Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CARNABY RESOURCES LIMITED Capital/Financing Update 2021

Jan 26, 2021

64675_rns_2021-01-26_4956f403-febf-4ade-ae07-b52b005d40d5.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement 27 January 2021

==> picture [142 x 48] intentionally omitted <==

EXPLORATION UPDATE COMPELLING STRELLEY AND

Fast Facts

Shares on Issue 117.8M

Market Cap (@ 35 cents) $41.2M

Cash $9.1M[1 ]

TICK HILL DRILL RESULTS

  • 1As of 30 October 2020 plus $500,000 received from Tailings Dam sale proceeds

Carnaby Resources Limited (ASX: CNB) ( Carnaby or the Company ) is pleased to provide an exploration update for the 100% owned Strelley and Tick Hill gold projects in the Mallina Basin, Pilbara, WA and Mt Isa, Qld regions.

Highlights - Strelley Project, Pilbara, Western Australia

  • At Stockade shallow aircore and reverse circulation ( RC ) drill results have identified a >1 km long gold mineralised corridor on broad ~200m spaced drilling open to the north. Results include;

  • PLAC0032 2m @ 2.15 g/t gold inc 1 m @ 3.85 g/t from 7m

  • o PLRC0003 7m @ 0.68 g/t gold inc 2m @ 1.6 g/t from 20m o PLRC0004 6m @ 0.63 g/t gold from 89m

  • At Palisade shallow and wide spaced aircore drilling has defined a 4 km long gold anomaly along the Berghaus Shear Zone. Results include;

  • PLAC0261 3m @ 0.33 g/t gold inc 1 m @ 0.65 g/t from 17m

  • o PLAC0292 1m @ 0.45 g/t gold from 16 m o PLAC0302 1m @ 1.08 g/t gold from 42 m

Highlights - Tick Hill Project, Mt Isa Queensland

  • At Tick Hill , RC drilling into the northern wall of the pit Wall has confirmed the high grade extension of the Tick Hill Main lode. Results include;

  • CBC037 1m @ 12.45 g/t gold from 82m

  • o CBC038 1m @ 7.95 g/t gold from 92m o CBC033 3m @ 2.30 g/t gold from 85m

The Company’s Managing Director, Rob Watkins commented:

Board and Management

Peter Bowler, Non-Exec Chairman Rob Watkins, Managing Director Greg Barrett, Non-Exec Director & Company Secretary

Paul Payne, Non-Exec Director

Company Highlights

  • Proven and highly credentialed management team

  • Tight capital structure and strong cash position

  • Commenced exploration at the Mallina Basin in the Pilbara of WA

  • Projects near to De Grey’s Hemi gold discovery on 394 km[2] of highly prospective tenure

  • 100% ownership of the Tick Hill Gold Project (granted ML’s) in Qld, historically one of Australia highest grade and most profitable gold mines

  • Past production of 511 koz at 22 g/t gold

  • Indicated and Inferred Mineral Resource of 845,000 t @ 2.47 g/t gold for 67,100 ounces[2]

  • Proven and Probable Ore Reserves of 459,900 t @ 1.89 g/t gold for 28,000 ounces[2]

  • 323 km[2] surrounding exploration package containing numerous gold and copper targets

  • 2Refer ASX release 5 June 2020, to be adjusted following Tailings Sale & NSR Royalty Agreement, refer ASX release 3 August 2020

“The drilling at Strelley has discovered several extensive gold mineralised corridors on very broad spaced and shallow drilling. Follow up drilling will begin in February. At Tick Hill, confirmation of the extension of the Main High Grade lode into the north wall of the open pit has further de-risked the open pit cutback, with a decision to mine or divest one step closer.”

Registered Office

78 Churchill Avenue Subiaco Western Australia 6008

T: +61 8 9320 2320

www.carnabyresources.com.au

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 8] intentionally omitted <==

1

STRELLEY PROJECT (Carnaby 100%)

First pass aircore and RC drilling programs were completed at Strelley in December 2020. The aim of the first pass drill programs was to scope out the Tabba Tabba and Berghaus Shear Zone structural pathways for evidence of broad mineralised trends beneath the shallow sand cover (Figure 1).

The average depth of holes across the aircore program was 30 m with transported cover averaging approximately 15m. The majority of the aircore drilling was completed at 80 m hole spacing and 320 to 640m traverses. At this extremely wide hole spacing and shallow hole depth, the aircore drilling program was designed to target secondary gold anomalism and define broad geochemical trends for future follow up infill drilling.

The drilling has successfully identified two main corridors of gold mineralisation at Stockade / Gibraltar and at Palisade, both of which are over 4 km in strike and sparsely drilled (Figure 2). Followed up drilling programs are planned to commence in February 2021.

==> picture [452 x 277] intentionally omitted <==

Figure 1. Carnaby Mallina Basin tenements showing location of the Strelley project.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

2

==> picture [369 x 275] intentionally omitted <==

Figure 2. Strelley project location map showing location gold mineralised corridors and intrusion style magnetic targets.

Stockade Prospect

Wide spaced and shallow aircore and RC drilling has identified a greater than 1 km long gold mineralised corridor at Stockade which requires immediate follow up drilling. The corridor is open to the north from a new aircore result of 2m @ 2.15 g/t gold from 6m including 1m @ 3.85 g/t gold from 7m in PLAC0032 (Figure 3 A-A’ & Figure 4).

Significant results from the drilling at Stockade include;

  • PLAC0032 2m @ 2.15 g/t gold inc 1 m @ 3.85 g/t from 7m

  • PLAC0003 1m @ 0.32 g/t gold from 18m Bottom of hole (BOH)

  • PLRC0003 1m @ 2.35 g/t gold from 7 m,

  • 3m @ 0.37 g/t gold from 14m,

  • 7m @ 0.68 g/t gold inc 2m @ 1.6 g/t from 20m , 2m @ 0.25g/t gold from 35m and

  • 2m @ 0.67 g/t gold from 48m inc 1 m @ 1.14 g/t from 48m

  • PLRC0004 5m @ 0.13 g/t gold from 2m and

  • 6m @ 0.63 g/t gold from 89m inc 1m @ 2.1 g/t from 90m

  • PLRC0005 8m @ 0.13 g/t gold from 115m and

15m @ 0.17 g/t gold from 135m BOH

  • Inc 1m @ 0.46 g/t from 149m BOH

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

3

The drilling completed to date is on very broad spacing averaging approximately 200 m drill line traverses and 80 m hole spacing.

Gold mineralisation is hosted within a strongly altered and sheared quartzite and schist unit surrounded by mafic rocks. A single small outcropping hill in the central part of the anomaly represents the only known outcrop of basement in the entire Strelley project area.

Three RC holes drilled on the central outcropping hill drill section intersected broad zones of gold mineralisation in steeply dipping shears with results up to 7m @ 0.68 g/t gold inc 2m @ 1.6 g/t gold from 20 m in PLRC0003 and 6 m @ 0.63 g/t gold from 89 m in PLRC0004 (Figure 3 B-B’ & Figure 5).

A shallow aircore traverse drilled 200 m north of the outcropping hill RC drill section on a wide spaced 80m hole spacing has intersected a continuation of the mineralised trend in PLAC0032 which recorded 2m @ 2.15 g/t gold from 6m including 1m @ 3.85 g/t gold from 7m in PLAC0032 and remains open to the north (Figure 3 A-A’ & Figure 4).

A shallow aircore drill traverse on 80m hole spacing has intersected the southern continuation of the mineralised corridor with a result of 1 m @ 0.32 g/t gold from 18m BOH in PLAC0003 (Figure 3 C-C’ & Figure 6). The nearest drilling along strike to PLAC0003 is 320m to the north and 200m to the south where historical RC drilling intersected 1 m @ 6.65 g/t gold and 8 m @ 0.69 g/t gold.

In addition to the main Stockade mineralised corridor, a second parallel trend is emerging approximately 1km to the northwest (Figure 3). A single RC hole PLRC0005 intersected a broad gold mineralised zone which appears to be increasing in gold grade down hole with results of 8m @ 0.13 g/t gold from 115m and 15 m @ 0.17 g/t gold from 135m including 1 m @ 0.46 g/t gold from 149m BOH . This hole will be extended with RC or diamond tail.

Several other high priority targets exist in the Stockade area including untested intrusion style magnetic anomalies and other geochemical trends identified in shallow historical drilling (Figure 2 & 3). The signing of the special lease land access agreement as announced on the 23 December 2020 (See ASX Release) has allowed these targets to now be fully tested in the upcoming drilling programs. Drilling can now commence for the first time on the southern extension of the Stockade gold mineralised corridor.

The drilling at Stockade has clearly identified broad gold mineralised corridors over greater than 1 km strike on wide spaced and shallow drilling and is a high priority target for follow up drilling commencing in February 2021.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

4

==> picture [411 x 393] intentionally omitted <==

Figure 3. Stockade location map showing drill results, gold mineralised corridors and intrusion style magnetic targets.

==> picture [451 x 205] intentionally omitted <==

Figure 4. Stockade Drill Section A-A’.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

5

==> picture [437 x 353] intentionally omitted <==

Figure 5. Stockade Hill Drill Section B-B’.

==> picture [439 x 261] intentionally omitted <==

Figure 6. Stockade Drill Section C-C’.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

6

Palisade Prospect

At the Palisade prospect shallow and wide spaced aircore drilling has defined a 4 km long gold anomaly along the interpreted northeast extension of the Berghaus Shear Zone into the Tabba Tabba Greenstone belt (Figure 7).

A new greater than 1.2 km long eastern extension of Palisade has been discovered in wide spaced and shallow aircore drilling on 640 m x 80 m spacing. Significant results include:

  • PLAC0261 3m @ 0.33 g/t gold inc 1 m @ 0.65 g/t from 17m

  • PLAC0292 1m @ 0.45 g/t gold from 16 m

o PLAC0302 1m @ 1.08 g/t gold from 42 m o PLAC0201 2m @ 0.29 g/t gold inc 1m @ 0.45 g/t from 14m

At the western extension of Palisade a new bedrock hosted gold anomaly has been intersected on wide spaced and shallow aircore drilling on 640 m x 80 m hole spacing. Results include 1m @ 0.088 g/t gold from 31m to bottom of hole in PLAC0148 (Figure 7).

In the central Palisade area a 1 km long and up to 300m wide zone of anomalous gold is hosted in a flat secondary calcrete horizon at the interface between cover and basement rocks. First pass RC drilling directly under the calcrete gold anomaly has not yet determined the source of the gold anomaly, which may have re-mobilised laterally from a primary source.

The Palisade prospect is a highly prospective and high priority target discovered in extremely wide spaced and shallow drilling. Follow up drilling in search of the source of the 4 km long Palisade gold anomaly will form part of a phase two drilling program to commence in February 2021.

Gibraltar Prospect

The Gibraltar prospect is located on the eastern edge of the Tabba Tabba Greenstone and is hosted in sheared mafic rocks where historical RC drill results up to 10m @ 1.6 g/t gold including 2 m @ 5.7 g/t gold has been intersected.

Limited follow up RC drilling intersected 2m @ 0.36 g/t gold from 145m including 1 m @ 0.58 g/t gold from 145m in PLRC0002 close to the bottom of hole at 150m, indicating that gold grades may be increasing towards the bottom of the hole (Figure 7). PLRC0002 will be extended with a diamond core tail in order to better understand the style and orientation of gold mineralisation at Strelley where the basement rocks are completely masked by shallow sand cover except for a single small, 20m long outcrop of quartzite at Stockade.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

7

==> picture [487 x 403] intentionally omitted <==

Figure 7. Palisade and Gibraltar location plan showing new drill results.

TICK HILL PROJECT (Carnaby 100%)

New high grade RC drill results have confirmed that the Tick Hill Main Lode extends 20m into the north wall of the historical open pit that produced 180,000oz @ 18.1 g/t from a 70m deep open pit (Figure 8).

The drilling intersected high grade gold mineralisation hosted in laminated lode including;

==> picture [252 x 49] intentionally omitted <==

Drilling closer to the historical north pit wall edge, where higher gold grades and wider zones of gold mineralisation are present in historical grade control results, was not possible due to restricted available drill platforms. Importantly the results have confirmed that the high-grade

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

8

gold mineralisation in historical grade control results does continue 20m into the north pit wall.

==> picture [451 x 298] intentionally omitted <==

Figure 8. Tick Hill North Pit Wall Drill Results on horizontal Flitch section.

The North pit wall extension forms part of the mineral inventory for the Tick Hill open pit cutback and the results released today have further de-risked the open pit cutback project. The Tick Hill open pit cutback is forecast to produce 63,300t @ 6.1 g/t for 12,500oz generating pre-tax cashflows of ~$15M at AISC of A$1,190/oz[1] . Carnaby is actively pursuing development options for the Tick Hill open pit cutback and is completing additional permitting requirements. A decision to mine and / or agreement to divest part or all of the open pit cutback project is continuing to be evaluated and discussed with 3[rd] parties.

A single diamond drill hole was completed at Tick Hill deeps in December 2020. Processing and analysis of the core is continuing with results only received from a small section of core with no significant results received to date.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

9

CORPORATE

Carnaby remains in a strong financial position with cash of $9.1M [2] , less December quarter expenditure, available to internally fund ongoing exploration programs. Funds from the sale of the Tick Hill Tailings project continue to be accumulated with $3.25 M cash received to date and a further $0.75M to be received on 4 March 2021 due to full-scale production from the Tailings officially commencing on 19 January 2021. Carnaby will also start receiving proceeds from a 5% royalty on all the tailings processed from Tick Hill, which is forecast to be approximately $2M .

1Refer to ASX release 5 June 2020 for full details regarding the Tick Hill PFS

2Refer to ASX release 30 December 2020

Further information regarding the Company can be found on the Company’s website www.carnabyresources.com.au

For further information please contact: Robert Watkins, Managing Director +61 8 9320 2320

Competent Person Statement

The information in this document that relates to exploration results is based upon information compiled by Mr Robert Watkins. Mr Watkins is a Director of the Company and a Member of the AUSIMM. Mr Watkins consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears. Mr Watkins has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which is undertaken to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).

Disclaimer

References may have been made in this announcement to certain ASX announcements, including references regarding exploration results, mineral resources and ore reserves. For full details, refer to said announcement on said date. The Company is not aware of any new information or data that materially affects this information. Other than as specified in this announcement and the mentioned announcements, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources, Exploration Target(s) or Ore Reserves that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

10

Table 1. Strelley Aircore & RC Drill Results

Location Hole ID Easting Northing Azimuth Dip Depth
From
Interval Au
(g/t)
Comments
STOCKADE PLAC0003 712636 7737675 330 -60 18 1 0.32 Bottom of
Hole
STOCKADE PLAC0025 712555 7738450 0 -90 49 1 0.05
STOCKADE PLAC0032 713072 7738194 330 -60 6 2 2.15
incl 7 1 3.85
STOCKADE PLAC0036 712914 7738474 330 -60 10 1 0.15
STOCKADE PLAC0041 712712 7738825 330 -60 32 1 0.08
GIBRALTAR PLAC0096 714446 7740939 330 -60 11 1 0.07
GIBRALTAR PLAC0098 714364 7741083 330 -60 10 1 0.12
PALLISADE PLAC0148 713256 7742369 330 60 31 1 0.09 Bottom of
Hole
PALLISADE PLAC0201 714684 7742460 330 -60 13 2 0.29
PALLISADE PLAC0205 714519 7742730 330 -60 15 2 0.25
PALLISADE PLAC0213 714200 7743278 330 -60 14 2 0.05
PALLISADE PLAC0229 715553 7742220 330 -60 33 1 0.07
PALLISADE PLAC0237 715238 7742780 330 -60 13 2 0.14
PALLISADE PLAC0259 715715 7743237 330 -60 12 3 0.11
PALLISADE PLAC0261 715632 7743380 330 -60 16 3 0.33
incl 17 1 0.65
PALLISADE PLAC0264 715509 7743588 330 -60 15 1 0.05
PALLISADE PLAC0292 716145 7743761 330 -60 16 1 0.45
PALLISADE PLAC0302 716822 7743878 330 -60 42 1 1.08
PALLISADE PLAC0309 716424 7744561 330 -60 19 1 0.07
PALLISADE PLAC0358 719038 7745158 330 -60 24 1 0.1
PALLISADE PLAC0395 714306 7742481 330 -60 13 2 0.16
PALLISADE PLAC0396 714275 7742540 330 -60 14 1 0.27
PALLISADE PLAC0400 714540 7742690 330 -60 13 2 0.25
STOCKADE PLAC0404 712934 7738439 330 -60 5 1 0.05
GIBRALTAR PLRC0002 714213 7740708 328 -59 145 2 0.36
incl 145 1 0.58
STOCKADE PLRC0003 712968 7737980 326 -59 7 1 2.35
14 3 0.37
20 7 0.68
incl 22 2 1.60
35 2 0.25
48 2 0.67
incl 48 1 1.14
STOCKADE PLRC0004 712937 7738040 146 -61 2 5 0.13
89 6 0.63
incl 90 1 2.10
91 4 0.29
incl 94 1 0.43

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

11

Location Hole ID Easting Northing Azimuth Dip Depth
From
Interval Au
(g/t)
Comments
STOCKADE PLRC0005 712783 7738701 330 -66 115 8 0.13
135 15 0.17
incl 149 1 0.46 Bottom of
Hole
STOCKADE PLRC0008 712973 7737963 328 -59 55 2 0.22
86 3 0.16
PALLISADE PLRC0010 714258 7742559 151 -60 14 1 0.10
STOCKADE PLRC0017 712932 7737812 334 -58 25 3 0.16
PALLISADE PLRC0020 713996 7742360 329 -58 14 1 0.15
STOCKADE PLRC0021 712634 7738502 271 -60 91 2 0.12
STOCKADE PLRC0022 714458 7740929 332 -59 25 1 0.17

Strelley aircore significant intercepts were calculated using a lower cutoff of 0.05g/t and no internal dilution. Strelley RC significant intercepts were calculated using a lower cutoff of 0.10g/t and a maximum of 3m of internal dilution.

Table 2. Tick Hill RC Drill Results

Location Hole ID Easting Northin
g
Azimuth Dip Dept
h
From
Interval Au
(g/t)
Comments
TICK HILL CBC033 388843 7606044 196.7 -54.5 85 3 2.30
TICK HILL CBC035 388844 7606042 187.8 -46.5 72 1 1.39
TICK HILL CBC035 388844 7606042 187.8 -46.5 76 2 0.55
88 2 1.55
TICK HILL CBC035 388844 7606042 187.8 -46.5 incl
89
1
2.41
TICK HILL CBC036 388845 7606046 57.0 -48.9 78 1 2.06
TICK HILL CBC036 388845 7606046 57.0 -48.9 92 1 1.21
TICK HILL CBC037 388845 7606044 186.2 -46.1 82 1 12.45
TICK HILL CBC038 388846 7606045 196.1 -48.5 82 1 2.12
TICK HILL CBC038 388846 7606045 196.1 -48.5 92 1 7.95
TICK HILL CBC043 388844 7606016 0.0 -90.0 0 8 0.70 composite
TICK HILL CBC044 388842 7606042 188.4 -47.6 76 1 0.56
TICK HILL CBC044 388842 7606042 188.4 -47.6 82 1 1.24

Tick Hill significant intercepts were calculated using a lower cutoff of 0.5g/t and a maximum of 1m of internal dilution.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

12

Section 1. Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (e.g. cut
channels,
random
chips,
or
specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure
sample
representivity
and
the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.

Strelley Aircore samples were collected using a cyclone
with a 1-2kg scoop sub-sample taken from either
individual metre intervals or over composite intervals
of 2-10m. Where the composite result exceeded
50ppb, the individual 1m samples composing the
composite were scoop sampled and submitted for
analysis.

Strelley RC samples were collected via an adjustable
cone splitter mounted below the cyclone. A 2-3kg
sample was collected from each 1m interval. The
remainder of the sample for each 1m interval was
collected in a green plastic bag. Composite samples
were collected from the green bags using a spear tube
over a 5m interval. Where the composite result
exceeded 50ppb, the 1m cone split samples
comprising the interval were collected for analysis.

Samples from aircore and RC were pulverised to obtain
a 25g charge for aqua regia digest and ICP-MS analysis
of Gold at trace level. The end of hole sample of every
air core hole at Strelley was analysed for full-suite
multi-elements using aqua regia digest and a ICP-MS
finish at trace level in addition to gold. All 1m
resampling of composite intervals at Strelley were
pulverised to obtain a 50g charge and analysed using
Fire Assay with an AAS finish at Ore Grade detection
levels.

Recent Tick Hill RC samples were collected via an
adjustable cone splitter mounted below the cyclone. A
2-3kg sample was collected from each 1m interval.
Samples were pulverised to obtain a 25g charge for
aqua regia digest and ICP-MS analysis of Gold at ore
grade level.

NQ sized half or quarter cut core samples from the
diamond hole at Tick Hill are being analysed for trace
level Gold using a 25g aqua regia digest and ICP-MS
finish and trace level Copper, Cobalt and Silver using
the same digest with an ICP-MS finish.
Drilling
techniques
• Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
• Aircore drilling total 372 holes for 11,127m drilled by Bostech
drilling.
• RC drilling total 37 holes for 1080m drilled by Ranger Drilling.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

13

Criteria JORC Code explanation Commentary
Drill sample
recovery

Method of recording and assessing
core and chip sample recoveries
and results assessed.

Measures
taken
to
maximise
sample
recovery
and
ensure
representative
nature
of
the
samples.

Whether
a
relationship
exists
between sample recovery and
grade and whether sample bias
may
have
occurred
due
to
preferential
loss/gain
of
fine/coarse material.

For the diamond drilling both drilled and recovered
metres were recorded for each drill run.

RC samples were dry and with high recoveries. The
cone splitter was set to achieve an approximate 2-3 kg
of sub sample for every metre drilled.

Aircore samples were recovered dry and with
consistent high sample recovery observed in the field.
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
• Logging was completed by geologists and is at a level sufficient
to generate maps, plans and sections found in company reports.
• All core and chips from the recent programme were logged with
Maxgeo Logchief software and uploaded to the Maxgeo
database.
• Tick Hill core and RC chips were photographed.
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material beingsampled.
• NQ drill core was half cut with core from the non-marked side of
the orientation line taken for analysis. The majority of intervals of
half cut core were 1m. Where the core interval exceeded 1.6m,
the core was quarter cut. The majority of quarter cut intervals
were 2m in length.
• For RC samples, all individual samples were collected using a cone
splitter mounted beneath the cyclone to collect a 2-3kg sample.
RC composite samples >1m were sampled using a 50mm
spear/tube from inside the bulk green bag sample. The sample
collect was dry.
• The sample size collected is considered appropriate to the grain
size of the material being sampled.
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For
geophysical
tools,
spectrometers,
handheld
XRF
instruments,
etc,
the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
• Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.

RC drill samples from the Tick Hill Pit were analysed at
ALS using a 25g aqua regia digest and an ICP-MS finish
for ore grade level gold level. A blank sample was
inserted at the start of each hole and 2 different
Carnaby selected standards were used, alternating at
every 25th sample. Diamond core at Tick Hill was
analysed at ALS using a 25g aqua regia digest and an
ICM-MS finish for trace level gold, silver, copper and
cobalt.

Air core and RC samples from Strelley were analysed
at ALS in Perth using a 25g aqua regia digest and an
ICP-MS finish for trace level gold. Carnaby selected
standards of various levels were inserted at
approximately every 50th sample. 1m resamples of
composite samples exceeding 50ppb were sent to ALS
Perth for analysis using a 50g charge and fire assay
with an AAS finish at ore grade detection levels.
Carnaby selected standards were inserted at ever 20th
sample.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

14

Criteria JORC Code explanation Commentary

Acceptable levels of accuracy and precision have been
established.
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss anyadjustment to assaydata.
• At the prospect scale the quality of the Strelley data is currently
considered acceptable for exploration purposes. Further
investigation and validation will be undertaken as work programs
progress.
Location of data
points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Qualityand adequacyof topographic control.
• Grid systems used for Strelley was MGA94/50.
• Grid Systems used for Tick Hill was MGA94/54.
Data spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• Reconnaissance aircore and RAB drilling was completed at 640m
x 80m spacing, closed up to 320m x 40 m at Palisade.
Orientation of
data in relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• The southern half of the project containing the Tabba Tabba
Shear strikes approximately NNE and is considered to be well
tested with EW drill and soil sample lines. In the northern half of
the project where the Tabba Tabba Shear bends to a NE
orientation coincident with a NE fault, the orientation of the
historical soil sampling and drill traverses is considered to be at a
non optimal orientation.
• New drill lines at Strelley have been orientated perpendicular to
the interpreted strike of the major shear zones to reduce any
potential samplingbias of the zones beingreported.
Sample security • The measures taken to ensure sample
security.
• Drill samples for Strelley were dispatched by Carnaby staff directly
to the transport company depot in Port Hedland for transport to
ALS labs in Perth.
• Drill samples from Tick Hill were taken directly to the Mt Isa ALS
samplepreparation facilitybyCarnabyStaff.
Audits or reviews • The results of any audits or reviews of
samplingtechniques and data.
• No external audits or reviews have been undertaken of the recent
samplingtechniques and data.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

15

Section 2. Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section).

Criteria Explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaininga licence to operate in the area.
• ELA45/5614 is an exploration licence application owned 100%
by Carnaby Resources Ltd.
• E45/4638 is a granted exploration license which is being
transferred from Lithium Power WA Holdings Pty Ltd (LPWA) to
Carnaby Resources Ltd as part of an agreement whereby LPWA’s
parent, Lithium Power International Ltd retains certain mineral
rights relating to Lithium minerals. Carnaby own 100% of the
gold rights on the tenement. Heritage survey and plan of works
have been completed on the tenement.
Acknowledgment
and appraisal of
exploration by
otherparties.
• Acknowledgment and appraisal of exploration
by other parties.
• Shaw River Manganese Limited completed the original gold
exploration on the tenement delineating several gold anomalies
in soils and drilling.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Strelley project is located in the northern part of the Archean
Pilbara Craton. The tenement is located within the Mallina basin
group greenstone and intrusives on the district scale Tabba
Tabba Shear zone which hosts significant gold mineralisation to
the SW within De Greys Mining Ltd’s tenure. The recent
discovery of the intrusion related Hemi gold discovery by De
Grey Mining Ltd has generated significant new interest in the
Mallina Basin. Within the Strelley project late intrusive rocks
equivalent in age to the Hemi gold discovery are present. Gold
mineralisation intersected in the Strelley project to date is
associated with silicification andquartz veining.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
• easting and northing of the drill hole collar
• elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
• dip and azimuth of the hole
• down hole length and interception depth
• hole length.
• If the exclusion of this information is justified on
the basis that the information is not Material
and this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the
case.
• Included in report. Refer to the report and Table 1.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
Material and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• Strelley aircore significant intercepts were calculated using a
lower cutoff of 0.05g/t and no internal dilution. Strelley RC
significant intercepts were calculated using a lower cutoff of
0.10g/t and a maximum of 3m of internal dilution.
• Tick Hill significant intercepts were calculated using a lower
cutoff of 0.5g/t and a maximum of 1m of internal dilution.
• Higher grade intercepts have been separately reported where
applicable.
• Metal equivalents have not been used.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

16

Criteria Explanation Commentary
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).
• All drill intercepts have been reported as downhole lengths and
not enough information is present to know the true widths of
these intersections.
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• See the body of the announcement.
Balanced
reporting
• Where
comprehensive
reporting
of
all
Exploration
Results
is
not
practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• The exploration results should be considered indicative of
mineralisation styles in the region.
Other
substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geological
observations;
geophysical survey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminatingsubstances.
• As discussed in the announcement
Further work • The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible
extensions,
including
the
main
geological interpretations and future drilling
areas, provided this information is not
commerciallysensitive.
• Planned exploration works are in the process of being prepared.

==> picture [595 x 11] intentionally omitted <==

==> picture [595 x 11] intentionally omitted <==

17