Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CAZALY RESOURCES LIMITED Capital/Financing Update 2011

May 29, 2011

64609_rns_2011-05-29_c987d106-0b91-404c-ad23-d4940c55b63c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 72] intentionally omitted <==

ASX ANNOUNCEMENT

30[th] May 2011

Further Encouraging Results at Hamersley Project

  • Further drilling results received

  • 40m @ 57.7% Fe (61.2% CaFe), 64m @ 56.6% Fe (60.2% CaFe) and 74m @ 54.3% Fe (57.9% CaFe)

  • Results from outside current resource area as well as infill

  • Results over full 2.8km of associated gravity anomaly. Provides further scope for additional resource increases

  • Infill drilling confirms mineralisation continuity

  • Metallurgical programme underway

  • Appoints Engenium to provide Order of Magnitude Study

Ongoing Exploration Success

Winmar Resources Limited (ASX:WFE) in conjunction with Cazaly Resources Limited (ASX:CAZ) is pleased to announce further results from the 12,000m RC drilling extension and infill program. Results from 22 RC holes have now been received, however 75% of the drilling results remain outstanding.

Mineralisation is now confirmed to stretch over the full 2.8km of the coincident gravity anomaly. The width of mineralisation appears to be much broader than anticipated, with additional drill holes added to the programme to fully define the extent of mineralisation. An updated JORC resource is planned for the current quarter.

Mineralisation occurs as fine pisolites, typical of Channel Iron Deposits (CID). Coarser, detrital mineralisation (DID) has also been intersected, which despite being lower grade (PLRC0066 24m @ 51.5% Fe), is significantly closer to surface and will assist development of the deposit.

Level 2, 38 Richardson Street, West Perth, WA, 6005 P. +61 8 9322 6283 F. +61 8 9322 6398 [email protected] www.winmarresources.com.au

==> picture [595 x 72] intentionally omitted <==

Several holes have also intersected significant bedrock mineralisation (BID). Although this has

not been a goal of the programme, this does present a target for future exploration.

==> picture [391 x 564] intentionally omitted <==

The current Inferred Resource Estimate for Winmar is 143Mt @ 52.6% Fe (55.6% CaFe). These new results are expected to extend the Main CID Zone currently comprising 92Mt @ 54.9% Fe (58.4% CaFe). See Table 2, below.

==> picture [595 x 72] intentionally omitted <==

Metallurgical Programme

A Diamond Drill rig has now been mobilised to site to complete a program of 4 large diameter diamond holes for the purpose of obtaining sample to commence metallurgical test work. Test work completed by Cazaly in 2010 indicated good potential for successful beneficiation of the CID material. This programme will involve a more comprehensive range of tests across the full strike of the deposit.

==> picture [243 x 182] intentionally omitted <==

==> picture [242 x 182] intentionally omitted <==

Diamond Drilling at Winmar, May 2011.

Appointment of Engenium to conduct Order of Magnitude Study

Winmar has appointed recognised engineering consultants, Engenium, to complete an Order of Magnitude Study. Engenium is a Project Delivery company servicing the resource and infrastructure sectors of Australia. Engenium’s service offering includes all aspects of project development from early metallurgical testwork programs, scoping/feasibility studies, engineering design and construction management. Founded in 2003, Engenium has assisted numerous junior, mid-tier and major companies in the Australian mining sector with the development of their iron ore projects.

The Order Of Magnitude Study will review potential development options for the Project.

==> picture [595 x 72] intentionally omitted <==

Table 1. Significant results for Winmar deposit, May 2011 (≥50% Fe)

Hole ID East **North ** **Depth ** **From ** **Length ** Fe% SiO2% Al2O3 P% S% **LOI ** CaFe% Notes
PLRC0051 604074 7530824 160 118 40 57.7 7.30 3.94 0.04 0.01 5.64 61.2 CID
PLRC0053 603577 7530748 150 116 28 56.6 8.87 3.95 0.03 0.01 5.40 59.8 CID
PLRC0054 603905 7531031 174 148 11 56.4 10.06 4.05 0.03 0.01 4.59 59.1 CID
164 10 56.9 7.45 3.11 0.04 0.01 7.49 61.5 BID
PLRC0056 603353 7531221 163 138 14 54.4 9.09 3.60 0.02 0.01 8.67 59.6 CID
**PLRC0057 ** 604395 7530462 174 100 74 54.3 11.27 3.75 0.05 0.01 6.14 57.9 CID + BID
100 66 54.5 11.78 3.69 0.04 0.01 5.63 57.7 CID
166 8 54.2 10.77 3.82 0.06 0.01 6.65 58.0 BID
PLRC0058 604255 7530316 180 100 78 54.5 9.2 4.5 0.1 0.0 7.4 58.8 CID+BID
100 **64 ** 56.6 8.46 3.55 0.04 0.01 5.95 60.2 CID
164 14 52.3 9.89 5.48 0.07 0.02 8.83 57.4 BID
**PLRC0061 ** 603826 7529891 192 146 46 53.7 10.58 4.70 0.05 0.01 6.79 57.6 CID + BID
146 30 52.5 11.76 5.41 0.05 0.01 6.68 56.3 CID
178 14 57.1 7.48 3.09 0.05 0.01 6.72 61.2 BID
PLRC0064 604763 7529752 157 88 32 53.8 11.65 3.70 0.05 0.01 7.03 57.8 CID
128 10 53.7 8.30 4.94 0.04 0.02 8.92 59.0 BID
152 5 54.5 10.80 6.78 0.03 **0.02 ** 3.58 56.6 BID
PLRC0065 604614 7529614 151 80 68 53.7 11.26 4.15 0.05 0.02 7.05 57.8 OAL +
BID
80 **52 ** 53.3 12.12 4.00 0.05 0.02 6.80 57.2 BID
132 16 54.9 8.48 4.65 0.06 0.02 7.86 59.5 BID
PLRC0066 604358 7529358 115 34 24 51.5 18.87 4.53 0.03 0.03 2.15 52.7 DID
68 2 51.1 17.44 6.40 0.03 0.01 2.53 52.4 CID
112 3 52.2 14.36 6.11 0.03 0.01 3.65 54.2 BID -
**PLRC0067 ** 604538 7530611 162 114 30 53.7 11.95 4.63 0.04 0.01 5.85 57.1 CID
146 4 53.9 11.06 3.91 0.06 0.01 7.18 58.1 CID
PLRC0069 604993 7529620 127 76 6 52.5 10.79 4.48 0.04 0.02 8.91 57.6 CID
PLRC0070 604846 7529480 145 78 28 53.2 11.6 3.30 0.05 0.01 8.32 58.0 CID+BID
78 12 54.0 11.5 2.65 0.05 0.01 8.00 58.7 CID
90 16 52.6 11.6 3.79 0.05 0.01 5.56 57.6 BID
PLRC0074 603197 7531040 150 120 6 51.7 14.02 5.07 0.02 0.01 5.37 54.66 CID
Notes: Hole coordinates refer to UTM Zone 50 (GDA94)
All holes drilled vertically
Samples analysed by Bureau Veritas Kalassay by XRF with LOI determined at 1000ºC
CaFe calculated by:(Fe%/(100-LOI%))*100

Table 2. Winmar Resource Estimate, June 2010, ID

Ore
Cut Off
Tonnes
Fe
CaFe
Al2O3
P
SiO2
LOI
Type
Fe %
t
%
%
%
%
%
%
Detrital Iron
40
36,090,000
45.81
47.05
5.68
0.03
25.12
2.65
Channel Iron
52
92,260,000
54.92
58.44
4.20
0.04
10.56
6.02
Bedded Iron
52
14,880,000
54.97
59.32
4.16
0.05
9.42
7.32
Channel &
Bedded Iron
52
107,140,000
54.93
58.57
4.19
0.04
10.40
6.20
Total
40 / 52
143,230,000
52.63
55.58
4.57
0.04
14.11
5.31
NB: Calcined Fe (CaFe) calculated by the formula CaFe%=(Fe%)/(100-LOI1000))*100

==> picture [595 x 72] intentionally omitted <==

For further information, please contact:

Mr Benjamin H. Cooper Executive Director Winmar Resources Limited 0425 3111 21 [email protected]

Notes:

The information that relates to exploration targets, exploration results and drilling data of Cazaly operated projects is based on information compiled by Mr Gregory Miles who is a Member of The Australian Institute of Geoscientists and is an employee of Cazaly Resources Limited. The information in this report that relates to the Winmar Deposit Resource Estimate is based on information compiled by Ms Felicity Repacholi‐Muir who is a Member of the Australian Institute of Geoscientists and is also a member of Cazaly Resources Limited. Both Ms Repacholi‐Muir and Mr Miles have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he they are undertaking to qualify as a Competent Persons as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Both Ms Repacholi‐ Muir and Mr Miles consent to the inclusion of their names in the matters based on their information in the form and context in which it appears.