ASX Announcement 20 May 2021

MOUNT BIRNIE AND DUCHESS COPPER PROSPECTS

NEW IP ANOMALIES 4,000m RC DRILLING UNDERWAY

Fast Facts

Shares on Issue 117.9M

Market Cap (@ 45.5cents) $53.7M Cash $8.0M[1 ]

1As of 31 March 2021

Board and Management

Peter Bowler, Non-Exec Chairman

Rob Watkins, Managing Director

Carnaby Resources Limited (ASX: CNB) ( Carnaby or the Company ) is pleased to provide an exploration update for the Greater Duchess Copper Gold Project in Mount Isa, Queensland.

Greg Barrett, Non-Exec Director & Company Secretary

Paul Payne, Non-Exec Director

Company Highlights

Highlights – Greater Duchess Copper Project, Mount Isa, Queensland

  • Results from a pole/dipole IP/Resistivity survey at the Mount Birnie Prospect have generated several significant IP chargeability anomalies along strike and adjacent to the Mount Birnie copper deposit (Figure 2)

  • A new area 500m to the south of the Mount Birnie Prospect has produced several IP chargeability anomalies across 4 consecutive lines (Figure 2).

  • At the Duchess Prospect a single IP line across the Duchess, Ivanhoe and Central lodes has identified IP chargeability anomalies associated with the known lodes and identified a deep IP anomaly under the main shaft area at Duchess, which historically produced 25,155t of copper @ 12% Cu .

  • A 4,000m RC drilling program targeting the Mount Birnie and Nil Desperandum Prospects and other key copper target areas within the Greater Duchess Copper Gold project has commenced.

The Company’s Managing Director, Rob Watkins commented:

“The extensive IP geophysical survey just completed at Nil Desperandum (see ASX release 7 May 2021), and now Mount Birnie and Duchess has generated numerous chargeability anomalies of high potential, which are now being targeted in the recently commenced 4,000m RC drilling program. We are excited about these targets and look forward with great anticipation to the results from this drilling program.”

  • Proven and highly credentialed management team

  • Tight capital structure and strong cash position

  • Projects near to De Grey’s Hemi gold discovery on 442 km[2] of highly prospective tenure

  • Greater Duchess Copper Gold Project, numerous camp scale IOCG deposits over 323 km[2] of tenure

  • 100% ownership of the Tick Hill Gold Project (granted ML’s) in Qld, historically one of Australia highest grade and most profitable gold mines

  • Past production of 511 koz at 22 g/t gold

  • Indicated and Inferred Mineral Resource of 845,000 t @ 2.47 g/t gold for 67,100 ounces[2]

  • Proven and Probable Ore Reserves of 459,900 t @ 1.89 g/t gold for 28,000 ounces[2]

  • 2Refer ASX release 5 June 2020, to be adjusted following Tailings Sale & NSR Royalty Agreement, refer ASX release 3 August 2020

Registered Office

78 Churchill Avenue Subiaco Western Australia 6008

T: +61 8 9320 2320

www.carnabyresources.com.au

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 8] intentionally omitted <==

1

==> picture [451 x 439] intentionally omitted <==

Figure 1. Greater Duchess Copper Gold project location map.

GREATER DUCHESS COPPER GOLD PROJECT (CNB 82.5 -100%)

The Greater Duchess Copper Gold Project encompasses over 70 km of IOCG targets north of the Tick Hill gold deposit, centred around the historical Duchess copper mining district and south of Hammer Metals’ (HMX) new Trafalgar copper gold discovery (see ASX release 17 February 2021).

Carnaby has completed a 15-line km ground Induced Polarisation ( IP ) pole / dipole survey at Nil Desperandum, Mount Birnie and Duchess. The IP survey was completed by Planetary Geophysics Pty Ltd and results processed by Southern Geoscience Consultants. The results from the Mount Birnie and Duchess areas have now been processed and are presented and

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

2

discussed below. Modelled chargeability and resistivity inversion sections are presented in Appendix 1.

A 4,000m RC drilling program has just commenced, targeting the new IP anomalies and deposit extensions at Nil Desperandum, Mount Birnie and other key target areas within the Greater Duchess Copper Gold Project.

MOUNT BIRNIE PROSPECT

Mount Birnie is a series of shallow, turn of the century historical copper workings hosted in steeply dipping NE striking lodes, last drilled by Carnaby in 2019 where results of up to 17 m @ 3.2 % copper from 84m including 3 m @ 9.3% copper from 76m and 2m @ 9.5% copper from 99m were reported (see ASX release 1 August 2019). Prior to the Carnaby drilling in 2019, the only other recorded historical drilling was from 1967 where diamond drill results of up to 11m @ 7.1% copper from 84m and 13m @ 3.3% copper including 4m @ 8.6% copper from 182m were recorded (see ASX release 11 June 2019). Very little drilling has been completed outside of the main workings area (Figure 2).

==> picture [411 x 350] intentionally omitted <==

Figure 2. Mount Birnie Plan showing location of IP lines and new IP anomalies.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

3

Carnaby has completed an extensive 5.9 line km, 5 line pole/dipole Induced Polarisation/Resistivity survey at Mount Birnie (Figure 2).

The results have highlighted several chargeability IP inversion anomalies (MBIP5-7) along strike and adjacent to the main known historical Mount Birnie workings area and at a new area approximately 500m south of Mount Birnie where a continuous broadly NE-SW striking chargeability anomaly has been generated over 4 consecutive IP lines (Figure 2).

MBIP1 to MBIP4 IP Anomalies

MBIP1 to MBIP4 IP chargeability inversion anomalies appear to form a continuous IP anomaly across 4 consecutive IP lines covering a strike length of approximately 500m, striking broadly NE SW (Figure 2). The modelled depth of the IP anomalies varies from approximately 50 to 150m below surface (Appendix 1).

The strongest recoded chargeability inversion is the from the SW end of line 6360 from the MBIP1 IP anomaly (Figure 3).

The source of the IP anomalies 500m south of Mount Birnie is presently unknown and is being targeted in the recently commenced RC drilling program.

==> picture [467 x 215] intentionally omitted <==

Figure 3. MBIP1 chargeability Inversion IP anomaly.

MBIP5 to MBIP7 IP Anomalies

MBIP5 to MBIP7 chargeability inversion anomalies are located along strike and adjacent to the Mount Birnie workings (Figure 2).

MBIP5 is located approximately 150m ENE of and potentially along strike from Mount Birnie where the eastern most drill hole at Mount Birnie is open to the NE and recorded 6m @ 1.1%

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

4

copper from 28m. The modelled depth of the MBIP5 anomaly is approximately 150m below surface (Appendix 1).

MBIP6 is located approximately 200-250m NW of Mount Birnie workings area and is modelled to occur at about 100m below surface. The anomaly is located away from the interpreted NE striking structural corridor of the Mount Birnie workings, however is close to Carnaby’s 2019 diamond hole MBD009 which intersected broad low level copper mineralisation associated with disseminated chalcopyrite of 95m @ 0.24% copper from 59m.

MBIP7 is located approximately 250m southwest of Mount Birnie and is broadly within the interpreted southwest structural striking corridor of the copper mineralisation. This anomaly is located close to a major NW fault breccia coincident with the strike of a NW oriented creek (Figure 2). Depth to the top of MBIP7 is modelled to be approximately 150m (Figure 4, Appendix 1).

==> picture [451 x 209] intentionally omitted <==

Figure 4. MBIP7 chargeability Inversion IP anomaly.

The source of the IP anomalies along strike and adjacent to Mount Birnie is presently unknown and is being targeted in the current RC drilling program which has just commenced.

DUCHESS PROSPECT

The Duchess Prospect is centred around the historical Duchess copper deposit that produced 25,155 t of copper at a head grade of 12% between 1900 and 1940 from a single steeply dipping shoot mined down to 260m below surface and over a strike length of approximately 150m.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

5

The Duchess prospect also includes the Ivanhoe and Central lodes immediately to the west of Duchess, where significant copper mineralisation has been defined and drilled by previous explorers.

Barrick completed HeliTEM at Duchess identifying a deep conductor anomaly directly beneath the mined area of the Duchess mine.

Carnaby completed a single 1.7 km IP line traversing across all 3 known lodes. The main aim of the IP line was to test for the HeliTEM anomaly directly below the Duchess Mine prior to a decision to drill.

==> picture [495 x 158] intentionally omitted <==

Figure 5. Duchess IP Line showing inversion modelling of chargeability and IP anomalies generated.

The results from the Duchess IP line encouragingly did define IP chargeability inversion anomalies associated with the known drilled Ivanhoe and Central lodes indicating the IP method is working well in detecting copper mineralisation. At the Duchess mine, a shallow chargeable inversion anomaly is interpreted to potentially represent remnant copper mineralisation not mined out historically. A deeper target has been identified below the main shaft area at Duchess Deeps and is under consideration for drilling. (Figure 5).

Further information regarding the Company can be found on the Company’s website www.carnabyresources.com.au

For further information please contact: Robert Watkins, Managing Director +61 8 9320 2320

Competent Person Statement

The information in this document that relates to exploration results is based upon information compiled by Mr Robert Watkins. Mr Watkins is a Director of the Company and a Member of the AusIMM. Mr Watkins consents to the inclusion in the report of the matters based upon the information in the form and context in which it appears. Mr Watkins has sufficient experience which

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

6

is relevant to the style of mineralisation and type of deposit under consideration and to the activity which is undertaken to qualify as a Competent Person as defined in the December 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (JORC Code).

Disclaimer

References may have been made in this announcement to certain ASX announcements, including references regarding exploration results, mineral resources and ore reserves. For full details, refer to said announcement on said date. The Company is not aware of any new information or data that materially affects this information. Other than as specified in this announcement and the mentioned announcements, the Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and, in the case of estimates of Mineral Resources, Exploration Target(s) or Ore Reserves that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

Previously released ASX Material References that relates to announcement include:

Nil Desperandum Strong IP Conductors, 7 May 2021

Greater Duchess Copper Gold Project Update, 17 February 2021

Mount Birnie Copper Project Drill Results up to 9.46% Copper, 1 August 2019

Spectacular Historical Drill Results – 11m @ 7.1% Cu, 11 June 2019

Tick Hill Key Target Area Update, 16 May 2019

Acquisition of Tick Hill Gold Project, Past Production 511koz @ 22.5g/t Gold, New Board Appointments, 12 March 2019

Appendix 1. Mount Birnie and Duchess IP Inversion Sections

==> picture [421 x 286] intentionally omitted <==

Mount Birnie Line 6360 showing inversion modelling of resistivity (top image) and chargeability (bottom image) and MBIP1 anomaly.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

7

==> picture [420 x 277] intentionally omitted <==

Mount Birnie Line 6520 showing inversion modelling of resistivity (top image) and chargeability (bottom image) and MBIP2 and MBIP7 anomalies.

==> picture [419 x 273] intentionally omitted <==

Mount Birnie Line 6680 showing inversion modelling of resistivity (top image) and chargeability (bottom image) and MBIP3 and MBIP6 anomalies.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

8

==> picture [407 x 284] intentionally omitted <==

Mount Birnie Line 6840 showing inversion modelling of resistivity (top image) and chargeability (bottom image) and MBIP4 anomaly.

==> picture [421 x 290] intentionally omitted <==

Mount Birnie Line 7000 showing inversion modelling of resistivity (top image) and chargeability (bottom image) and MBIP5 anomaly.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

9

==> picture [451 x 271] intentionally omitted <==

Duchess IP Line showing inversion modelling of resistivity (top image) and

chargeability (bottom image).

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels,
random
chips,
or
specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure
sample
representivity
and
the
appropriate calibration of any measurement
tools or systems used.
• Aspects
of
the
determination
of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types(eg
Multi-channel IP receiver (10x Iris Fullwaver or GDD RX32) •
One GDD TXIV, 20Amp transmitter
• 20x half-cell non-polarising electrodes
• Eight kilometres of industry rated IP cable and collection
mechanisms
• Two 64s Garmin handheld GPS
• Field processing computer

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

10

Criteria JORC Code explanation Commentary
submarine nodules) may warrant disclosure of
detailed information.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core
is oriented and if so,bywhat method,etc).
• N/A as IP geophysical survey results
Drill sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
• Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
N/A as IP geophysical survey results
Logging • Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
The total length and percentage of the
relevant intersections logged.
• N/A as IP geophysical survey results
Sub-sampling
techniques and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling
stages
to
maximise
representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material beingsampled.
• N/A as IP geophysical survey results
Quality of assay
data and
laboratory tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For
geophysical
tools,
spectrometers,
handheld
XRF
instruments,
etc,
the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied and
their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
Multi-channel IP receiver (10x Iris Fullwaver or GDD RX32) •
One GDD TXIV, 20Amp transmitter
• 20x half-cell non-polarising electrodes
• Eight kilometres of industry rated IP cable and collection
mechanisms
• Two 64s Garmin handheld GPS
• Field processing computer
6 line, line 1 angled 125°‐305°, all other lines angles 035°‐
215°
• All Lines at Mount Birnie using 50 m A‐spacing on receivers
and 100 m on transmitter. At Duchess 100 m A‐spacing on
receivers and 100 m on transmitter
• Receiver and transmitter points offset.
• Measurements made in PDP and DPP sense.

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

11

Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss anyadjustment to assaydata.
• N/A as IP geophysical survey results
Location of data
points
• Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
• Specification of the grid system used.
• Qualityand adequacyof topographic control.
• Sample locations were obtained using a Garmin GPS in UTM
MGA94 mode
Data spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
N/A as IP geophysical survey results
Orientation of
data in relation to
geological
structure
• Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Most IP lines are at right-angles to the main mineralisation.
Sample security • The measures taken to ensure sample
security.
• N/A as IP geophysical survey results
Audits or reviews • The results of any audits or reviews of
samplingtechniques and data.
• N/A as IP geophysical survey results

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section).

Criteria Explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
• The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
• The Queensland projects comprise the Tick Hill Mine Project
Region (105.5km2) and the Regional Leases (217.3km2). The
projects comprise of three Mining Leases at Tick Hill (3.9km2-
100% interest acquired from Diatreme and Superior – ML’s 7094,
7096 and 7097), twelve surrounding and regional tenements
(293.3km2- 82.5% interest to be acquired from Syndicated –
EPM’s 9083, 11013, 14366, 14369, 17637, 18980, 19008, 25435,
25439, 25853, 25972,); and two additional tenements held by
Carnaby associated entities (25.6km2– 100% beneficial interest
held by a wholly owned subsidiary of Carnaby – EMP26651 and
27101).
• Beneficial interest in the Western Australian tenements
(969.3km2) is held by Carnaby through wholly owned subsidiary
of Carnaby (E69/3510,E69/3509 and E38/3289).

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

12

Criteria Explanation Commentary
• The Tick Hill ML’s are subject to a royalty on gold production, to
a 3rdparty, using the following formula: Production Royalty =
Percent Royalty Rate X Recovered Gold / 100. The Percent
Royalty Rate (below $5M in total royalty) = (Annual Recovered
Grade (g/t) / 5) – 1. The Percent Royalty Rate (above $5M in total
royalty) = (Annual Recovered Grade (g/t) / 10) – 0.5. For gold
produced from the tailings dam, the Percentage Royalty Rate will
be 10% for gold recovered above 1g/t Au.
• The 3rdparty royalty holder for Tick Hill ML’s has the right to
purchase anycopper ore or concentrates on commercial terms.
Acknowledgment
and appraisal of
exploration by
other parties.
• Acknowledgment and appraisal of exploration
by other parties.
• There has been exploration work conducted over the
Queensland project regions for over a century by previous
explorers. The project comes with significant geoscientific
information which covers the tenements and general region,
including: a compiled database of 6658 drill hole (exploration
and near-mine), 60,300 drilling assays and over 50,000 soils and
stream sediment geochemistry results. This previous is
understood to have been undertaken to an industry accepted
standard and will be assessed in further detail as the projects are
developed. Longreach Minerals Pty Ltd completed the diamond
drillingin 1967.
Geology • Deposit type, geological setting and style of
mineralisation.
• The Tick Hill project area is located in the Mary Kathleen domain
of the eastern Fold Belt, Mount Isa Inlier. The Eastern Fold Belt is
well known for copper, gold and copper-gold deposits; generally
considered variants of IOCG deposits. The region hosts several
long-lived mines and numerous historical workings. Deposits are
structurally controlled, forming proximal to district-scale
structures which are observable in mapped geology and
geophysical images. Local controls on the distribution of
mineralisation at the prospect scale can be more variable and is
understood to be dependent on lithological domains present at
the local-scale, and orientation with respect to structures and the
stress-field during D3/D4 deformation, associated with
mineralisation.
• Consolidation of the ground position around the mining centres
of Tick Hill and Duchess and planned structural geology analysis
enables Carnaby to effectively explore the area for gold and
copper-gold deposits.
• The Malmac Project in Western Australia is within the
Palaeoproterocic Earaheedy basin abutting the northern part of
the Yilgarn Craton. All projects are perspective for orogenic gold
while the Malmac Project is also considered perspective for base
metal mineralisation.
• The Throssel Project in Western Australia is positioned within the
Archaean granite greenstone terrane of the Eastern Goldfields
which formspart of the Yilgarn Craton.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
o
easting and northing of the drill hole
collar
o
elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception
depth
o
hole length.
• N/A as IP geophysical survey results

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

13

Criteria Explanation Commentary
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearlyexplain whythis is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.
• Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
• The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
• N/A as IP geophysical survey results
Relationship
between
mineralisation
widths and
intercept lengths
• These relationships are particularly important in
the reporting of Exploration Results.
• If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
• If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length,
true width not known’).
• N/A as IP geophysical survey results
Diagrams • Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
• See the body of the announcement.
Balanced
reporting
• Where
comprehensive
reporting
of
all
Exploration
Results
is
not
practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
• The exploration results should be considered indicative of
mineralisation styles in the region.
Other
substantive
exploration data
• Other exploration data, if meaningful and
material, should be reported including (but not
limited
to):
geological
observations;
geophysical survey results; geochemical survey
results; bulk samples – size and method of
treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminatingsubstances.
• As discussed in the announcement
• Inversion modelling was completed by Southern Geoscience
Consultants using RES2DINV
Further work • The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
• Diagrams clearly highlighting the areas of
possible
extensions,
including
the
main
geological interpretations and future drilling
areas, provided this information is not
commerciallysensitive.
• Drill testing of the IP anomalies is being completed

==> picture [596 x 11] intentionally omitted <==

==> picture [596 x 10] intentionally omitted <==

14