BULLETIN RESOURCES LIMITED Capital/Financing Update 2012

Mar 19, 2012

64546_rns_2012-03-19_5df353ea-d7bb-4643-81b9-f0a3dc862405.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Bulletin Resources is the 100% owner of the Nicolson’s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource of 1.46 million tonnes at 5.7g/t Au (for a total of 266,900 ounces) and a 120,000 tpa processing facility currently under care and maintenance.

ASX Code: BNR

Issued capital:

62,190,128 listed ord. shares 5,184,872 restricted ord. shares 8,250,000 unlisted options

Share price at 19 March 2011: $0.115

Market capitalisation at 19 March 2012: $7.7 million

Cash on hand at 31 December 2011: $3.9 million

Directors:

Non-Executive Chairman: Phil Retter Managing Director: Martin Phillips Executive Director Operations: Mick Fitzgerald Non-Executive Director: Steve Robinson

Investor and Media Contact: [email protected] Fergus Ross Six Degrees Investor Relations [email protected] +61 2 9230 0661

[ASX Announcement ]

20 March 2012

Bulletin increases Mineral Resource to 266,900oz of gold

  • New resource estimate increases Indicated Resource component by 25% to 164,400oz Au

  • Wagtail resource grows 73% to 203,000t at 5.98g/t Au for 39,100oz

39,100oz
Project Tonnes Grade(g/t Au) Ounces
Nicolson’s
Indicated 765,000 5.94 146,000
Inferred 395,000 5.54 70,300
Total 1,159,000 5.80 216,300
Rowdies
Indicated 63,000 4.19 8,500
Inferred 33,000 2.78 3,000
Total 96,000 3.70 11,400
Wagtail
Indicated 52,000 5.92 9,800
Inferred 152,000 6.00 29,200
Total 203,000 5.98 39,100
Total
Indicated 879,000 5.81 164,400
Inferred 579,000 5.50 102,500
Total 1,459,000 5.69 266,900

1Resource estimate reported at 0.5 g/t Au lower cut-off grade for potential open-pit material and 3.0 g/t Au for potential underground material. Totals are rounded.

  • Drilling to recommence in April

  • Bulletin enters into a 3 year contractual licence to explore Exploration Licence E80/4473 covering 100km[2] of prospective stratigraphy along the Halls Creek goldfield. Bulletin has also been granted an option to acquire a 100% interest in the tenement

Bulletin’s Managing Director, Martin Phillips commented: “The resource upgrade at Wagtail greatly enhances the inventory of shallow, high grade mineralisation and will have a positive impact on the outcome of the feasibility study which is still on track for completion at the end of this month.”

“With a circa 50km strike length of the historic Halls Creek goldfield now secured, we can also commence executing our resource growth strategy during the forthcoming field season.”

Martin Phillips Managing Director

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

Bulletin Resources Limited (ASX: BNR) (“Bulletin”) is pleased to announce the following update on activities at its 100% owned Nicolson’s project located in the Kimberley Region of WA.

Updated Mineral Resource Estimate

The Company’s resource consultant, Optiro Pty Ltd (“Optiro”) has completed an updated Mineral Resource estimate for the Nicolson’s, Rowdies and Wagtail deposits incorporating all the results from the drilling program completed during the December 2011 quarter.

The updated Mineral Resource estimate has been categorised into both open pit and underground. The open pit estimate is reported at a 0.5g/t Au lower cut-off grade constrained by conceptual open pit shells. Mineralisation outside of the conceptual pit shells is reported at a 3.0g/t Au lower cut-off in recognition of the potential for underground extraction.

The total open pit and underground Mineral Resource for the Nicolson’s project now stands at 1.46 million tonnes at 5.69g/t Au for 266,900oz (refer to Table 1 for breakdown).

Further details on the resource estimate can be found in the appendix to this announcement.

A RC drill rig has recently been contracted and subject to favourable weather conditions, is scheduled to arrive on site in April. The main objectives of the drilling program are to;

  • continue upgrading the open pit resource inventory to the Indicated category;

  • evaluate the resource potential of the recently defined Nicolson’s North and Western Reef targets;

  • commence evaluation of the new Paddock Well satellite target; and

  • complete verification and in-fill drilling of the Golden Crown and Faugh-a-Ballagh prospects in advance of a new resource estimate.

Page 2

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

Table 1: Nicolson’s Project Mineral Resource as at March 2012[1]

Prospect Resource Category Cut-off
grade
Tonnes Grade g/t
Au grade
Ounces
gold
Nicolson’s Open pit Indicated ( /
)
0.5
470,000 ( / )
5.88
88,900
Open pit Inferred 0.5 33,000 4.16 4,400
Total open pit 503,000 5.77 93,300
Underground Indicated 3.0 294,000 6.04 57,100
Underground Inferred 3.0 362,000 5.66 65,900
Total underground 656,000 5.83 123,100
Total Nicolson’s 1,159,000 5.80 216,300
Rowdies Open pit Indicated 0.5 50,000 4.04 6,400
Open pit Inferred 0.5 30,000 2.62 2,600
Total open pit 80,000 3.50 9,000
Underground Indicated 3.0 14,000 4.73 2,100
Underground Inferred 3.0 3,000 4.65 400
Total underground 16,000 4.72 2,400
Total Rowdies 96,000 3.70 11,400
Wagtail Open pit Indicated 0.5 49,000 6.01 9,400
Open pit Inferred 0.5 112,000 6.09 21,900
Total open pit 161,000 6.07 31,300
Underground Indicated 3.0 3,000 4.47 400
Underground Inferred 3.0 40,000 5.73 7,300
Total underground 43,000 5.64 7,800
Total Wagtail 203,000 5.98 39,100
Total Total Openpit 744,000 5.59 133,600
Total Underground 715,000 5.79 133,300
Project 1,459,000 5.69 266,900
  1. Differences in totals due to rounding

New Tenement Acquisition

Bulletin has entered into a 3 year contractual licence with a private group to explore granted Exploration Licence E80/4473 located in the Halls Creek goldfield (Figure 1). Bulletin has also been granted an option to acquire a 100% interest in the tenement which covers an area of approximately 100km[2] .

The tenement covers numerous historic gold workings, one of them being the Reform mine which produced approximately 210oz Au in the late 1800s. A further 2,300oz Au was reportedly produced from alluvial workings during the 1980s. Sampling of the Reform workings in the 1930s recorded grades from 0.3 to 13 g/t Au[1] . Minor drilling at Reform produced a best result of 8m at 5.84g/t Au from 16m[2] .

In addition to the Nicolson’s project, Bulletin has now built a dominant land position within the historic goldfield (circa 348km[2] ) covering a 50km strike length of prospective

1 Finucane, K.J., 1939, The Twelve-Mile alluvial workings and Elvire River Dredging reserves, Halls Creek, east Kimberley district. WA Report 42.

2Warne, S.B., 1989, Progress report on mining and exploration of Mary River joint venture tenements.

Page 3

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

stratigraphy extending from Golden Crown in the northeast to the historic Mary River goldfield in the southwest (Figure 1).

As part of the acquisition, Bulletin paid $20,000 upon signing of the agreement. Bulletin has been granted the contractual right to explore on the tenement for a period of 3 years from the date of the agreement. Bulletin will maintain the tenement in good standing by meeting all outgoings and complying with statutory reporting and expenditure commitments.

On the date Bulletin elects to exercise the option to acquire the tenement (being no more than three years after the date of agreement), Bulletin must issue shares in Bulletin to the value of $100,000. These shares will be issued at the volume weighted average price calculated over the last 10 trading days preceding the Completion Date and will be held in escrow for 12 months.

Page 4

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

==> picture [451 x 520] intentionally omitted <==

Figure 1: Location Map for E80/4473

Page 5

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

About Bulletin Resources

Bulletin Resources holds a 100% interest in the Nicolson’s Gold project which comprises a contiguous mineral tenement holding covering approximately 70km[2] in the Kimberley Region of WA. The project is estimated to host an Indicated Resource of 879,000 tonnes at 5.81g/t Au for approximately 164,400 ounces of gold and an Inferred Resource of 579,000 tonnes at 5.50g/t Au for approximately 102,500 ounces of gold (total of 1.46 million tonnes at 5.69g/t Au for 266,900 oz Au). Also located on the project is a 120,000 tpa processing facility currently under care and maintenance. The principal objective of the company is to advance the project to the stage of decision to mine.

Prospect
Category
Prospect
Category
Tonnes
Grade
(g/t Au)
Ounces
Tonnes
Grade
(g/t Au)
Ounces
Tonnes
Grade
(g/t Au)
Ounces
Nicolson’s
Open pit Indicated
Open pit Inferred
Total open pit
Underground Indicated
Underground Inferred
Total underground
Total Nicolson’s
470,000
5.88
88,900
33,000
4.16

4,400
503,000
5.77
93,300
294,000
6.04

57,100
362,000
5.66
65,900
656,000
5.83

123,100
1,159,000
5.80
216,300
Rowdies
Open pit Indicated
50,000
4.04

6,400
Open pit Inferred
30,000
2.62

2,600
Total open pit
Underground Indicated
Underground Inferred
Total underground
Total Rowdies
Wagtail
Open pit Indicated
Open pit Inferred
Total open pit
Underground Indicated
Underground Inferred
Total underground
Total Wagtail
80,000
3.50

9,000
14,000
4.73
2,100
3,000
4.65

400
16,000
4.72
2,400
96,000
3.70

11,400
49,000
6.01
9,400
112,000
6.09

21,900
161,000
6.07
31,300
3000
4.47

400
40,000
5.73
7,300
43,000
5.64

7,800
203,000
5.98
39,100
Total
Total Open pit
744,000
5.59

133,600
Total Underground 715,000
5.79
133,300
Project total 1,459,000
5.69

266,900

Differences in totals due to rounding

Page 6

ASX Announcement

==> picture [120 x 44] intentionally omitted <==

Competent Persons statement

The information in this table that relates to Mineral Resources is based on information compiled by Mr Ian Glacken, who is a Fellow of the AusIMM. Mr Glacken is a full time employee of Optiro Pty Ltd where he holds the title of Principal Consultant. Mr Glacken has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Glacken consents to the inclusion in this table of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Exploration Results is based on information compiled by Mark Csar, who is a Fellow of The AusIMM. Mark Csar is a full-time employee of the company and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mark Csar consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Page 7

==> picture [109 x 46] intentionally omitted <==

20 March 2012

APPENDIX

==> picture [79 x 69] intentionally omitted <==

Ref: J_1355_G

Marty Phillips Managing Director Bulletin Resources Level 1, 435 Roberts Road, Subiaco, WA 6008

Dear Marty

RESOURCE UPDATE – NICOLSON’S PROJECT

Optiro Pty Ltd (Optiro) has completed a Mineral Resource update for the Nicolson’s Project during February 2012 on behalf of Bulletin Resources (BNR). The project area includes the Nicolson's, Rowdies, Wagtail North, and Wagtail South deposits.

For Nicolson's, Rowdies and Wagtail North, revised estimates were generated from mineralisation interpreted in 2011. Modifications were based on the inclusion of new drilling and the refinement of the Mineral Resource classification as a consequence of the new exploration. The Wagtail South estimate is based on the reinterpretation of historic RC drill data combined with new interpretations from aircore drilling carried out during 2011. In previously reported estimates (2010 and 2011) the Wagtail South deposit was referred to as Wagtail. A global tonnage grade report is provided as Table 1. Tonnes and grade for each deposit are provided in the Tabulations section of this memorandum.

Table 1 February 2012 Nicolson's Project Mineral Resource - global tonnes and grade by gold cut-off and resource category

Au cut-off
(g/t)
Resource
category
'000 Tonnes Au g/t '00 Oz
0.5 Indicated 1,070 5.14 1,770
Inferred 916 4.13 1,216
Total 1,986 4.68 2,986
1 Indicated 1,036 5.29 1,761
Inferred 857 4.36 1,201
Total 1,893 4.87 2,962
2 Indicated 885 5.92 1,683
Inferred 636 5.38 1,099
Total 1,521 5.69 2,783
3 Indicated 709 6.78 1,545
Inferred 497 6.16 984
Total 1,206 6.52 2,529

==> picture [118 x 20] intentionally omitted <==

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

An optimised pit shell was used to classify material as potential open pit or potential underground material. Potential open pit material was reported above a cut-off grade of 0.5 g/t gold for material located within the optimised shell and potential underground material was reported for material above a cut-off grade of 3 g/t gold and located below the optimised shell. A breakdown by potential mining method, resource category, and prospect is provided in Table 2.

Table 2 February 2012 Nicolson's Project Mineral Resource – report by prospect, resource category and potential mining approach

Nicolson's 2012
Au cut-off
(g/t)
Resource
category
Location '000 Tonnes* Au (g/t) '00 Oz*
Open Pit 0.50 Indicated 470 5.88 889
Inferred 33 4.16 44
Sub-total 503 5.77 933
Underground 3.00 Indicated 294 6.04 571
Inferred 362 5.66 659
Sub-total 656 5.83 1,231
Total 1,159 5.80 2,163
Rowdies 2012
Au cut-off
(g/t)
Resource
category
Location '000 Tonnes* Au (g/t) '00 Oz*
Open Pit 0.50 Indicated 50 4.04 64
Inferred 30 2.62 26
Sub-total 80 3.50 90
Underground 3.00 Indicated 14 4.73 21
Inferred 3 4.65 4
Sub-total 16 4.72 24
Total 96 3.70 114
Wagtail(Includes Wagtail North and Wagtail South) 2012
Au cut-off
(g/t)
Resource
category
Location *'000 Tonnes ** Au (g/t) '00 Oz*
Open Pit 0.50 Indicated 49 6.01 94
Inferred 112 6.09 219
Sub-total 161 6.07 313
Underground 3.00 Indicated 3 4.47 4
Inferred 40 5.73 73
Sub-total 43 5.64 78
Total 203 5.98 391
Total Indicated 879 5.81 1,644
Total Inferred 579 5.50 1,025
Total 1,459 5.69 2,669

* Differences in sub-total tally and total is due to rounding

P a g e | 2

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Nicolson's Project Geology

The Nicolson’s Project is located approximately 35 km to the southwest of Halls Creek in Western Australia. The Project comprises the former Nicolson’s Find open pit mine, which has mineralisation extensions suitable for immediate open pit or underground mining development; a treatment plant with a nominal capacity of 10,000 tonnes per month; the Nicolson’s South prospect, approximately 100 m to the south of the Nicolson’s Find pit and advanced prospects at Rowdies, Wagtail North and Wagtail. Other noteworthy gold prospects are found at Western Reefs, Springvale, Burntout and Shifty’s.

Deposits are associated with north-northeast trending shear zones which form part of the Eastern and Central belts of the Halls Creek Orogen. The project has a history of exploration by various owners over twenty years.

Gold mineralization in the Nicholson’s area is structurally controlled within a 400 m wide NNE trending dextral strike slip Nicolson’s Find Shear Zone (NFSZ), and is hosted within folded and metamorphosed turbiditic greywackes, felsic volcaniclastics, mafic volcanics and laminated siltstones and mudstones. This zone forms part of a regional northeast-trending strike slip fault system developed across the Halls Creek Orogen

P a g e | 3

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Nicolson's

Nicolson’s encompasses both the Nicolson's Find and Nicolson's South prospects. The resource has been drilled to a vertical depth of approximately 320 m and the mineralisation has been modelled from surface to a vertical depth of approximately 350 m.

The estimate is based predominantly on RC drilling, with a minor amount of RAB drilling. The drillhole spacing varies from approximately 10 m by 10 m in the upper part (near pit), averaging 30 m by 30 m and extending to 50 m by 50 m at vertical depths greater than 200 m.

The Mineral Resource estimate has been classified and reported in accordance with the Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code, 2004).

The deposit was estimated using Ordinary Kriging (OK) grade interpolation for 53 separate mineralised zones constrained by 3D wireframed solids. The wireframes are based on mineralisation interpretations, using a nominal gold cut-off of 0.5 g/t above the 200 mRL and 1 g/t below the 200 mRL. A minimum downhole length of 2 m was used above the 200 mRL and 1 m below the 200 mRL.

The block dimensions used in the model were 10 mN by 5 mE by 5m mRL, with subcelling used for volume fill.

Statistical analysis of the resource composites for each lode determined that a high grade cut of 45 g/t was appropriate for the Main Northern lode and some lodes constrained to the Nicolson's footwall zone. The Main Southern lode was assigned a high grade cut of 40 g/t, with the remaining footwall, hangingwall and central lodes having no high grade cuts assigned.

The resource was classified as Indicated and Inferred Mineral Resources. Indicated material was defined where the drillhole mineralisation intercept spacing was less than or equal to 30 m by 30 m, where continuity of mineralisation was evident and where the number of intercepting drillholes was greater than two. The Inferred Resource included those lodes and lode portions where the number of drillhole intersections was less than three and the drillhole intercept spacing was greater than 30 m by 30 m.

Features of the resource estimate are as follows.

  • The Nicolson's Mineral Resource extends over a strike length of 750 m. Its downdip extension ranges in vertical depth from 200 m in the south to 350 m in the north.

  • Optiro carried out an independent geologist's review in November 2010. The report presents the view of independent geologists on the geology, data quality; Mineral Resources and exploration potential of Bulletin’s gold prospects in the Nicolson’s Find area, Halls Creek, Western Australia.

  • Drillholes used in the resource estimate included 242 RC holes and 20 RAB holes for a total of 1,338 m within the resource wireframes.

  • The hole spacing varies from 10 m to 20 m near surface, increasing to 50 m for mineralisation below 200 m vertical depth. Drill azimuths are predominantly 270° with dips generally 60°.

  • RC drilling by BNR in 2011 ranged from 140 to 146 mm hole diameters, with samples collected at 1 m intervals over the entire drillhole. Samples were collected using a cone splitter.

  • 2011 RC drillhole collars were surveyed using a Hemisphere R320 GNSS DGPS. DGPS collar coordinates were validated against locations surveyed using the real time kinematic RTK method.

P a g e | 4

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

  • Downhole surveys were completed using a Reflex Survey tool with an aluminium extension rod. Downhole surveys were taken 3 m back from the drill bit and located centrally within the 6 m aluminium rod (last rod) in order to negate rod string influences. Results were manually and electronically recorded. Generally, survey sample depths were at 10 m then every 50 m thereafter downhole (i.e. 10 m, 60 m, 110 m etc.) and at the end of hole if greater than 30 m since the previous survey. Historical holes were either surveyed with camera or electronic multi-shot (EMS).

  • Logging and sampling methods are considered by Optiro to be of an acceptable standard.

  • For the samples acquired in 2011, 250 g pulps were split to 40 g and fused in a lead collection fire assay. The resultant prill was digested in aqua regia and the gold content of the sample determined by AAS.

  • BNR has verified some historical and recent drilling results with diamond drillholes. This is further supported by proximal drillholes, demonstrating a good correlation in grade.

  • BNR has implemented a full QAQC programme. A review of results suggests that no bias is present and that data is suitable for resource estimation.

  • Samples within the wireframes were composited to 1 m intervals based on analysis of the sample lengths in the database. Residuals were included in the estimation set but are not significant.

  • Grades were estimated into a Surpac block model with parent block dimensions of 10 mN by 5 mE by 5m mRL and subcelling for volume representation.

  • Gold was estimated into parent model cells using ordinary kriging (OK) interpolation. Estimation was constrained using geological wireframes conceived by BNR and wireframed by Optiro. Optiro derived estimation parameters for each lode using a combination of estimation and search domains. Different variography models were applied to the Northern and Southern lodes. Search domains were modified to account for a localised change in the strike and dip within estimation domains.

  • Estimation used four (4) passes. For the Northern lodes, the first pass used a search radius of 50 m with a minimum of 8 and maximum of 32 samples. For the Southern lodes the first pass used a search radius of 90 m with a minimum of 4 and maximum of 12 samples. The search radius was increased by a factor of 1.5 for both Northern and Southern lodes for second pass. With the third pass the minimum sample number was reduced to 4 for the Northern lodes and 2 for the Southern lodes. A final fourth pass reduced the minimum number of samples to 1 for both.

  • Density was assigned based on weathering surfaces. Using logged geology codes, the top of fresh (TOF) and base of complete weathered (BOW) surfaces were wireframed. Fresh mineralised material below the TOF was assigned a density of 2.9 g/cm[3] and transitional material above the TOF and below the BOW material was allocated a density of 2.4 g/cm[3] . The remaining material above the BOW surface and below topography was assigned a density of 2.0 g/cm[3] .

P a g e | 5

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Rowdies and Wagtail North

Wagtail North is located 100 m to the south of Rowdies and some 600 m south of Nicolson’s. Both Mineral Resources were estimated into the same block model.

Drilling in the resource extends to a vertical depth of approximately 160 m for Wagtail North and 140 m for Rowdies. Mineralisation for both deposits was modelled from surface to a vertical depth of approximately 160 m. The estimate is based on RC and aircore (AC) drilling. For both Rowdies and Wagtail North the section spacing is in the order of 20 m, with drillhole spacing varying between 10 and 50 m.

The Mineral Resource estimate has been reported in accordance with the Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code, 2004).

The deposit was estimated using Ordinary Kriging (OK) grade interpolation for 51 lodes constrained by resource wireframes. Wireframes are based on mineralisation interpretations, using a nominal gold cutoff of 0.5 g/t with a minimum downhole length of 2 m.

The block dimensions used in the model were 10 mN by 5 mE by 5m mRL with subcelling for volume representation.

Statistical analysis of the resource composites for both deposits determined that high grade cuts of 20 g/t and 45 g/t were appropriate for Rowdies and for Wagtail North respectively.

The resource was classified as Indicated and Inferred Mineral Resource. Indicated material was defined where the drillhole mineralisation intercept spacing was less than 30 m by 30 m, where continuity of mineralisation was evident and where the number of intercepting drillholes were greater than two. The Inferred Resource included those lodes and lode portions where the number of drillhole intersections was less than three and the drillhole intercept spacing was greater than 30 m by 30 m.

Features of the resource estimate are as follows.

  • The Rowdies resource extends over a strike length of 150 m with down dip extension ranging from a maximum vertical depth from 200 m in the south to 350 m in the north. The Wagtail North resource strike length is 170 m, with down dip extensions reaching a maximum vertical depth of 150 m.

  • Drillholes used in the resource estimate and within mineralised domains included 33 RC holes (206 m) and 2 AC holes (14 m) for Rowdies; 32 RC holes (236 m) and 4 AC holes (13 m) for Wagtail North

  • The estimate is based on RC and AC drilling. For both Rowdies and Wagtail North the section spacing is in the order of 20 m, with the hole spacing varying between 10 and 50 m on section. Drill azimuths are predominantly 270° with dips generally 60°

  • RC drilling in by BNR in 2011 used hole diameters between 140 and 146 mm, with samples collected at 1m intervals over the entire drillhole. Samples were processed through a cone splitter.

  • 2011 RC drillhole collars were surveyed using a Hemisphere R320 GNSS DGPS. DGPS collar coordinates were validated against locations surveyed using the RTK method.

P a g e | 6

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

  • Downhole surveys were completed using a Reflex Survey tool with an aluminium extension rod. Downhole surveys were taken 3 m back from the drill bit and located centrally within the 6m aluminium rod (last rod) to negate rod string influences. Results were manually and electronically recorded. Generally, survey sample depths were at 10m then every 50m downhole (i.e. 10m, 60, 110m etc) and at the end of hole if it was greater than 30m since the previous survey. Historical holes were either surveyed with camera or electronic multi-shot (EMS).

  • Logging and sampling methods are considered by Optiro to be of an acceptable standard.

  • For the samples acquired in 2011, a 250 g pulp was re-split to 40 g and fused in a lead collection fire assay. The resultant prill was digested in aqua regia and the gold content of the sample determined.

  • BNR has verified some historical and recent drilling results with diamond drillholes. This is further supported by proximal drillholes demonstrating a good correlation in grade.

  • BNR has implemented a QAQC programme. A review of results suggests that no bias is present and that the data is suitable for resource estimation.

  • Samples within the wireframes were composited to 1m intervals based on analysis of the sample lengths in the database.

  • Statistical analysis of the resource composites for both deposits determined that high grade cutsof 20 g/t and 45 g/t were appropriate for Rowdies and Wagtail North respectively.

  • Grades were estimated into a Surpac block model having parent block dimensions of 10 mN by 5 mE by 5 mRL.

  • Gold was estimated into parent model cells using ordinary kriging (OK) grade interpolation. Estimation was constrained using gold wireframes conceived by BNR and wireframed by Optiro. Optiro derived estimation parameters with each lode estimated using a combination of estimation and search domains. Different variography models were applied to Rowdies and Wagtail North deposits. Search domains were created to account for a localised change in the strike and dip within estimation domains.

  • Estimation used four (4) passes. For Rowdies, the first pass used a search radius of 60 m with a minimum of 4 and maximum of 12 samples. For the Wagtail North the first pass used a search radius of 50 m with a minimum of 4 and maximum of 12 samples. The search radius was increased by a factor of 1.5 for both Rowdies and Wagtail North for second pass. With the third pass the minimum sample number was reduced to 1 for both Rowdies and Wagtail North. In the fourth pass the search radius was increased by a factor of 3.

  • Density was assigned based on weathering surfaces. Using logged geology codes top of fresh (TOF) and base of complete weathered (BOW) surfaces were wireframed. Fresh mineralised material below the TOF was assigned a density of 2.9 g/cm[3] , transitional material above the TOF and below the BOW was allocated density of 2.4 g/cm[3] . Remaining material above the BOW surface and below topography was assigned a density of 2.0 g/cm[3] .

  • The resource was classified into Indicated and Inferred Mineral Resource categories according to the JORC Code. Indicated material was defined where the drillhole mineralisation intercept spacing was less than 30 m by 30 m, where the continuity of mineralisation was evident and where the number of intercepting drillholes were greater than two. The Inferred Resource included those lodes and lode portions where the number of drillhole intersections was less than three and drillhole intercept spacing was greater than 30 m by 30 m.

P a g e | 7

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Wagtail South (Previously reported as Wagtail)

Wagtail South is located 300 m south of Wagtail North. Drilling in the resource extends to a maximum vertical depth of approximately 110 m. Mineralisation was modelled from surface to a vertical depth of approximately 60 m.

The estimate is based predominantly on air core (AC), with a minor amount of RC drilling. The drillhole spacing is predominantly 40 m by 20 m with some 20 m by 20 m infill drilling located to the south. Due to uncertainty regarding the location and grade of much of the historic drilling this has been removed for the purposes of the current estimate.

The Mineral Resource estimate has been reported in accordance with the Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code, 2004).

The deposit was estimated using Ordinary Kriging (OK) grade interpolation of 16 separate mineralised zones constrained by 3D wireframed solids. The wireframes are based on mineralisation interpretations, using a nominal gold cut-off of 0.5 g/t and minimum downhole length of 2 m.

The block dimensions used in the model were 10 mN by 5 mE by 5m mRL with sub celling used for volume fill. Statistical analysis of the resource composites for each lode determined that a high grade cut of 40 g/t gold was appropriate.

The resource was classified as Indicated and Inferred. Indicated material was defined where the drillhole mineralisation intercept spacing was less than or equal to 30 m by 30 m, where continuity of mineralisation was evident and where the number of intercepting drillholes within a mineralised zone was greater than three. Indicated Mineral Resources also included material below the small historic pit floor representing the up-dip extrapolation of mineralisation classified as Indicated at depth. The Inferred Resource included those lodes and lode portions where the number of drillhole intersections was less than three and the drillhole intercept spacing was greater than 30 m by 30 m.

Features of the resource estimate are as follows.

  • The Wagtail South Mineral Resource extends over a strike length of 110 m. Its down dip extension has a maximum vertical depth of 60 m.

  • Optiro carried out an independent geologist's review in November 2010. That report presents the view of independent geologists on the geology, data quality and exploration potential of Bulletin’s gold prospects in the Nicolson’s Find area.

  • Drillholes used in the resource estimate included 18 AC holes and 6 RC holes, for a total of 105 m within the resource wireframes.

  • The drillhole spacing is predominantly 40 m by 20 m, with some 20 m by 20 m infill drilling in the south. Drill azimuths are predominantly 270° with dips generally 60°.

  • 2011 AC drilling used a 4 1/2” -face-sampling bit and a two-tiered riffle splitter.

  • Samples were collected every metre with duplicates and standards every 20 m. Samples were sent to Kalassay in Perth. Laboratory received weights were consistently 2 – 3 kg and all samples were dry.

  • 2011 drill collars and validated historical drill collars were surveyed using a Hemisphere R320 GNSS DGPS. DGPS collar co-ordinates were validated against locations surveyed using the RTK method

P a g e | 8

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

  • RC drilling was downhole surveyed using a Reflex Survey tool with an aluminium extension rod. Downhole surveys were taken 3 m back from the drill bit and were located centrally within the 6 m aluminium rod (last rod) in order to negate rod string influences. Results were manually and electronically recorded. Generally, survey sample depths were at 10 m then every 50 m thereafter downhole (i.e. 10 m, 60 m, 110 m etc.) and at the end of hole if greater than 30 m since the previous survey. Historical holes were surveyed with either camera or electronic multi-shot (EMS).

  • For samples acquired in 2011, 250 g pulps were split to 40 g and fused in a lead collection fire assay. The resultant prill was digested in aqua regia and the gold content of the sample determined by AAS.

  • Logging and sampling methods are considered by Optiro to be of an acceptable standard.

  • BNR has implemented a full QAQC programme. No QAQC review of AC sample data was undertaken by Optiro.

  • Samples within the wireframes were composited to even 1 m intervals based on analysis of the sample lengths in the database. No residuals were generated.

  • Statistical analysis of the resource composites for each lode determined that a high grade cut of 40 g/t was appropriate.

  • Grades were estimated into a Surpac block model having parent block dimensions of 10 mN by 5 mE by 5m mRL, with subcelling for volume representation.

  • Gold was estimated into parent model cells using ordinary kriging (OK) interpolation. Estimation was constrained using geological wireframes conceived by BNR and wireframed by Optiro. Optiro derived estimation parameters for each lode estimated using a combination of estimation and search domains. Due to the paucity in sample data a global set of variography parameters were used for all lodes. Search domains were modified to account for a localised change in the strike and dip within estimation domains.

  • Estimation used three (3) passes. The first pass used a search radius of 35 m with a minimum of 4 and a maximum of 16 samples. The search radius was increased by a factor of 1.5 for the second pass, maintaining the same search radius as for pass 1. With the third pass, the minimum sample number was reduced to 2, maintaining the same search radius and maximum samples as for pass 2.

  • Density was assigned by elevation intervals. Material below the 220 mRL (Fresh) was assigned a density of 2.7 g/cm[3] , material between 220 mRL and 255 mRL (Transitional) was assigned a density of 2.4 g/cm[3] . Material above the 220 mRL and below topography (Oxide) was assigned a density of 2.2 g/cm[3] .

  • The resource was classified as Indicated and Inferred according to the JORC Code. Indicated material was defined where the drillhole mineralisation intercept spacing was less than or equal to 30 m by 30 m, where continuity of mineralisation was evident and where the number of intercepting drillholes was greater than three. Indicated Mineral Resources also included material below the pit floor representing the up-dip extrapolation of mineralisation classified as Indicated at depth. The Inferred Resource included those lodes and lode portions where the number of drillhole intersections was less than three and the drillhole intercept spacing was greater than 30 m by 30 m.

P a g e | 9

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Tabulations

Tonnes and grade reports by deposit for 2011 and 2012 Mineral Resource updates are provided in tables 3 to 6.

Table 3 February 2012 and September 2011 Nicolson's Mineral Resource - tonnes and grade by gold cut-off and resource category

Au
cut-off
(g/t)
September 2011 February 2012 Difference % Difference
Resource
category
Au
**g/t **
Au
**g/t **
Tonnes Tonnes
Tonnes Oz Tonnes Oz
Oz

Oz
0.5 Indicated 894,757 5.13 147,575 919,536 5.30 156,688 24,779 9,113 3% 6%
Inferred 527,028 4.97 84,213 537,323 4.65 80,330 10,295 -3,883 2% -5%
Total 1,421,785 5.07 231,757 1,456,859 5.06 237,006 35,074 5,249 2% 2%
1 Indicated 872,590 5.24 147,005 891,396 5.44 155,905 18,805 8,900 2% 6%
Inferred 513,463 5.08 83,862 529,802 4.70 80,058 16,339 -3,804 3% -5%
Total 1,386,053 5.18 230,834 1,421,198 5.16 235,774 35,145 4,939 3% 2%
2 Indicated 771,767 5.71 141,682 773,887 6.02 149,784 2,120 8,102 0% 6%
Inferred 409,036 5.98 78,642 463,946 5.15 76,818 54,910 -1,823 13% -2%
Total 1,180,803 5.80 220,189 1,237,833 5.69 226,446 57,030 6,257 5% 3%
3 Indicated 615,155 6.53 129,148 626,328 6.86 138,139 11,173 8,991 2% 7%
Inferred 358,285 6.47 74,529 376,900 5.72 69,313 18,615 -5,216 5% -7%
Total 973,440 6.51 203,742 1,003,228 6.43 207,397 29,788 3,654 3% 2%

Table 4 February 2012 and September 2011 Rowdies Mineral Resource - tonnes and grade by gold cut-off and resource category

Au
cut-off
(g/t)
September 2011 September 2011 September 2011 February 2012 February 2012 February 2012 Difference Difference % Difference % Difference
Resource
category
Tonnes Aug/t Oz Tonnes Aug/t Oz Tonnes Oz Tonnes Oz
0.5 Indicated 85,420 3.50 9,612 90,688 3.46 10,082 5,268 470 6% 5%
Inferred 80,443 1.97 5,095 82,527 2.01 5,326 2,084 231 3% 5%
Total 165,863 2.76 14,707 173,215 2.77 15,409 7,352 702 4% 5%
1 Indicated 81,283 3.64 9,512 86,551 3.59 9,980 5,268 468 6% 5%
Inferred 64,107 2.30 4,741 66,088 2.34 4,963 1,981 222 3% 5%
Total 145,390 3.05 14,253 152,639 3.04 14,943 7,249 690 5% 5%
2 Indicated 60,400 4.36 8,467 64,208 4.29 8,855 3,808 389 6% 5%
Inferred 23,033 3.82 2,829 27,729 3.60 3,209 4,696 380 20% 13%
Total 83,433 4.21 11,296 91,937 4.08 12,064 8,504 769 10% 7%
3 Indicated 40,049 5.35 6,889 42,420 5.24 7,146 2,371 257 6% 4%
Inferred 9,143 5.90 1,734 9,508 5.86 1,792 365 58 4% 3%
Total 49,192 5.45 8,623 51,928 5.35 8,938 2,736 315 6% 4%

P a g e | 10

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

Table 5 February 2012 and September 2011 Wagtail North Mineral Resource - tonnes and grade by gold cut-off and resource category

Au
cut-off
(g/t)
September 2011 September 2011 September 2011 February 2012 February 2012 February 2012 Difference Difference % Difference % Difference
Resource
category Tonnes Au
**g/t **
Oz Tonnes Au
**g/t **
Oz Tonnes Oz Tonnes Oz
0.5 Indicated 27,777 5.05 4,510 42,551 4.85 6,634 14,774 2,124 53% 47%
Inferred 173,086 3.63 20,200 256,927 3.63 30,014 83,841 9,814 48% 49%
Total 200,863 3.83 24,710 299,478 3.81 36,648 98,615 11,938 49% 48%
1 Indicated 27,219 5.14 4,498 40,107 5.10 6,572 12,888 2,074 47% 46%
Inferred 150,051 4.07 19,635 231,565 3.94 29,367 81,514 9,733 54% 50%
Total 177,270 4.23 24,133 271,672 4.11 35,939 94,402 11,807 53% 49%
2 Indicated 13,301 9.11 3,896 30,351 6.30 6,150 17,050 2,254 128% 58%
Inferred 80,596 6.32 16,377 118,685 6.39 24,365 38,089 7,988 47% 49%
Total 93,897 6.72 20,272 149,035 6.37 30,514 55,138 10,242 59% 51%
3 Indicated 12,206 9.71 3,811 25,987 6.95 5,807 13,781 1,996 113% 52%
Inferred 51,126 8.57 14,087 86,383 7.88 21,885 35,257 7,798 69% 55%
Total 63,332 8.79 17,897 112,370 7.66 27,692 49,038 9,794 77% 55%

Table 6 February 2012 and September 2011 Wagtail South Mineral Resource - tonnes and grade by gold cut-off and resource category

September 2011 September 2011 September 2011 February 2012 February 2012 February 2012 Difference Difference % Difference % Difference
Au cut-off
(g/t)
Resource
category
Tonnes Au
**g/t **
Oz Tonnes Au
**g/t **
Oz Tonnes Oz Tonnes Oz
0.5 Indicated - 17,488 6.42 3,608 17,488 3,608
Inferred 17,477 5.26 2,956 39,423 4.7 5,956 21,946 3,000 126% 102%
Total 17,477 5.26 2,956 56,911 5.23 9,564 39,434 6,608 226% 224%
1 Indicated - 17,474 6.42 3,608 17,474 3,608
Inferred 17,025 5.37 2,939 29,876 5.96 5,721 12,851 2,782 75% 95%
Total 17,025 5.37 2,939 47,350 6.13 9,329 30,325 6,390 178% 217%
2 Indicated - 16,167 6.79 3,531 16,167 3,531
Inferred 13,812 6.26 2,780 25,618 6.73 5,545 11,806 2,765 85% 99%
Total 13,812 6.26 2,780 41,785 6.76 9,077 27,973 6,297 203% 227%
3 Indicated 717 9.24 213 14,424 7.34 3,402 13,708 3,189 1913% 1498%
Inferred - 23,915 7.02 5,401 23,915 5,401
Total 717 9.24 213 38,339 7.14 8,802 37,623 8,589 5251% 4035%

P a g e | 11

RESOURCE UPDATE – NICOLSON’S PROJECT

==> picture [109 x 46] intentionally omitted <==

References

BNR, 2011 Optiro, 2011

Optiro, 2010

Nicolson's JORC Table 1 Information. Unpublished report.

Nicolson's Gold Project - Updated Mineral Resource estimate. An unpublished report for Bulletin Resources Limited.

Independent geologist's report on the Mineral Assets of Bulletin Resources Ltd. An unpublished report for Bulletin Resources Limited.

Yours faithfully

OPTIRO

==> picture [293 x 64] intentionally omitted <==

==> picture [82 x 84] intentionally omitted <==

Ian Glacken FAusIMM(CP), CEng Principal Consultant

The information in this report which relates to Mineral Resources is based upon information compiled by Ian Glacken, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Ian Glacken is an employee of Optiro and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Ian Glacken consents to the inclusion in the report of a summary based upon his information in the form and context in which it appears.

P a g e | 12