CAPRICORN METALS LTD — Capital/Financing Update 2016
Sep 1, 2016
64670_rns_2016-09-01_5511437b-3a8a-440f-97e7-8cf5a13fd60f.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [182 x 144] intentionally omitted <==
ASX ANNOUNCMENT 2 September 2016
Australian Securities Exchange Code: CMM
ABN: 84 121 700 105
Board of Directors:
Mr Guy LeClezio Non-Executive Chairman
Mr Peter Thompson Managing Director
Mr Peter Langworthy Technical Director
Mr Heath Hellewell Non-Executive Director
Issued Capital:
Shares 486M Options 18.3M Share Price A$0.145 Market Cap. A$70.4M
EXPLORATION OFFICE:
1 Coventry Parade North Fremantle, WA 6159
REGISTERED OFFICE: 15 Lovegrove Close Mount Claremont, WA 6010
T +61 8 9384 3284 F +61 8 9284 3801
E [email protected] www.capmetals.com.au
FIVE RIGS DRILLING AT KARLAWINDA
Major resource in-fill and extensional drill program well underway at Karlawinda Gold Project with 88 holes already completed
2[nd] September 2016 : Capricorn Metals Ltd (ASX: CMM) is pleased to advise that a major drilling campaign is well underway at its 100%-owned Karlawinda Gold Project (Figure 1) as part of its strategy to fast-track the development of a significant new mid-tier Australian gold project.
The key objectives of the current program, which is being undertaken with five rigs currently operating, are to underpin the recently approved Definitive Feasibility Study (“DFS”) and to provide initial tests of a series of high priority resource expansion and exploration targets.
The centrepiece of the Karlawinda Project is the Bibra Gold Deposit ( Inferred Resource of 25.5Mt at 1.1g/t Au for 914,000 ounces – see ASX announcement 4th July 2016)[1] and a key objective of the current drilling program is to in-fill the drill-hole pattern and elevate that resource to Measured and Indicated status.
This drilling is an important component of the Definitive Feasibility Study on the Karlawinda Project, following the completion of a positive Scoping Study (see ASX Announcement 29th July 2016).
KEY POINTS:
-
Drilling is progressing ahead of schedule with four shifts of reverse circulation (“RC”) drilling and 4 shifts of diamond drilling underway.
-
To date, 78 RC holes (9,500m) and 10 diamond holes (1,276m) have been completed. Assay results are expected to start flowing back from the laboratory in the short term.
-
50,000m of Reverse Circulation drilling is being undertaken to upgrade the resource classification from Inferred to Indicated and Measured.
-
An initial 10,000m RC drilling program will test a series of high priority resource expansion and exploration targets.
-
The first exploration drilling has been completed at the Portrush Prospect, which is located immediately to the west and in the hangingwall of the Bibra Deposit (Figure 2).
-
A 5,000m diamond core drilling program has been designed to collect key resource, geotechnical and metallurgical data. An allocation of this drilling will also be used to target a number of deeper high grade gold exploration targets.
-
Capricorn has mobilized a team of 40 personnel (staff and contractors) to undertake the program.
-
Drilling is scheduled to continue until early November and the Company will provide regular updates with drill hole results on these programs over the coming weeks.
1 Capricorn report that it is not aware of any new information or data that materially affects the information included in the resource announcement dated 4[th] July 2016 and, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.
==> picture [298 x 236] intentionally omitted <==
Figure 1: Karlawinda Gold Project Location Plan
==> picture [494 x 224] intentionally omitted <==
Figure 2a: Portrush Prospect Cross Section
==> picture [209 x 244] intentionally omitted <==
Figure 2b: Portrush Prospect Plan
==> picture [34 x 40] intentionally omitted <==
Page 2 of 5
==> picture [252 x 190] intentionally omitted <==
Bibra RC Drilling Operations
==> picture [252 x 189] intentionally omitted <==
RC Sampling
==> picture [252 x 190] intentionally omitted <==
Mobile Field Camp
==> picture [252 x 190] intentionally omitted <==
Bibra RC Drilling Operations
==> picture [252 x 189] intentionally omitted <==
Diamond Core Processing
==> picture [252 x 190] intentionally omitted <==
Field Office
==> picture [34 x 40] intentionally omitted <==
Page 3 of 5
==> picture [246 x 186] intentionally omitted <==
Bibra Diamond Core
==> picture [252 x 313] intentionally omitted <==
==> picture [252 x 190] intentionally omitted <==
==> picture [247 x 186] intentionally omitted <==
Bibra Diamond Core
Example of Bibra primary gold mineralization.
Gold is associated with sulphide (pyrite) that has formed in stringers and disseminations within the rock foliation.
Quartz veining and silica flooding is typical of higher grade mineralized zones.
Host lithology is sandstone metamorphosed to lower amphibolite facies.
Example of Bibra laterite gold mineralization.
Intersection is approximately 5 metres below surface.
==> picture [34 x 40] intentionally omitted <==
Page 4 of 5
For and on behalf of the Board
==> picture [94 x 26] intentionally omitted <==
Peter Thompson Managing Director
For further information, please contact:
Mr Peter Thompson, Managing Director Mr Nicholas Read Email: [email protected] Read Corporate Phone: 0417 979 169 Phone: 0419 929 046
Competent Persons Statement
The information in this report that relates to Exploration Results or Mineral Resources is based on information compiled or reviewed by Mr. Michael Martin who is Principal Resource Geologist at Perth based consultant group OMNI GeoX Pty Ltd and is a current Member of the Australian Institute of Geoscientists. Mr. Michael Martin acts as a consultant for Capricorn Metals Limited and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Martin consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.
==> picture [34 x 40] intentionally omitted <==
Page 5 of 5