HEAVY SIDE BUILDING MATERIALS: AN ATTRACTIVE PLACE TO BE

POPULATION GROWTH
9.8 billion estimated world's population by 2050, meaning about 2 billion more vs today.

MORE URBAN DEMAND
70% of population expected to live in cities by 2050 (vs 55% today), with clear impact on residential (new homes and more renovation) and urban infrastructure.

SUSTAINABILITY ON THE RISE
Consumer gradually more interested in sustainable products and low carbon construction. Tighter carbon regulation both in mature and emerging economies will favour circular economy models.

INNOVATION IN BUILDING CONSTRUCTION
More efficient construction solutions, both in residential and infrastructure, will be needed in order to preserve natural resources.


ALL CONSTRUCTION SEGMENTS ARE GOING TO CAPTURE THESE MEGATRENDS:
RESIDENTIAL
Strong demand, fueled by population growth and urbanization.
NON RESIDENTIAL
Climate policies to support private investments.
INFRASTRUCTURE
Relevant infrastructure package are going to be implemented in our key markets (EU Green Deal, IIJA,..).

CEMENT AND CONCRETE DEMAND IS LIKELY TO REMAIN FAVOURABLE OVER THE NEXT DECADE.


QUO VADIS CEMENT?
ROLE OF CEMENT AND CONCRETE
Concrete is the most used man-made material on our planet. Cement and concrete likely to remain irreplaceable materials that will play a significant role in solving the challenges of tomorrow
KNOW-HOW IS KEY TO TACKLE THE TRANSITION
The complexity of technology and logistics will increase during the transition. Proficiency and expertise of the management in the concrete value chain will be determinant in understanding and identifying the best solutions
PURSUING COST LEADERSHIP
Major changes in input costs (structure, weight).
New ROI models based on cost efficiency in production and distribution
NET ZERO CONCRETE
Globally, cement industry contributes to ca. 6% of total man-made GHG emissions annually. The concrete decarbonization is very challenging for the sector and will require disruptive technlogy, like CCUS, which today are not fully available on industrial scale
CRITICAL SIZE CAN MATTER
Not only raw materials; availability of efficient energy and CCU/S crucial production in the long run. Critical mass of a producer in a region helpful to access and connect to new infrastructure
RICHER COMMODITY
New energy intensive technologies and more demanding customer are changing the value of cement and concrete.
Possibly relative value versus substitutes (stell, wood, asphalt, etc.) to remain attractive.


BUZZI UNICEM TODAY: WELL POSITIONED TO CATCH FUTURE OPPORTUNITIES




OUR JOURNEY TO NET ZERO
HOW TO GET THERE
Proven track record in CO2 emissions reduction. Already reduced by 17% CO2 emissions in 2021 vs 1990.
NEXT CHAPTER: NEW, SCIENCE BASED, REDUCTION TARGETS
Targeting to achieve CO2 emissions (scope 1 net) below 500 kg per ton of cementitious material by 2030, meaning another 20% reduction vs 2021 level*.
TCFD alignment SBTi validation on-going
ROADMAP 2030 – 2050 Realistic path to turn ambition into reality
*scope including Brazil, excluding Russia



OUR JOURNEY TO NET ZERO



MAIN ASSUMPTIONS
SCOPE
The roadmap has been developed considering all companies being part of the scope of consolidation excluding Russian ones due to the current uncertainty, and including BCPAR, our Brazilian joint venture. Production data concerns the grey clinker (standard and oil well) only and all cements/binders formulated with it.
CCUS INFRASTRUCTURES
It is foreseen a successful cooperation of different actors to build and manage the CO2 transport network; identify the storage or reuse sites (e.g. production of biofuels); obtain the acceptance by the public opinion; obtain adequate support by the government.
AVAILABILITY OF MATERIALS
It is assumed that clinker substitutes (slag, pozzolans, fly ash, etc.) remain available at competitive costs.
MARKET PROJECTION
Up to 2030, the production scenario takes into account the market forecasts provided by individual countries. An increase between 5 and 10% is expected by 2030 and 2050 in comparison to 2021.
INSTITUTIONAL SUPPORT
Institutional support in permits and specific authorizations to facilitate the use of alternative fuels and the implementation of innovative technologies is expected.
AVAILABILITY OF ELECTRICITY FROM RENEWABLE SOURCES
The roadmap considers decarbonization plans announced at national level for the electricity sector, which envisage the progressive use of renewable sources and for the residual share of production with fossil fuels the use of CO2 capture and storage.


CO2 EMISSIONS AND CEMENT PRODUCTION PROCESS



CO2 EMISSIONS AND CEMENT PRODUCTION PROCESS GROSS vs NET



CO2 EMISSIONS - 2021 GROSS vs NET
20 566 t/000


GROSS
NET


NET


ROADMAP TO NET ZERO CO2 REDUCTION LEVERS
EFFICIENCY IN CONCRETE PRODUCTION AND DESIGN & CONSTRUCTION
CLINKER CONTENT IN CEMENTS RECARBONATION
ALTERNATIVE FUELS WITH BIOMASS CONTENT
FOSSIL FUELS WITH LOWER EMISSION FACTOR
EFFICIENCY IN ELECTRIC AND THERMAL ENERGY CONSUMPTION
DECARBONIZATION OF ELECTRICITY
CARBON CAPTURE, (USAGE) AND STORAGE


EFFICIENCY IN CONCRETE PRODUCTION AND DESIGN & CONSTRUCTION
....according to the patent filed by the Nervi construction company, "if a continuous body were to be replaced by a filamentous structure, with the fibers arranged according to isostatic lines, [...] the behavior of this body, due to the given external forces, it is identical to that of the continuous body […] obtaining a considerable economy of materials without modifying the play of internal forces".




CLINKER CONTENT IN CEMENTS


In 2021
67.3% In 2030
63.4% In 2050


ALTERNATIVE FUELS WITH BIOMASS CONTENT


In 2021
45.4%
In 2030
69.5% In 2050


FOSSIL FUELS WITH LOWER EMISSION FACTOR
The combustion of methane gas with the same energy supplied emits about half the CO2 emitted by the combustion of coal or petcoke.

from 2030
Contribution of methane to thermal energy from fossil fuels


EFFICIENCY IN ELECTRIC AND THERMAL ENERGY CONSUMPTIONS

Additional electric and thermal consumptions requested by CCUS has not been taken into account

RECARBONATION KEY FACTS
-
- Concrete naturally absorbs CO2 from the atmosphere throughout its lifetime.
-
- Products, such as mortar and concrete blocks, carbonate rapidly. Reinforces concrete carbonates slowly – by design – to protect steel reinforcement from corrosion.
-
- Improved demolition practices and innovative industrial carbonation techniques can enhance and accelerate carbonation CO2 capture.

CARBONATION IS THE NATURALLY OCCURRING PROCESS IN WHICH CONCRETE ABSORBS CO2 , PERMANENTLY REMOVING CARBON FROM THE ATMOSPHERE.
CARBONATION OF CONCRETE IS A WELL-ESTABLISHED SCIENCE AND RECOGNIZED BY THE IPCC (INTERGOVERNMENTAL PANEL ON CLIMATE CHANGE) AS AN IMPORTANT CARBON EMISSIONS SINK.



CARBON CAPTURE, (USAGE) AND STORAGE



DECARBONIZATION OF ELECTRICITY



ABSOLUTE EMISSIONS scope1 GROSS + scope2 BREAKDOWN BY LEVERS INCLUDING ELECTRICITY DECARBONIZATION



GCCA vs BU: 2050
GCCA ACTIONS TO A NET ZERO FUTURE
Percentage contribution to net zero and CO2 emissions saving in 2050
BUZZI UNICEM TO NET ZERO




BU: 2030 vs 2050
BUZZI UNICEM 2030 target
BUZZI UNICEM TO NET ZERO



2030 TARGET Specific emissions scope1 NET


KgCO2 /t cem.ious prod.
In 2021
<500 KgCO2 /t cem.ious prod.
In 2030

In 2050


INITIATIVES BY GEOGRAPHIC AREA
CENTRAL AND EASTERN EUROPE - DYCKERHOFF



ROADMAP 2030 DYCKERHOFF EXECUTIVE SUMMARY
PRODUCT INNOVATION – CEDUR AND ECO COMFORT
CEDUR and ECO-COMFORT (CEM II/C) crucial to reduce CO2 emission in the construction.
Dyckerhoff 1st cement producer to receive technical greenlight for the production of CEM II/C in Germany.
AMBITIOUS CAPEX PROGRAM TO FUEL THE TRANSITION
Dyckerhoff is planning to invest ~256 million euros over the period, having more than 50 initiatives.
Significant focus on product mix.
CCU/S INSTALLATION AT INDUSTRIAL SCALE IN GERMANY
Initial capture at Deuna cement plant to start in 2027 (first pick of CO2 ).
Scaled up to 0,28 mt CO2 p.a. by 2030.
SCOPE 1 NET CO2 EMISSIONS
Dyckerhoff countries to reduce CO2 net emissions to <450 kg CO2 /t cementitious product.
Dyckerhoff ETS countries to perform even better: <400 kg CO2 /t cementitious product.



CEDUR AND ECO COMFORT: CO2 EFFICIENT CEMENTS
<39%
CO2 footprint in comparison to standard CEM I cements
-25%
Potential to reduce CO2 intensity in comparison to the status quo of binder mixes
3
Cement plants in Germany producing CEM II/C cements
CEM II/C cements are the crucial approach to reduce the CO2 emissions in construction. Dyckerhoff received as 1 st cement producer in Germany the general technical approval for its CEM II/C cement.




CCU/S: GREEN ENERGY COOPERATION WITH TES&OGE IN DEUNA
DEUNA CEMENT PLANT (GERMANY) WILL PARTIALLY CAPTURE ITS CO2 AND PARTICIPATE AT A CO2 CIRCULAR ECONOMY INITIATIVE. CAPEX: 35-50 €M
CARBON CAPTURE AT CEMENT PLANT IN DEUNA (THURINGIA)
CO2 emissions will be captured and transferred into liquid CO2 at Deuna cement plant. Initial start in 2027, scaled up for approx. 250,000 tons CO2 capture by 2030.
1,000 KM CO2 TRANSPORT NETWORK
The CO2 will be transported* to Wilhelmshaven. From there is will be exported by TES for a circular closed looped system or sequestration.

* either by train through a JV of Rhenus & TES or by pipeline through a JV of OGE & TES.
GREEN ENERGY HUB WILHELMSHAVEN
TES will import green methane which can be used in turn in industrial processes.




CCU/S: CATCH FOR CLIMATE
CI4C – CEMENT INNOVATION FOR CLIMATE WAS FOUNDEND BY BUZZI UNICEM/DYCKERHOFF, HEIDELBERGCEMENT, SCHWENK ZEMENT AND VICAT.
DEMONSTRATION PLANT ON INDUSTRIAL SCALE IN MERGELSTETTEN
CI4C will build and operate a demonstration plant, where the oxyfuel (from oxygen and fuel) process will be applied. EPC contract with tkIS signed.
CAPTURE OF CO2 BY OXYFUEL PROCESS
Pure oxygen is introduced into the cement kiln instead of air: No other components gets into the burning process. Highly concentrated CO2 is created. ~100% of CO2 can be captured.
REFUELS
The captured CO2 is used to produce reFuels with the help of renewable electrical energy and turned into climate-neutral synthetic fuels such as kerosene for air traffic.





CAPEX REQUIREMENTS BY 2030
Dyckerhoff - Central and Eastern Europe
~ 256 m€
Additional capex in 2022-2030
>50
Projects in 5 countries and 12 plants
~ 134 m€
in product portfolio change




CO2 EMISSIONS BY 2030 Dyckerhoff - Central and Eastern Europe*
Scope 1 Net CO2 emissions
<450 kg CO2 /t. cem.ious
Clinker content in cements (K/C)
63% vs 72% in 2021
Alternative Fuels with biomass content (thermal substitution)
59% vs 53% in 2021
* Including: Germany, Luxembourg, Poland, Czech Rep., Ukraine. Excluding: Russia




INITIATIVES BY GEOGRAPHIC AREA
UNITED STATES


ROADMAP 2030 USA EXECUTIVE SUMMARY
ACCELERATED PATH FOR PLC TYPE 1L CONVERSION
Reducing K/C from 89% to 81%, substituting clinker with limestone (up to 15%) and other SCMs
Total transition in all plants to PLC Type 1L by the end of 2022*
ACCELERATED PATH FOR FUEL MIX CHANGES
By 2030:
- +50% alternative fuels utilization (from 20% in 2021 to 30% by 2030)
- Fossil fuels substitution with natural gas (up to 70%)
CAPITAL INTENSIVE EFFORT IN ORDER TO ACHIEVE TARGETS
Planning to invest ~272 m\$ with more than 30 initiatives over the period
Significant effort on capex aiming to lower the clinker content as well as on investment in renewable energy production
OUTPERFORMING PCA TARGETS
Significant CO2 emissions reduction thanks to the implementation of the commercial and capex initiatives planned.
By 2030, scope 1 net CO2 emissions < 600 kg CO2/t cem.ious prod.
*Excl. plants with oil well cement production



PLC Type 1L: CO2 EFFICIENT CEMENTS
<12%
CO2 footprint in comparison to standard Type I/II cements
Type 1L cement is the crucial approach to reduce the CO2 emissions in construction. As of May 31, 2022, 5 cement plants have fully converted production of Type I/II to Type 1L, another plant will fully convert by end of June, and the remaining 2 plants will fully convert by year-end.
8
Cement plants in USA producing Type 1L cement




ALTERNATIVE FUELS USAGE
Capital expenditure
~ 52 m\$
Thermal substitution
Up to 30%
Plants with alternative fuels usage by 2030
7 (out of 8)



NATURAL GAS CONVERSION PROJECTS

6 (out of 8)

*mainly petcoke and coal


CAPEX REQUIREMENTS
~272 m\$*
By 2030
>30
Initiatives in 8 plants
~69 m\$
Photovoltaic and Wind Power Systems

*Not considering CCUS Pilot Test projects **Including: photovoltaic and wind mill projects


CO2 EMISSIONS BY 2030
Scope 1 Net CO2 emissions
<600 kg CO2 /t. cem.ious prod.
Clinker content in cements (K/C)
81% vs 89% in 2021
Alternative fuels with biomass content (thermal substitution)
30% vs 20% in 2021



CARBON CAPTURE PILOT TEST PROJECTS
FACILITIES UNDER CONSIDERATION FOR IMPLEMENTING PILOT TESTS
- Maryneal, TX: closest to CO2 sequestration site. 4th largest BU plant in USA
- Festus, MO: closest to CO2 sequestration site. Largest BU plant in USA
ESTIMATED PROJECT DEVELOPMENT COSTS AND CAPTURE RATE
- Maryneal, TX: 10-15 USDm (capture rate: 15 t CO2 /day)
- Festus, MO: 15-30 USDm (capture rate: 42 t CO2 /day)
TECHNOLOGIES UNDER EVALUATION FOR PILOT TESTING
- Solvent scrubbing
- Membrane separation
- Solvent-Sorbent Hybrid scrubbing
PARTIAL FUNDING FROM US DEPARTMENT OF ENERGY
Planning to apply for partial funding from the US Department of Energy Grant Program
R&D grant could cover up to 80% of the pilot project cost





| State | Emissions Reduction Targets | ||
|---|---|---|---|
| Pennsylvania | No Targets | ||
| California | 40% below 1990 by 2030** | ||
| Maryland | 40% below 2006 by 2030 | ||
| Oregon | 75% below 1990 by 2050 | ||
| Maine | 80% below 1990 by 2050 | ||
| New York | 85% below 1990 by 2050 ** | ||
| Colorado | 90% below 2004 by 2050 | ||
| Nevada | Near-zero emissions by 2050 | ||
| Washington | Net-zero by 2050 | ||
| Virginia | Net- zero by 2045 |
-


INITIATIVES BY GEOGRAPHIC AREA
ITALY

ROADMAP ITALY EXECUTIVE SUMMARY
PRODUCT INNOVATION – C GREEN PUSH
C-Green cements are more sustainable and circular with up to 70% of recycled materials and lower clinker content
C-Green up to 60% of the volumes by 2030 (2x compared to 2021)
LOWER CLINKER CONTENT AND MORE FOSSIL FUELS SUBSTITUTION ARE KEY
- K/C from 77% to 65%
- 3x more alternative fuels utilization (from 16% to 48%)
- Fossil fuels substitution with natural gas (up to 30%)
AMBITIOUS CAPEX PROGRAM TO FUEL THE TRANSITION
Planning to invest ~170 million euros with more than 30 initiatives over the period
Significant focus on investment in renewables, aiming to both decarbonize electricity and to hedge power inflation
SCOPE 1 CO2 EMISSIONS NET <500 Kg CO2 / t. cem.ious prod.
Commercial and capex initiatives will lead to a significant reduction of CO2 emissions


C-GREEN PUSH: PRODUCT PORTFOLIO DEPLOYMENT
CEM I:
- Stop of CEM I 42,5R by 2022, moving to CEM II/A-LL 42,5R
- Progressive introduction of CEM II/A-LL 52,5 from 2023 )
CEM II:
- 42.5 from II/A-LL to II/B-LL
- II/C-M with slag or natural puzzolan + limestone
CEM III:
- Short term volume increase
- Subs. of III/A with II/C-M by 2025/26
CEM IV & V:
- Substitution of fly ashes with natural puzzolan
- Introduction of CEM V/A (S-P)



MAIN TECHNOLOGICAL ACTIONS TO REDUCE CO2
LOWER CLINKER CEMENT
- New generation of admix developed with producers
- Incremental usage of SCM
- Composite cements by separate grinding
FOSSIL FUELS SUBSTITUTION
- RDF fuels new lines
- Introduction of biogenic dried sewage sludge
- Natural gas substitution (up to 30%)*
DECARBONATED AND MINERALIZING RAW MATERIALS
- Bypass dust washing to reduce Cl content recirculation and subsequent CO2 recovery
- Usage of electric arch steel slag as supplementary raw meal material
- Fluorite usage to reduce burning T° and fuel consumption
OTHER TECHNOLOGICAL MEASURES
- DeCONOx installation to reduce CO/COT to support incremental usage of alternative fuels
- Scope 2 measures:
- Photovoltaic systems
- Waste Heat Recovery installation**


CAPEX ALLOCATION TO CO2 RELATED PROJECTS
~173m€
By 2030
>30
Initiatives in 9 plants

Photovoltaic System



PV PROJECTS SUMMARY: «NATURALLY» HEDGING THE RISK
>29
Initiatives

RES generation

2022 BGT consumption

RES coverage
OPTIONS TO IMPLEMENT THE RENEWABLE ELECTRICITY STRATEGY

- On site and near site generation
- Off- site PPA
- Grid incentives (auction at fixed price)
- ~31% Purchasing renewable certificates


CO2 EMISSIONS BY 2030
Scope 1 Net CO2 emissions
<500 kg CO2 /t. cem.ious
Clinker content in cements (K/C)
65% vs 77% (2021)
Alternative Fuels with biomass content (thermal substitution)
48% vs 17% (2021)

Kg CO2/t cem.ious
(net)


INITIATIVES BY GEOGRAPHIC AREA



CO2 EMISSIONS BY 2030
Scope 1 Net CO2 emissions
<450 kg CO2 /t. cem.ious
Clinker content in cements (K/C)
58% vs 60% in 2021
Alternative Fuels with biomass content (thermal substitution)
47% vs 28% in 2021

Kg CO2/t cem.ious
prod. (net)


CAPEX REQUIREMENTS
~ 72 m€
By 2030



INNOVATIVE TECHNOLOGIES TO ACCELERATE DECARBONIZATION



CCUS FACILITIES DEVELOPMENT
Global pipeline of commercial CCUS facilities operating and in development, 2010-2021 www.iea.org


BUZZI UNICEM - ITALGAS FEASIBILITY STUDY


BUZZI UNICEM – ITALGAS: FEASIBILITY STUDY
- Memorandum of Understanding signed in December 2021
- Scope of work: Development of a feasibility study on the implementation of Power to Gas plants in combination with Carbon Capture Systems at Buzzi Unicem production plants
- Target: Italgas economic offer for the realization of the system assessed in the feasibility study at Buzzi Unicem production plants, in case of concrete opportunities for both parties in terms of feasibility and sustainability
- Scientific advisor: Politecnico di Torino
- Project timeline: Dec. 2021 June 2022
- Main project steps:
-
- Technology definition
-
- Market analysis
-
- Business model development
-



BUZZI UNICEM – ITALGAS: POWER TO GAS TECHNOLOGY



DEUNA PLANT: STUDY ON PARTIAL CO2 CAPTURE


STUDY ON PARTIAL CO2 CAPTURE DEUNA PLANT CURRENT SITUATION AND BACKGROUND
Dyckerhoff is working with strong partners to decarbonize the Deuna plant
- TES (Tree Energy Solutions) offering a full solution to decarbonize the energy and process related emissions
- Setting up the LNG, green gas, CO2 terminal in Wilhelmshaven "AvantHy"
- Building the CO2 network in Germany together with its partner OGE
▪ OGE (Open Grid Europe)
operating the largest gas transmission network in Germany
- 12.000 km pipelines for gas
- 30 compressor stations (1.000 MWtotal), 111 GW peak load and 654 TWh gas transported in 2020
- 17 border crossings and 1.009 exit points


CURRENT SITUATION AND BACKGROUND

TES offer

- TES is setting up a complete value chain which includes the terminal in Wilhelmshaven near the Jade bay at northern seashore. This terminal will be connected to the gas-, CO2 -, and hydrogen pipeline network as well as the railway network.
- Together with Rhenus, TES offers to pick up CO2 by train in 2026, latest 1st quarter of 2027
- In a first step, CCS is offered
- In a second step, the captured CO2 will be used for CCU in a closed loop
- Transport to the Middle East as a feedstock is foreseen.
- The CO2 will be used to produce "green CH4" out of "green H2" using the high solar energy potential in this region
- Methane (CH4 ) will return to Europe with the same ships.


STUDY ON PARTIAL CO2 CAPTURE DEUNA PLANT WHAT IS IN FAVOR OF DEUNA?
Deuna plant has the most promising preconditions for a (partial, post combustion) CO2 capture unit
- High raw material reserves, good permission situation, high acceptance in the region
- Good space situation for the big footprint of a CPU
- Comparable high CO2 content in the stack (own stack for the clinker cooler air vent)
- Powerful energy supply acc. to the plant history
- Large train station and rail lines
- Existing LOI with a partner who will be able to pick up CO2 in near future
- Good geological preconditions also for CCS close to the plant, if it will be politically feasible



STUDY ON PARTIAL CO2 CAPTURE DEUNA PLANT SCOPE OF THE PROJECT
The project target is to do a comprehensive feasibility study, cost calculation and timetable considering:
- Existing process figures
- Define the optimal reduction rate taking a potential future expansion into account
- Integration of only one or both kilns?
- Cost estimation for Capex and Opex
From today point of view, a post-combustion CO2 capture system will be chosen among the industrial readily available capture technology, i.e. Amine based or Cryogenic Techn.
First CO2 delivered by train expected in 2026, latest 1st quarter of 2027 followed by potential full CO2 capture and transport by pipeline to Wilhelmshaven


CI4C: OXYFUEL CO2 CAPTURE TECHNOLOGY


CI4C – ''PURE OXYFUEL''
"OXYFUEL" def.: combustion of fuel by replacing air (ca. 21% O2 + 79% inert components: N2 , Ar) with pure oxygen as oxidizer
- CI4C Cement Innovation For Climate: J.V. of four partners
- The catch4climate project is intended to create the conditions for the large-scale use of CO2 capture technologies in cement plants
- First application of so-called "Pure Oxyfuel" technology in the cement production process
- Significant improvement in CO2 capture potential from flue gas expected at much lower electricity costs
- The long-term goal is to establish a process for complete and costefficient capture of CO2 emissions from a cement plant.
- Technology provider is TKIS (Polysius)
The EPC contract with TKIS was recently signed.



CI4C – ''PURE OXYFUEL''
PILOT PLANT (450 TPD) IN MERGELSTETTEN (SCHWENK Cement Plant, South Germany)



CI4C – ''PURE OXYFUEL'' vs 1st gen. Oxyfuel
OPPORTUNITY (according to TKIS)
- Smaller structure (lower CAPEX and OPEX)
- Smaller gas volume in pre-heater
- Higher CO₂ concentration in the raw gas
- Clinker cooler waste air can be used for raw milling process



VERNASCA PLANT: CLEANKER PROJECT CA-LOOPING TECHNOLOGY

THE CLEANKER PROJECT
- Ultimate objective: advancing the integrated Calcium-Looping (CaL) process for CO2 capture in cement plants
- Primary targets:
- Demonstrate the integrated CaL process at TRL 7, in a new demo system connected to the operating cement burning line of Vernasca cement plant
- Demonstrate the technical-economic feasibility of the integrated CaL process in retrofitted large scale cement plants through process modelling and scale-up study.
- Starting date: October 1 st 2017
- Duration: 4 years + 1.5 years extension (Covid-related delays)
- End date: March 31st 2023
- Partner: 13 from 5 EU member states + Switzerland and China



CALCIUM LOOPING WORKING PRINCIPLE



CALCIUM LOOPING WORKING PRINCIPLE

- Flue gases enter the Carbonator together with CaO, which acts as a selective CO2 sorbent Carbonation reaction: CaO + CO2 → CaCO3 @ 600 – 650 °C
- CO2 is removed from the flue gases and bonded into CaCO3
- The CaO is produced in the Calciner, where the opposite reaction takes place and the captured CO2 is released
Calcination reaction:
CaCO3 → CaO + CO2 @ 900°C
- Heat is provided by Oxy-fuel combustion → Combustion gas is very rich in CO2 (no N2 dilution)
- Continuous CaCO3 make-up and CaO purge are needed to counteract CaO deactivation as a CO2 sorbent


CALCIUM LOOPING – VERNASCA PILOT PLANT



THE EXPERIMENTAL CAMPAIGNS
- 9 experimental campaigns foreseen:
- 5 short tests: one week each, non-continuous operation, test of several operating points
- 4 long tests: one week of continuous operation each
- → The aim of the short tests is to identify the most attractive operating conditions for the longer test runs
4 weeks of short tests have been carried out
- Test of air-fired calcination at first, then oxyfuel calcination
- Evaluation of the impact of the main governing parameters:
- Flow rate of fresh raw meal to the calciner
- Flow rate of recarbonated raw meal recycled to the calciner
- Gas flow rate at carbonator inlet
- Calciner outlet temperature
- Temperature of calcined raw meal entering the carbonator
- Main results to assess the performance of the system:
- Loss On Ignition (LOI) of samples from calciner and carbonator outlet
- Gas composition (CO2 , O2 ) at calciner outlet, carbonator inlet and outlet


CONCLUSIONS AND NEXT STEPS
- The pilot produced consistent data showing that CO2 capture actually takes place in the Calcium Looping system
- Oxyfuel calcination has been tested and managed for a significant number of hours
- The data obtained in the short tests carried out in the last weeks are currently being analyzed, with the following main targets:
- → To assess the impact of the governing parameters on the overall performance of the system
- → To define the most interesting operating windows to be verified in the long tests
- → To simulate the performance of a full-scale Calcium Looping system


CO2 CAPTURE - KPI


KEY PERFORMANCE INDICATORS FOR CO2 CAPTURE
- The KPIs listed below are calculated for any new process () by comparison with a reference process (), i.e. the state-ofthe-art clinker production process
-
SPECCA: Specific Primary Energy Consumption per CO2 Avoided
- Both thermal energy and electricity are expressed as primary energy,
- Equivalent CO2 emissions are considered, i.e. the sum of direct and indirect (electricity production) emissions,
-
CCA: Cost of CO2 Avoided
- It is calculated starting from the difference in clinker production cost,


CO2 CAPTURE TECHNOLOGIES COMPARISON
| Chemical absorption |
Oxyfuel | Integrated Calcium Looping |
Pressure Swing Adsorption |
|
|---|---|---|---|---|
| Additional thermal consumption |
1'000 – 3'000 |
0 | 2'100 – 2'400 |
0 |
| Additional electricity consumption |
30 – 120 |
150 – 200 |
40 – 60 |
300 – 450 |
| SPECCA | 3.7 – 7 |
1.6 – 2.2 |
3.1 – 4.4 |
3.2 – 5 |
| CCA | 55 – 80 |
40 – 60 |
50 – 70 |
40 – 70 |
Steps considered in the table above:
- CO2 capture
- CO2 conditioning to meet specifications for pipeline/ship transport are considered
Steps not considered:
- CO2 transport
- CO2 utilization and/or storage

FINANCING NET ZERO


FINANCIAL ROADMAP AGENDA
ORGANIC GROWTH TO REMAIN POSITIVE
Demand to remain lively and prices trend to reflect the value appreciation along the value chain.
PROTECTING MARGINS THROUGH COST LEADERSHIP
Cost management along the value chain as key to provide competitive advantage.
Focusing on core business and flexibility to reach optimization in each region
RE-BALANCING THE CAPEX PORTFOLIO FOR THE TRANSITION
~750 million euros expected by 2030 to be allocated for transition projects.
~70-80 million euros p.a. allocated to CO2 specific capex
STRONG FOCUS ON ROIC
Right mix in fast payback and strategic long term projects to drive capex selection and to preserve cash generation
FINANCING THE TRANSITION, WHILE PRESERVING FINANCIAL SOUNDNESS
Funding approach as a balanced mix of solid cash flows and working capital management, as well as external funding (debt or public subsidies)
Retaining sound investment grade profile.
MOVING TO THE NEXT PHASE, PRESERVING OUR AMBITIONS
Reducing CO2 emissions will be a capital intensive effort but this will not change our ambitions to allocate cash to growth and shareholders


INDUSTRY LEADING PERFOMANCE THROUGH THE CYCLE
Net Sales
Solid growth fueled by sound demand, driven by residential, infrastructure needs and non-residential recovery. CAGR (2010-2021): +2.2%
EBITDA
Over proportional growth to Net Sales, with EBITDA which has more than doubled compared to 2010
CAGR (2010-2021): +6.2%
EBITDA Margin %
Leading performance driven by cost efficiency and synergies
+800 bps vs 2010.



TRANSITION PRICE AND COST TRENDS



STRONG CASH GENERATION AND VALUE CREATIVE CAPITAL ALLOCATION
Over the last 10 years, we have invested 3.2 billion euros in our industrial assets, thereof ca. 700 million euros in special projects dedicated to installed capacity expansion and ca.700 million euros in equity investments
In the same period, we have invested ca. 700 million euros in equity investments, in order to enter in new countries (Brazil, 2018) and to strenghten our position in existing markets (Germany and Italy)
From 2010, we have generated strong cash flows from operations (ca. 4.3 billion euros) with a CAGR equal to +43%
EURm


CAPEX REQUIREMENTS BY 2030
Expected capex requirements for 2030 target:
750 million euros
This plan leads to CO2 specific capex per year equal to 20-30% of the annual avg capex spending
Maintaining ~8% of capex* to net sales ratio over the period
*excluding financial investments



CAPEX REQUIREMENTS BY 2030

| Payback Duration(2) | |
|---|---|
| Clinker content in cements |
< 5 years |
| Alternative fuels with biomass content |
< 5 years |
| Fossil fuels with lower emission factors |
5-15 years |
| Efficiency in electric and thermal energy consumptions |
5-15 years |
| Decarbonization of electricity |
5-15 years |
| CCU/S (3) | < 5 years |
(1) Including: Alternative fuels with biomass content, fossil fuels with lower emission factors and efficiency in electric and thermal energy consumption
(2) General assumption; not considering opex
(3) Only referring to a specific CCUS installation


DRIVING VALUE THROUGH CAPITAL EFFICIENCY
ROIC improvement driven by growth in profitability, cost savings and efficient capital allocation



STRONG BALANCE SHEET, PRESERVING INVESTMENT CAPACITY FOR GROWTH



STRONG CASH GENERATION AND VALUE CREATIVE CAPITAL ALLOCATION



DISCIPLINED AND BALANCED FINANCIAL APPROACH
WITHIN THE COMPANY….
- Margins protection, through organic gowth, adequate pricing and efficient cost management
- Selective decisions on Capex (~8% to Net Sales)
- Maintaining positive avg ROIC vs WACC spread
- Maintaining investment grade metrics (Net debt/EBITDA ratio of 1.5 x – 2.0 x)
- Focus on cash generation and allocating exceeding cash to M&A and shareholders
…AND EXTERNAL FUNDING
- Funding plan with access to fixed income markets and loan markets as well as private placements focusing on maturity profiles, flexibility and cost of funding.
- Proactively looking for public subsidies for developing new technologies
- ESG targets and metrics will be integrated in our financial documentations.


DISCLAIMER
THIS REPORT CONTAINS COMMITMENTS AND FORWARD-LOOKING STATEMENTS BASED ON ASSUMPTIONS AND ESTIMATES. EVEN IF THE COMPANY BELIEVES THAT THEY ARE REALISTIC AND FORMULATED WITH PRUDENTIAL CRITERIA, FACTORS EXTERNAL TO ITS WILL COULD LIMIT THEIR CONSISTENCY (OR PRECISION, OR EXTENT), CAUSING EVEN SIGNIFICANT DEVIATIONS FROM EXPECTATIONS. THE COMPANY WILL UPDATE ITS COMMITMENTS AND FORWARD-LOOKING STATEMENTS ACCORDING TO THE ACTUAL PERFORMANCE AND WILL GIVE AN ACCOUNT OF THE REASONS FOR ANY DEVIATIONS.