Quarterly Report • May 12, 2025
Quarterly Report
Open in ViewerOpens in native device viewer




cambi.com
Cambi enables the transformation of wastewater solids and organic waste into valuable bioresources delivering reliable technology and solutions for water utility companies and large industrial facilities around the world

City skyline of Singapore

Cambi THP system under five-year service agreement in Copenhagen, Denmark
Weak EBITDA performance in the first quarter, driven by temporary delays on ongoing projects and negative currency effects
Four contracts announced in India, Spain, Norway, and Denmark
Entered the Indian market with a THP contract in Mumbai, marking a strategic milestone
First long-term service agreement signed for a THP system outside the UK
Delivering on 17 construction projects in line with site readiness and manufacturing schedules
Profitable quarter despite higher cost base and temporary project delays
Revenue in the first quarter was NOK 225 million, a 4% increase from NOK 216 million in the first quarter of 2024. Cambi continued to meet client schedules; however, several projects experienced site delays, resulting in deferred revenue recognition.
Operating expenses amounted to NOK 92 million, compared with NOK 78 million in the same period last year. The increase reflects higher ongoing payroll and other operating expenses, combined with the impact of a weak Norwegian krone. The increase in expenses is the result of a strategic decision to strengthen Cambi's sales, marketing, project execution, and innovation capabilities.
EBITDA was NOK 14 million, compared to NOK 36 million in the first quarter of 2024.
Operating cash flow for the quarter was NOK -53 million, compared to NOK -12 million in the same period last year. The net outflow is related to the timing of milestone payments received from the ongoing construction contracts.
Order intake totalled NOK 170 million, compared to NOK 401 million in the same period of 2024. The order intake includes revenue from spare parts, soil sales, contract variation orders, and contracts below the threshold for market announcements. It also includes a negative currency exchange rate impact from the order backlog of NOK 39 million.
Order backlog stood at NOK 1,177 million at the end of March, 32% lower than one year earlier, when it was NOK 1,727 million. The backlog provides good visibility for the activity level through the remainder of 2025 and parts of 2026.

in NOK million


in NOK million

At the close of the first quarter 2025, Cambi had an order backlog of NOK 1,177 million.
In the Technology segment, the backlog includes 17 construction projects, with consideration given to the progress achieved thus far and the work that remains. The pending work is accounted for in the backlog and is anticipated to convert into revenue in upcoming periods.
In the Solutions segment, the backlog consists of the value of remaining work under Grønn Vekst's biosolids and garden waste handling contracts. There were no THP upgrade projects recognised in the backlog at the end of the first quarter.
Approximately two-thirds of the order backlog is denominated in foreign currencies, exposing it to exchange rate fluctuations and associated risks.
Two THP contracts, one expansion and a five-year service agreement
Cambi entered 2025 with strong momentum, signing two new THP contracts and one contract expansion in the first quarter.
In January, Cambi secured its first contract in India, marking a major milestone in market expansion efforts. The project, signed with DRN Infrastructure, involves the delivery of a THP system to the Versova wastewater treatment plant in Mumbai. The contract follows several years of market development and positions Cambi in a large and increasingly important market. Delivery is scheduled for 2027.
In February, Cambi was awarded a contract for a THP system at the new Silvouta wastewater treatment plant in Santiago de Compostela, Spain. The contract, signed with a consortium of Espina, Obrascon and Aquambiente, includes a small THP system designed to operate between two digesters, optimising dewatering and biogas production while producing biosolids suitable for land application. Delivery is planned for 2026.
In March, Cambi signed a medium-sized contract expansion for the ongoing Veas project in Norway, Norway's largest wastewater treatment plant. The new scope includes nitrogen recovery through ammonium sulphate production and delivery of a backup steam boiler, extending Cambi's role in the project beyond its core thermal hydrolysis technology. The full project scope is scheduled for delivery by the end of 2026.
Finally, within the Solutions segment, Cambi secured a five-year maintenance agreement for the THP plant in operation since the autumn of 2024 at the Damhusåen wastewater treatment plant in Copenhagen, Denmark. This contract also covers process equipment surrounding the THP, and is Cambi's first multi-annual service agreement outside the UK.
These contracts support Cambi's continued global footprint expansion and reflect the company's ability to deliver both core and value-added solutions across diverse markets.

City skyline of Mumbai, India

City skyline of Santiago de Compostela, Spain

City skyline of Oslo waterfront, Norway
Steady project progress marked by temporary delays in client schedules
In the first quarter, Cambi continued to advance its project portfolio in line with site readiness and manufacturing schedules. On several projects, delays in workstreams outside Cambi's scope resulted in limited or no registered progress during the period. These delays are expected to be recovered in the coming quarters.
In South Africa, commissioning of the two THP systems delivered to Sasol at the Secunda industrial complex progressed well during the quarter, nearing completion. Five other THP projects, located in Kansas City (USA), Hong Kong (China), Antwerp (Belgium), Lillestrøm (Norway) and Safi (Morocco) did not progress during the quarter. Cambi has completed installation and is awaiting client site readiness before commissioning can begin.
The company made good progress with the THP installation for the project in Fredrikstad, Norway. In addition, the two THP systems for the Tuas water reclamation plant in Singapore completed manufacturing and were dispatched.
The projects in San Francisco (California, USA), Louisville (Kentucky, USA), Perth (Australia), and Wellington (New Zealand) continued to progress in the manufacturing phase. The THP system for Lviv (Ukraine) is also in manufacturing. Part of the manufacturing scope for the US projects has been outsourced domestically and will not be exposed to US tariffs for imports from the UK.
Cambi's engineering team continued working on the design of the THP systems for Honolulu (Hawaii, USA), Oslo (Norway), and Palma de Mallorca (Spain). Engineering commenced for the two new THP projects in Mumbai (India) and Santiago de Compostela (Spain).

THP installation in progress in Fredrikstad, Norway

THP vessels in Congleton, UK, ready for dispatch to Singapore

THP system in manufacturing in Congleton, UK, for the project in Louisville, US

Making progress on most construction contracts in the first quarter
Revenue in the first quarter reached NOK 176 million, up 10% from NOK 161 million in the same period of 2024. Progress continued on most of the 17 ongoing THP construction projects, although several remained on hold awaiting client site readiness for installation or commissioning.
EBITDA amounted to NOK 19 million, a reduction of 38% from NOK 30 million in the first quarter of 2024. The lower result is mainly driven by higher payroll expenses and a negative currency effect due to a stronger Norwegian krone at the end of the quarter.
Order intake for the first quarter of 2025 was NOK 124 million, compared to NOK 303 million one year earlier. Cambi secured two equipment contracts and one significant contract expansion during the quarter.
Order backlog ended the first quarter at NOK 954 million, compared to NOK 1,460 million recorded at the end of the first quarter of 2024. The backlog provides good coverage for the activity level for upcoming periods. The segment's backlog is expected to be fully converted during 2026.

Rising interest in THP site services. Increase in winter bulk soil demand.
Peder Lillebø was appointed as Managing Director of Cambi Solutions in the first quarter of 2025, taking on a newly established position within the existing business segment and joining Cambi's Executive Management team.
In the first quarter, Cambi finalised commissioning of the process gas units for the large Gaobeidian solids treatment centre in Beijing, China, and delivered a minor upgrade to the Mapocho plant in Santiago de Chile.
The operations and maintenance support team continued preparations for an anticipated busy THP maintenance season starting in spring, by manufacturing proprietary parts, replenishing inventory, and attending training programmes.
At the end of the quarter, Cambi secured a fiveyear service agreement for the sludge line at the new Damhusåen THP plant in Copenhagen. The contract represents an important milestone reflecting growing demand for Cambi's expertise from THP clients across Europe.
The upgrades team was awarded a feasibility study for a future sludge line upgrade at a THP site in Europe and continues to develop potential THP upgrade projects, presenting clients with value-adding alternatives for efficiency improvements and cost savings.

Process gas unit commissioned at the Gaobeidian sludge treatment centre in Beijing, China
Bulk soil sales totalled 22,900 tonnes in the first quarter, a 15% increase compared to 20,000 tonnes in the same period last year. As usual, winter remains a low season for the bulk soil business.
As previously announced, Grønn Vekst delivers on its retail soil commitments but will exit the market at the end of the 2025 season. Bulk production and sales of peat-free soil continue, alongside biosolids and garden waste handling.
Discussions on the future of the soil bagging facility are progressing and the outcome will be communicated to the market in due course.

Grønn Vekst re-establishing a peat bog and creating a flower meadow in Oslo, Norway
There were no new biosolids and garden waste contracts announced during the quarter. All ongoing contracts were carried out as scheduled. Grønn Vekst continues to focus on re-establishing the profitability of its core business operations.
thousand tonnes of bulk soil sold in the quarter
23 25 soil production and composting sites in Norway
Lower Services revenue and higher cost base weighed on results
Revenue in the first quarter was NOK 49 million, down 11% from NOK 55 million in the same period of 2024. Revenue from Services declined due to the absence of larger THP upgrade projects. Both soil sales and THP site activity levels are seasonally lower in winter.
EBITDA for the quarter was NOK -5 million, compared to NOK 6 million in the first quarter of 2024. The result reflects the seasonal low activity level in soil sales and services, and lower activity related to upgrade projects.
Order intake totalled NOK 45 million, representing a decline of 54% from NOK 98 million one year earlier. Although a long-term service agreement was announced during the quarter, the reported figure primarily reflects ongoing operations that are recognised directly as revenue.
Order backlog ended the first quarter at NOK 223 million, compared to NOK 267 million at the end of the first quarter one year earlier. The Solutions segment backlog consists entirely of biosolids and garden waste handling contracts for Grønn Vekst.

Strategic focus on future growth and operational resilience
Cambi remains well positioned to meet growing global demand for sustainable wastewater and sludge treatment solutions. High energy costs, tightening environmental regulations, and increasing attention to nutrient recovery continue to underpin long-term demand for the company's technologies and solutions.
Cambi's strategic direction is evolving to support long-term growth by building on its recognised expertise in advanced anaerobic digestion. While thermal hydrolysis remains at the core of its offering, the company is exploring adjacent opportunities - initially in nearby markets where it has a strong presence and a proven track record.
In parallel, Cambi is making deliberate investments in the organisation, particularly in marketing, sales, innovation, and project execution capabilities to position itself for larger and more complex project deliveries in the years ahead.
In the United Kingdom, a new investment cycle in the water sector is gradually taking shape. However, the timeline for THP contract awards remains uncertain and dependent on customer planning. Cambi is actively engaged with key stakeholders and stands ready to support clients as projects advance.
The financial outlook continues to be shaped by external factors, including the timing of project execution, currency fluctuations, and geopolitical developments. Delays in project milestones continue to defer revenue recognition in some projects.
In the United States, recently imposed import tariffs have introduced additional uncertainty. While a trade agreement between the US and the UK is under negotiation, tariffs on UK-origin goods currently apply to planned equipment deliveries from Cambi's UK manufacturing facility for three ongoing projects. However, Cambi's main concern was related to the 25% steel tariffs, which in the latest trade deal announcement appear to have been waived for exports from the UK.
The US contracts explicitly exclude tariffs from the base price and allow for recovery through contractual mechanisms. Nevertheless, Cambi remains exposed to indirect risks related to cost approvals, recovery timing, and payment milestones linked to equipment delivery.
Management is closely monitoring the situation and has taken steps to mitigate the impact, including exploring local manufacturing options for future projects. At the same time, Cambi continues to prioritise trust-based, constructive dialogue with clients to manage cost exposure and maintain project continuity.
Grønn Vekst is progressing efforts to re-establish profitability by exiting the retail soil market and refocusing on core activities, i.e., biosolids and garden waste composting and bulk soil production in Norway.
At the General Meeting on 8 May 2025, shareholders approved a capital repayment of NOK 0.30 per share. The Board of Directors was also authorised to consider additional dividend payments of up to NOK 0.70 per share, subject to the achievement of key project milestones. In its assessment, the Board will consider Cambi's liquidity, investment needs, and overall financial position.
Cambi maintains a good financial position, supported by an order backlog that provides revenue coverage for the remainder of 2025 and into 2026.
The Board of Directors and CEO of Cambi ASA have approved the quarterly report and unaudited interim financial statements.
Asker, 12 May 2025
| Q1 2025 |
Q1 2024 |
Year 2024 |
|
|---|---|---|---|
| Revenue | 225.1 | 215.6 | 1,033.4 |
| Materials, goods, and services | 119.8 | 101.1 | 461.3 |
| Gross margin | 105.3 | 114.6 | 572.1 |
| Payroll expenses | 56.9 | 48.7 | 219.9 |
| Other operating expenses | 34.7 | 29.5 | 126.5 |
| Total operating expenses | 91.6 | 78.2 | 346.3 |
| EBITDA | 13.7 | 36.3 | 225.7 |
| Depreciation and amortisation | 7.0 | 5.9 | 26.1 |
| Operating profit | 6.6 | 30.4 | 199.6 |
| Net financial items | -1.7 | -9.4 | -9.4 |
| Profit before tax | 5.0 | 21.0 | 190.2 |
| Income tax expense | 1.0 | - | 41.5 |
| Net profit | 3.9 | 21.0 | 148.7 |
| Attributable to | |||
| Equity holders of the parent company | 4.3 | 21.4 | 149.7 |
| Non-controlling interests | -0.3 | -0.4 | -1.1 |
| Assets | Q1 2025 |
Q1 2024 |
Year 2024 |
|---|---|---|---|
| Intangible assets | 6.3 | 25.5 | 11.1 |
| Tangible assets | 48.7 | 36.3 | 48.5 |
| Employee loans | 4.3 | 5.4 | 4.1 |
| Investments in shares | 0.7 | 0.7 | 0.7 |
| Total non-current assets | 59.9 | 67.9 | 64.4 |
| Inventories | 154.1 | 90.7 | 157.9 |
| Earned but not invoiced project revenue | 246.3 | 169.1 | 218.3 |
| Other receivables | 213.9 | 114.8 | 213.1 |
| Current financial investments | - | 107.6 | - |
| Cash and cash equivalents | 99.9 | 225.5 | 154.8 |
| Total current assets | 714.1 | 707.7 | 744.2 |
| Total assets | 774.1 | 775.6 | 808.6 |
| Equity | |||
| Total equity | 462.2 | 373.0 | 476.1 |
| Liabilities | |||
| Deferred tax | 45.5 | 12.6 | 45.5 |
| Non-current liabilities | - | - | - |
| Accrued project cost, provisions, and guarantees | 92.5 | 149.8 | 94.3 |
| Other current liabilities | 174.0 | 240.2 | 192.7 |
| Total liabilities | 311.9 | 402.6 | 332.5 |
| Total equity and liabilities | 774.1 | 775.6 | 808.6 |
| Q1 | Q1 | Year | |
|---|---|---|---|
| Cash flows from operating activities | 2025 | 2024 | 2024 |
| Profit before tax |
5.0 | 21.0 | 190.2 |
| Tax paid for the period |
-0.1 | -2.5 | -8.4 |
| Depreciation and amortisation |
7.0 | 5.9 | 26.1 |
| Change in inventory |
3.8 | -19.8 | -87.0 |
| Change in accounts receivable |
-18.0 | -2.0 | -75.8 |
| Change in accounts payable |
-3.4 | -6.8 | 20.4 |
| Change in project accruals |
-29.7 | -9.7 | -114.5 |
| Effect of exchange rate fluctuations |
-19.4 | 13.2 | 36.3 |
| Change in other accruals |
2.1 | -11.5 | -3.8 |
| Net cash flows from operating activities |
-52.8 | -12.2 | -16.5 |
| Cash flows from investment activities | |||
| Payments forthe purchase of fixed assets |
-2.2 | -2.9 | -20.9 |
| Proceeds from employee loan repayments |
- | 0.8 | 2.3 |
| Proceeds from the sales of current financial investments |
- | - | 110.2 |
| Net cash flows from investmentactivities |
-2.2 | -2.1 | 91.5 |
| Cash flows from financing activities | |||
| Repayment of long-term liabilities |
- | -0.2 | -0.2 |
| Payment of dividends |
- | - | -160.0 |
| Net cash flows from financing activities |
- | -0.2 | -160.2 |
| Net change in cash and cash equivalents |
-54.9 | -14.4 | -85.1 |
|---|---|---|---|
| Cash and cash equivalents at the start of the period |
154.8 | 240.0 | 240.0 |
| Cash and cash equivalents at the end of the period |
99.9 | 225.5 | 154.8 |
| Share capital |
Own shares |
Share premium |
Other equity |
Minority interests |
Total | |
|---|---|---|---|---|---|---|
| Equity as of 1 January 2025 |
3.2 | -0.0 | 123.5 | 346.6 | 2.8 | 476.1 |
| Net profit or loss |
- | - | - | 4.3 | -0.3 | 3.9 |
| Share-based incentive programme |
- | - | - | 0.1 | - | 0.1 |
| Investments in subsidiaries |
- | - | - | - | - | - |
| Currency exchange differences |
- | - | - | -17.8 | -0.2 | -18.0 |
| Equity as of 31 March 2025 |
3.2 | -0.0 | 123.5 | 333.2 | 2.3 | 462.2 |
Cambi ASA is a limited liability company with headquarters in Asker, Norway. The consolidated interim financial statements comprise Cambi ASA and its subsidiaries (collectively "Cambi").
Cambi is a global technology and solutions supplier for sustainable biosolids management, transforming waste products into bioresources such as renewable energy, fertilisers, and soil products. Cambi's core offer is its reliable thermal hydrolysis process (THP), which treats wastewater solids, or sludge, and other organic waste fractions at high temperature and pressure.
Thermal hydrolysis works in all climates and is compatible with all wastewater solids and waste treatment regulations. It can integrate at new and existing anaerobic digestion sites.
The process has multiple cost-saving and environmental benefits. Coupled with anaerobic digestion, it increases biogas production, improves dewatering, reduces demand for non-renewable energy resources, and produces biosolids easy to process in thermal facilities or recycle to land as soil conditioner or instead of synthetic fertilisers.
Thermal hydrolysis is suitable for all biosolids outlets, including land application and thermal processes such as drying, pyrolysis, and incineration. Overall, it is often the technology with the lowest carbon footprint and the lowest total cost over the asset operation lifetime.
Cambi systems are installed at many wastewater treatment facilities owned by the world's leading water utility companies. Established in 1992, the company has grown to span six continents, with 92 facilities in 28 countries and the capacity to process the wastewater solids of a population of around 121 million at the end of the first quarter of 2025.
Besides anaerobic digestion technology and solutions using THP, Cambi owns the soil recycling company Grønn Vekst, who recycles waste fractions from municipalities and industry, i.e., wastewater solids, garden waste and stonemeal.
From these resources, Grønn Vekst produces high-quality compost-based soil products as substitutes for peat-based soils. In Norway, Grønn Vekst is the largest producer of bulk and peat-free soils, operating at 25 different sites, and a leading wastewater solids recycling company.
| Technology | Solutions | |||||
|---|---|---|---|---|---|---|
| Q1 | Q1 | Year | Q1 | Q1 | Year | |
| Revenue | 176.0 | 160.6 | 740.4 | 49.1 | 55.0 | 2024 293.0 |
| Materials, goods and services |
88.1 | 69.4 | 282.2 | 179.0 | ||
| Gross margin |
87.9 | 91.2 | 458.2 | 23.4 | 114.0 | |
| Payroll expenses |
44.2 | 12.7 | 50.8 | |||
| Other operating expenses |
25.2 | 35.3 | ||||
| Total operating expenses |
69.3 | 61.2 | 260.4 | 22.3 | 86.1 | |
| EBITDA | 18.5 | 30.0 | 197.8 | -4.9 | 27.9 | |
| Depreciation and amortisation |
4.7 | 7.2 | ||||
| Operating profit |
13.9 | 25.4 | 178.9 | 20.7 | ||
| 2025 | 2024 | 2024 38.2 23.0 4.6 |
2025 169.1 91.3 18.9 |
2024 31.7 31.7 17.4 10.5 9.5 6.5 17.0 6.4 2.4 1.4 -7.3 5.0 |
The Technology segment includes the research, development, sale, manufacturing and delivery of complete THP systems and associated equipment.
The Solutions segment encompasses all services provided to Cambi's growing based of installed THP plants, including upgrades, maintenance, and operations. It also includes Grønn Vekst, which specialises in the recycling of biosolids and other organic waste.
16 | Cambi ASA - First-quarter report 2025
Unaudited, in NOK million
Unaudited, in NOK million
| Net contribution on ongoing projects |
Q1 2025 |
Q1 2024 |
|---|---|---|
| Accumulated revenue recognised for ongoing projects | 1,690.5 | 1,080.5 |
| Accumulated cost of materials, goods, and services for ongoing projects | 686.7 | 480.0 |
| Net contribution on ongoing projects as of 31 March | 1,003.8 | 600.4 |
| Accrued project revenue recorded as current assets in the balance sheet |
||
|---|---|---|
| Earned but not invoiced revenue on construction contracts | 246.3 | 169.1 |
| Accrued project cost recorded as current liabilities in the balance sheet |
||
|---|---|---|
| Accrued project cost, provision, and guarantees | 92.5 | 149.8 |
Revenue from construction contracts is recognised through the percentage-of-completion method, measured by the percentage of costs incurred to date divided by the estimated total costs for each contract.
Construction contracts include both new THP equipment deliveries, recorded under the Technology segment, and upgrade-related equipment deliveries for existing Cambi THP systems, recorded under the Solutions segment. Projects with a total contract value below NOK 15 million or a planned duration of less than 12 months are excluded from the order backlog and are therefore not counted as ongoing construction projects.
Cambi had 17 ongoing construction projects at the end of the first quarter, all in the Technology segment. At the end of the first quarter of 2024, Cambi also had 17 ongoing construction projects, of which 16 in the Technology segment and 1 (one) in the Solutions segment.
As of 31 March 2025, the accumulated contribution from ongoing projects was NOK 1,004 million, recognised through profit and loss from the commencement of the projects.

Cambi ASA Skysstasjon 11B 1383 Asker Norway
This report is for information purposes only. Cambi ASA (Cambi) gives no representation or warranty, expressed or implied, as to the accuracy or completeness of any information included herein. No information, including projections, estimates, targets and opinions, contained in this report is or can be relied upon as a promise or representation by Cambi.
The report may contain information obtained from third parties. Such information has been accurately reproduced. As far as Cambi can ascertain and is aware of, no facts have been omitted that would render the reproduced information inaccurate or misleading. While all steps have been taken to ensure the report's accuracy, Cambi does not accept any responsibility for any errors or resulting loss or damage whatsoever. Readers have the responsibility to thoroughly check all aspects for themselves. Enquiries about the reproduction of content from this publication should be directed to Cambi.
The report contains forward-looking statements related to Cambi's current plans, objectives, forecasts and estimates. These statements only consider available information up to and including the date that this report was prepared. Cambi makes no guarantee that these forward-looking statements will prove right. The future development of Cambi with its subsidiaries and the achieved results are subject to a variety of risks and uncertainties, which could cause actual events or results to differ significantly from those reflected in the forward-looking statements. Many of these factors are beyond the control of Cambi with its subsidiaries and, therefore, cannot be precisely predicted.