Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CEC Investor Presentation 2018

Oct 30, 2018

51857_rns_2018-10-30_3dce3e60-a761-43e9-b554-599fe8dff70b.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [533 x 105] intentionally omitted <==

Investor Conference Nov. 1[st] 2018

==> picture [69 x 69] intentionally omitted <==

http://www.ecotek.com.tw/cec_csr/index.php
創造對環境友善、讓客戶信賴的全方位工程公司

==> picture [91 x 19] intentionally omitted <==

==> picture [155 x 12] intentionally omitted <==

1

1

Content

Company Introduction
Operation Overview
Financial Highlight
Future Prospect

2

Company Introduction: Profile

Paid-in Capital NTD 1.23B
Market Cap NTD 4.33B
Major Business Environmental Engineering
M&E Engineering
O&M Engineering
Number of
Employee
1180(Admin. 7%, Design 12%, Construction 28%, O&M 53%)
Company
Location
HQ and Technical Center in Kaohsiung City.
Oversea subsidiary company in Vietnam & China

==> picture [91 x 19] intentionally omitted <==

==> picture [155 x 12] intentionally omitted <==

3

3

Company Introduction: Profile

==> picture [638 x 455] intentionally omitted <==

----- Start of picture text -----

M&E, Plant Environmental Protection Operation &
Engineering & Energy Maintenance
O&M
Water Treatment
Steel Plant

• advanced water water purification plant
& waste water plant
purification

• steel plant
Aluminum sewage & waste water treatment and reclamation • incineration plant
Plant • industrial water

chemical dosing for waste
Biotech & treatment
Pharmaceutical Mechanical O&M
Plant

Air Pollution Control heavy rotary
equipment
Synthetic • de-dust • refractory
Fiber Mill • de-Nox, de-SOX, de-Dioxin maintenance

System turnkey maintenance
• deodorization
Industrial
Plant Electrical
Incineration Plant
Maintenance

Power system
Energy •
Panel control system

power plant & co-
generation plant

PV plant Major Repair &
• LED Periodical Repair
4
----- End of picture text -----

==> picture [91 x 19] intentionally omitted <==

==> picture [155 x 12] intentionally omitted <==

4

Operation Overview

Environmental
PV
M&E
Protection

==> picture [158 x 160] intentionally omitted <==

==> picture [157 x 160] intentionally omitted <==

==> picture [158 x 159] intentionally omitted <==

==> picture [347 x 21] intentionally omitted <==

----- Start of picture text -----

Refractory Biotech
----- End of picture text -----

==> picture [157 x 160] intentionally omitted <==

==> picture [158 x 159] intentionally omitted <==

==> picture [114 x 19] intentionally omitted <==

----- Start of picture text -----

Oversea
----- End of picture text -----

==> picture [157 x 159] intentionally omitted <==

5

==> picture [157 x 159] intentionally omitted <==

M&E Engineering

  - `Stable profit earned from group company, e.g., CSC or DSC equipment revamping, site maintenance and O&M, etc.`

  - `Start with the Group and expand outside the Group, we promote turnkey construction for M&E equipment so revenue and profit will increase.`
  • 2018 major on-going projects

  • CSC Revamping Project of No. 2 Blast Furnace 3rd Campaign

  • CSC Retrofit Project of Conveying Coal/Iron Ore

  • CSC RMTP Operation and Maintenance work

  • CSC IWI Operation and Maintenance work

  • CSC W1 stage 2 Improvement of stone-crushing system

  • DSC Retrofit Project of Conveying – RM Storage Yard for wind & dust protection enhancement

6

==> picture [157 x 159] intentionally omitted <==

M&E Engineering

CSC Production Line – M&E Engineering
CSC Recycling Plant O&M
CSC Residual Materials
Pretreatment Plant

==> picture [13 x 11] intentionally omitted <==

----- Start of picture text -----

7
----- End of picture text -----

==> picture [263 x 217] intentionally omitted <==

==> picture [157 x 159] intentionally omitted <==

  • Develop the engineering market about recycling and re-using city waste water (reclaimed water). Continuously develop project of waste water treatment, water purification and O&M.

  • Upgrade air pollution technique of de-NOX, de-SOX and dust collection. Expand the operation area.

  • 2018 major on-going projects

  • Cheng-Ching Lake Advanced Water Treatment Plant O&M

  • Kinmen county, Tai-hu Advanced Water Treatment Plant O&M

  • New Taipei City, Sanxia Yingge Water Resources Plant Project

  • Kaohsiung City, Kangshan Qiaotou Sewage Treatment Plant Project

  • Water Transmission Pipeline Project (from Jin-jiang River, China to Kinmen county)

  • CSC Main Transmission Pipeline and Domestic Water Distribution (from Feng-shan stream Wastewater Reclamation Plant)

  • Revamping Dust-collecting System for Xin-dian Refuse Incineration Plant and Shu-lin Refuse Incineration Plant

  • CSC #2 Indoor Scrap Yard Expansion Project for Dust-collecting

  • CSCC Ping-nan Plant SCR project

8

==> picture [157 x 159] intentionally omitted <==

Waste Water Treatment
De-minimal System

==> picture [199 x 149] intentionally omitted <==

==> picture [220 x 151] intentionally omitted <==

Water
Treatment
SCR
Air Pollution Control
Dust
Collection
FGD

9

==> picture [157 x 159] intentionally omitted <==

PV Engineering

  • Corporate strategy taken between CSC PV Co. and CEC in completing the project of CSC Group 80MWp PV plant installation.

  • Mid-to-long term target inside the Group extending to outside the Group, CEC continuously pushes for site turnkey project.

2018 major on-going projects

  • CSC #3 Cold Rolling Mill Plant PV Construction Project.

  • CSC Lin-hai Plant PV Construction Project

  • CSAC L6/L7 Plant PV Construction Project

  • DSC Center Shop PV Construction Project

  • CSMC Main Plant and Fong-bi-tou Plant PV Construction Project

  • CHS Lu-kang Plant PV Construction Project

  • CSSC Yan-chao Plant PV Construction Project

10

==> picture [157 x 159] intentionally omitted <==

PV Engineering

==> picture [637 x 330] intentionally omitted <==

11

==> picture [157 x 159] intentionally omitted <==

Refractory Engineering

  - `By projects of refractory maintenance, we can gain the first-hand/latest information about new-built project and enhance the client’s trust to CEC.`

  - `Strengthen the professionals’ technique, searching  for sources of global refractory materials and expanding business about refractory turnkey construction.`
  • 2018 major on-going projects

  • CSC Revamp #3 BFR Refractory Project

  • CSC Revamp #3/#4 Hot Stove Refractory Project

  • CSC Revamp Y41#2 Heating Furnace

  • DSC Refractory Maintenance—Steel-making area

  • DSC Repair #21 Hot Stove Connection Pipe

  • CSCC Graphitizing furnace - refractory turnkey project

12

==> picture [157 x 159] intentionally omitted <==

Refractory Engineering

==> picture [199 x 151] intentionally omitted <==

==> picture [220 x 157] intentionally omitted <==

==> picture [204 x 157] intentionally omitted <==

Lime Burner

==> picture [204 x 157] intentionally omitted <==

Hot Stove

==> picture [220 x 158] intentionally omitted <==

Hot Stove Pipeline

Blast Furnace

Heating Furnace

13

Coke Oven

==> picture [157 x 159] intentionally omitted <==

Biotech & Pharmaceutical

  • Biotech construction of whole plant provides complete service for (1) design (2) commissioning (3) liability test, etc.

==> picture [248 x 226] intentionally omitted <==

----- Start of picture text -----

建築
、內裝
空調及
潔淨管線
通風
廠設工程
公用流 電力
體系統 弱電
給排水及
消防
廢水處理
----- End of picture text -----

  • 2018 major on-going projects
Manufacturing Plant
Cailway Biopharmaceuticals Co.Ltd
Mackay Memorial Hospital
  • Formosa Laboratories, Inc.

14

==> picture [157 x 159] intentionally omitted <==

Biotech & Pharmaceutical

EirGenix (台康生技) Medigen(高端疫苗)

==> picture [225 x 169] intentionally omitted <==

==> picture [238 x 167] intentionally omitted <==

Taimed (中裕)

==> picture [194 x 146] intentionally omitted <==

==> picture [93 x 124] intentionally omitted <==

Scino(神隆針劑)

==> picture [173 x 124] intentionally omitted <==

==> picture [182 x 137] intentionally omitted <==

==> picture [187 x 140] intentionally omitted <==

==> picture [20 x 11] intentionally omitted <==

----- Start of picture text -----

15
----- End of picture text -----

==> picture [157 x 159] intentionally omitted <==

Oversea

  • Expand business base to Vietnam, in response to governmental New Southbound Policy.

  • Actively exploit EPC project of water treatment and pollution control for local steel plant and PET plant.

  • 2018 major on-going projects

  • CSVC M&E Maintenance

  • FHS Coke Making Plant M&E Maintenance

  • FHS Coke Making Plant Refractory Maintenance

  • FHS #1/#2 Sinter Plant FGD,SCR System Project

  • • FET(VN) 400,000 tons PET Plant Construction Project

  • • Tung-ho Steel Co.(VN) Rolling Mill Plant M&E Construction and Utility Project

16

==> picture [157 x 159] intentionally omitted <==

Tung Ho
Steel M&E
Project

Oversea

FHS M&E Project
FET(VN) PET Plant Project

==> picture [208 x 147] intentionally omitted <==

==> picture [199 x 147] intentionally omitted <==

==> picture [210 x 49] intentionally omitted <==

==> picture [201 x 45] intentionally omitted <==

17

Financial Highlight: Construction contracts were signed but not yet recorded

==> picture [709 x 386] intentionally omitted <==

----- Start of picture text -----

Unit: NT$, Thousand
15,000,000
14,138,430
12,760,963
10,785,904 10,807,660 [ 11,022,658 ]
10,239,563
30th,June,2018
10,000,000
Oversea
27%
5,000,000
Taiwan
73%
0
2013 2014 2015 2016 2017 30th,June,2018
18
----- End of picture text -----

==> picture [545 x 161] intentionally omitted <==

----- Start of picture text -----

Others Others
0.01% 3%
Environmental
Vietnam
Protection
Operation and
24.90%
Maintenance Engineering
24%
Taiwan 25%
75.09%
M&E Engineering
48%
----- End of picture text -----

 District:Taiwan75.09%,Vietnam 24.9%    Category:
                                               M&E Engineering 48%,

==> picture [617 x 222] intentionally omitted <==

----- Start of picture text -----

Operation and Maintenance25%, 12,000,000 Unit: NT$, Thousand
9,971,393
10,000,000
8,474,982
8,000,000 7,597,194
6,000,000
82% 81%
4,000,000
75%
2,000,000
-
105 106 107Q3
19
Taiwan Oversea
----- End of picture text -----

1[st] Half of 2018 Consolidated Income Statement

Unit: NT$, Thousand

2018/06/30 2018/06/30 2018/06/30 2017/06/30 2017/06/30 2017/06/30 YOY
Sales Revenues 5,021,394
100%
3,939,986
100%
27%
Operating costs 4,732,610 95% 3,610,996 91% 31%
Gross Profit 278,054
5%
328,825
9%
-15%
Operating expenses 213,090 4% 192,223 5% 11%
Operating income 64,964
1%
136,602
4%
-52%
Total non-operating income
and expenses
17,391 1% (63,671) -2% -127%
Profit before income tax 82,355
2%
72,931
2%
13%
Income tax expense 36,592 1% 21,304 1% 72%
Profit for the period 45,763
1%
51,627
1%
-11%
Total basic earnings per share 0.37 0.42

20

Unit: NT$, Thousand Unit: NT$, Thousand Unit: NT$, Thousand Unit: NT$, Thousand Unit: NT$, Thousand Unit: NT$, Thousand Unit: NT$, Thousand
2018/06/30 2017/06/30
Current assets 6,237,259
83%
5,965,465
84%
Non-current assets 1,234,022 17% 1,138,214 16%
Total assets 7,471,281
100%
7,103,679
100%
Current liabilities 4,007,196 54% 3,696,765 52%
Non-current liabilities 481,180
6%
454,611
6%
Total Liabilities 4,488,376 60% 4,151,376 58%
Total equity 2,982,905
40%
2,952,303
42%
Total liabilities and equity 7,471,281 100% 7,103,679 100%
*“Contract liabilities-current”NT$1.62B

21

Dividend Payout

Unit: NT$

==> picture [694 x 413] intentionally omitted <==

----- Start of picture text -----

6.00 100
5.51
90 90
5.06
4.90
5.00 4.84 83
82
80 80
4.44 4.50
71 73 72 71 3.89 69 4.11 73 70
4.00
3.71
3.50 3.50
60
59
3.39
3.20
3.00
3.00 50
2.70
2.55
40
2.00 2.00
2.00 1.80 1.80
30
1.51
1.25
20
1.00
10
- 0
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
EPS Cash DPS Cash Dividend Payout Ratio(%)
----- End of picture text -----

22

Future Prospect

1. New Field Exploitation: On basis of current M&E, environmental engineering, rebuild internal procedure to reduce cost and to advance core technologies. At the same time, form strategic alliances and cooperate with the government to promote policy of “energy saving & carbon reduction” and circular economy.

2. Operation & Maintenance: Boost up the M&E and Refractory by business mode of combining construction procurement with labor, within the Group and outside the Group, in order to increase company’s revenue and profit.

3. Resources Integration: Upgrade company competitive by new business mode of participating in projects of development, production and integration, in the field of reclaimed water, green energy and refractory.

23

23

==> picture [158 x 134] intentionally omitted <==

Business Profit Potential

1. Revamping Project of CSC No.2 Blast Furnace 3[rd] Campaign (6.36B) 2. Revamping #1 Power Plant(MB, TG-9,TG-10) (10B)

3.Taiwan has 19 Refuse Incineration Plants which are built over 15 years. 3 of 19
plants have awarded bids in revamping; the rest of 16 plants will also keep up
one after another. (15.342B)

4. Effluent Recycling Project of Public Sewage Treatment (pending bid for vender): Project of Fu-tian Reclaimed Water Treatment (130k ton/per day, 9.3B), Project

of An-pin Reclaimed Water Treatment (30k ton/per day, 3.62B), Project of Sui-nan Reclaimed Water Treatment (10k ton/per day, 0.77B)total: 13.69B 5. In 2020, Taiwan Environmental Protection Admin. will tighten the standard about air pollutants, in order to improve the pollution from current Coal-fired boiler & heavy-oil burner. EX: particular pollutant (30mg/Nm3), SOx(50ppm)、NOx(100ppm) It means over half of 15 thousand boilers in Taiwan needs revamping.over 30B potential profits

24

==> picture [533 x 105] intentionally omitted <==

Thank You for Listening Your Comments are welcome

25