Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CARNAVALE RESOURCES LIMITED Capital/Financing Update 2019

Mar 12, 2019

64607_rns_2019-03-12_75db5fda-6abc-4252-b7ae-e161b40607b4.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

CARNAVALE RESOURCES LIMITED ASX Release 13 March 2019

==> picture [86 x 57] intentionally omitted <==

Multiple visible cassiterite occurrences in drilling at the Kikagati Tin Project, Uganda

Carnavale Resources (ASX: CAV) is pleased to advise geological logging of recently completed diamond core holes has identified multiple occurrences of fine grained to coarse grain cassiterite, a tin bearing mineral, at the Kikagati Tin Project, located in the Isingiro District of southern Uganda.

  • Multiple visible cassiterite occurrences

  • Stacked “ladder style” quartz veins

  • Tier 1 scale geological target

  • Drilling nearing 70% complete

  • Initial samples in laboratory, results pending

Drilling continues at the Kikagati Tin Project, with 1,353.5m completed to date of the planned 2,000m programme. The more recent drill holes are designed to intersect the maximum number of stacked and mineralised quartz veins hosted within the quartzite host which is approximately 100m thick.

Stacked mineralised veins and visible cassiterite

The stacked “ladder style” quartz veins and associated intense muscovite and tourmaline alteration is evident along the entire prospect strike length of 3,000m and in drilling of over 900m down dip extent. Artisanal miners have exploited the cassiterite bearing veins outcropping at surface to a depth of approximately 40m and visible cassiterite is noted in the recent drilling associated with the same stacked ladder style quartzmuscovite-tourmaline veins at depth in the drilling.

Multiple occurrences of visible fine grained to coarse grain cassiterite have been noted in both the internal portion of the quartz veins and associated with the intense muscovite-tourmaline alteration selvages. The nuggety nature of cassiterite mineralisation is expected based on mapping and historic reports reviewed and undertaken by the Company.

Initial drill core samples for the first 6 holes have been submitted to the ALS laboratory in South Africa and results are expected in the coming weeks. The remaining drill core samples are currently being processed in preparation for dispatch to the laboratory.

Tier 1 scale

Drilling has now clearly demonstrated the project has Tier 1 scale with considerable potential to further grow in scale at depth and potentially along strike beneath surficial cover.

Minimum scale of the known visible quartz veining style mineralisation and geological host unit is now defined as:

3,000m strike length x 900m down dip x 100m thickness

The recent drilling has successfully shown the outcropping style of stacked quartz veins occurs throughout the prospect strike length and extends continuously down dip with a vein density averaging up to 10% within the quartzite unit. Additional layer parallel mineralisation remains to be proven which would add to the mineralisation volume.

Carnavale Resources Limited ABN 49 119 450 243

1

Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA, 6016 T + 61 8 9380 9098 F + 61 8 9380 6761 E: [email protected] W : www.carnavaleresources.com

CARNAVALE RESOURCES LIMITED

==> picture [86 x 57] intentionally omitted <==

The following composite schematic cross section (Figure 1) aims to demonstrate the considerable overall down dip extents defined from drilling. Drill hole KKDD009 is currently in progress and is intended to complete the overall initial drill testing of the Kikagati deposit extents and demonstrate over 900m of down dip continuation to the mineralisation.

Figure 1 Composite schematic cross section illustrating the >900m down-dip mineralisation potential at Kikagati.

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 22] intentionally omitted <==

==> picture [525 x 23] intentionally omitted <==

==> picture [525 x 15] intentionally omitted <==

Cassiterite in drill core

Multiple occurrences of visible fine grained to coarse grain cassiterite have been noted in both the internal portion and margins of the quartz veins and associated with the intense muscovite-tourmaline alteration selvages. Figure 2 shows the variable nature of cassiterite mineralisation and illustrates the nuggety nature of the cassiterite mineralisation from fine to coarse grained.

Cassiterite within the drill core has been logged at the following intervals in drilling.

  • KKDD003 105m

  • KKDD006 87.1m, 87.4m, 96.3m and 132.6m

  • KKDD007 125.8m, 177.3m, 181m and 184.5m

==> picture [525 x 34] intentionally omitted <==

2

==> picture [86 x 57] intentionally omitted <==

CARNAVALE RESOURCES LIMITED

Figure 2 Visible cassiterite crystals in drill core

  1. Cassiterite alongside a small quartz vein with lesser amounts of mica, tourmaline and arsenopyrite.

  2. A small “bleb” of mica, graphite and some cassiterite within the quartzite.

  3. Large cassiterite crystal approximately 5cm across within a quartz vein.

  4. Cassiterite within a milky quartz vein with very little associated mica or tourmaline.

  5. Euhedral cassiterite crystal on the boundary of a quartz vein and the altered quartzite host rock.

  6. Small cassiterite crystals developed within the muscovite-rich vein selvage.

==> picture [491 x 44] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 44] intentionally omitted <==

==> picture [491 x 44] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 44] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 44] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 45] intentionally omitted <==

==> picture [491 x 40] intentionally omitted <==

==> picture [525 x 34] intentionally omitted <==

3

CARNAVALE RESOURCES LIMITED

==> picture [86 x 57] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 32] intentionally omitted <==

==> picture [528 x 31] intentionally omitted <==

Drilling programme progress

  • 8 holes for 1,353.5m drilled to date.

  • Multiple occurrences of cassiterite observed in drill core.

  • Numerous stacked quartz-muscovite-tourmaline veins.

The 2,000m planned diamond drilling programme is designed to demonstrate the mineralised extents of the Kikagati deposit and provide an indication of the grade potential of the deposit. Clearly the early drilling has confirmed the Tier 1 scale dimensions of the geological host quartzite unit. The grade of the individual veins and the potential of the parallel shear alteration remains to be confirmed.

To date 8 diamond holes have been completed for a total of 1,353.5m and listed in Table 1. Diamond hole, KKDD009 (Figure 1), is currently in progress. Upon completion of drilling and geological logging, samples from the last 3 diamond holes will be dispatched to the laboratory.

Forward Programmes

The remaining planned drilling is centred on completion of the programme at the Kikagati deposit including hole KKDD009, currently in progress, for a proposed 300m. This hole is located on the northern most cross section and will provide the uppermost demonstration of down dip and northern most along strike potential.

Initial assays results are expected from drill holes KKDD001 – KKDD006 in the coming few weeks with samples for KKDD007-009 anticipated to be submitted to the laboratory by the end of March.

==> picture [525 x 34] intentionally omitted <==

4

CARNAVALE RESOURCES LIMITED

==> picture [86 x 57] intentionally omitted <==

Figure 3 Interpreted cross section for holes KKDD001, 006 and 007 (Note that all the veins digitized are actual intersections that range in thickness from 0.3 to 2m.)

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 15] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 16] intentionally omitted <==

==> picture [491 x 9] intentionally omitted <==

==> picture [525 x 34] intentionally omitted <==

5

==> picture [86 x 57] intentionally omitted <==

CARNAVALE RESOURCES LIMITED

Figure 4 Interpreted cross section for holes KKDD003, 005 and 008. (Note that all the veins digitized are actual intersections that range in thickness from 0.3 to 2m.)

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 17] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 16] intentionally omitted <==

==> picture [483 x 15] intentionally omitted <==

==> picture [525 x 34] intentionally omitted <==

6

CARNAVALE RESOURCES LIMITED

==> picture [86 x 57] intentionally omitted <==

Figure 5 Geological plan showing drill pad locations

Pad 1 = Drill holes KKDD001, 006, 007

Pad 2 = Drill hole KKDD002

Pad 3 = Drill holes KKDD003, 005, 008

Pad 4 = Drill hole KKDD004

Pad 5 = Drill hole KKDD009 in progress

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 16] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 16] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 17] intentionally omitted <==

==> picture [465 x 16] intentionally omitted <==

==> picture [465 x 16] intentionally omitted <==

==> picture [465 x 16] intentionally omitted <==

Table 1 Drill hole details

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 14] intentionally omitted <==

==> picture [539 x 11] intentionally omitted <==

==> picture [525 x 34] intentionally omitted <==

7

CARNAVALE RESOURCES LIMITED

==> picture [86 x 57] intentionally omitted <==

For further information contact:

Ron Gajewski Andrew Beckwith Chairman Director

P: +61 8 9380 9098

Competent Persons Statement

The information in this report that relates to Exploration Results is based on, and fairly represents information and supporting documentation prepared by Mr. Andy Beckwith, a Competent Person who is a Member of The Australian Institute of Geoscientists. Mr. Beckwith is a director of Carnavale Resources Limited. Mr. Beckwith has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr. Beckwith consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

Statements regarding Carnavale’s plans with respect to the mineral properties, resource reviews, programmes, economic studies and future development are forward-looking statements. There can be no assurance that Carnavale’s plans for development of its mineral properties will proceed any time in the future. There can also be no assurance that Carnavale will be able to confirm the presence of additional mineral resources/reserves, that any mineralisation will prove to be economic or that a mine will successfully be developed on any of Carnavale’s mineral properties.

Information relating to Previous Disclosure

Information relating to Exploration Results associated with previous disclosures relating to the Kikagati Project in this announcement has been extracted from the following ASX announcements:

“Cassiterite (tin mineral) observed in diamond drilling, Kikagati Project, Uganda”, 27 November 2018 “Carnavale advances Kikagati Tin Project, Uganda”, 30 August 2018 “Carnavale to acquire large-scale Tin Project, Uganda”, 24 April 2018

The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

==> picture [525 x 34] intentionally omitted <==

8

Table JORC Code, 2012 Edition

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases, more explanation may be required,
such as where there is coarse gold that
has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant
disclosure of detailed information.

Initial diamond core sampling completed for
the first 6 holes and submitted to the
laboratory with results pending

Carnavale intends to complete sampling of
the next 3 diamond holes on completion of
KKDD009 during March.

All drilling and sampling will be undertaken
in an industry standard manner.

All
core
is
geologically
logged
and
photographed, HQ and PQ drill core is cut in
half, with one half sent to the laboratory for
assay and the other half retained on site.

Holes
are
sampled
over
potentially
mineralised intervals on a nominal 1m basis
and down to 0.1m geological boundaries.

Samples are sent to an independent
laboratory with the entire sample pulverised
and sub-sample analysed.
Drilling techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).

The drill holes comprised HQ and PQ core.
Drill sample recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative
nature of the samples.

Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.

Core recovery is measured for each drilling
run by the driller and then checked by the
Company geological team during the mark
up and logging process.

Samples have been marked out and are
considered representative with generally 95-
100% recovery.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc.) photography.

The total length and percentage of the
relevant intersections logged.

The entire hole has been geologically and
geotechnically logged and photographed by
Company
geologists,
with
systematic
sampling to be undertaken on the prospective
parts of the stratigraphy based on rock type
and alteration observed.

9

Criteria JORC Code explanation Commentary
Sub-sampling
techniques and
sample preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Whether sample sizes are appropriate to
the grain size of the material being
sampled.

Sampling of the first 6 holes completed and
dispatched to laboratory, results pending.

Drill core is collected from the diamond drill
rig, logged and photographed, drill core is
then cut in half using a core saw, with one
half sent to the laboratory for assay and the
other half retained.

Holes
are
sampled
over
mineralised
intervals to geological boundaries down to
0.1m and on a nominal 1m basis where
applicable.

Industry prepared independent standards
are inserted approximately 1 in 20 samples.
Quality of assay data
and laboratory tests

The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.

Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and precision
have been established.

The samples have been submitted to a
commercial
independent
laboratory
in
Johannesburg, South Africa.

The techniques are considered quantitative
in nature.

As discussed previously certified reference
standards will be inserted by the Company
and the laboratory also carries out internal
standards in individual batches.

The sampling and analytical techniques are
considered normal industry practice and
suitable for resource estimation.
Verification of
sampling and
assaying

The verification of significant intersections
by either independent or alternative
company personnel.

The use of twinned holes.

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

Sample results will be merged by the
company’s database consultants.

Results will be uploaded into the company
database, checked and verified.
Location of data
points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.

Drill hole collar locations are located by
handheld GPS to an accuracy of +/-5m.

Locations are given in UTM 36S.

Diagrams and location table are provided in
the report.

Topographic control is by a 30m resolution
DTM.
Data spacing and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.

Whether sample compositing has been

Drilling is along the strike of the mineralised
zone between 500m to 1000m apart.

All holes are monitored in regard to location,
dip and downhole azimuth and dip for
location purposes, geologically logged in
detail and provide a strong basis for
geological
control
and
continuity
of
mineralisation.

10

Criteria JORC Code explanation Commentary
applied.
Orientation of data in
relation to geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.

Two drilling inclinations are used: 1) To
target
lithological
boundaries
of
the
mineralised
zone.
2)
To
target
the
mineralised veins. Both are approximately
perpendicular to the bedding planes and
quartz veins respectively.

In some cases, drilling is not at right angles
to the dip of mineralised structures and as
such true widths are less than downhole
widths. This will be allowed for in resource
estimates when geological interpretations
are completed.
Sample security
The measures taken to ensure sample
security.

Samples are collected by on site company
personnel/contractors and delivered direct to
the laboratory via a transport contractor.
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.

No audits have been completed. Review of
QAQC data to be carried out by database
consultants and company geologists.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a license to
operate in the area.

Kikagati drilling is on ML1430 and EL1380
which are located in the Isingiro District in
South-West Uganda.

The licences are 100% owned by African
Panther Resources (U) Limited (APRU).

Carnavale has the right to earn 51% of the
project by drilling 2,000m of diamond core,
with the right to earn up to 70% by sole
funding to completion of a Bankable
Feasibility Study.

All the land associated with the drilling has
compensation agreements in place and
there are no known land issues.
Exploration done by
other parties

Acknowledgment and appraisal of
exploration by other parties.

APRU has completed several pitting
programmes to test the colluvial gravels.

No hard-rock drilling has been undertaken
on any of the licences prior to Carnavale’s
involvement.
Geology
Deposit type, geological setting and style
of mineralisation.

At Kikagati Prospect, the geology is
composed of a quartzite sequence over
and underlain by phyllites. The sequence
has been folded and is east dipping at the
drill target. Mineralisation targeted is within
a series of west dipping quartz veins where
cassiterite occurs within veins and along
the altered wall rock on vein boundaries.
Additional potential for layer parallel
mineralization is interpreted to occur in fine
grained units within the quartzite sequence.
Drill hole Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:

easting and northing of the drill hole collar

Drill
hole
location
and
directional
information is provided in the attached
report.

11

Criteria JORC Code explanation Commentary

elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is
justified on the basis that the information is
not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
Data aggregation
methods

In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.

The assumptions used for any reporting of
metal equivalent values should be clearly
stated.

Samples results are pending
Relationship
between mineralisa-
tion widths and
intercept lengths

These relationships are particularly
important in the reporting of Exploration
Results.

If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
_hole length, true width not known’). _

Drilling is not always perpendicular to the dip
of mineralisation and true widths are less than
downhole widths. Estimates of true widths will
only be possible when all results are received,
and final geological interpretations have been
completed.
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.

Representative plans and sections are
provided in the report.
Balanced reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.

All results will be provided upon completion of
sampling and results received and assessed.

The report is considered balanced and
provided in context.
Other substantive
exploration data

Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.

No meaningful previous work has been done
on the project except as described in the
report and previous reports.
Further work
The nature and scale of planned further

The Company plans to complete the 2,000m

12

Criteria JORC Code explanation Commentary
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
programme and conduct detailed sampling of
the drill holes.

Geological interpretation and wireframes of
geology
and
mineralisation
will
be
undertaken.

Follow up infill drilling to increase the
definition of the mineralisation will be
undertaken subject topositive results.

13