903 -70 75 110.00 Downhole composite 12.00 23.91 54.17 5.39 0.06
JBR-RC-11-00094 11.00 26.00 15.00 34.49 45.55 2.92 0.01
JBR-RC-11-00094 722770 7945814 972 -70 50 80.00 Downhole composite 15.00 34.49 45.55 2.92 0.01
JBR-RC-11-00095
JBR-RC-11-00095
0.00
13.00
10.00
50.00
10.00
37.00
29.06
29.49
43.41
46.13
9.00
6.98
0.04
0.06
JBR-RC-11-00095 722417 7946019 886 -60 50 80.00 Downhole composite 47.00 29.40 45.55 7.41 0.06
JBR-RC-11-00098 44.00
80.00
36.00 29.77 46.10 2.30 0.05
JBR-RC-11-00098 722986 7944416 969 -70 60 100.00 Downhole composite 36.00 29.77 46.10 2.30 0.05
JBR-RC-11-00099 10.00 27.00 17.00 34.49 45.91 4.38 0.05
JBR-RC-11-00099 723029 7944437 953 -70 60 80.00 Downhole composite 17.00 34.49 45.91 4.38 0.05
JBR-RC-11-00100 0.00 13.00 13.00 42.82 31.58 3.96 0.03
JBR-RC-11-00100 722978 7944128 935 -80 60 55.00 Downhole composite 13.00 42.82 31.58 3.96 0.03
JBR-RC-11-00101 0.00 6.00 6.00 21.52 53.06 9.49 0.03
JBR-RC-11-00101 722864 7945305 877 -70 75 80.00 Downhole composite 6.00 21.52 53.06 9.49 0.03
JBR-RC-11-00102 721647 7945760 908 -70 50 100.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00103 721673 7945852 910 -90 0 70.00 NO SIGNIFICANT INTERSECTION

AUSTRALIAN SECURITIES EXCHANGE ANNOUNCEMENT

==> picture [63 x 48] intentionally omitted <==

& MEDIA RELEASE

Appendix B – Jambreiro Iron Ore Project - New RC Drill Hole Results – September 2011 (continued)

DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC DOWN-HOLE INTERSECTIONS- JAMBREIRO- RC
Hole ID SAD East **SAD North ** mRL Dip Azi Final
Depth(m)
From (m) To (m) Downhole
width(m)
Fe% SiO2% Al2O3% P%
JBR-RC-11-00104 720885 7943903 879 -90 0 100.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00105 722194 7944347 857 -90 0 64.00 NO SIGNIFICANT INTERSECTION
JBR-RC-11-00106 7.00 25.00 18.00 25.23 58.18 3.70 0.03
JBR-RC-11-00106 722144 7944932 900 -80 30 60.00 Downhole composite 18.00 25.23 58.18 3.70 0.03
JBR-RC-11-00107 50.00 55.00 5.00 23.97 59.35 4.30 0.04
JBR-RC-11-00107 721819 7945172 841 -80 30 80.00 Downhole composite 5.00 23.97 59.35 4.30 0.04
JBR-RC-11-00108
JBR-RC-11-00108
0.00
38.00
3.00
47.00
3.00
9.00
22.75
22.94
57.42
62.92
5.25
2.91
0.03
0.03
JBR-RC-11-00108 721954 7945016 875 -80 30 100.00 Downhole composite 12.00 22.89 61.55 3.49 0.03

Intervals calculated using a 20% Fe cut-off grade with 3 metre minimum mining width All samples were analysed using an XRF fusion method with LOI at 1000[0] C