Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

CAMECO CORP Regulatory Filings 2006

Apr 11, 2006

30088_ffr_2006-04-11_55fd72b1-1788-41a7-9a12-b69dae3e157b.zip

Regulatory Filings

Open in viewer

Opens in your device viewer

6-K 1 o31049e6vk.htm FORM 6-K e6vk PAGEBREAK

UNITED STATES SECURITIES AND EXCHANGE COMMISSION

Washington, DC 20549

FORM 6-K

Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16 Under the Securities Exchange Act of 1934

For the month of April, 2006

Cameco Corporation

(Commission file No. 1-14228)

2121-11th Street West Saskatoon, Saskatchewan, Canada S7M 1J3 (Address of Principal Executive Offices)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.

Form 20-F o Form 40-F þ

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes o No þ

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b):

PAGEBREAK

Exhibit Index

Exhibit No. Description Page No.
1. Material Change Report dated April 11, 2006 3 – 4

SIGNATURE

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: April 11, 2006
By: “Gary
M.S. Chad”
Gary M.S. Chad
Senior Vice-President, Governance, Legal and Regulatory Affairs, and Corporate Secretary

2

PAGEBREAK

FORM 51-102F3 MATERIAL CHANGE REPORT

Item 1 — Name and Address of Company

Cameco Corporation (“Cameco”) 2121 – 11 th Street West, Saskatoon, Saskatchewan S7M 1J3

Item 2 — Date of Material Change

April 6, 2006

Item 3 — News Release

The English version and the French translation version of the press release relating to this material change were distributed and filed by Canadian Corporate News through their Canadian Timely Disclosure Pack and U.S. Timely Disclosure Pack on April 6, 2006.

Item 4 — Summary of Material Change

On April 6, 2006, Cameco announced that construction had been delayed at the second shaft of the Cigar Lake project in northern Saskatchewan due to a water inflow that began on April 5, 2006 at the bottom of the shaft. Due to the delayed construction of the second shaft, Cameco’s preliminary assessment indicates that Cigar Lake production may be delayed by six months and begin in late 2007.

Prior to the April 6, 2006 announcement, Cameco was in the process of reviewing the capital costs of the Cigar Lake project. The company will provide updated cost projections in the first quarter report which will be released on April 28, 2006. The results of the capital cost review and the costs for dealing with the delays due to this incident are expected to increase the current estimate of $520 million by 10% to 20%.

Item 5 — Full Description of Material Change

On April 6, 2006, Cameco announced that construction has been delayed at the second shaft of Cigar Lake project in northern Saskatchewan due to a water inflow. The second shaft will be primarily used for underground ventilation during production. Due to the delayed construction of the second shaft, Cameco’s preliminary assessment indicates that Cigar Lake production may be delayed by six months and begin in late 2007.

The water inflow began in the second shaft of the Cigar Lake project in northern Saskatchewan in late afternoon of April 5, 2006 at the bottom of the 6-metre wide shaft, 392 metres below the surface. All the workers safely left the area and removed equipment. There was no impact on the environment. There is no access between this shaft and the underground development and this event will not impact existing underground development in any way. An investigation is underway to determine the cause of the incident.

3

PAGEBREAK

After evaluating the situation, Cameco decided to allow water to fill to natural levels in the second shaft that is currently being developed at Cigar Lake. The company determined this was the most prudent choice since it allowed more remediation options.

The incident began when a worker noticed a leak in a valve that was preventing water from coming up a drill hole. These drill holes are routinely used to test for the presence of ground water and to grout off any water inflows. In the process of tightening, the valve broke, allowing water to enter the bottom of the shaft.

Cameco is reviewing potential methods to deal with the current situation. The company had already been considering the possibility of freezing the area around the bottom of the shaft to deal with the difficult ground conditions. Cameco will be able to provide a timetable for the remediation process after the plans have been finalized. The water will not damage the concrete-lined shaft.

Prior to the April 6, 2006 announcement, Cameco was in the process of reviewing the capital costs of the Cigar Lake project. The company will provide updated cost projections in the first quarter report which will be released on April 28, 2006. The results of the capital cost review and the costs for dealing with the delays due to this incident are expected to increase the current estimate of $520 million by 10% to 20%.

Item 6 — Reliance on subsection 7.1(2) or (3) of National Instrument 51-102.

Not applicable.

Item 7 — Omitted Information

Not applicable.

Item 8 — Executive Officer

Gary M.S. Chad Senior Vice-President, Governance, Legal and Regulatory Affairs, and Corporate Secretary Cameco Corporation (306) 956-6303

Item 9 — Date of Report

April 11, 2006

4