7 October 2016

ASX Release (ASX code: “FYI”)

FYI Furthers Due Diligence with Positive Exploration Results from Underground Potash Project Review

FYI Resources Limited (FYI) is pleased to update the market on progress of the due diligence review on the Sino-Lao Potash project in Laos, currently majority-owned by Yuntianhua Group (“YTH”), China.

The Sino-Lao project has successfully completed trial production studies, and FYI are negotiating a Joint Venture with YTH to take the project to commercial production.

YTH have invested approximately US$180m into the project to date. The largest part of this investment is into asset infrastructure, including underground mine development, and surface processing facilities.

FYI’s due diligence review of the underground and supporting facilities is therefore an integral component in the Sino-Lao potash project assessment.

FYI’s technical review team undertook a detailed mine inspection and supporting sampling program of the 190 level (364RL) development and production drives of the Sino-Lao project.

Highlights

  • Substantial infrastructure already established.

  • Assays indicating a carnallitite mineralogy.

  • Comparable due diligence grades to those reported by YTH.

  • Low insolubles

Purpose of Underground Review

The review of the underground facilities and sampling program provides FYI with an ideal qualitative and quantitative technical due diligence reference point in respect to providing:

==> picture [166 x 171] intentionally omitted <==

Thong Mang Potash Mine - underground access and development drives

==> picture [165 x 171] intentionally omitted <==

Thong Mang Potash Mine - underground production drive and conveyor belt

  • validation of the potash mineralisation (extent and grade);

  • demonstrable evidence of previous operation and inputs for future mine design;

  • confidence in supporting reference points and data inputs for the deposit and FYI’s exploration model that is currently being determined; and,

  • sufficient bulk sample material for metallurgical test work and process design (of which studies are to begin shortly).

53 Canning Highway, VICTORIA PARK, WA 6100 Tel: +61 8 9361 3100 Fax: +61 8 9361 3184 Website: www.fyiresources.com.au ACN 061 289 218

==> picture [165 x 65] intentionally omitted <==

Underground Review

The FYI review team appraised the winder room, the main, auxiliary and ventilation shafts, the main haulage lifts, the mine services at 400 level (pumps, electrics, switching gear), the production and development drives, the conveyors, ventilation, and other equipment.

- Plan map of Sino Lao Potash Project Location

==> picture [474 x 335] intentionally omitted <==

Underground Sampling

Eight samples were collected for due diligence purposes from the wall and floor of the 190 Level (364RL) of the Sino-Lao potash project over an area of approximately 800m[2] by the due diligence team (see sample locations on mine map below).

The samples were gathered for two distinct purposes:

1. Due diligence

Samples 071901, 903,904,905,907 and 908 were collected approximately 400m from the Main shaft along the Eastern access drive and start of the production drives. Each sample was a 5kg grab sample, comprising representative fresh material which was randomly collected by geo-pick and chisel. The material was composited over an approximate 1m[2] area from the production walls and faces designed to test the previous reported production grade.

Samples 071902 and 071906 were collected randomly by geo-pick and chisel as 5kg grab samples (each composited over an approximate 1m[2] area) from the corner of the floor and walls of the test points as loosely fallen or non-fresh material to test the effect of various salt dissolution.

==> picture [165 x 65] intentionally omitted <==

2. Metallurgical studies

  • An aggregated bulk sample (120kg) was collected from the same sample points to provide material for:

  • a) Back testing of the existing flow sheet and process design.

  • b) Future test work for possible improvements in process design and metallurgical recovery.

The grab samples are indicative of the style of potash mineralisation at that underground location and not necessarily representative of the entire Thong mang Mining Area.

The samples, sealed in plastic and secured in airtight drums, were sent to Metallurgy Pty Ltd in Perth, Australia for sample preparation, where the analysis samples were homogenised, then reduced from 5kg to 200g and sent to Intertek in Perth for analysis. Analysis was for six elements: Ca, Cl, Insol, K, Mg and Na. Methods comprised:

Water Extraction to determine soluble species in Salt (NaCl). Analysed by Gravimetric Technique. (Insol)

Water Extraction to determine soluble species in Salt (NaCl). Analysed by Inductively Coupled Plasma Optical (Atomic) Emission Spectrometry. (Ca, K, Mg, Na)

Water Extraction to determine soluble species in Salt (NaCl). Analysed by Volumetric Technique. (Cl)

The bulk residues will be aggregated and used in addition for the metallurgical studies which are currently being undertaken.

The results for the underground sampling analysis are provided below.

Sino-Lao Underground Samples 190Level (364RL)

Sample Na K Ca Mg Cl Insoluble
ID % % mg/Kg % % %
071901 18.8 7.72 1727 4.28 48.4 0.03
071902 32.5 2.36 1319 1.29 56.1 0.04
071903 4.5 12.34 435 7.65 40.3 0.01
071904 14.8 12.20 195 4.67 46.7 0.01
071905 12.2 10.76 986 5.71 44.2 0.09
071906 36.0 1.31 1062 0.40 57.6 <0.01
071907 17.3 9.19 913 4.71 47.7 0.09
071908 7.2 13.55 822 6.81 42.2 0.11

==> picture [165 x 65] intentionally omitted <==

Three-dimensional view of the Sino-Lao UG development

==> picture [484 x 305] intentionally omitted <==

Plan view of the sample locations at 190 level Sino-Lao UG potash mine (see red insert in above diagram)

==> picture [483 x 245] intentionally omitted <==

==> picture [165 x 65] intentionally omitted <==

Summary of Underground Review

The evaluation of the Sino-Lao underground potash project was designed with two specific purposes in mind:

  • a) in support of the due diligence review; and,

  • b) to assist future design studies (mining and processing).

FYI views the underground mine assessment and supplementary underground sample analysis as being consistent with our previous due diligence findings in being supportive for progressing the joint venture negotiations.

About the Sino-Lao Potash Project

As previously reported, the Sino-Lao project is a trial potash production facility with a reported annual capacity of 50,000t/yr (end product).

The facility is fully developed including surface processing facilities and underground mining development of both access and production headings.

FYI, in collaboration with YTH, are discussing the upscaling of the trial production to full scale commercial production of between 500,000–1,000,000t/yr (end product).

Further Information: Roland Hill

Managing Director Tel: +61 414666178

About FYI Resources Limited

FYI is an ASX-listed natural resources focused public company. The Company’s principal objective is the assembling of a quality portfolio of potash projects in Southeast Asia with the view to long term development and production.

FYI is targeting shallow, thick, high grade deposits typically associated with the geology of the basin regions in Thailand and Laos.

The FYI Board and the in-country management groups believe the targeted Thai and Laos project areas have the potential to host world class potash deposits.

The information in this report relates to the Exploration Result that has been compiled by Mr Mark Pudovskis B.Sc, who is an employee of CSA Global. He is a member of the Australian Institute of Mining and Metallurgy. He has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity to which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mark Pudovskis consents to the inclusion in the public release of the matters based on his information in the form and context in which it appears.

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Sino-Lao Project Exploration Result:

JORC Code (2012 Edition) Table 1

Section � Sampling Techniques and Data

(Criteriainthis (Criteriainthis sectionapply to allsucceeding sections.) sectionapply to allsucceeding sections.)
Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (e.g. cut channels, random chips, or
Eight grab samples of 4-5kg were collected by hand for due diligence
techniques specific specialised industry standard measurement tools purposes from the wall and floor of the 190 Level (364RL) of the
appropriate to the minerals under investigation, such as down hole Thong mang underground mine. The actual sample location was
gamma sondes, or handheld XRF instruments, etc.). These approximately 1m2 that was cleaned via the removal of the surface
examples should not be taken as limiting the broad meaning of material to expose a fresh surface and then each sample was
sampling. uniformaly sourced by equal amount of material over the square metre
Include reference to measures taken to ensure sample using geo-pick and cold chisel.
representivity and the appropriate calibration of any measurement
tools or systems used.
Aspects of the determination of mineralisation that are Material to
the Public Report.
It is unknown how representative the sampled material is to the
remainder of the underground mine or the entire Thong mang Mining
Area.
In cases where ‘industry standard’ work has been done this would Samples for analysis were packed in double plastic bags, labelled and
be relatively simple (e.g. ‘reverse circulation drilling was used to placed in a poly weave bag then into an airtight drum for transfer to
obtain 1 m samples from which 3 kg was pulverised to produce a the Vientiane airport in preparation for airfreight to Perth, Australia.
30 g charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
Samples were pulverised and homogenised to produce a 200g
prepared sample for analysis.
(e.g. submarine nodules) may warrant disclosure of detailed There was no downhole geophysics assisting the sampling.
information.
Drilling Drill type (e.g. core, reverse circulation, open-hole hammer, rotary The Exploration Results relate only to grab sampling. Drilling was not
techniques air blast, auger, Bangka, sonic, etc.) and details (e.g. core used.
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc.).
Drill sample
Method of recording and assessing core and chip sample recoveries The Exploration Results relate only to grab sampling. Drilling
recovery and results assessed. discussion is not applicable.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.

CSA-Report Nº: xxx

4

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Logging Whether core and chip samples have been geologically and The channel and grab samples were neither logged or photographed.
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
The total length and percentage of the relevant intersections
logged.
Sub- If core, whether cut or sawn and whether quarter, half or all core There was no sub-sampling or QA QC procedures adopted for the grab
sampling taken. sampling. The sampling was only for due diligence purposes and not
techniques If non-core, whether riffled, tube sampled, rotary split, etc. and as a material input for future Mineral Resource estimations.
and sample whether sampled wet or dry.
preparation For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the
in situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
Quality of The nature, quality and appropriateness of the assaying and Samples were prepared for at IMO (Metallurgy Pty Ltd) Welshpool,
assay data laboratory procedures used and whether the technique is Perth by crushing and homogenising the 5kg sample to a 200g sample
and considered partial or total. for analysis at Intertek Genalysis Laboratory Services, Welshpool,
laboratory For geophysical tools, spectrometers, handheld XRF instruments, Perth, Australia.
tests etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Analysis was for six elements: Ca, Cl, Insol, K, Mg and Na. Methods
comprised:
Nature of quality control procedures adopted (e.g. standards, Water Extraction to determine soluble species in Salt (NaCl). Analysed
blanks, duplicates, external laboratory checks) and whether by Gravimetric Technique. (Insol)
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Water Extraction to determine soluble species in Salt (NaCl). Analysed
by Inductively Coupled Plasma Optical (Atomic) Emission
Spectrometry. (Ca, K, Mg, Na)
Water Extraction to determine soluble species in Salt (NaCl). Analysed
by Volumetric Technique. (Cl)
These methods are suitable for the soluble analysis of potash samples.
The laboratory applied appropriate quantities of checks, internal blanks

CSA-Report Nº: xxx

5

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
and standards.
Verification The verification of significant intersections by either independent or
Verification of grab sampling against the trial mining results was not
of sampling alternative company personnel. possible as the trial mining results have not been released.
and
assaying

The use of twinned holes.
Documentation of primary data, data entry procedures, data
The assay data is stored on a local FYI server.
verification, data storage (physical and electronic) protocols. The assay data is raw and has not been adjusted.
Discuss any adjustment to assay data.
Location of Accuracy and quality of surveys used to locate drill holes (collar and
The sample points were not survey captured. Their approximate
data points down-hole surveys), trenches, mine workings and other locations positions, suitable for due diligence purposes, were determined from
used in Mineral Resource estimation. underground reference points – drives / cross on the 190 Level and
Specification of the grid system used. marked approximately on a schematic map of the underground drives.
Quality and adequacy of topographic control. These points were located approximately 400m west of the centre of
the mine shaft. The Thong mang mine facility was surveyed with a
handheld GPS and recorded in WGS84 UTM 48N coordinates. The
location is 259505E 2017685N.
There is no survey control confirming the RL of the 190 Level.
Data Data spacing for reporting of Exploration Results. The Exploration Result for Thong mang is based upon 8 sampling
spacing and
Whether the data spacing and distribution is sufficient to establish points, spaced approximately 20 – 50m apart over an approximate
distribution the degree of geological and grade continuity appropriate for the area of 800m2 as illustrated below in figure 3.
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied. The spacing is insufficient for any input to a Mineral Resource
Whether sample compositing has been applied. estimation and is not a reflection on the overall mineralisation present
on Thong mang.
Orientation Whether the orientation of sampling achieves unbiased sampling of No structural information was collected or was able to be collected
of data in possible structures and the extent to which this is known, from the samples. The walls of the underground potash mine were not
relation to considering the deposit type. structurally mapped however given that potash is subjected readily to
geological If the relationship between the drilling orientation and the halokinetic deformation and diapirism, any small scale structural
structure orientation of key mineralised structures is considered to have measurements will have no meaningful bearing on any future Mineral
introduced a sampling bias, this should be assessed and reported if Resource estimation.
material.
Sample The measures taken to ensure sample security. The samples were sealed in plastic and locked in an air-conditioned
security room at the Thong mang facility prior to transportation for analysis in
Australia. Samples for analysis are securely packaged and tracked
during transportation. FYI verified the safe arrival of the samples in
the Perth sample preparation facility.

CSA-Report Nº: xxx

6

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Audits or The results of any audits or reviews of sampling techniques and No audit or review of the exploration results has been completed.
reviews data.

Section � Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

  • Criteria JORC Code explanation MineralType, reference name/number, location and ownership including tenement and agreements or material issues with third parties such as joint land tenure ventures, partnerships, overriding royalties, native title interests, status historical sites, wilderness or national park and environmental settings.

  • The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

Commentary

The Mining Areas – Natan and Thong mang, illustrated in figure 1 (total 76km[2] ) are owned by Yuntianhua. The ownership structure is:

  • 72% - Sino Lao Mining Development and Investment Co Ltd (Sino Lao) - site owners and operators.

  • Of the remaining 28% equity, Yunnan Geological Mineral Group (YGMG) own 8%, the remaining 20% is owned by six other parties. YGMG was awarded equity based on completing the 2001-2003 technical drill program.

Evidence of the licence of title is the document “An Exploitation and Production Agreement for Potash Mineral in Vientiane Basin, LAO People’s Democratic Republic between The Government of LAO People’s Democratic Republic and Yunnan Sino Lao Mining Development & Investment Co., LTD, People’s Republic China (Sino Lao), dated November 2004”

The Agreement describes a three phase program - Feasibility Study Period (36 months), Construction Period (36 moths), Operating Period (24 years) which can be prolonged two times and per time is equal to 10 years under the approval of the Government.

The Agreement has not been independently verified.

There are no known impediments or issues with third parties such as joint ventures, royalties, native title, national parks or environment.

FYI have signed a memorandum of understating with YTH to undertake due diligence work on the Sino Lao project.

Exploration
done by other
Acknowledgment and appraisal of exploration by other parties. The exploration history is summarised as:
parties
2001– 2003: Yuntianhua exploration

CSA-Report Nº: xxx

7

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
o Five cored boreholes on Thong mang (logs received for only
three boreholes, total 1222.45m)
o Seven cored boreholes on Natan. (logs received for only six
boreholes, total 3235.45m)
o Detailed geochemical analysis of all evaporite samples and
downhole deviation measurements of each borehole. There
was no seismic completed.
o Completed a foreign estimate however it does not meet
JORC standards and is therefore not suitable for public
release.
2011 – 2013: Yuntianhua mine and Pilot plant
o 2
x
shafts

Primary
ventilation
and
haulage
of
approximately 2m diameter, secondary auxiliary (less than
2m diameter)
o Two x drives, one at 143m and a second at 190m. Levels
were selected on grade and geology.
o Two x drives are 3m in height.
o Trial mining was completed over a 2.5-year period, 2011 -
2013 with approximately 35,000t of K2O product produced.
o Shaft
capacity
is
120,000t/annum,
plant

capacity
60,000t/annum.
2016 – Present: FYI
o Eight underground grab samples
o Two x PSI Drilling core boreholes (adjacent to ZK1) – assays
not available at present.
o Digital capture of historic borehole data into an Access
Database
o Generation of ArcGIS borehole location plans
There is anecdotal evidence of earlier (pre- 2000) drilling by
Vietnamese companies however no supporting evidence is
available.
Geology Deposit type, geological setting and style of mineralisation. The Project is a potash (carnallitite-dominant) deposit located in the
Sakon Nakhon Basin. As described by Warren, J. (2006). Evaporites:
sediments,
resources
and
hydrocarbons.
Berlin,
_Germany: _

CSA-Report Nº: xxx

8

Sino Lao Potash Project Exploration Result Table 1

FYI RESOURCES LTD

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Springer.“Potash in the halite-dominated Cretaceous Maha Sarakham
Formation is preserved within two basins, the northern Sakon Nakhon
Basin which extends in to Laos and the southern Khorat Basin”.
As further asserted by Warren, J. (2006). Evaporites: sediments,
resources and hydrocarbons. Berlin, Germany: Springer. “The only
well studied and significant potash-rich zones are in the upper section
of the Lower Salt Member along the western margin of the Khorat
Plateau. The potash interval is dominated by carnallitite (up to 20-30m
thick), which forms a widespread stratiform unit along the western
margins of both the Khort and Sakon Nakhon basins. It is locally
capped by lesser sylvinite (<6m) and covered by a bed of colour
banded red and grey halite (up to 6m thick). The potash stratigraphy
is in turn overlain by the Lower Clastic Member.”
The stratigraphy of the Lower Salt Member is summarised after
Warren, J. (2006):

Upper-most colour banded Halite (0-6m)

Sylvinite zone (0-6m) - Not always present and the contact is
transitional to the underlying carnallitite

Carnallitite zone (0 up to 15-30m)

Lower zone of massive to bedded halite with trace carnallitite
(50-300m)
Drill hole A summary of all information material to the understanding of the The Exploration Results are based on eight underground grab samples
Information exploration results including a tabulation of the following from an existing trial potash mine. Details relating to drill collars,
information for all Material drill holes: dips, azimuth, hole length are not relevant for such sampling
o easting and northing of the drill hole collar techniques.
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should
_clearly explain why this is the case. _
Data In reporting Exploration Results, weighting averaging techniques, None of the data collected was aggregated.
aggregation
methods
maximum and/or minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material and should be
The reported grades are raw.
_stated. _

CSA-Report Nº: xxx

9

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria
JORC Code explanation
Commentary Commentary Commentary Commentary Commentary Commentary Commentary

Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples
of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values
should be clearly stated.
A summary of the sample’s analytical results is included below in
‘Balanced Reporting’.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the reporting of
Exploration Results.

If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.

If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Thong mang geometry is interpreted as relatively flat lying based on
the distribution of historical assay reports. There is no seismic to
support this interpretation.
The eight sample points were collected over an area of aproximately
800m2. Given the Thong mang Mining Area is approximately 38km2,
the spatial distribution of the sample data and any thickness
relationship is not material for the nature of the deposit. No
conclusions should be draw from the distribution of the potash
sample grades.
Diagrams

Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
_drill hole collar locations and appropriate sectional views. _
A project location plan with underground working schematic
illustrating approximate sampling locations in included below in
figures 1, 2 and 3, and is included within the body of ASX release.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
The Exploration Results are reported as a grade for each
summary table is included below.
sample. The
Insoluble
%
0.03
0.04
0.01
0.01
0.09
<0.01
0.09
0.11
Sample
ID
Na K Ca Mg Cl Insoluble
% % mg/Kg % % %
071901 18.8 7.72 1727 4.28 48.4 0.03
071902 32.5 2.36 1319 1.29 56.1 0.04
071903 4.5 12.34 435 7.65 40.3 0.01
071904 14.8 12.20 195 4.67 46.7 0.01
071905 12.2 10.76 986 5.71 44.2 0.09
071906 36.0 1.31 1062 0.40 57.6 <0.01
071907 17.3 9.19 913 4.71 47.7 0.09
071908 7.2 13.55 822 6.81 42.2 0.11

CSA-Report Nº: xxx

10

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Other Other exploration data, if meaningful and material, should be There has been no additional meaningful exploration completed with
substantive reported including (but not limited to): geological observations; tangible results available by FYI Resources which adds support to the
exploration geophysical survey results; geochemical survey results; bulk Exploration Result.
data samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Further work
The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
Significant in-ground work comprising 2D (and potentially 3D) seismic
data, drilling and downhole wireline logging is required to establish any
future JORC compliant Mineral Resources
areas, provided this information is not commercially sensitive. Prior to undertaking additional drilling, it is recommended to complete
a 2D seismic program in order to evaluate the sub-surface geology,
identify areas of structural discontinuity (specifically salt diapers and
their margins which are prone to host sylvinite after carnallitite) to
enable appropriate exploration borehole planning.
Approximately 8 – 10 boreholes, spaced 2km apart over each Mining
Area. On the assumption of an average drill depth of 400m, a total
meterage of 3200m – 4000m on each Mining Area will be required.
This volume of drilling will be sufficient to define a Mineral Resources
assuming all related JORC Table 1 guidelines are adequately adhered
to.
Wireline logging is integral to any potash exploration program whether
to aid geological logging/interpretation or integrated with seismic data
to enhance robust basinal interpretation. VSP (Velocity) survey and
logs (sonic and density) are required to generate a synthetic
seismogram with density and gamma logs providing a means of
assessing mineralogy.
Each drill hole is recommended to be logged from the end of hole depth
to surface casing with geophysical wireline tools. The data collected
will provide detailed downhole information that can be used to cross-
reference lithology, mineralogy, and geochemical assay data. Gamma
and density should be considered mandatory. Neutron is useful for
assisting identifying the hygroscopic evaporites.
To progress to a JORC Mineral Resource classification the following
guideline is suggested:

CSA-Report Nº: xxx

11

FYI RESOURCES LTD

Sino Lao Potash Project Exploration Result Table 1

==> picture [34 x 46] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
Inferred Resource: Area within 2 km of a drill hole with
geochemical analyses with 2D seismics but without 3D seismic
coverage.
Indicated Resource: Area within 2 km of a drill hole with
geochemical analyses with 3D seismic coverage.
Measured Resource: Area within 2 km of a drill hole with
geochemical analyses displaying strong spatial analysis and
with 3D seismic coverage.

CSA-Report Nº: xxx

12

FYI RESOURCES LTD

==> picture [34 x 46] intentionally omitted <==

Sino Lao Potash Project Exploration Result Table 1

==> picture [543 x 44] intentionally omitted <==

==> picture [543 x 44] intentionally omitted <==

==> picture [543 x 43] intentionally omitted <==

==> picture [543 x 44] intentionally omitted <==

==> picture [543 x 43] intentionally omitted <==

==> picture [543 x 43] intentionally omitted <==

==> picture [543 x 44] intentionally omitted <==

==> picture [543 x 43] intentionally omitted <==

==> picture [543 x 44] intentionally omitted <==

Figure 1: Project loca�on plan with Sino-Lao UG potash mine

FYI RESOURCES LTD

==> picture [34 x 46] intentionally omitted <==

Sino Lao Potash Project Exploration Result Table 1

==> picture [381 x 242] intentionally omitted <==

----- Start of picture text -----

Main Shaft Auxiliary Shaft
190 Level
Ventilation Shaft
Production
Development
N
Mine Services
----- End of picture text -----

Figure 2: Three dimensional view of the Sino-Lao UG development

==> picture [440 x 224] intentionally omitted <==

----- Start of picture text -----

071901
071902
071907
071906
071904
071908
071903
~ 20m
071905
----- End of picture text -----

Figure 3: Plan view of the sample loca�ons at 190 level Sino-Lao UG potash mine