Cemindia Projects Limited — Investor Presentation 2024
Nov 7, 2024
61981_rns_2024-11-07_4397b0b2-6d7e-4a42-8ddb-b5b79f98720e.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [133 x 89] intentionally omitted <==
ITD Cementation India Limited
Dept. of Corporate Services – Corporate Relationship, BSE Limited, Phiroze Jeejeebhoy Towers, Dalal Street, Mumbai 400 001.
National Stock Exchange of India Limited, Listing Department, Exchange Plaza, C-1, Block ‘G’ BandraKurla Complex, Bandra (East), Mumbai 400 051.
Date Our Reference No. Our Contact Direct Line 07[th] November, 2024 SEC/11/2024 RAHUL NEOGI 91 22 67680814 [email protected]
Dear Sirs,
Sub: Unaudited Financial Results for the quarter and half year ended 30[th] September, 2024 Scrip Code No: 509496 (BSE) / ITDCEM (NSE)
Pursuant to Regulation 30 of the Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015 as amended from time to time (Listing Regulations), enclosed please find presentation on Unaudited Financial Results for the quarter and half year ended 30[th] September, 2024.
You are requested to take the same on record. The presentation is being made available on the Company’s website www.itdcem.co.in in accordance with Regulation 46 of the Listing Regulations.
Thanking you,
Yours faithfully, For ITD Cementation India Limited
Rahul Neogi
Digitally signed by Rahul Neogi DN: c=IN, o=Personal, title=6712, pseudonym=AA1033A64D9F053BE262E00B3AA08E8D, 2.5.4.20=d6d0df5445796b87b8d90ab7a54ecb6fa930dd 593fdf12cc80090f398780228b, postalCode=400101, st=Maharashtra, serialNumber=8D2A9ED0DFE2EEF0B6F68C1B48856DD1 03F7E3A97C4B25E6D1B16D812D7260A5, cn=Rahul Neogi Date: 2024.11.07 19:18:10 +05'30'
(RAHUL NEOGI) COMPANY SECRETARY
Encl: as above
ITD Cementation India Limited
Registered & Corporate Office : 9th Floor, Prima Bay, Tower - B, Gate No. 5, Saki Vihar Road, Powai, Mumbai - 400 072. Tel.: 91-22-66931600 Fax : 91-22-66931628 www.itdcem.co.in Corporate Identity Number : L61000M H1978PLC020435
==> picture [60 x 60] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [158 x 6] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [158 x 6] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [158 x 7] intentionally omitted <==
==> picture [160 x 160] intentionally omitted <==
==> picture [96 x 48] intentionally omitted <==
==> picture [252 x 163] intentionally omitted <==
ITD Cementation India Limited Investor Presentation Q2 FY25 / H1 FY25
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
==> picture [112 x 36] intentionally omitted <==
==> picture [142 x 82] intentionally omitted <==
==> picture [75 x 46] intentionally omitted <==
This Presentation is for general information only and may contain statements about expected future events and financial and operating results of ITD Cementation India Limited, which could be forward-looking. By their nature, forward-looking statements require the Company to make assumptions and are subject to inherent risks and uncertainties.
Disclaimer
There is significant risk that the assumptions, predictions and other forward-looking statements may not prove to be accurate. Readers are cautioned not to place undue reliance on forwardlooking statements as a number of factors could cause assumptions, actual future results and events to differ materially from those expressed in the forward-looking statements.
Accordingly, this Presentation is subject to the disclaimer and qualified in its entirety by the assumptions, qualifications and risk factors referred to in this document. This does not purport to be a record of the proceedings of the Analysts & Institutional Investors Conference Call. No part of the Presentation shall be copied or disseminated, in whole or in part, in any manner.
2 ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
==> picture [249 x 333] intentionally omitted <==
01 Company Overview
==> picture [263 x 221] intentionally omitted <==
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
3
Our History
==> picture [792 x 381] intentionally omitted <==
----- Start of picture text -----
Skanska AB
Branch office was Kvaerner ASA acquired ITD, acquired
converted into Cemindia acquired Trafalgar Kvaerner Skanska AB
The Cementation
House Plc. interest in
Company Limited Construction
India subsidiary
Company Limited, (named as renamed as Subsequently, the Group Limited. Skanska
U.K, operated a Cemindia Trafalgar House Company Subsequently, the Cementation India
branch in India
Company Construction changed its Company Limited.
Limited) of The India Limited name to changed its Thereupon, the
Cementation Kvaerner name to Company
Company Limited Cementation Skanska changed its
India Limited name to ITD
Cementation
Cementation
India Limited
India Limited
1931 1994 2001
1978 1998 2005
Over 90 years of rich industry experience
Cem 4
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
Italian-Thai Development Public Company Limited (ITD) – Promoter
-
Amongst the leading infrastructure & construction company in Thailand for over 60 years.
-
Received ‘The Royal Seal of Garuda’ in 1985 - Highest and most honorable achievement for civilian companies in Thailand
-
Global presence in India, Bangladesh, Lao PDR, the Philippines, Vietnam, Africa etc.
-
Access to the latest technology and know-how, international design and engineering as well as skilled personnel to augment our local strength.
==> picture [314 x 295] intentionally omitted <==
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
==> picture [59 x 4] intentionally omitted <==
----- Start of picture text -----
Commitment, Reliability, Quality
----- End of picture text -----
5
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Area of Operations
==> picture [719 x 214] intentionally omitted <==
----- Start of picture text -----
URBAN INFRASTRUCTURE, HIGHWAYS, BRIDGES AND
MARITIME STRUCTURES
MRTS AND AIRPORTS FLYOVERS
----- End of picture text -----
- Jetty, Dolphins, Berths &
Wharfs
-
Ship lift, Dry Dock, Wet Basin
-
Breakwater, Piled approach
-
Elevated Metro
-
Underground Metro
-
Station Buildings and Track work
-
Integrated Passenger Terminal
-
National Highways
-
River Bridges
-
Flyovers
-
Pre-stressed Box Girders
-
Dredging and land reclamation
-
Costal erosion protection,
Rock Bund
Cem
Commitment, Reliability, Quality
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
6
Area of Operations
==> picture [779 x 214] intentionally omitted <==
----- Start of picture text -----
INDUSTRIAL STRUCTURES HYDRO, DAMS, TUNNELS FOUNDATION AND
WATER AND WASTE WATER
AND BUILDINGS AND IRRIGATION SPECIALIST ENGINEERING
----- End of picture text -----
-
Institutional
-
Commercial
-
Factories & Warehouse
-
Industrial
-
Dam and Power House
-
Tunnels
-
Intake structures
-
Pressure shafts
-
Irrigation Projects
-
Micro Tunneling
-
Diaphragm Wall
-
Ground Improvement • Civil work for Water
-
• Rehabilitation work Treatment plant and • Slope Stabilization / Rock Sewerage Plant
-
Slope Stabilization / Rock Anchors
-
Pipeline for Drainage Project
==> picture [79 x 41] intentionally omitted <==
----- Start of picture text -----
Cem
Commitment, Reliability, Quality
----- End of picture text -----
7
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Corporate Objectives
OUR VISION
Our aim is a satisfied client, a strong and proactive workforce and quality product finished on time maintaining highest safety standard and to budget
OUR MISSION
To make ITD Cementation India Limited, the country’s leading construction Company in customer choice, quality and safety
==> picture [248 x 259] intentionally omitted <==
OUR CORE VALUES
-
Our safety, health and quality standards are second to none.
-
We are Customer’s delight.
-
Employees are our most important asset and working conditions and training must enable them to give their best.
-
We strive to ensure timely commencement and completion of projects.
-
Plant and machinery are our wealth. We ensure their proper maintenance to prolong productivity.
-
We prioritise state-of-the art technology
-
Environmental awareness and care for our surroundings in which we live is a part of our business philosophy.
-
Our competitive edge is maintained through specialist skills and commitment to both training and R&D.
Re-certified through TUV Nord under the latest IMS standards ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS)
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
Commitment, Reliability, Quality
QMS – Quality Management Systems, OHS – Occupational Health & Safety Management Systems, EMS – Environmental Management Systems
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
8
Board of Directors
==> picture [131 x 131] intentionally omitted <==
Mr. Piyachai Karnasuta Chairman
==> picture [130 x 131] intentionally omitted <==
Mr. Santi Jongkongka Executive Vice Chairman
==> picture [131 x 131] intentionally omitted <==
Mr. Jayanta Basu Managing Director
==> picture [131 x 131] intentionally omitted <==
Ms. Jana Chatra Independent Director
==> picture [130 x 131] intentionally omitted <==
Mr. Sunil Shah Singh Independent Director
==> picture [131 x 131] intentionally omitted <==
Mr. Pankaj I.C. Jain Independent Director
Cem Commitment, Reliability, Quality
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
9
Shareholding Pattern*
==> picture [327 x 316] intentionally omitted <==
----- Start of picture text -----
Bodies
Corporate,
3.2%
Individual,
26.9%
Promoter,
46.6%
Mutual
Funds incl. FII,
AIF, 2.3% 21.0%
As on September 30, 2024
----- End of picture text -----*
-
Market Capitalisation of over Rs 9,300 crore as on November 07, 2024
-
Listed on NSE and BSE
-
Strong institutional shareholding : over 23.0%
| TOP SHAREHOLDERS | % holding |
|---|---|
| MASSACHUSETTS INSTITUTE OF TECHNOLOGY | 3.5% |
| HITESH RAMJI JAVERI | 2.3% |
| ACADIAN EMERGING MARKETS | 1.2% |
| 238 PLAN ASSOCIATES | 1.1% |
Cem Commitment, Reliability, Quality
10
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
02
Robust Financial Performance
==> picture [249 x 333] intentionally omitted <==
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
11
Performance Highlights – Q2 FY25
| REVENUE 24% Rs 1,991 crore EBITDA 18% Rs 204 crore PAT 34% Rs 72 crore |
REVENUE 24% Rs 1,991 crore EBITDA 18% Rs 204 crore PAT 34% Rs 72 crore |
|---|---|
| Particulars | Contract Value (Rs crore)* |
| Construction of residential colony in New Delhi (Phase II) excluding taxes and duties | 1,048 |
| Piling Work at JSW, Utkal in Odisha | 105 |
| Total | 1,153 |
| *Excluding taxes and duties |
Cem Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
12
Consolidated Financials - Quarterly (Rs crore)
==> picture [792 x 384] intentionally omitted <==
----- Start of picture text -----
Revenue
2,381
2,258
2,017 1,991
1,610
Sep'23 Dec'23 Mar'24 Jun'24 Sep'24
EBITDA Profit After Tax
242 237 100
220
204 90
79
173 72
52
Sep'23 Dec'23 Mar'24 Jun'24 Sep'24
Sep'23 Dec'23 Mar'24 Jun'24 Sep'24
Cem 13
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
==> picture [792 x 446] intentionally omitted <==
----- Start of picture text -----
Performance Highlights – H1 FY25
REVENUE EBITDA PAT
27% 27% 63%
Rs 4,372 crore Rs 442 crore Rs 172 crore
Contract Value
Orders secured during the year
(Rs crore)
Construction of multistoried commercial building in Uttar Pradesh 1,641
Construction of residential colony in New Delhi (Phase II) 1,048
Third Berth (Jetty) at Dahej LNG Terminal in Gujarat 917
Piling and Associate works at Mundra 136
Piling Work at JSW, Utkal in Odisha 105
Total 3,847
Excluding taxes and duties
Cem 14
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
==> picture [792 x 446] intentionally omitted <==
----- Start of picture text -----
Consolidated Financials - Yearly (Rs crore)
Revenue
7,718
5,091
4,372
3,809
2,728
Mar'21 Mar'22 Mar'23 Mar'24 H1 FY25
809
EBITDA Profit After Tax
274
463 442 172
338 125
258
69
16
Mar'21 Mar'22 Mar'23 Mar'24 H1 FY25
Mar'21 Mar'22 Mar'23 Mar'24 H1 FY25
Cem 15
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
Consolidated Financials - Yearly (Rs crore)
==> picture [792 x 375] intentionally omitted <==
----- Start of picture text -----
Networth Debt 950
862
1,636 725
1,498
1,242
1,135 515
1,069
409
Mar'21 Mar'22 Mar'23 Mar'24 Sep'24 Mar'21 Mar'22 Mar'23 Mar'24 Sep'24
Gross Debt to Equity
0.58 0.58 0.58
0.45
0.38
Mar'21 Mar'22 Mar'23 Mar'24 H1 FY25
Cem 16
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
==> picture [249 x 333] intentionally omitted <==
02 Business Overview
==> picture [263 x 221] intentionally omitted <==
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
17
Robust Order Book (Rs crore)
==> picture [783 x 180] intentionally omitted <==
----- Start of picture text -----
20,044 19,918
17,986
15,548
11,732
Mar'21 Mar'22 Mar'23 Mar'24 Sep' 24
----- End of picture text -----
MULTI YEAR REVENUE VISIBILITY ORDERBOOK OF RS 17,986 CRORE
-
Secured orders worth ~Rs 3,850 crore in FY25 till date
-
Clientele comprises of Government (50%), PSU (11%) and Private Sector (39%)
-
Established presence in India with 13 states / 1 union territory and is currently executing project in Sri Lanka and Bangladesh
Cem Commitment, Reliability, Quality
18
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Diversified Order Book (Rs crore)
| Sectors | Contract Value |
% Order book |
|---|---|---|
| Maritime Structures | 5,834 | 32.4% |
| Urban Infrastructure, MRTS and Airports | 3,549 | 19.7% |
| Industrial Structures and Buildings | 3,095 | 17.2% |
| Highway, Bridges and Flyovers | 2,549 | 14.2% |
| Hydro, Dams, Tunnels and Irrigation | 1,942 | 10.8% |
| Foundation and Specialist Engineering | 553 | 3.1% |
| Water and Waste Water | 464 | 2.6% |
| Total | 17,986 | 100.0% |
Cem Commitment, Reliability, Quality
19
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Maritime Structures
==> picture [389 x 179] intentionally omitted <==
==> picture [381 x 181] intentionally omitted <==
| Major Projects under execution | Major Projects under execution | Rs 5,834 crore |
|---|---|---|
| Marine project in Bangladesh |
West Container Terminal in the Port of Colombo, Sri Lanka |
|
| Balance Outer Harbour Works in Andhra Pradesh |
Piers, Landside Tunnels & Building in Karwar, Karnataka |
|
| Udangudi project in Tamil Nadu |
Wharf and Approach trestle works at JNPT in Maharashtra |
|
| Captive Oil Jetty at Kamarajar Port in Tamil Nadu |
Third Berth (Jetty) at Dahej LNG Terminal in Gujarat |
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
Commitment, Reliability, Quality
20
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Urban Infrastructure, MRTS and Airports
==> picture [389 x 180] intentionally omitted <==
==> picture [389 x 179] intentionally omitted <==
Major Projects under execution
-
Underground tunneling and stations for metros in Chennai, Bengaluru, Mumbai and Kolkata
-
Elevated metro stations and buildings in Kolkata
-
Depot metro building in Surat
-
Modification & Refurbishment of terminal buildings in Ahmedabad airport
==> picture [123 x 125] intentionally omitted <==
----- Start of picture text -----
Rs
3,549
crore
----- End of picture text -----
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
==> picture [59 x 4] intentionally omitted <==
----- Start of picture text -----
Commitment, Reliability, Quality
----- End of picture text -----
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
21
Industrial Structures and Buildings
==> picture [389 x 174] intentionally omitted <==
==> picture [389 x 174] intentionally omitted <==
Major Projects under execution
-
Redevelopment of Residential colony at Kasturba Nagar in New Delhi – PH I and PH II
-
Thal Sena Bhawan in Delhi
-
Piling and Civil work for Coke Oven Project at Hazira plant in Gujarat
-
Circuit bench of Calcutta High Court at Jalpaiguri in West Bengal
-
Aerospace museum at AF station in Palam, Delhi
-
Construction of buildings for Sikkim University
==> picture [123 x 125] intentionally omitted <==
----- Start of picture text -----
Rs
3,095
crore
----- End of picture text -----
Cem
Commitment, Reliability, Quality
22
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Highways, Bridges and Flyovers
==> picture [389 x 206] intentionally omitted <==
==> picture [389 x 205] intentionally omitted <==
==> picture [123 x 125] intentionally omitted <==
----- Start of picture text -----
Rs
2,549
crore
----- End of picture text -----
Major Projects under execution
- Six laning road project in Uttar Pradesh
==> picture [792 x 41] intentionally omitted <==
----- Start of picture text -----
Cem 23
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
Hydro, Dams, Tunnels and Irrigation
==> picture [389 x 191] intentionally omitted <==
==> picture [389 x 191] intentionally omitted <==
Major Projects under execution
-
Railway tunnels in West Bengal and Sikkim
-
Civil & Hydro-Mechanical Works of 500 MW Hydel Power, Pumped Storage Project in Andhra Pradesh
-
Water conveyor system of lined gravity canal/tunnels in Telangana
==> picture [123 x 125] intentionally omitted <==
----- Start of picture text -----
Rs
1,942
crore
----- End of picture text -----
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
==> picture [59 x 4] intentionally omitted <==
----- Start of picture text -----
Commitment, Reliability, Quality
----- End of picture text -----
24
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Water and Waste Water | Foundation & Specialist Engineering
==> picture [389 x 204] intentionally omitted <==
==> picture [389 x 204] intentionally omitted <==
==> picture [792 x 165] intentionally omitted <==
----- Start of picture text -----
Major Projects under execution Rs Rs
Major Projects under execution
Water infrastructure project in Karwar, 464 553
Brahmaputra Riverfront development in
Karnataka
Guwahati, Assam
crore crore
Cem 25
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
==> picture [249 x 333] intentionally omitted <==
03
CSR Awards & Recognition
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
26
Corporate Social Responsibility
==> picture [308 x 127] intentionally omitted <==
Vocational training centre
==> picture [229 x 127] intentionally omitted <==
==> picture [239 x 126] intentionally omitted <==
Cancer and Cataract surgeries
==> picture [307 x 144] intentionally omitted <==
Digital classroom initiatives
==> picture [252 x 149] intentionally omitted <==
==> picture [209 x 149] intentionally omitted <==
Residential buildings for persons with Toilet for school children in village Autism
==> picture [28 x 11] intentionally omitted <==
----- Start of picture text -----
Cem
----- End of picture text -----
Commitment, Reliability, Quality
27
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
Awards & Recognition
==> picture [792 x 383] intentionally omitted <==
----- Start of picture text -----
Cem
28
Commitment, Reliability, Quality ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
----- End of picture text -----
==> picture [112 x 36] intentionally omitted <==
Contact Information
==> picture [169 x 98] intentionally omitted <==
==> picture [46 x 36] intentionally omitted <==
Corporate Office: Prima Bay, 9th Floor, Tower-B, Gate No. 5, Saki-Vihar Road, Powai, Mumbai - 400072
==> picture [45 x 37] intentionally omitted <==
Phone: +91 22 66931600
==> picture [47 x 36] intentionally omitted <==
Fax : +91 22 66931628
==> picture [75 x 46] intentionally omitted <==
==> picture [47 x 36] intentionally omitted <==
www.itdcem.co.in
==> picture [46 x 37] intentionally omitted <==
ISO 9001:2015 (QMS), ISO 14001:2015 (EMS) and ISO 45001:2018 (OHS-MS) Sustaining Growth. Expanding Horizons
29