AI assistant
BULLETIN RESOURCES LIMITED — Capital/Financing Update 2011
Jul 13, 2011
64546_rns_2011-07-13_236f5da9-4d95-42b2-97ff-22d3485b6562.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
Bulletin Resources is the 100% owner of the Nicolson’s Gold Project located near Halls Creek in the Kimberley region of Western Australia. The project has a combined open pit and underground Mineral Resource of 1 million tonnes at 5.20g/t Au (for a total of 169,500 ounces) and a 120,000 tpa processing facility currently under care and maintenance.
ASX Code: BNR
Issued capital:
55,500,003 listed ord. shares 11,874,997 restricted ord. shares 8,250,000 unlisted options
Share price (13 July 2011): $0.135
Market capitalisation at 13 July 2011: $9.10 million
Cash on hand at 31 March 2011: $8.96 million
[ASX Announcement ]
14 July 2011
Bulletin Successfully Tests Gold Processing Facility
SUMMARY
-
Power station, crushing circuit, conveyors, ball mill and leaching circuits successfully energised and mechanically tested.
-
Results received for a further 7 holes at Nicolson’s Find. Best results include:
-
NRC11044 : 2.0m at 14.1 g/t Au from 137m NRC11048 : 2.0m at 6.9 g/t Au from 159m NRC11064 : 2.0m at 6.7 g/t Au from 282m
-
Drilling advances into Nicolson’s South with significant mineralisation intersected at depth. Best results to date are:
NRC11014 : 4.0m at 5.0 g/t Au from 129m;
- and 3.0m at 9.2 g/t Au from 135m
Directors:
Non-Executive Chairman: Phil Retter Managing Director: Marty Phillips Executive Director Operations: Mick Fitzgerald Non-Executive Director: Steve Robinson
Marty Phillips Managing Director
Investor and Media Contact:
Marty Phillips +61 8 9388 6921 Fergus Ross Six Degrees Investor Relations [email protected] +61 2 9230 0661
Bulletin Resources Limited
ASX Announcement
Bulletin Resources Limited (ASX: BNR) (“Bulletin”) is pleased to provide the following update on activities at its 100% owned Nicolson’s Gold Project located near Halls Creek in northern WA.
PROCESSING FACILITY RESTART
As part of a detailed condition check of the 120,000 tpa processing facility, Bulletin has successively re-energised and mechanically tested the power station, crushing circuit, conveyors, ball mill and leaching circuits. Testing began on 25 June with the aim of determining the electrical and mechanical condition of all equipment. This outcome will form part of the scope and cost for refurbishing and returning the processing facility back to full operation.
DRILLING RESULTS
Assay results have now been received for an additional 7 holes drilled at Nicolson’s Find and from the first 14 holes at Nicolson’s South. The results are summarised in Table 1 (see below).
At Nicolson’s Find, high grade intersections continue be encountered within the footwall lode, including from re-entries of several holes that were terminated prematurely by the former owners of the project. Significant results include:
1NRC11044 : 2.0m at 14.1 g/t Au from 137m
1NRC11048 : 2.0m at 6.9 g/t Au from 159m NRC11064 : 2.0m at 6.7 g/t Au from 282m
The first phase of drilling at Nicolson’s South was mainly aimed at assessing the up-plunge potential of the high grade lode mineralisation for mine planning purposes. While host structures were intersected in several holes, no significant gold results were returned. The highly weathered nature of the host rocks at Nicolson’s South suggests the possibility for supergene depletion within the shallower levels of the deposit.
More encouraging indications have been returned from the limited results received to date from holes targeting extensions to the Nicolson’s South lode at depth and include:
NRC11014 : 4.0m at 5.0 g/t Au from 129m; and
3.0m at 9.2 g/t Au from 135m
1 Holes NRC11044 and NRC11048 are extensions of historical holes.
Page 2
Bulletin Resources Limited
ASX Announcement
Bulletin’s Managing Director, Marty Phillips said: “It was a surprisingly smooth restart of the facility after having been idle for nearly 8 years. While some refurbishment will be required we are very encouraged by its overall condition.”
“Drilling at Nicolson’s South is nearly complete and the drill rig will now advance further south to commence the assessment of our priority open pit targets at Rowdies and Wagtails.”
Page 3
Bulletin Resources Limited
ASX Announcement
| Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
Bulletin Resources Limited ASX Announcement |
|
|---|---|---|---|---|---|---|---|---|
| Table 1:1Latest AssayResults from Nicolson’s Gold Project | ||||||||
| Hole ID | Local North |
Local East |
Local mRL |
From (m) |
To (m) |
2Down- hole Interval (m) |
3Grade (g/t Au) |
4Zone |
| Nicolson’s Find Intersections | ||||||||
| NRC11026 | 19381 | 10139 | 297 | 98 | 99 | 1 | 5.6 | Main |
| NRC11028 | 19420 | 10182 | 295 | 124 | 125 | 1 | 1.6 | Main |
| NRC11029 | 19440 | 10181 | 296 | 100 122 |
101 124 |
1.0 2.0 |
2.3 2.0 |
HW Main |
| 5NRC11044 | 19582 | 10163 | 298 | 124 137 141 |
125 139 143 |
1.0 2.0 2.0 |
2.2 14.1 1.5 |
FW FW FW |
| 5NRC11048 | 19589 | 10182 | 298 | 159 163 |
161 164 |
2.0 1.0 |
6.9 1.3 |
FW FW |
| NRC11049 | 19600 | 10242 | 297 | 219 228 |
222 229 |
3.0 1.0 |
2.7 2.9 |
FW FW |
| NRC11064 | 19695 | 10306 | 298 | 278 282 333 |
279 284 335 |
1.0 2.0 2.0 |
5.5 6.7 1.9 |
FW FW FW |
| Nicolson’s South Intersections | ||||||||
| NRC11001 | 19040 | 9964 | 294 | - | - | - | - | |
| NRC11002 | 19040 | 10077 | 292 | - | - | - | - | |
| NRC11003 | 19060 | 9963 | 295 | - | - | - | - | |
| NRC11004 | 19100 | 9967 | 297 | - | - | - | - | |
| NRC11006 | 19100 | 10031 | 295 | - | - | - | - | |
| NRC11007 | 19100 | 10099 | 292 | - | - | - | - | |
| NRC11008 | 19120 | 10073 | 295 | 130 | 131 | 1.0 | 1.3 | Main |
| NRC11009 | 19140 | 9983 | 298 | - | - | - | - | |
| NRC11010 | 19140 | 10024 | 297 | 78 | 80 | 2.0 | 2.1 | Main |
| NRC11012 | 19200 | 9975 | 301 | - | - | - | - | |
| NRC11014 | 19200 | 10070 | 296 | 109 129 135 |
110 133 138 |
1.0 4.0 3.0 |
4.0 5.0 9.2 |
HW? Main Main |
| NRC11018 | 19240 | 10146 | 294 | 200 226 |
201 227 |
1.0 1.0 |
2.7 1.3 |
Main FW |
| NRC11020 | 19278 | 9976 | 303 | 4 30 |
5 31 |
1.0 1.0 |
1.1 1.8 |
Main FW |
| NRC11022 | 19320 | 10095 | 299 | 82 - |
83 - |
1.0 - |
1.3 - |
HW Main |
Notes:
1Drilling and assay results in Table 1 are down-hole intervals compiled using a 1.0 g/t Au lower cut with no internal dilution unless noted. No upper cut value has been applied to the assay results.
2True intersection widths are estimated to be 60 to 80 % of down-hole intersection widths. All holes are drilled with a dip of -60[o] and azimuth of 270[o] to grid unless otherwise indicated. Holes NRC11044 and NRC11048 are extensions of historical holes.
3Drill samples were analysed using a 40 gram fire assay with AAS finish.
4Zones are mineralised zones. They are denoted as Hanging Wall (HW), Main (Main) and Footwall (FW) for the Nicolson’s Find and Nicolson’s South deposits. 5Holes NRC11044 and NRC11048 are extensions of historical holes.
Page 4
Bulletin Resources Limited
ASX Announcement
==> picture [435 x 305] intentionally omitted <==
Figure 1: Long section showing approximate location of Nicolson’s foot wall zone drill intersections and resource model extent (in orange) superimposed on main zone resource outline
==> picture [441 x 309] intentionally omitted <==
Figure 2: Long section showing approximate location of Nicolson’s main zone drill intersections superimposed on a gram/metre representation of the main zone
Page 5
Bulletin Resources Limited ASX Announcement
About Bulletin Resources
Bulletin Resources holds a 100% interest in the Nicolson’s Gold project which comprises a contiguous mineral tenement holding covering approximately 70km[2] in the Kimberley Region of WA. The project is estimated to host an Indicated Resource of 787,900 tonnes at 5.05g/t Au for approximately 127,800 ounces of gold and an Inferred Resource of 234,200 tonnes at 5.54g/t Au for approximately 41,700 ounces of gold. Also located on the project is a 120,000 tpa processing facility currently under care and maintenance. The principal objective of the company is to advance the project to the stage of decision to mine.
==> picture [416 x 200] intentionally omitted <==
Competent Persons statement
The Information in this report that relates to the interpretation of Exploration Results and Mineral Resources has been based on information compiled by Mark Csar. Mark Csar is a Fellow of the Australian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity they have undertaken to qualify as a Competent Person as defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code 2004). Mark Csar is a full-time employee of Bulletin Resources Limited and consents to the inclusion in this report of the matters based on his information in the context in which it appears.
Page 6