ANNUAL GENERAL MEETING Managing Director Presentation

ASX Code: CMM

25[th] November 2016 Celtic Club, West Perth Peter Thompson Managing Director

www.capmetals.com.au

ABN 841 21 700 105

Disclaimer & Competent Person Statement

CAUTIONARY STATEMENT – FORWARD LOOKING STATEMENTS

This announcement may contain certain “forward-looking statements” which may not have been based solely on historical facts, but rather may be based on the Company’s current expectations about future events and results. Where the Company expresses or implies an expectation of belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. The detailed reasons for that conclusion are outlined throughout this announcement and all Material Assumptions are disclosed.

However, forward looking statements are subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forwardlooking statements.

Such risks include, but are not limited to resource risk, metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as governmental regulation and judicial outcomes.

For a more detailed discussion of such risks and other factors, see the Company’s Annual Reports, as well as the Company’s other filings. Readers should not place undue reliance on forward looking information. The Company does not undertake any obligation to release publically any revisions to any “forward looking statement” to reflect events or circumstances after the date of this announcement, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

CAUTIONARY STATEMENT – PRELIMINARY NATURE OF STUDY

This announcement has been prepared in accordance with the JORC Code (2012) and the ASX Listing Rules. The Company advises that the Scoping Study results contained in this announcement are preliminary in nature as the conclusions are based on low-level technical and economic assessments, and are insufficient to support the calculation of Ore Reserves or to provide an assurance of economic development at this time. There is a low level of geological confidence associated with Inferred Mineral resources as used in this report and there is no certainty that further exploration work will result in the determination of Indicated Mineral Resources or that the outcomes of the Scoping Study will be realised. Accordingly, these Inferred Resources should not be relied on by investors when making investment decisions.

ASX announcements are available on the Company’s website at www.capmetals.com.au

COMPETENT PERSONS STATEMENT

The information in this report that relates to Exploration Results or Mineral Resources is based on information compiled or reviewed by Mr. Michael Martin who is Principal Resource Geologist at Perth based consultant group OMNI GeoX Pty Ltd and is a current Member of the Australian Institute of Geoscientists. Mr. Michael Martin acts as a consultant for Capricorn Metals Limited and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Martin consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

The information in this report that relates to Exploration Results or Mineral Resources is based on information reviewed by Mr. Peter Langworthy, Technical Director, who a current Member of the Australian Institute of Mining and Metallurgy. Mr. Peter Langworthy is a full-time Executive Director of Capricorn Metals Limited and has sufficient experience, which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Martin consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

1

1

KARLAWINDA PROJECT OVERVIEW

==> picture [472 x 440] intentionally omitted <==

Excellent location, 60km from Newman

  • Transport hub

  • Gas (pipeline or trucked CNG)

  • Workforce

  • Engineering Services

  • Camps

  • • Airport, 80 minutes to Perth, 7 flights/day

  • Granted Mining Lease

2

2016 Achievements

Major Project Benchmarks

MAJOR PROJECT BENCHMARKS MAJOR PROJECT BENCHMARKS MAJOR PROJECT BENCHMARKS
February 2016 Project acquired
April 2016 Funding in place
May 2016 Resource expansion drilling program completed
June 2016 Upgraded inferred resource (25.5mt @ 1.1g/t for 914,000oz)
July 2016 Scoping study complete – STRONGLY POSITIVE OUTCOME
July 2016 GO AHEAD - definitive feasibility study
August – Nov 2016 DFS progressing on-time and on-budget.
75,000m Drilling, New discoveries, Borefield identified, Native Title Agreement, Mining Lease granted

3

Fast Tracking to Production Bibra Inferred Resource – 25.5mt @ 1.1g/t for 914,000 ounces gold

**Mineralisation Type ** Tonnes (Mt) Au (g/t) Cut Ounces
Laterite 2.1 1.3 85,000
Saprolite 4.3 1.0 142,000
Transitional 1.5 1.2 58,000
Fresh 17.6 1.1 629,000
Total Inferred 25.5 1.1 914,000

Resource Estimation based on:

43 diamond drill holes: 5,373 metres 313 RC drill holes: 52,202 metres Drill spacing: Inferred boundary 50 x 50 metres Top cut: 10g/t laterite / 16g/t main ore body Lower cut: 0.5g/t Pit Constraint: A$1750/oz optimal pit shell

==> picture [472 x 236] intentionally omitted <==

==> picture [470 x 54] intentionally omitted <==

==> picture [472 x 54] intentionally omitted <==

4

25 x 25m Infill Drilling, 200100N Section

==> picture [960 x 406] intentionally omitted <==

5

Mining Studies

MINING STUDIES

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

Large-scale, staged open pits

Year 1 should process the highest margin, surface laterite

==> picture [6 x 6] intentionally omitted <==

Near-surface ounces

Laterite and saprolite: 220,000 ounces

==> picture [6 x 6] intentionally omitted <==

Attractive stripping ratios

Flat dipping geometries

==> picture [6 x 6] intentionally omitted <==

Multiple stacked lodes

==> picture [6 x 6] intentionally omitted <==

Favourable geotechnical conditions

==> picture [6 x 6] intentionally omitted <==

==> picture [411 x 194] intentionally omitted <==

Starter Pit Depth to 130m

==> picture [394 x 222] intentionally omitted <==

----- Start of picture text -----

Final Pit to 220m
depth
----- End of picture text -----

6

6,000 OVM, up to 9,000 OVM in laterite

==> picture [596 x 447] intentionally omitted <==

----- Start of picture text -----




----- End of picture text -----

  • Highest gold endowment at surface, 85,000oz in laterite

  • New discoveries expected to add tonnes & ounces to 20-100m depth

  • Easily achievable 30m-60m vertical advance/year required.

==> picture [157 x 208] intentionally omitted <==

7

3Mt/yr Processing Plant

PROCESSING STUDIES

Metallurgy simple, non-refractory Conventional Gravity-CIL processing 91-93% gold recoveries Coarse grind size (106 micron) 30% of gold gravity recoverable Economy of scale: 3.0Mtpa plant Low Opex: 3 operators/shift Plant design work by Mintrex Good quality water

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 10] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [9 x 9] intentionally omitted <==

==> picture [546 x 413] intentionally omitted <==

8

Exploration Strategy

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

==> picture [10 x 10] intentionally omitted <==

Target significant expansion of current resource base Extension of potential mine-life Target areas identified as prospective for high-grade gold mineralisation Open Pit

Underground

==> picture [8 x 8] intentionally omitted <==

Dedicated exploration budget outside of Bibra

==> picture [836 x 223] intentionally omitted <==

9

==> picture [484 x 540] intentionally omitted <==

Regional Endowment

  • Tangadee Structural Corridor

  • Major Gold systems developed on this structure

  • Karlawinda is a recent discovery – Bibra in 2009

  • A significant emerging goldfield

Image from Jon Hronsky, 2016

10

Multiple drill targets

High Potential Exploration Targets

  • 5 major near-surface targets within 500m of Bibra Resource

==> picture [7 x 8] intentionally omitted <==

Targeting open pit and underground locations within 8km zone

==> picture [7 x 8] intentionally omitted <==

New mineralization discovered at Portrush

==> picture [7 x 8] intentionally omitted <==

  • & Sth Corridor Prospects

Northern Corridor targets will be priority for drilling in 2017

==> picture [7 x 8] intentionally omitted <==

==> picture [598 x 404] intentionally omitted <==

11

Exploration Targets Near Pit Satellites

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

Portrush Prospect KBRC366: 11m @ 1.00g/t Au KBRC367: 7m @ 1.40g/t Au KBAC377: 8m @ 1.15g/t Au KBRC150: 17m @ 1.00g/t Au KBRC071: 12m @ 1.02g/t Au

Easky Prospect KBRC019: 12m @ 1.5g/t Au KBRC570: 8m @ 2.6g/t Au KBRC150: 7m @ 1.3g/t Au KBAC389: 10m @ 1.5g/t Au

Tramore Prospect KBRC021: 12m @ 1.5g/t Au KBRC020: 4m @ 2.0g/t Au KBRC022: 7m @ 1.8g/t Au KBRC071: 6m @ 1.1g/t Au KBRC145: 22m @ 1.0g/t Au KBRC148: 17m @ 1.2g/t Au

==> picture [328 x 437] intentionally omitted <==

==> picture [7 x 6] intentionally omitted <==

==> picture [7 x 6] intentionally omitted <==

Southern Corridor NEW INTERSECTIONS KBRC430: 12m @ 1.37g/t Au within 100m @ 0.47 g/t Au

KBRC431: 8m @ 1.42g/t Au within 54m @ 0.69g/t Au

Southern Corridor KBRC040: 9m @ 2.5g/t Au KBRC039: 4m @ 2.6g/t Au KBRC278D: 8m @ 1.1g/t Au KBRC279D: 4m @ 1.0g/t Au KBRC152: 2m @ 6.5g/t Au KBRC280D: 5m @ 3.6g/t Au

12

Southern Corridor Discovery (Oct 2016)

==> picture [645 x 383] intentionally omitted <==

==> picture [302 x 256] intentionally omitted <==

13

Francopan-K3 Prospect

==> picture [563 x 423] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 8] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [7 x 7] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

==> picture [6 x 6] intentionally omitted <==

==> picture [6 x 7] intentionally omitted <==

Repeat of the Bibra Gold System??

Large-scale mineralised system 5km from Bibra Deposit

Strong potential for high grade mineralisation over large area defined by wide-spaced drilling 5km x 2.5km target area

Stacked lodes

Francopan daylights at K3?

KBD001: 37m @ 1.9g/t Au. Includes: 8m @ 5.1g/t Au and 1m @ 21.8g/t Au KBD009: 33m @ 1.0g/t Au. Includes: 6m @ 4.5g/t Au and 1 metre @ 18.3g/t Au KBD025: 81m @ 1.2g/t Au . Includes: 7m @ 3.5g/t Au (includes 1m@ 20.3g/t Au) 15m@ 3.0g/t Au 6m @ 3.1g/t Au

14

CMM in 2017...

==> picture [11 x 12] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

==> picture [11 x 12] intentionally omitted <==

Continue to grow a large scale gold system

Update Bibra Resource

==> picture [10 x 10] intentionally omitted <==

Aggressive Exploration for more Karlawinda deposits

==> picture [10 x 10] intentionally omitted <==

DFS complete 2Q 2017 Funding Construction Production 2018 Increased profile

Pipeline of positive news flow