Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

BUXTON RESOURCES LIMITED Capital/Financing Update 2023

Aug 6, 2023

64585_rns_2023-08-06_04a263b6-e963-4f62-8f76-405f4002498f.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [209 x 63] intentionally omitted <==

==> picture [108 x 76] intentionally omitted <==

ASX Release 7[th] August 2023

GRAPHITE BULL UPDATE – Downstream Processing Success

  • Excellent results from ProGraphite on first bulk concentrate sample;

  • Li-ion battery quality benchmarks exceeded by simple caustic bake purification; 99.97% TGC easily achieved

  • Spheronising gave excellent shape and size distribution, yield also above average

  • Concentrate micronised well with relatively little energy input

  • Second bulk sample despatched to Anzaplan

  • Strategic and economic studies underway

Buxton Resources Ltd (ASX:BUX) is pleased to update shareholders on progress at Buxton’s 100% owned Graphite Bull project, Gascoyne Region, WA.

Buxton is delighted with excellent early downstream (PSG) test results from ProGraphite in Germany, supporting Graphite Bull’s emergence as one of the premier graphite deposits in Australia. See Figure 1 below for a scanning electron microscope image of spheronised Graphite Bull concentrate (SPG15, d50=15 micron sized);

==> picture [452 x 245] intentionally omitted <==

Figure 1: SEM image of Buxton’s SPG15 spheronised product

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

This first bulk (11.6 kg) concentrate sample was despatched from ALS Perth to ProGraphite in April (ASX 01/05/23). Electrochemical work will continue over the next eight weeks, but initial micronising, spheronising and purification outcomes are now available, and are everything Buxton could have wished for.

The concentrate was easily micronised, with relatively low power input. Spheronising was successful; homogenous spherical graphite with excellent, very narrow particle size ranges was produced at good yields. Purification was similarly very successful, with simple, industrystandard caustic bake methods able to exceed the tough PSG specification limits set for lithium-ion battery manufacture.

Micronising and spheronising to nominal 14, 15 and 19 micron spheres gave tight size distributions (d90:d10 ratios 2.2 to 2.4), and nominal yields of 52%, 52% and 46% respectively; all at the better end of results usually achieved on this lab-scale equipment.

Industry-standard purification was trialled, being caustic (NaOH) bake followed by a sulphuric acid wash. No hydrochloric (HCl) or hydrofluoric (HF) acid was required. The 250[o] C bake yielded 99.97% TGC purity and very low critical contaminant values, bettering industry benchmarks. Summary ICP results in Table 1 below.

Table 1: ICP results for major elements from ProGraphite Test 248 (all ppm except TGC as %)

TGC% Si Fe Cu V Cr Pb Zn Ag Ni Cd K
99.97 24.0 14.9 1.3 0.4 0.2 <0.4 0.4 <1.7 5.3 <0.1 <5

Buxton is delighted with all these early results, which vindicate efforts over the past year and support Graphite Bull’s emergence as one of the premier graphite deposits in Australia. Despite the initial, non-optimised and lab-scale nature of this work, results across micronising, spheronising and purification have all equalled or exceeded industry benchmarks on this first attempt.

The Company looks forward to receiving electrochemical testwork results from ProGraphite in about eight weeks’ time.

Buxton’s second bulk concentrate sample has arrived in Germany enroute to Dorfner Anzaplan for more extensive testwork. First results from that work are expected in November.

Planning for infill and extensional drilling at Graphite Bull continues. Pegging of proposed collars and access tracks followed by Heritage clearances to be completed prior to earthworks.

Buxton is undertaking strategy-level evaluations of operating scenarios, possible products and markets, likely offtakers, and ballpark operating and capital costs. Internal work is being supported by industry specialists Wave International and CPC Engineering, both well-regarded WA-based expert graphite consultants.

Buxton is taking a measured approach to de-risking Graphite Bull. These latest excellent PSG (purified spheronised graphite) testwork results reaffirm the Li-ion battery space and uPSG production as a leading option for Graphite Bull concentrate.

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [104 x 76] intentionally omitted <==

The 100% owned Graphite Bull project is located in WA’s Gascoyne district, about 750 km north of Perth. For project location, see Figure 2 below.

==> picture [452 x 307] intentionally omitted <==

Figure 2: Location of Buxton’s Graphite Bull Project, 750km north of Perth.

Demand for Li-ion batteries, fuel cells and other graphite-intensive renewables technology continues to escalate, pushing the global graphite market into deficit for the first time in modern history (see Figure 3 below).

Buxton looks forward to providing regular updates to shareholders on this exciting WA graphite project.

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [105 x 75] intentionally omitted <==

==> picture [378 x 206] intentionally omitted <==

Figure 3: Graphite Market Balance

For further information, please contact:

Eamon Hannon Sam Wright Managing Director Company Secretary [email protected] [email protected]

About the Graphite Bull Project

The at-surface, high-grade Graphite Bull (formerly Yalbra) Project is in the Tier 1 jurisdiction of Western Australia, Gascoyne region, on granted Exploration License E09/1985. Graphite Bull was acquired by Buxton in 2012; by 2014 an airborne EM survey, several drilling programs and two resource estimates were completed. The Graphite Bull project currently has a JORC (2012) compliant Inferred Resource of 4 Mt @ 16.2 % TGC (ASX 24/10/2014).

Due to projected growth of the global Lithium-ion battery market, and the essential part graphite will play in that – graphite is the single largest component of Li-ion batteries – Buxton recommenced work at Graphite Bull in 2022. Work since then has been focused on metallurgical testwork through to final product (Purified Spheronised Graphite), and increasing the Resource confidence and size, with very promising results to date.

Forecast battery-related demand (Benchmark Mineral Intelligence) means that by 2027, global graphite production needs to double; by 2040, eight times current production will be required to supply the world’s lithium-ion battery anode market. Graphite Bull is therefore a very attractive project, being a high-grade deposit located in a Tier 1 mining jurisdiction, with outstanding Resource growth potential.

T. 08-9380 6063 www.buxtonresources.com.au E. [email protected]

PO Box 661 Suite 1, First Floor Nedlands WA 6009 14-16 Rowland Street Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [105 x 76] intentionally omitted <==

Competent Persons

The information in this document that relates to Exploration Results is based on information compiled by Mr Eamon Hannon, Fellow of the Australasian Institute of Mining and Metallurgy, and a full-time employee of Buxton Resources Limited. Mr Hannon has sufficient experience which is relevant to the activity being undertaken to qualify as a “Competent Person” as defined in the 2012 edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Hannon consents to the inclusion in this document of the matters based on the information in the form and context in which it appears.

The information in this document that relates to metallurgical test work managed by Battery Limits Pty Ltd (BL) and ProGraphite GmbH is based on, and fairly represents, information and supporting documentation reviewed by Mr David Pass, BSc (Mineral Science and Chemistry), who is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Pass is a full-time employee of BL, who has been engaged by Buxton Resources Ltd to provide metallurgical consulting services. Mr Pass has approved and consented to the inclusion in this document of the matters based on his information in the form and context in which it appears.

JORC Table: Section 1 – Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (eg cut channels, random
chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
investigation, such as down-hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
The metallurgical sample was collected from diamond
drillhole YBDD002 and is a composite of PQ and HQ half
core from 20-24m (PQ), 32-57m (HQ) and 112-134m
(HQ) depths.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases,
more explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drilling techniques Drill type (e.g., core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (e.g. core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is oriented and if so, by what method, etc).
The metallurgical sample was composited from core
samples recovered from diamond drilling.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed.
Buxton undertook geotechnical logging at the time of
drilling. The interval weighted average recovery of 93%
was recorded for all recovery logged core intervals
within the metallurgical sample.
No relationship between sample recovery and grade has
been identified.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
All Buxton drill holes are geologically logged by qualified
and experienced geologists, recording relevant data to a
set template to metre intervals. All logging included
lithological features, mineral assemblages,
mineralisation percentages and basic graphite
characteristics, all qualitative by nature.
Whether logging is qualitative or quantitative in nature.
_Core(or costean, channel, etc) photography. _
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half or
all core taken.

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [104 x 76] intentionally omitted <==

Sub-sampling
techniques and
sample preparation
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
All material used for the metallurgical sample were
selected from half-core samples of previously sawn
Buxton diamond drill core from 2013-14
These intervals selected for the metallurgical sample
represent a combination of Resource Domains 10, 40
and 50 which contribute 100% of the Inferred tonnes to
the 2014 Resource.
The metallurgical sample was also selected so as to
provide a bulk sample which approximated the average
grade of the Resource. The sample totalled 132.7 kg at
an estimated grade of 15.8% TGC based on assay
intervals of the other half of this cut core (not weighted
by recovery).
ALS Metallurgy subsequently determined the head grade
of this sample to be 16.5% Total Carbon, matching
expectations and the 2014 Resource grade of 4.0 Mt at a
Total Graphitic Carbon grade of 16.2% (see ASX
announcement 24thOctober 2014).
Based on grade, location, lithologies, oxidation states
and mineralogy the metallurgical sample is considered
representative of the known Resource.
Sample preparation is consistent with industry best
practice and appropriate for the analysis being
undertaken.
See ASX announcement 24 October 2014 for further
information relevant to the historic drillingcampaigns.
For all sample types, the nature, quality and
appropriateness of the samplepreparation technique.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in-situ material collected, including
for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
See ASX announcement 24 October 2014 for information
relevant to the laboratory test work undertaken during
previous drilling campaigns.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.
Not applicable for this release.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
These Preliminary Results are reported as interim
information during a work program still being
documented. Two previous sets of testwork from one
sample, managed by two consultants, running in parallel
through two different metallurgical facilities and two
different analytical facilities, all well-credentialled
leading practitioners in their fields, gives Buxton great
confidence in the quality of work and results, including
for this fourth tranche of testwork.
Battery Limits used ALS Metallurgy, ALS Analytical, and
ProGraphite GmbH in Germany, a well-established
international graphite consultancy.
See ASX announcement 24 October 2014 for information
relevant to the QA procedures undertaken during
previous drillingcampaigns.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.
Not applicable for this release.
The use of twinned holes. Not applicable for this release.
See ASX announcement 24 October 2014 for information
related to the use of twinned holes during the historic
drilling campaigns.

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [104 x 76] intentionally omitted <==

Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Drillhole data was hand entered to spreadsheets,
imported to a Microsoft Access Database and then
validated by company geologists using GIS and 3D
visualisation software.
Discuss any adjustment to assay data. No adjustments to assay data have been made.
Location of data
points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Not applicable for this release. See ASX announcement
24 October 2014 for information relevant to the historic
drilling campaigns.
Specification of the grid system used. All surface surveying was completed using a handheld
GPS to MGA94/Zone 50 Southgrid system.
Quality and adequacy of topographic control. See ASX announcement 24 October 2014 for information
relevant to the historic drilling campaigns.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. The metallurgical sample was derived from YBDD002,
located towards the eastern end of the 2014 Resource
extent. The metallurgical sample is a composite of the
three Resource Domains (10, 40 & 50) that contributed
to the 2014 Resource.
See ASX announcement 24 October 2014 for comments
on drill spacing and compositing undertaken during the
historic drillingcampaigns.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimationprocedure(s) and classifications applied.
Whether sample compositing has been applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
The metallurgical sample represents a composite of
three intervals totalling a 51m intersection through the
known resource that was selected to minimise any
orientation bias that may have been introduced during
drilling.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is considered
to have introduced a sampling bias, this should be
assessed and reported if material.
Sample security The measures taken to ensure sample security. Graphite Bull drill core has been under Buxton’s
stewardship since drilling in 2014. Core and samples
were packaged and stored in secure storage from the
time of collection through to submission.
Buxton staff collected the composite sample from core
in November 2022 and personally delivered it to ALS
Metallurgy in Balcatta. Best practice methods were
employed by the laboratory upon receipt. The
subsequent concentrate bulk sample (11.6 kg) was
couriered directly by DHL International from ALS
Balcatta, to ProGraphite in Nuernberg, Germany, via
German customs in Leipzig.
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
CSA conducted a field review of the sampling techniques
and data collection methods in 2014 when the last
drilling campaign was conducted. It was considered by
CSA at that time that Buxton’s sampling techniques and
data acquisition procedures were acceptable for JORC
2014 compliant resource estimation.

JORC Table: Section 2 – Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
BUX have a 100% interest in exploration license
E09/1985.
A 0.75% Gross Revenue Royalty was granted under a
Tenement Sale Agreement dated 31 March 2016,
between Montezuma Mining Company Ltd
(“Montezuma”) and Buxton Resources Limited. This
royalty is currently held by Electric Royalties Ltd
(TSXV:ELEC & OTCQB:ELECF).

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

The tenement is in good standing with DMIRS and there
are no known impediments for exploration on this
tenement.
Numerous exploration parties have held portions of the
area covered by BUX tenure previously. The only
substantive historical exploration was by Carpentaria
Exploration Company in the 1970s.
No other parties were involved in the exploration
program that generated data used in this release.
The Graphite Bull Project area lies within the Errabiddy
Shear Zone, situated at the contact between the
Glenburgh Terrane of the Gascoyne Province and the
Narryer Terrane of the Yilgarn Carton, on the SW margin
of the Capricorn Orogen.
The known graphitic mineralisation occurs as lenses in
graphitic paragneiss assigned to the Quartpot Pelite.
This unit has been interpreted to have been deposited
between 2000 Ma and 1985 Ma in a fore-arc setting to
the Dalgaringa continental margin arc (part of the
Glenburgh Terrain), and subsequently deformed
between 1965–1950 Ma during the Glenburgh Orogeny
within the Errabiddy Shear Zone which represents the
suture between the colliding Pilbara–Glenburgh and
Yilgarn Cratons.
All units at Graphite Bull show evidence for
metamorphism in the amphibolite to granulite facies,
with the production of voluminous leucosomes and
leucogranites within the pelitic lithologies
Not applicable.
Not applicable. All drillholes results have been previously
reported
All drillholes have been drilled approximately
perpendicular to the strike of the mineralisation.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
The tenement is in good standing with DMIRS and there
are no known impediments for exploration on this
tenement.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other
parties.
Numerous exploration parties have held portions of the
area covered by BUX tenure previously. The only
substantive historical exploration was by Carpentaria
Exploration Company in the 1970s.
No other parties were involved in the exploration
program that generated data used in this release.
Geology Deposit type, geological setting and style of
mineralisation.
The Graphite Bull Project area lies within the Errabiddy
Shear Zone, situated at the contact between the
Glenburgh Terrane of the Gascoyne Province and the
Narryer Terrane of the Yilgarn Carton, on the SW margin
of the Capricorn Orogen.
The known graphitic mineralisation occurs as lenses in
graphitic paragneiss assigned to the Quartpot Pelite.
This unit has been interpreted to have been deposited
between 2000 Ma and 1985 Ma in a fore-arc setting to
the Dalgaringa continental margin arc (part of the
Glenburgh Terrain), and subsequently deformed
between 1965–1950 Ma during the Glenburgh Orogeny
within the Errabiddy Shear Zone which represents the
suture between the colliding Pilbara–Glenburgh and
Yilgarn Cratons.
All units at Graphite Bull show evidence for
metamorphism in the amphibolite to granulite facies,
with the production of voluminous leucosomes and
leucogranites within the pelitic lithologies
Drill hole Information A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
Not applicable.
o_easting and northing of the drill hole collar_
o_elevation or RL (Reduced Level – elevation above sea_
level in metres) of the drill hole collar
o_dip and azimuth of the hole_
o_down hole length and interception depth_
o_hole length_
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report,
the Competent Person should clearly explain why this is
the case.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Not applicable. All drillholes results have been previously
reported
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should
be shown in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the
reporting of Exploration Results.
All drillholes have been drilled approximately
perpendicular to the strike of the mineralisation.
If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.

PO Box 661 Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au Nedlands WA 6009 14-16 Rowland Street E. [email protected] Subiaco WA 6008

==> picture [209 x 63] intentionally omitted <==

==> picture [104 x 76] intentionally omitted <==

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg ‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported. These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
See text and figures in body of release.
Balanced reporting Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low
and high grades and/or widths should be practiced to
avoid misleading reporting of Exploration Results.
This document is reporting interim headline results.
Metallurgical data by nature consists of complex
matrices of inter-linked results, the reporting of which
in full would diminish the quality and clarity of
communication. Final results will be reported in more
detail as warranted.
Other substantive
exploration data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
The metallurgical sample was delivered by BUX to ALS
Metallurgy in Perth on 17 Nov 2022. ALS crushed and
blended the sample to 100% passing 3.35 mm,
conducted head assays and prepared splits for
subsequent test work run by two separate consultants
(and partner labs) in Perth in competitive collaboration;
BatteryLimits (ALS) and IMO-Metallurgy (Intertek).
A bulk run of 80kg was then completed by ALS using an
optimised flotation protocol based on previous sighter
work. The resultant 11.6 kg of Flake concentrate was
despatched to ProGraphite in Nuernberg, Germany on
14/04/23, where it was classified, then run through
standardised micronising and spheronising equipment.
Two industry-standard caustic (NaOH) bake
purifications at 250 deg C and 500 deg C were then
performed on the resulting spheronised graphite.
Further work The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).
See text and figures in body of release.
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Not applicable.

Suite 1, First Floor T. 08-9380 6063 www.buxtonresources.com.au 14-16 Rowland Street E. [email protected] Subiaco WA 6008

PO Box 661 Nedlands WA 6009