QUARTERLY REPORT For the quarter ended 30 June 2014
— 2 —
==> picture [596 x 490] intentionally omitted <==
----- Start of picture text -----
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|QUARTERLY ACTIVITIES REPORT|30 June 2014|
|TABLE OF CONTENTS|
|1.|HIGHLIGHTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|3|
|2.|CORPORATE REVIEW|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|3.|MARILLANA IRON ORE PROJECT (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|3 .1|Rail and port infrastructure .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|4.|REGIONAL IRON ORE PROJECTS (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|5|
|4 .1|Ophthalmia exploration .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|5|
|4 .2|Ophthalmia development .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|10|
|4 .3|West Pilbara exploration .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|11|
|4 .4|Competent Person’s Statement .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|11|
|4 .5|JORC 2012 TABLE 1 .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|12|
|5.|TENEMENTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|17|
|6.|DAMAJIANSHAN MINE (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|19|
|7.|CORPORATE PROFILE|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|20|
|8.|GLOSSARY|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|21|
|9.|TABLE OF MATERIAL DRILL RESULTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|22|
|10.|APPENDIX 5B|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|26|
----- End of picture text -----
2
QUARTERLY ACTIVITIES REPORT 30 June 2014
1. HIGHLIGHTS
-
Brockman participated in a court-facilitated mediation, requested by The Pilbara Infrastructure Pty Ltd (TPI), to pursue a commercial resolution, which could include access or haulage on 8 May 2014 before the Hon Chief Justice Martin, the Chief Justice of the Supreme Court of Western Australia. The mediation was adjourned for the parties to consider their positions. The mediation is without prejudice to the status of the Supreme Court proceedings currently underway or to Brockman’s position regarding its access application .
-
A total of 137 holes for 9,668 m was RC drilled during the quarter at the Ophthalmia Project. It has been conducted to upgrade Inferred Mineral Resources to the Indicated category primarily at the Coondiner (Pallas and Castor deposits)and Kalgan Creek Deposits, with limited drilling also undertaken at the Three Pools prospect.
-
Results have largely confirmed the previously interpreted geological model, but with a thicker core of mineralisation encountered in some deposits. Better results include: Pallas Deposit
-
126 m at 59 .5% Fe from 34 m in hole CNRC0270; and 124 m at 58 .9% Fe from 4 m in hole CNRC0293 .
Castor Deposit
-
124 m at 58 .8% Fe from 28 m in hole CNRC0233;
-
118 m at 59.2% Fe from 20 m in hole CNRC0229 (ended in mineralisation); and 102 m at 58 .9% Fe from 2 m in hole CNRC0291 .
Kalgan Creek Deposit
-
116 m at 58.4% Fe from 10 m in hole KRC0118; and
-
98 m at 60.1% Fe from 0 m in hole KRC0119.
-
Subsequent to the end of the quarter, Mr. Colin Paterson has been appointed as Chief Executive Officer of Brockman Mining Australia Pty Ltd upon the resignation by Mr Russell Tipper .
3
QUARTERLY ACTIVITIES REPORT 30 June 2014
2. CORPORATE REVIEW
Cash position
The consolidated cash position of the Group as at 30 June 2014 was HK$223.7 million .
Corporate
During the quarter, the Board welcomed Mr. Choi Yue Chun, Eugene as an independent non-executive director of the Company, with effect from 12 June 2014. Mr. Choi Yue Chun, Eugene, aged 41, holds a Bachelor of Laws degree from The University of Hong Kong, was admitted as a solicitor of the High Court of Hong Kong in 1997 and is a member of the Law Society of Hong Kong. He has over 15 years of experience in the legal field, specialising in corporate finance and compliance matters for listed companies in Hong Kong. Mr. Choi is currently the senior legal counsel of RUSAL Global Management B .V .
Subsequent to the end of the Quarter Brockman announced the resignation of Mr. Russell Tipper as Chief Executive Officer, Brockman Mining Australia Pty Ltd, a wholly-owned subsidiary of the Company, and the appointment of Mr . Colin Paterson as the new Chief Executive Officer of Brockman Mining Australia Pty Ltd with immediate effect .
Mr. Paterson, previously held the position of General Manager Resources and Business Development. He brings a wealth of project and strategic experience having been a founding Director of Brockman Resources Limited, acquired by the Company in 2012, and is an integral member of the team progressing infrastructure solutions for the project. Mr. Paterson has over 30 years’ experience in the resources sector covering a diverse range of geological environments
throughout Australia, but principally in Pilbara iron ore as well as gold and nickel exploration in the Archaean of Western Australia. He has extensive experience in the technical supervision of exploration projects; resource development, project generation and project evaluations.
3. M A R I L L A N A I R O N O R E PROJECT (100% INTEREST)
3.1 Rail and port infrastructure
Rail Access
Brockman is seeking access rights to The Pilbara Infrastructure Pty Ltd’s (“TPI’s”) below-rail infrastructure under the Western Australian Railways (Access) Code 2000 (“Code”), to allow it to haul up to 20 Mtpa of hematite iron ore product from its Marillana Iron Ore Project (“Marillana”), for a term of 20 years, to Port Hedland where North West Infrastructure (“NWI”) has a capacity allocation of 50 Mtpa for iron ore export from South West Creek in the Inner Harbour.
Brockman proposes to procure the necessary spur lines and associated infrastructure to connect Marillana with the TPI railway and the TPI railway to the proposed NWI facilities in Port Hedland, which will include unloading, stockpiling and ship loading facilities in South West Creek, Port Hedland.
Following determinations by the ERA, setting Floor and Ceiling Costs (“F&C Costs”) for the TPI railway and approving the conduct of negotiations between Brockman and TPI pursuant to section 10 of the Code, on 7 October 2013, TPI commenced legal proceedings in the WA Supreme Court, for a Judicial Review of the F&C Costs determination and the section 10 approval, and contemporaneously commenced an action challenging the
4
QUARTERLY ACTIVITIES REPORT 30 June 2014
validity of Brockman’s access proposal (Writ Action). The trial on both the Writ Action and the Judicial Review has been listed for hearing between 18 August and 22 August inclusive .
Brockman is continuing to advance the preparation of submissions to satisfy TPI’s request for further information, regarding Brockman’s managerial and financial capability (section 14) and the availability of capacity (sections 15), as required under the Code. As part of that process, Brockman lodged an application with the Supreme Court for a mandatory injunction, seeking orders that TPI properly comply with its statutory obligations under the ‘request for information’ process under the Code, to provide original data relating to train running times . During the quarter, TPI supplied certain data, subject to confidentiality orders, to Brockman’s experts for validation of the TPI rail capacity model.
Mediation
North West Infrastructure
NWI has continued to work with the Port Hedland Port Authority, on commercial terms for a lease and development agreement to govern the development of the proposed NWI port facilities in the Port Hedland harbour.
4. R E G I O N A L I R O N O R E PROJECTS (100% INTEREST)
4.1 Ophthalmia exploration
The Ophthalmia Project, located north of Newman in the East Pilbara region of Western Australia, is the most significant iron ore project for the company outside of its flagship Marillana project. Since iron ore was discovered in August 2011, Brockman has reported a total of 305 Mt of Indicated and Inferred Mineral Resources (Refer ASX announcement dated 10 March 2014 and Table 2) from three separate areas/deposits at Ophthalmia, i.e., Sirius, Coondiner and Kalgan Creek (Figure 1).
As part of the rail access proceedings, TPI had requested, and, subject to certain conditions, Brockman agreed to a courtfacilitated mediation, which occurred on 8 May 2014 before the Hon. Chief Justice Martin, the Chief Justice of the Supreme Court. The mediation, which remains subject to the confidentiality provisions of the Supreme Court, was adjourned for the parties to consider their positions . The mediation is without prejudice to the status of the Supreme Court proceedings currently underway or to Brockman's position regarding its access application .
5
QUARTERLY ACTIVITIES REPORT 30 June 2014
==> picture [385 x 282] intentionally omitted <==
Figure 1: General location map of Ophthalmia Iron Ore Project
A program of reverse circulation (RC) drilling at Ophthalmia, predominantly an infill and extension drilling programme at the Coondiner and Kalgan Creek Deposits, has been conducted to upgrade Inferred Mineral Resources to the Indicated category and close off existing zones of mineralisation . Limited exploration of other targets at Three Pools was also carried out. Drilling commenced in early April, with a total of 137 holes for 9,668 m drilled by the end of June. The total drilling includes 91 holes for 6,296 m at Coondiner, 35 holes for 2,442 m at Kalgan Creek and 11 holes for 930 m at Three Pools. Drilling was mostly carried out with a conventional truck-mounted RC drilling
rig, but a track-mounted rig was used for the drilling at Three Pools . Difficult site access and reliability issues with the track mounted drill rig meant that the drilling at Three Pools was only able to test targets in the southeast of the licence and could not test the immediate strike extensions of the existing Top Forge prospect . Drilling is expected to finish by late July, with preparation of new Mineral Resource estimates for Coondiner and Kalgan Creek to commence following final receipt of all assays.
6
QUARTERLY ACTIVITIES REPORT 30 June 2014
All significant intersections for the June quarter are listed in Table 1 and a complete list of drill holes and intersections is provided in Appendix A. Drill hole locations are shown in Figures 2 to 4.
==> picture [512 x 125] intentionally omitted <==
----- Start of picture text -----
Hole ID From To Width Fe CaFe + SiO2 Al2O3 P S LOI
(m) (m) (m) (%) (%) (%) (%) (%) (%) (%)
Coondiner Prospect
CNRC0229 20 138 118 59 .2 62 .97 3 .45 4 .73 0 .20 0 .01 6 .06
CNRC0230 20 96 76 59 .7 63 .39 4 .09 3 .74 0 .17 0 .00 5 .89
CNRC0233 28 152 124 58 .8 62 .19 4 .68 4 .52 0 .19 0 .00 5 .41
CNRC0234 22 92 70 60 .3 63 .29 4 .09 3 .93 0 .16 0 .00 4 .79
CNRC0235 20 70 50 59 .5 62 .72 5 .18 3 .78 0 .12 0 .00 5 .20
CNRC0237 24 74 50 56 .9 60 .81 6 .37 4 .88 0 .13 0 .01 6 .48
CNRC0268 28 118 90 59 .7 62 .76 4 .82 3 .94 0 .23 0 .00 4 .88
----- End of picture text -----
| Hole ID | From (m) |
To (m) |
Width (m) |
Fe (%) |
CaFe + (%) |
SiO2 (%) |
Al2O3 (%) |
P (%) |
S (%) |
LOI (%) |
|---|---|---|---|---|---|---|---|---|---|---|
| Coondiner Prospect | ||||||||||
| CNRC0229 | 20 | 138 | 118 | 59 2 | 62 97 | 3 45 | 4 73 | 0 20 | 0 01 | 6 06 |
| CNRC0230 | 20 | 96 | 76 | 59 7 | 63 39 | 4 09 | 3 74 | 0 17 | 0 00 | 5 89 |
| CNRC0233 | 28 | 152 | 124 | 58 8 | 62 19 | 4 68 | 4 52 | 0 19 | 0 00 | 5 41 |
| CNRC0234 | 22 | 92 | 70 | 60 3 | 63 29 | 4 09 | 3 93 | 0 16 | 0 00 | 4 79 |
| CNRC0235 | 20 | 70 | 50 | 59 5 | 62 72 | 5 18 | 3 78 | 0 12 | 0 00 | 5 20 |
| CNRC0237 | 24 | 74 | 50 | 56 9 | 60 81 | 6 37 | 4 88 | 0 13 | 0 01 | 6 48 |
| CNRC0268 | 28 | 118 | 90 | 59 7 | 62 76 | 4 82 | 3 94 | 0 23 | 0 00 | 4 88 |
| CNRC0270 | 34 | 160 | 126 | 59 5 | 62 71 | 4 58 | 4 30 | 0 19 | 0 00 | 5 11 |
| CNRC0271 | 18 | 112 | 94 | 59 0 | 62 35 | 4 88 | 4 46 | 0 15 | 0 00 | 5 37 |
| CNRC0272 | 14 | 88 | 74 | 57 9 | 61 27 | 5 17 | 5 34 | 0 21 | 0 00 | 5 44 |
| CNRC0277 | 18 | 82 | 64 | 59 8 | 63 15 | 4 18 | 4 00 | 0 19 | 0 00 | 5 30 |
| CNRC0278 | 16 | 110 | 94 | 59 7 | 62 98 | 3 65 | 4 76 | 0 20 | 0 00 | 5 24 |
| CNRC0284* | 18 | 109 | 91 | 59 5 | 63 60 | 4 03 | 3 55 | 0 17 | 0 00 | 6 40 |
| CNRC0285 | 12 | 76 | 64 | 57 7 | 61 38 | 5 50 | 5 01 | 0 17 | 0 01 | 5 97 |
| CNRC0287 | 10 | 100 | 90 | 57 8 | 61 21 | 5 93 | 5 04 | 0 16 | 0 00 | 5 52 |
| CNRC0290 | 4 | 94 | 90 | 57 8 | 61 66 | 5 51 | 4 71 | 0 17 | 0 00 | 6 31 |
| CNRC0291 | 2 | 104 | 102 | 58 9 | 62 55 | 5 12 | 3 91 | 0 19 | 0 00 | 5 86 |
| CNRC0292 | 6 | 102 | 96 | 58 4 | 62 18 | 5 22 | 4 20 | 0 20 | 0 00 | 6 02 |
| CNRC0293 | 4 | 128 | 124 | 58 9 | 62 48 | 4 86 | 4 30 | 0 19 | 0 00 | 5 72 |
| CNRC0295 | 12 | 66 | 54 | 58 8 | 62 08 | 4 98 | 4 52 | 0 23 | 0 00 | 5 29 |
| CNRC0317 | 14 | 86 | 72 | 59 6 | 62 43 | 5 56 | 3 86 | 0 19 | 0 01 | 4 61 |
| Three Pools Prospect | ||||||||||
| TPRC0030 | 2 | 62 | 60 | 58 6 | 62 07 | 4 48 | 4 77 | 0 22 | 0 02 | 5 55 |
| Kalgan Creek Prospect | ||||||||||
| KRC0118 | 10 | 126 | 116 | 58 4 | 61 80 | 4 91 | 4 93 | 0 18 | 0 00 | 5 48 |
| KRC0119 | 0 | 98 | 98 | 60 1 | 63 68 | 2 53 | 4 68 | 0 22 | 0 01 | 5 54 |
| KRC0123 | 2 | 74 | 72 | 61 1 | 64 13 | 2 99 | 3 85 | 0 19 | 0 01 | 4 79 |
| KRC0126 | 12 | 62 | 50 | 59 2 | 62 75 | 4 25 | 4 47 | 0 16 | 0 01 | 5 67 |
| KRC0129 | 24 | 78 | 54 | 59 7 | 63 37 | 3 67 | 4 23 | 0 17 | 0 01 | 5 84 |
| KRC0131 | 28 | 94 | 66 | 60 2 | 64 00 | 2 72 | 4 30 | 0 19 | 0 01 | 5 96 |
Table1 Significant BID drill intersections at Ophthalmia for the June quarter 2014
- CaFe represents calcined Fe and is calculated using the formula CaFe = Fe%/((100-LOI)/100) * hole ends in mineralisation
Notes: Intersections reported at 54% Fe lower cut-off grade, minimum thickness 50 m including a maximum of 4 m of internal waste. Analyses by Ultratrace Laboratories using XRF spectrometry.
7
==> picture [596 x 338] intentionally omitted <==
----- Start of picture text -----
QUARTERLY ACTIVITIES REPORT 30 June 2014
Deposit Class Tonnes Fe CaFe SiO2 Al2O3 S P LOI
(Mt) (%) (%) (%) (%) (%) (%) (%)
Indicated 12 .5 59 .25 62 .64 4 .02 4 .79 0 .007 0 .20 5 .41
Kalgan Creek1 Inferred 39 .7 59 .07 62 .55 4 .53 4 .55 0 .005 0 .17 5 .56
Sub Total 52.1 59.11 62.56 4.41 4.60 0.006 0.18 5.52
Coondiner Indicated 82 .5 58 .1 61 .7 5 .61 4 .48 0 .008 0 .17 5 .76
(Pallas and Inferred 46 .4 58 .7 62 .1 5 .37 4 .40 0 .006 0 .18 5 .44
Castor) Sub Total 128.9 58.3 61.8 5.52 4.45 0.008 0.17 5.64
Indicated 105 .0 60 .35 63 .67 3 .54 3 .97 0 .007 0 .18 5 .22
Sirius Inferred 19 .0 60 .15 63 .41 4 .09 3 .83 0 .009 0 .17 5 .14
Sub Total 124.0 60.32 63.63 3.62 3.95 0.007 0.18 5.20
Indicated 200 .0 59 .35 62 .77 4 .42 4 .23 0 .007 0 .18 5 .45
Ophthalmia
Inferred 105 .1 59 .10 62 .50 4 .82 4 .35 0 .006 0 .17 5 .43
Project
Total 305.0 59.27 62.68 4.56 4.27 0.007 0.17 5.45
----- End of picture text -----*
Table 2: Ophthalmia Mineral Resource (DSO) Summary
-
CaFe represents calcined Fe and is calculated by Brockman using the formula CaFe = Fe% / ((100-LOI)/100)
-
** Tonnes may not add up due to rounding
Coondiner
Assay results have been received for all holes drilled at Coondiner . Results from the Pallas Deposit have largely confirmed the previously interpreted geological model, but have also demonstrated continuity of the south-eastern extension to the deposit first identified in late 2013 . Mineralisation has been outlined over a 600 m strike length, beyond the existing Mineral Resource boundary, having a central core over 100 m thick (Figure 2), including:
Drilling at the Castor Deposit has also confirmed the previous interpretation and extended the limits of the mineralisation by 400 m to the east (Figure 3). Results have also demonstrated that the deposit contains a central core over 100 m thick, with better intersections listed below:
124 m at 58.8% Fe from 28 m in hole CNRC0233;
118 m at 59.2% Fe from 20 m in hole CNRC0229 (ended in mineralisation), and 102 m at 58.9% Fe from 2 m in hole CNRC0291.
126 m at 59.5% Fe from 34 m in hole CNRC0270; and
124 m at 58.9% Fe from 4 m in hole CNRC0293.
- 1 The Mineral Resources for Kalgan Creek and Coondiner were prepared and first disclosed under JORC Code 2004. Refer the ASX announcements made 16/10/2012 and 4/12/2012 respectively. Neither has been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. All material assumptions and technical parameters, underpinning the estimates, continue to apply and have not materially changed, nor have the Competent Person’s findings been materially modified.
8
QUARTERLY ACTIVITIES REPORT 30 June 2014
==> picture [426 x 297] intentionally omitted <==
Figure 2 Pallas Deposit drill hole locations and drilling results
==> picture [426 x 225] intentionally omitted <==
Figure 3 Castor Deposit and Three Pools area drill hole locations and drilling results
9
QUARTERLY ACTIVITIES REPORT 30 June 2014
Kalgan Creek
Results have been received for 15 of the 35 holes drilled at Kalgan Creek. Results are generally in line with expectations, except for holes KRC0118 and KRC0119 drilled at the western end of the main deposit (Figure 4), which intersected thicker than expected zones of mineralisation, including:
116 m at 58.4% Fe from 10 m in hole KRC0118; and 98 m at 60.1% Fe from 0 m in hole KRC0119.
Additional drilling has been planned for July, to further test the extent of this thick zone of near surface mineralisation.
==> picture [426 x 301] intentionally omitted <==
Figure 4 Kalgan Creek Deposit drill hole locations and drilling results
Three Pools
Encouraging results have also been received from the 11 holes drilled at Three Pools, where DSO grade mineralisation, up to a maximum thickness of 60 m, was intersected in each of three widely spaced traverses over a total strike length of 1,000 m (Figure 3). Problems with the trackmounted RC rig, required to drill in the hilly
terrain at Three Pools, prevented further drilling of these prospects in the current programme .
4.2 Ophthalmia development
Preliminary metallurgical test work has been carried out on core samples from the Sirius Deposit . A baseline pot grate sinter test, carried out at the China Iron & Steel
10
QUARTERLY ACTIVITIES REPORT 30 June 2014
Research Institute (CISRI), consisted of one substitution test for a Pilbara competitor’s iron ore fines product . The Ophthalmia ore produced a sinter product of comparable quality with similar yield, productivity and fuel consumption rates to that of the competitor product .
4.3 West Pilbara exploration
A programme of infill RC drilling has been planned for the coming quarter, to facilitate an upgrade of the Mineral Resources at the Duck Creek Deposit.
4.4 Competent Person’s Statement
Comminution testwork, performed by ALS Metallurgy, included unconfined compressive strength (UCS), crushing work index (CWi) and Bond abrasion index (Ai). The results of these tests have confirmed that the Ophthalmia ore is very weak, very soft, moderately abrasive and is likely to require low energy in the primary and secondary crushing circuits. Sizing analysis has shown that the ore grade is consistent across all of the size fractions, providing little opportunity to upgrade via conventional de-sliming processes.
The continuing positive exploration and testing results from Ophthalmia are particularly significant in supporting the development of rail and port infrastructure solutions for the Marillana Project.
As Ophthalmia is located only 80 km southeast of Marillana, there is the opportunity to either extend the proposed Marillana railway to Ophthalmia or to haul material by truck from Ophthalmia to Marillana for loading onto trains .
Following an in-house concept mining s t u d y o f t h e O p h t h a l m i a i r o n o r e deposits, that showed the Ophthalmia Project is potentially viable, Brockman has commenced a Pre-Feasibility Study for a 15 Mtpa DSO mining operation at Ophthalmia, predicated on the Company achieving a rail and port infrastructure solution for the Marillana Project. During the quarter, the Company appointed Scope Australia Pty Ltd as the lead engineering consultant in the Brockman integrated project team for implementation of the study.
The information in this report that relates to Mineral Resources at Coondiner and Kalgan Creek is based on information compiled by Mr James Farrell and Mr Aning Zhang .
Mr James Farrell, who is a Chartered P r o f e s s i o n a l a n d M e m b e r o f t h e Australasian Institute of Mining and Metallurgy and a full-time employee of Golder Associates Pty Ltd, produced the Mineral Resource estimates at Coondiner and Kalgan Creek based on the data and geological interpretations provided by Brockman. Mr Farrell has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’ . Mr Farrell consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .
Mr Aning Zhang, who is a Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of Brockman Mining Australia Pty Ltd, provided the geological interpretations and the drill hole data used for the Mineral Resource estimations at Coondiner and Kalgan Creek. Mr Zhang has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of
11
QUARTERLY ACTIVITIES REPORT 30 June 2014
the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves .’ Mr Zhang consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .
The information in this report that relates to Exploration Results is based on, and fairly represents information and supporting documentation compiled by Mr Aning Zhang. Mr Zhang, who is a Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of
Brockman Mining Australia Pty Ltd, has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’ . Mr Zhang consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .
4.5 JORC 2012 TABLE 1
Section 1 Sampling Techniques and Data OPHTHALMIA PROJECT
==> picture [427 x 17] intentionally omitted <==
----- Start of picture text -----
Criteria Explanation
----- End of picture text -----
| Criteria | Explanation |
|---|---|
| Sampling techniques | • Sampling carried out under Brockman protocols and QAQC procedures as per industry best practice. • Reverse Circulation (RC) chip samples collected via a cone splitter mounted on the side of the drill rig • For each two-metre interval the cone splitter produced two samples (A and B) collected into pre-numbered calico bags and a bulk sample collected in a pre-numbered polyweave bag_._ • Quality of sampling during drilling was continuously monitored by an experienced geologist and field assistant |
| Drilling techniques | • Reverse Circulation (RC) drilling employed a 140mm diameter face- sampling hammer • Drill holes are spaced on a nominal 200m (E-W) by 100m (N-S) grid (Coondiner and Kalgan Creek). |
| Drill sample recovery | • RC sample recovery is recorded as a percentage (to the nearest 10%) by the geologist and is based on how much of the sample is returned from the cone splitter • A geologist and field assistant were present during drilling to ensure that sample recovery was maximised and that samples were representative. Any problems were immediately rectified. • No significant sample recovery problems were encountered. • Twinned RC and diamond drill holes show comparable assay results indicating that wet drilling has not adversely affected the RC samples • Previous metallurgical testing shows that assay results are similar across all size ranges. |
12
| QUARTERLY | |||
| Criteria | Explanation | ||
| Logging | • Logging of RC holes was at 1m intervals (Brockman procedure) corresponding with 1m bulk samples recovered during drilling. This level of detail supports appropriate Mineral Resource estimation, mining studies and metallurgical studies • Geophysical data were collected from the RC holes (natural gamma, gamma density, magnetic susceptibility & resistivity, and down-hole deviation) by Surtron Technologies. Not all holes were open at depth, which precluded 100% recovery of data from all of the drill holes. |
||
| Sub-sampling techniques and sample preparation |
Sampling technique — RC samples • Samples averaging about 3 kg each were collected from each two- metre interval via a cone splitter • Samples were kept dry where possible. • The sample size is considered appropriate for correctly characterising the mineralisation, based on the style of mineralisation (massive goethite-hematite), the thickness and consistency of intersections, the sampling methodology and percent value assay ranges for the primary elements. Sample preparation • Samples were dried at 105°C and weighed. • Samples were crushed to nominal -6.3 mm, with samples in excess of 2 kg being riffle split. • Samples were pulverised to 80% passing at 75 µm. Quality control procedures • Field duplicate submitted every 25th sample (1:25). • ‘Blind’ Certified Reference Material inserted every 25th sample (1:25). • Lab duplicates were randomly generated by a laboratory program, typically about 1 in 20 samples (1:20). • Lab repeats were taken and standards inserted at a predetermined level specified by the lab. |
13
| QUARTERLY | |||
| Criteria | Explanation | ||
| Quality of assay data and laboratory tests |
• All RC samples submitted to Nagrom Laboratory in Perth were assayed for Fe, SiO2, Al2O3, TiO2, MnO, CaO, P, S, MgO, and K2O by XRF and for LOI at 1000°C by thermogravimetric analysis (TGA). • Laboratory procedures are in line with ISO9001 Quality Management System and appropriate for iron ore deposits. • Samples were dried at 105°C, weighed, crushed to a nominal -6.3mm size, and then pulverised to 80% passing 75 micron. • A 0.8g sub-sample was collected and fused in 8g of 12:22 lithium borate flux with 5% lithium nitrate additive. The resultant glass bead was analysed by XRF. • Another 1–2g sub-sample was dried and ignited at 1000°C with LOI calculated one constant mass was reached. LOI is the percentage mass change due to igniting the dry sample. • There were no indications that samples were unrepresentative, with all lab duplicate samples within 2.5% of the original sample value. • Samples have been collated, and will be sent to an umpire laboratory as an independent check of the assay results. • Certified Reference Materials (CRMs) with a range of values appropriate to the mineralisation were inserted at predefined intervals by Brockman and randomly by the lab at set levels. Results from the CRMs show that sample assay values are accurate and precise. • Analysis of field duplicate samples shows that greater than 95% of pairs have less than 5% difference. Analysis of lab pulp repeats indicates that the precision of samples is also within acceptable limits. |
||
| Verification of sampling and assaying |
• Significant intersections have been independently verified by alternative company personnel. • The Competent Person has visited site and inspected the sampling process in the field, and has also inspected the laboratory. • Twinned RC and diamond drill holes show equivalent assay results. • Primary data are captured on Toughbook laptops using Ocris software. The software has validation routines to prevent data entry errors • All field data were sent by the geologist present during drilling to a database management company (Expedio) in Perth and stored in a secure SQL database. • Assay data were sent by the laboratory direct to Expedio and uploaded into the SQL database. • No adjustments or calibrations were made to any assay data used in the estimate |
14
| QUARTERLY | |||
| Criteria | Explanation | ||
| Location of data points | • All collars were initially surveyed by Brockman personnel using a hand held GPS, and later by Bore Hole Geophysical Services using a differential GPS with a nominal horizontal and vertical accuracy of 15cm • Down-hole gyroscopic surveys were conducted by Surtron Technologies using a conventional gyroscope. • The grid system for Sirius is MGA_GDA94 Zone 50 and the vertical datum is AHD. • A DEM for the project area was acquired by Fugro Spatial Solutions with a quoted horizontal accuracy of 60 cm and a vertical accuracy of 30 cm |
||
| Data spacing and distribution |
• Drill holes are spaced on a nominal 200m (E-W) by 100m (N-S) grid (Coondiner and Kalgan Creek). • This drill spacing is sufficient to establish the degree of geological and grade continuity required under the 2012 JORC code. • Samples were collected at 2m intervals. |
||
| Orientation of data in relation to geological structure |
• Lithological units strike east-southeast and are folded about a series of upright to slightly inclined, open to close folds. The mineralisation envelope is also folded. All but two of the holes were drilled vertically, with the other two holes drilled at 60° to the north in order to be oriented perpendicular to mineralisation • Due to the varying intersection angles all results are defined as down- hole widths. |
||
| Sample security | • The chain of custody is managed by Brockman. • Samples were packed into polyweave bags and sealed, and then placed inside Bulka Bags which were sealed by the geologist and field assistant present during drilling • Samples were picked up from site by a local transport company and deposited with Regal Transport, who delivered the samples to the laboratory. • Once received at the laboratory, the samples were sorted and securely stored until analysis. • The lab receipted samples received against the sample dispatch documents |
||
| Audits or reviews | • The database is maintained by an independent external consultant (Expedio), who carried out routine checks and validations. Brockman also conducted internal validation of the database Golder conducted an external audit of the database with respect to sampling and QAQC procedures in February 2014. |
15
| QUARTERLY | ||
| Criteria | Explanation | |
| Mineral tenement and land tenure status |
• Exploration Prospects are located wholly within Exploration Leases E47/1598, E47/1599, E47/2280 and E47/2291 which are 100% owned by Brockman. • The tenements lie within the Nyiyaparli Native Title Claim (WC05/06). • At the time of reporting, there are no known impediments to obtaining a licence to operate in the area, and the tenements are in good standing |
|
| Exploration done by other parties |
• No substantive previous exploration within E47/1598 and E47/1599 was identified by Brockman. Previous RC drilling by Sheffield Resources on E47/2280 identified BID mineralisation |
|
| Geology | • Mineralisation on all four tenements consists of hematite-goethite ore hosted within shaly BIF of the c. 2.49 Ga Boolgeeda Iron Formation (upper Hamersley Group). • The prospects are located within the Ophthalmia Fold Belt about 20- 35 km northwest of Newman. |
|
| Drill hole information | • Refer to the figures. |
|
| Data aggregation methods |
• A nominal 54% Fe lower cut-off grade was used for reporting of significant intercepts |
|
| Relationship between mineralisation widths and intercept lengths |
• Mineralisation at all Exploration Prospects defines a folded sub- horizontal sheet. Overall, most holes were drilled perpendicular to mineralisation, but because of the folding some holes are slightly or moderately oblique to mineralisation. Therefore, all results are defined as down-hole widths rather than true widths. |
|
| Diagrams | • Maps of the deposits with interpretations of the stratigraphy and hole collar positions are shown in Figures 2–4. |
|
| Balanced reporting | • All results are reported. |
|
| Other substantive exploration data |
• Detailed geological and structural mapping of the prospect has been completed by Brockman geologists. • Cross-sections through Pallas, Castor, Kalgan Creek, and Three Pools have been constructed in order to determine the structural and stratigraphic controls on mineralisation • Preliminary metallurgical test work (size assaying and a single sinter test) has been undertaken. |
|
| Further work | • Updated Mineral Resources estimates will be prepared for Coondiner and Kalgan Creek. |
16
| QUARTERLY | |||||||
| Project | Location | Type | Tenement number |
Commodity | Status | Interest held |
|
| Duck Creek | West Pilbara | E | 47/1936 | Iron Ore | Granted | 100% | |
| Duck Creek | West Pilbara | E | 47/3104 | Iron Ore | Application | 100% | |
| Ethel Creek | East Pilbara | E | 46/0921 | Iron Ore | Granted | 100% | |
| Ethel Creek | East Pilbara | E | 46/0979 | Iron Ore | Application | 100% | |
| Lalla Rookh | North Pilbara | E | 45/3144 | Iron Ore | Granted | 100% | |
| Marillana | East Pilbara | E | 47/2176 | Iron Ore | Application | 100% | |
| Mt Lockyer | North Pilbara | E | 47/2650 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | E | 47/1845 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | E | 47/2622 | Iron Ore | Application | 100% | |
| Ophthalmia | East Pilbara | E | 47/2623 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2353 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2354 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2698 | Iron Ore | Application | 100% |
Tenements acquired during the Quarter
| Project | Location | Type | Tenement number |
Commodity | Status | Interest held |
|---|---|---|---|---|---|---|
| Duck Creek | West Pilbara | E | 47/3151 | Iron Ore | Application | 100% |
| Duck Creek | West Pilbara | E | 47/3152 | Iron Ore | Application | 100% |
| Robertson Range | West Pilbara | E | 45/4410 | Iron Ore | Application | 100% |
Tenements held at end of Quarter
==> picture [427 x 28] intentionally omitted <==
----- Start of picture text -----
Tenement Interest
Project Location Type number Commodity Status held
----- End of picture text -----
| Project | Location | Type | Tenement number |
Commodity | Status | Interest held |
|---|---|---|---|---|---|---|
| Cheela Plains | West Pilbara | E | 08/2264 | Iron Ore | Granted | 100% |
| Chichester Range | East Pilbara | E | 45/3693 | Iron Ore | Granted | 100% |
| Duck Creek | West Pilbara | E | 47/1725 | Iron Ore | Granted | 100% |
| Duck Creek | West Pilbara | E | 47/3151 | Iron Ore | Application | 100% |
| Duck Creek | West Pilbara | E | 47/3152 | Iron Ore | Application | 100% |
| Fig Tree | East Pilbara | E | 47/3023 | Iron Ore | Application | 100% |
| Fig Tree | East Pilbara | E | 47/3024 | Iron Ore | Application | 100% |
| Fig Tree | East Pilbara | E | 47/3025 | Iron Ore | Application | 100% |
| Irwin Hills | Goldfields | E | 39/1284 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | E | 39/1307 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | E | 39/1471 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | L | 39/0163 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | P | 39/4594 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | P | 39/4595 | Nickel/Cobalt | Granted | 40% |
| Irwin Hills | Goldfields | P | 39/4682 | Nickel/Cobalt | Granted | 40% |
17
| QUARTERLY | |||||||
| Project | Location | Type | Tenement number |
Commodity | Status | Interest held |
|
| Irwin Hills | Goldfields | M | 39/1088 | Nickel/Cobalt | Application | 40% | |
| Irwin Hill | Goldfields | M | 39/1090 | Nickel/Cobalt | Application | 40% | |
| Irwin Hill | Goldfields | M | 39/1091 | Nickel/Cobalt | Application | 40% | |
| Irwin Hill | Goldfields | M | 39/1092 | Nickel/Cobalt | Application | 40% | |
| Lalla Rookh | North Pilbara | E | 45/3379 | Iron Ore | Granted | 100% | |
| Lalla Rookh | North Pilbara | E | 45/3380 | Iron Ore | Granted | 100% | |
| Marillana | East Pilbara | E | 47/1408 | Iron Ore | Granted | 100% | |
| Marillana | East Pilbara | L | 45/0236 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 45/0238 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 46/0097 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0369 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0389 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0408 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0544 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0566 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 47/0567 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | L | 52/0124 | Iron Ore | Application | 100% | |
| Marillana | East Pilbara | M | 47/1414 | Iron Ore | Granted | 100% | |
| Millstream Hill | East Pilbara | E | 47/2766 | Iron Ore | Application | 100% | |
| Mt Goldsworthy | North Pilbara | E | 45/3931 | Iron Ore | Granted | 100% | |
| Mt Stevenson | West Pilbara | E | 47/3105 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | E | 47/1850 | Iron Ore | Granted | 100% | |
| Mt Stuart | West Pilbara | E | 47/2215 | Iron Ore | Granted | 100% | |
| Mt Stuart | West Pilbara | E | 47/2976 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | E | 47/2993 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | E | 47/2994 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | P | 47/1711 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | P | 47/1712 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | P | 47/1713 | Iron Ore | Application | 100% | |
| Mt Stuart | West Pilbara | P | 47/1714 | Iron Ore | Application | 100% | |
| Nimingara | North Pilbara | E | 45/4051 | Iron Ore | Application | 100% | |
| Ophthalmia | East Pilbara | E | 47/1598 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | E | 47/1599 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | E | 47/2280 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | E | 47/2291 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | E | 47/2594 | Iron Ore | Granted | 100% | |
| Ophthalmia | East Pilbara | P | 47/1715 | Iron Ore | Application | 100% | |
| Pannawonica | West Pilbara | E | 47/2409 | Iron Ore | Granted | 100% | |
| Pannawonica | West Pilbara | E | 47/2410 | Iron Ore | Granted | 100% | |
| Paraburdoo | West Pilbara | E | 47/1942 | Iron Ore | Granted | 100% | |
| Paraburdoo | West Pilbara | E | 47/2081 | Iron Ore | Granted | 100% | |
| Pippingarra | North Pilbara | E | 45/3948 | Iron Ore | Granted | 100% | |
| Port Hedland | North Pilbara | E | 45/3939 | Iron Ore | Application | 100% | |
| Port Hedland | North Pilbara | L | 45/0296 | Iron Ore | Application | 100% | |
| Red Hill | West Pilbara | E | 08/2011 | Iron Ore | Granted | 100% |
18
| QUARTERLY | |||||||
| Project | Location | Type | Tenement number |
Commodity | Status | Interest held |
|
| Red Hill | West Pilbara | E | 08/2297 | Iron Ore | Granted | 100% | |
| Red Hill | West Pilbara | P | 08/0628 | Iron Ore | Granted | 100% | |
| Red Hill | West Pilbara | P | 08/0629 | Iron Ore | Granted | 100% | |
| Robertson Range | West Pilbara | E | 45/4410 | Iron Ore | Application | 100% | |
| Shovelanna | East Pilbara | E | 46/0781 | Iron Ore | Granted | 100% | |
| Shovelanna | East Pilbara | E | 52/2238 | Iron Ore | Granted | 100% | |
| Tom Price | West Pilbara | E | 47/2098 | Iron Ore | Granted | 100% | |
| Tom Price | West Pilbara | E | 47/2355 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2455 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2699 | Iron Ore | Application | 100% | |
| Tom Price | West Pilbara | E | 47/2700 | Iron Ore | Application | 100% | |
| Vivash | East Pilbara | E | 47/3064 | Iron Ore | Application | 100% | |
| Vivash | East Pilbara | E | 47/3065 | Iron Ore | Application | 100% | |
| West Hamersley | West Pilbara | E | 47/1603 | Iron Ore | Granted | 100% | |
| West Hamersley | West Pilbara | E | 47/2667 | Iron Ore | Application | 100% | |
| West Hamersley | West Pilbara | E | 47/2904 | Iron Ore | Application | 100% | |
| West Hamersley | West Pilbara | E | 47/2905 | Iron Ore | Application | 100% | |
| West Hamersley | West Pilbara | E | 47/3054 | Iron Ore | Application | 100% | |
| Western Gate Well |
West Pilbara | E | 45/4240 | Iron Ore | Application | 100% |
6. DAMAJIANSHAN MINE (100% INTEREST)
During the quarter ended 30 June 2014, cash receipts from product sales of approximately RMB6.7 million (RMB9.6 m i l l i o n , M a r c h 2 0 1 4 q u a r t e r ) w e r e recorded . The decrease in cash receipts from product sales mainly attributed from decrease in sales volume of copper concentrate as a result of seasonal reductions in production during the quarter ended 31 March 2014 .
Cash payments for production associated with mining operations during the quarter amounted to approximately RMB4.9 million (RMB6.6 million, March 2014 quarter).
Production activities resumed after the long holidays and a rise in productivity was recorded. Cash payments for exploration activities and development recorded at RMB1.3 million (RMB1.4 million, March 2014). Drilling activities were continued during the quarter with approximately 714m recorded (322m, March 2014 quarter).
| Jun’ 14 Quarter (Tonnes) |
Mar’ 14 Quarter (Tonnes) |
Variance % |
|
|---|---|---|---|
| Ore mined and delivered to stockpile | 52,124 | 12,608 | 313% |
| Ore processed | 26,206 | 7,864 | 233% |
| Concentrate produced (metal tonnes) | 188 | 55 | 242% |
| Concentrate sold (metal tonnes) | 72 | 126 | (43)% |
19
QUARTERLY ACTIVITIES REPORT 30 June 2014
Mining license
The mining right certificate has been obtained in June 2013, such license granted an extension of the mining right in Damajianshan Mine for one year which expired in June 2014 .
The renewal of the short-term mining right certificate is in progress and the management expects that such renewal will be granted soon.
With reference to an independent legal opinion received by Luchun Xingtai Mining Co., Ltd (“Luchun”) in February 2014, there is no legal barrier for Luchun to renew its mining right certificate when it expires. Accordingly, the Directors are of the opinion that the Group will be able to renew the mining right certificate continuously at minimal charge.
Branch Share Registrars and Transfer Office — Hong Kong
Tricor Secretaries Limited Level 22, Hopewell Centre 183 Queen’s Road East Hong Kong
Branch Share Registrars and Transfer Office — Australia
Computershare Investor Services Pty Limited
Reserve Bank Building Level 2, 45 St George’s Terrace Perth, Western Australia, 6000
Securities on issue at 30 June 2014 Quoted securities
8,381,982,131 fully paid shares on issue 15,000,000 options quoted, expiring 30 September 2014
Unquoted securities
420,000,000 unlisted options granted
7. CORPORATE PROFILE
Brockman Mining Limited
ARBN 143 211 867
Non-executive Directors: Kwai Sze Hoi (Chairman) Liu Zhengui (Vice Chairman) Ross Stewart Norgard
Executive Directors:
Luk Kin Peter Joseph (CEO) C h a n K a m K w a n J a s o n ( C o m p a n y Secretary)
Warren Talbot Beckwith Kwai Kwun Lawrence
Independent Non-executive Directors: Uwe Henke Von Parpart Yip Kwok Cheung Danny Yap Henry Fat Suan Choi Yue Chun Eugene (appointed 12 June 2014)
Registrars
-
83,400,000 share options, expiring 13 December 2015 EX HK$0.72
-
88,100,000 share options, expiring 14 January 2016 EX HK$0.717
-
88,100,000 share options, expiring 14 January 2016 EX HK$0.967
-
3,600,000 share options, expiring 28 February 2016 EX HK$0.717
-
3,600,000 share options, expiring 28 February 2016 EX HK$0.967
-
76,600,000 share options, expiring 20 May 2016 EX HK$0.717
-
76,600,000 share options, expiring 20 May 2016 EX HK$0.967
There were no shares or options issued during the period .
The following options lapsed during the period:
-
150,000 share options, expiring 28 February 2016 EX HK$0.717
-
150,000 share options, expiring 28 February 2016 EX HK$0.967
Principal Share Registrars and Transfer Office
MUFG Fund Services (Bermuda) Limited The Belvedere Building 69 Pitts Bay Road Pembroke HM 08
By order of the Board of Directors of Brockman Mining Limited Chan Kam Kwan, Jason Company Secretary, Hong Kong
20
QUARTERLY ACTIVITIES REPORT 30 June 2014
8. GLOSSARY
“ASX”
“Board”
“Brockman” or “Company”
“Damajianshan Mine”
“DSO”
“ERA”
- “Group”
“JORC”
“km”
“Marillana Project”
“m”
- “Mt”
“NWI”
“Ophthalmia Project”
“Q”
“Stock Exchange”
- “Supreme Court”
“T”
ASX Limited ACN 008 624 691, or the financial products market, The Australian Securities Exchange, as the situation requires
the Board of Directors
Brockman Mining Limited ARBN 143 211 867, a company incorporated in Bermuda and listed on the SEHK and ASX
A copper mine located in the Yunnan Province, PRC, in which the Company has 100% equity interest
Direct Shipping Ore
Western Australian Economic Regulation Authority
Brockman Mining Limited, its associates and subsidiaries
Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves
kilometres
The 100% owned Marillana iron ore project is Brockman’s flagship project located in the Hamersley Iron Province
metre
million tonnes
North West Infrastructure, the joint venture company which represents the interests of its three shareholder companies: Brockman Mining Australia Pty Ltd; Atlas Iron Limited and FerrAus Limited, to facilitate the construction of a port facility capable of annually exporting 50 million tonnes of iron ore from the South-West Creek location at the Inner Harbour at Port Hedland, Western Australia
The 100% owned Ophthalmia iron ore project is located 80 km south of the Marillana Project
Quarter (financial)
The Stock Exchange of Hong Kong Limited
Supreme Court of Western Australia
Tonne(s)
21
| QUARTERLY | |||||||||||||||||
| Project | Hole ID | MGA E | MGA N | AHD RL | Dip | Azimuth | End Depth |
From | To | Width | Fe | SiO2 | Al2O3 | P | S | LOI | |
| (m) | (m) | (m) | (º) | (º) | (m) | (m) | (m) | (m) | (%) | (%) | (%) | (%) | (%) | (%) | |||
| Coondiner | CNRC0227 | 768208 | 7439608 | 690 | 0 | -90 | 55 | no significant intercepts | |||||||||
| Coondiner | CNRC0228 | 766396 | 7440150 | 656 | 0 | -90 | 67 | ||||||||||
| Coondiner | CNRC0229 | 766651 | 7440153 | 673 | 0 | -90 | 139 | 20 | 138 | 118 | 59 2 | 3 45 | 4 73 | 0 20 | 0 01 | 6 06 | |
| Coondiner | CNRC0230 | 766652 | 7440305 | 673 | 0 | -90 | 109 | 20 | 96 | 76 | 59 7 | 4 09 | 3 74 | 0 17 | 0 00 | 5 89 | |
| Coondiner | CNRC0231 | 768213 | 7439895 | 651 | 0 | -90 | 55 | no significant intercepts | |||||||||
| Coondiner | CNRC0232 | 766802 | 7439952 | 654 | 0 | -90 | 85 | 22 | 28 | 6 | 57 4 | 5 58 | 4 76 | 0 19 | 0 01 | 6 45 | |
| Coondiner | CNRC0233 | 766803 | 7440052 | 659 | 0 | -90 | 157 | 28 | 152 | 124 | 58 8 | 4 68 | 4 52 | 0 19 | 0 00 | 5 41 | |
| Coondiner | CNRC0234 | 766794 | 7440180 | 670 | 0 | -90 | 121 | 22 | 92 | 70 | 60 3 | 4 09 | 3 93 | 0 16 | 0 00 | 4 79 | |
| Coondiner | CNRC0235 | 766801 | 7440251 | 648 | 0 | -90 | 85 | 20 | 70 | 50 | 59 5 | 5 18 | 3 78 | 0 12 | 0 00 | 5 20 | |
| Coondiner | CNRC0236 | 767003 | 7440096 | 671 | 0 | -90 | 103 | no significant intercepts | |||||||||
| Coondiner | CNRC0237 | 766995 | 7439904 | 607 | 0 | -90 | 85 | 24 | 74 | 50 | 56 9 | 6 37 | 4 88 | 0 13 | 0 01 | 6 48 | |
| Coondiner | CNRC0238 | 767204 | 7440114 | 665 | 0 | -90 | 60 | no significant intercepts | |||||||||
| Coondiner | CNRC0239 | 767201 | 7439952 | 682 | 0 | -90 | 78 | 22 | 26 | 4 | 59 0 | 7 31 | 3 32 | 0 08 | 0 00 | 4 24 | |
| Coondiner | CNRC0240 | 767197 | 7439905 | 610 | 0 | -90 | 66 | no significant intercepts | |||||||||
| Coondiner | CNRC0241 | 766952 | 7440602 | 608 | 0 | -90 | 48 | ||||||||||
| Coondiner | CNRC0242 | 766949 | 7440700 | 652 | 0 | -90 | 66 | ||||||||||
| Coondiner | CNRC0243 | 766594 | 7440965 | 645 | 0 | -90 | 46 | 20 | 24 | 4 | 59 6 | 6 74 | 3 21 | 0 11 | 0 00 | 4 10 | |
| Coondiner | CNRC0244 | 766590 | 7441053 | 641 | 0 | -90 | 48 | 14 | 40 | 26 | 57 5 | 6 78 | 4 84 | 0 16 | 0 01 | 5 32 | |
| Coondiner | CNRC0245 | 766491 | 7440812 | 637 | 0 | -90 | 49 | 14 | 32 | 18 | 58 8 | 5 61 | 4 15 | 0 12 | 0 01 | 5 17 | |
| Coondiner | CNRC0246 | 766489 | 7440892 | 657 | 31 | holes abandoned | |||||||||||
| Coondiner | CNRC0247 | 766488 | 7440896 | 642 | 7 | ||||||||||||
| Coondiner | CNRC0248 | 766492 | 7440901 | 642 | 0 | -90 | 49 | 28 | 42 | 14 | 58 8 | 5 96 | 3 85 | 0 15 | 0 00 | 5 33 | |
| Coondiner | CNRC0249 | 766495 | 7441151 | 639 | 0 | -90 | 61 | 10 | 52 | 42 | 58 6 | 5 53 | 4 38 | 0 18 | 0 00 | 5 44 | |
| Coondiner | CNRC0250 | 766506 | 7441257 | 639 | 0 | -90 | 34 | no significant intercepts | |||||||||
| Coondiner | CNRC0251 | 766397 | 7441000 | 641 | 0 | -90 | 37 | 20 | 30 | 10 | 56 5 | 8 50 | 4 69 | 0 15 | 0 00 | 5 25 | |
| Coondiner | CNRC0252 | 766368 | 7441238 | 641 | 0 | -90 | 43 | no significant intercepts | |||||||||
| Coondiner | CNRC0253 | 766304 | 7441103 | 641 | 0 | -90 | 60 | 12 | 52 | 40 | 56 6 | 6 39 | 4 91 | 0 20 | 0 01 | 6 80 | |
| Coondiner | CNRC0254 | 766296 | 7441007 | 642 | 0 | -90 | 55 | 18 | 22 | 4 | 57 1 | 7 10 | 5 20 | 0 07 | 0 01 | 5 41 | |
| Coondiner | CNRC0255 | 766203 | 7441190 | 641 | 0 | -90 | 60 | 20 | 46 | 26 | 57 1 | 7 86 | 4 64 | 0 15 | 0 00 | 5 03 | |
| Coondiner | CNRC0256 | 766004 | 7441254 | 645 | 0 | -90 | 60 | no significant intercepts | |||||||||
| Coondiner | CNRC0257 | 765796 | 7441147 | 647 | 0 | -90 | 55 | ||||||||||
| Coondiner | CNRC0258 | 765601 | 7441204 | 636 | 0 | -90 | 75 | ||||||||||
| Coondiner | CNRC0259 | 765193 | 7440794 | 643 | 0 | -90 | 73 | ||||||||||
| Coondiner | CNRC0260 | 764998 | 7440859 | 645 | 0 | -90 | 37 | ||||||||||
| Coondiner | CNRC0261 | 764698 | 7441050 | 636 | 0 | -90 | 49 |
22
| QUARTERLY | |||||||||||||||||
| Project | Hole ID | MGA E | MGA N | AHD RL | Dip | Azimuth | End Depth |
From | To | Width | Fe | SiO2 | Al2O3 | P | S | LOI | |
| (m) | (m) | (m) | (º) | (º) | (m) | (m) | (m) | (m) | (%) | (%) | (%) | (%) | (%) | (%) | |||
| Coondiner | CNRC0262 | 764600 | 7440903 | 643 | 0 | -90 | 73 | 18 | 22 | 4 | 55 2 | 6 31 | 4 97 | 0 18 | 0 02 | 8 30 | |
| Coondiner | CNRC0263 | 764503 | 7441006 | 633 | 0 | -90 | 37 | no significant intercepts | |||||||||
| Coondiner | CNRC0264 | 764501 | 7440931 | 638 | 0 | -90 | 31 | ||||||||||
| Coondiner | CNRC0265 | 765799 | 7441256 | 646 | 0 | -90 | 37 | ||||||||||
| Coondiner | CNRC0266 | 765985 | 7441347 | 642 | 0 | -90 | 43 | 14 | 30 | 16 | 57 3 | 6 15 | 5 17 | 0 16 | 0 01 | 5 88 | |
| Coondiner | CNRC0267 | 770700 | 7440196 | 647 | 0 | -90 | 61 | 22 | 28 | 6 | 61 9 | 3 40 | 2 83 | 0 15 | 0 01 | 4 41 | |
| Coondiner | CNRC0268 | 770700 | 7439897 | 641 | 0 | -90 | 133 | 28 | 118 | 90 | 59 7 | 4 82 | 3 94 | 0 23 | 0 00 | 4 88 | |
| Coondiner | CNRC0269 | 770949 | 7440151 | 642 | 0 | -90 | 52 | no significant intercepts | |||||||||
| Coondiner | CNRC0270 | 770702 | 7439996 | 632 | 0 | -90 | 169 | 34 | 160 | 126 | 59 5 | 4 58 | 4 30 | 0 19 | 0 00 | 5 11 | |
| Coondiner | CNRC0271 | 770695 | 7440101 | 647 | 0 | -90 | 120 | 18 | 112 | 94 | 59 0 | 4 88 | 4 46 | 0 15 | 0 00 | 5 37 | |
| Coondiner | CNRC0272 | 770949 | 7440023 | 643 | 0 | -90 | 97 | 14 | 88 | 74 | 57 9 | 5 17 | 5 34 | 0 21 | 0 00 | 5 44 | |
| Coondiner | CNRC0273 | 770953 | 7439874 | 643 | 0 | -90 | 60 | 24 | 28 | 4 | 58 6 | 8 32 | 3 05 | 0 09 | 0 01 | 4 21 | |
| Coondiner | CNRC0274 | 770952 | 7439732 | 648 | 0 | -90 | 55 | 12 | 16 | 4 | 56 1 | 8 34 | 4 12 | 0 10 | 0 01 | 6 20 | |
| Coondiner | CNRC0275 | 771071 | 7439730 | 645 | 0 | -90 | 55 | no significant intercepts | |||||||||
| Coondiner | CNRC0276 | 771075 | 7439832 | 641 | 0 | -90 | 79 | ||||||||||
| Coondiner | CNRC0277 | 771080 | 7439919 | 648 | 0 | -90 | 100 | 18 | 82 | 64 | 59 8 | 4 18 | 4 00 | 0 19 | 0 00 | 5 30 | |
| Coondiner | CNRC0278 | 771034 | 7440002 | 641 | 0 | -90 | 118 | 16 | 110 | 94 | 59 7 | 3 65 | 4 76 | 0 20 | 0 00 | 5 24 | |
| Coondiner | CNRC0279 | 771060 | 7440085 | 658 | 0 | -90 | 67 | 18 | 26 | 8 | 61 3 | 4 00 | 2 89 | 0 12 | 0 02 | 4 69 | |
| Coondiner | CNRC0280 | 771193 | 7439802 | 641 | 360 | -60 | 72 | no significant intercepts | |||||||||
| Coondiner | CNRC0281 | 770106 | 7439594 | 640 | 0 | -90 | 65 | ||||||||||
| Coondiner | CNRC0282 | 770450 | 7439480 | 610 | 0 | -90 | 67 | ||||||||||
| Coondiner | CNRC0283 | 770674 | 7439452 | 635 | 0 | -90 | 55 | ||||||||||
| Coondiner | CNRC0284* | 770819 | 7440055 | 645 | 0 | -90 | 109 | 18 | 109 | 91 | 59 5 | 4 03 | 3 55 | 0 17 | 0 00 | 6 40 | |
| Coondiner | CNRC0285 | 770827 | 7440099 | 650 | 0 | -90 | 85 | 12 | 76 | 64 | 57 7 | 5 50 | 5 01 | 0 17 | 0 01 | 5 97 | |
| Coondiner | CNRC0286 | 770822 | 7440159 | 590 | 0 | -90 | 79 | no significant intercepts | |||||||||
| Coondiner | CNRC0287 | 770836 | 7440001 | 613 | 0 | -90 | 114 | 10 | 100 | 90 | 57 8 | 5 93 | 5 04 | 0 16 | 0 00 | 5 52 | |
| Coondiner | CNRC0288 | 770824 | 7439950 | 610 | 0 | -90 | 85 | 12 | 30 | 18 | 56 1 | 10 32 | 3 78 | 0 11 | 0 01 | 4 93 | |
| Coondiner | CNRC0289 | 770553 | 7440200 | 603 | 0 | -90 | 61 | 14 | 44 | 30 | 57 9 | 5 62 | 5 08 | 0 13 | 0 00 | 5 66 | |
| Coondiner | CNRC0290 | 770552 | 7440145 | 625 | 0 | -90 | 103 | 4 | 94 | 90 | 57 8 | 5 51 | 4 71 | 0 17 | 0 00 | 6 31 | |
| Coondiner | CNRC0291 | 770541 | 7439999 | 649 | 0 | -90 | 109 | 2 | 104 | 102 | 58 9 | 5 12 | 3 91 | 0 19 | 0 00 | 5 86 | |
| Coondiner | CNRC0292 | 770551 | 7440049 | 622 | 0 | -90 | 115 | 6 | 102 | 96 | 58 4 | 5 22 | 4 20 | 0 20 | 0 00 | 6 02 | |
| Coondiner | CNRC0293 | 770548 | 7440097 | 644 | 0 | -90 | 133 | 4 | 128 | 124 | 58 9 | 4 86 | 4 30 | 0 19 | 0 00 | 5 72 | |
| Coondiner | CNRC0294 | 770199 | 7440250 | 680 | 0 | -90 | 61 | 18 | 48 | 30 | 56 0 | 6 62 | 5 90 | 0 17 | 0 00 | 6 26 | |
| Coondiner | CNRC0295 | 770201 | 7440197 | 656 | 0 | -90 | 67 | 12 | 66 | 54 | 58 8 | 4 98 | 4 52 | 0 23 | 0 00 | 5 29 | |
| Coondiner | CNRC0296 | 770200 | 7440154 | 644 | 0 | -90 | 79 | 12 | 36 | 24 | 58 4 | 5 62 | 4 46 | 0 17 | 0 01 | 5 30 | |
| Coondiner | CNRC0297 | 770190 | 7440095 | 621 | 0 | -90 | 49 | 22 | 26 | 4 | 59 0 | 8 46 | 2 74 | 0 14 | 0 00 | 3 86 | |
| Coondiner | CNRC0298* | 770002 | 7440249 | 628 | 0 | -90 | 54 | 14 | 54 | 40 | 57 1 | 6 27 | 5 44 | 0 18 | 0 00 | 5 67 | |
| Coondiner | CNRC0299 | 769997 | 7440349 | 639 | 0 | -90 | 37 | 12 | 20 | 8 | 58 1 | 6 44 | 3 68 | 0 17 | 0 01 | 5 64 | |
| Coondiner | CNRC0300 | 769805 | 7440197 | 644 | 0 | -90 | 55 | no significant intercepts |
23
| QUARTERLY | |||||||||||||||||
| Project | Hole ID | MGA E | MGA N | AHD RL | Dip | Azimuth | End Depth |
From | To | Width | Fe | SiO2 | Al2O3 | P | S | LOI | |
| (m) | (m) | (m) | (º) | (º) | (m) | (m) | (m) | (m) | (%) | (%) | (%) | (%) | (%) | (%) | |||
| Coondiner | CNRC0301 | 769799 | 7440247 | 650 | 0 | -90 | 85 | 14 | 58 | 44 | 56 8 | 7 51 | 4 71 | 0 16 | 0 00 | 5 61 | |
| Coondiner | CNRC0302 | 769803 | 7440301 | 650 | 0 | -90 | 60 | 16 | 28 | 12 | 57 1 | 6 04 | 5 61 | 0 19 | 0 00 | 5 58 | |
| Coondiner | CNRC0303 | 769603 | 7440247 | 650 | 0 | -90 | 49 | no significant intercepts | |||||||||
| Coondiner | CNRC0304 | 769605 | 7440354 | 650 | 0 | -90 | 49 | 18 | 26 | 8 | 56 8 | 6 58 | 5 38 | 0 17 | 0 01 | 5 71 | |
| Coondiner | CNRC0305 | 769399 | 7440200 | 650 | 0 | -90 | 37 | no significant intercepts | |||||||||
| Coondiner | CNRC0306 | 769404 | 7440300 | 650 | 0 | -90 | 60 | ||||||||||
| Coondiner | CNRC0307 | 769402 | 7440399 | 650 | 0 | -90 | 49 | 16 | 30 | 14 | 55 5 | 7 29 | 6 06 | 0 17 | 0 01 | 6 29 | |
| Coondiner | CNRC0308 | 770002 | 7440153 | 647 | 0 | -90 | 55 | 10 | 18 | 8 | 55 9 | 9 22 | 4 24 | 0 08 | 0 01 | 5 82 | |
| Coondiner | CNRC0309 | 771304 | 7439840 | 634 | 0 | -90 | 37 | 4 | 18 | 14 | 56 6 | 6 49 | 5 65 | 0 16 | 0 00 | 5 95 | |
| Coondiner | CNRC0310 | 771356 | 7439788 | 633 | 0 | -90 | 37 | 2 | 22 | 20 | 57 8 | 5 66 | 4 81 | 0 16 | 0 02 | 5 65 | |
| Coondiner | CNRC0311 | 771210 | 7439936 | 644 | 360 | -60 | 36 | no significant intercepts | |||||||||
| Coondiner | CNRC0312 | 767197 | 7439851 | 616 | 0 | -90 | 60 | 26 | 30 | 4 | 55 6 | 8 08 | 5 94 | 0 07 | 0 01 | 5 51 | |
| Coondiner | CNRC0313 | 766601 | 7441106 | 603 | 0 | -90 | 55 | 24 | 42 | 18 | 56 6 | 8 33 | 4 54 | 0 17 | 0 00 | 5 23 | |
| Coondiner | CNRC0314 | 764699 | 7440904 | 605 | 0 | -90 | 79 | 48 | 62 | 14 | 58 7 | 4 78 | 3 98 | 0 21 | 0 00 | 6 03 | |
| Coondiner | CNRC0315 | 766800 | 7440331 | 609 | 0 | -90 | 55 | no significant intercepts | |||||||||
| Coondiner | CNRC0316 | 770552 | 7440248 | 601 | 0 | -90 | 31 | 18 | 26 | 8 | 56 4 | 7 10 | 5 37 | 0 14 | 0 01 | 5 93 | |
| Coondiner | CNRC0317 | 770551 | 7439951 | 637 | 0 | -90 | 109 | 14 | 86 | 72 | 59 6 | 5 56 | 3 86 | 0 19 | 0 01 | 4 61 | |
| Three Pools | TPRC0026 | 771996 | 7439026 | 655 | 0 | -90 | 97 | no significant intercepts | |||||||||
| Three Pools | TPRC0027 | 774432 | 7437702 | 611 | 0 | -90 | 67 | 6 | 24 | 18 | 56 7 | 6 03 | 5 53 | 0 16 | 0 02 | 6 24 | |
| Three Pools | TPRC0028 | 774113 | 7437960 | 552 | 0 | -90 | 120 | no significant intercepts | |||||||||
| Three Pools | TPRC0029 | 774114 | 7437852 | 563 | 0 | -90 | 93 | ||||||||||
| Three Pools | TPRC0030 | 774102 | 7437767 | 579 | 0 | -90 | 85 | 2 | 62 | 60 | 58 6 | 4 48 | 4 77 | 0 22 | 0 02 | 5 55 | |
| Three Pools | TPRC0031 | 773393 | 7437649 | 632 | 0 | -90 | 91 | no significant intercepts | |||||||||
| Three Pools | TPRC0032 | 773403 | 7437832 | 627 | 0 | -90 | 79 | ||||||||||
| Three Pools | TPRC0033 | 773404 | 7437762 | 628 | 0 | -90 | 79 | 8 | 54 | 46 | 57 6 | 6 06 | 5 17 | 0 19 | 0 01 | 5 48 | |
| Three Pools | TPRC0034 | 773417 | 7438088 | 622 | 0 | -90 | 66 | no significant intercepts | |||||||||
| Three Pools | TPRC0035 | 772497 | 7438006 | 602 | 0 | -90 | 73 | ||||||||||
| Three Pools | TPRC0036 | 772502 | 7437775 | 546 | 0 | -90 | 79 | ||||||||||
| Kalgan Creek | KRC0117 | 782622 | 7433800 | 507 | 0 | -90 | 85 | 0 | 6 | 6 | 60 0 | 4 20 | 2 20 | 0 10 | 0 02 | 5 79 | |
| Kalgan Creek | KRC0118 | 782621 | 7433900 | 543 | 0 | -90 | 139 | 10 | 126 | 116 | 58 4 | 4 91 | 4 93 | 0 18 | 0 00 | 5 48 | |
| Kalgan Creek | KRC0119 | 782807 | 7433877 | 552 | 0 | -90 | 109 | 0 | 98 | 98 | 60 1 | 2 53 | 4 68 | 0 22 | 0 01 | 5 54 | |
| Kalgan Creek | KRC0120 | 782508 | 7433830 | 477 | 0 | -90 | 37 | 4 | 12 | 8 | 56 6 | 7 13 | 3 61 | 0 16 | 0 02 | 6 60 | |
| Kalgan Creek | KRC0121 | 782540 | 7433910 | 539 | 0 | -90 | 109 | 48 | 92 | 44 | 57 7 | 6 30 | 4 93 | 0 18 | 0 01 | 4 96 | |
| Kalgan Creek | KRC0122 | 782802 | 7433780 | 556 | 0 | -90 | 55 | 0 | 12 | 12 | 60 4 | 4 75 | 3 39 | 0 12 | 0 12 | 4 21 | |
| Kalgan Creek | KRC0123 | 782801 | 7433831 | 550 | 0 | -90 | 100 | 2 | 74 | 72 | 61 1 | 2 99 | 3 85 | 0 19 | 0 01 | 4 79 | |
| Kalgan Creek | KRC0124 | 783003 | 7433706 | 552 | 0 | -90 | 67 | 2 | 30 | 28 | 58 8 | 3 35 | 4 33 | 0 24 | 0 01 | 6 44 | |
| Kalgan Creek | KRC0125 | 783202 | 7433642 | 537 | 0 | -90 | 61 | 0 | 36 | 36 | 59 9 | 3 93 | 3 72 | 0 15 | 0 01 | 5 46 | |
| Kalgan Creek | KRC0126 | 783606 | 7433597 | 497 | 0 | -90 | 73 | 12 | 62 | 50 | 59 2 | 4 25 | 4 47 | 0 16 | 0 01 | 5 67 | |
| Kalgan Creek | KRC0127 | 784004 | 7433460 | 531 | 0 | -90 | 55 | 14 | 46 | 32 | 56 9 | 6 26 | 4 40 | 0 13 | 0 01 | 7 25 | |
| Kalgan Creek | KRC0128 | 784198 | 7433425 | 532 | 0 | -90 | 91 | 26 | 70 | 44 | 59 3 | 4 33 | 4 06 | 0 17 | 0 01 | 5 93 |
24
| QUARTERLY | |||||||||||||||||
| Project | Hole ID | MGA E | MGA N | AHD RL | Dip | Azimuth | End Depth |
From | To | Width | Fe | SiO2 | Al2O3 | P | S | LOI | |
| (m) | (m) | (m) | (º) | (º) | (m) | (m) | (m) | (m) | (%) | (%) | (%) | (%) | (%) | (%) | |||
| Kalgan Creek | KRC0129* | 784405 | 7433374 | 527 | 0 | -90 | 78 | 24 | 78 | 54 | 59 7 | 3 67 | 4 23 | 0 17 | 0 01 | 5 84 | |
| Kalgan Creek | KRC0130 | 784396 | 7433336 | 528 | 0 | -90 | 67 | 10 | 54 | 44 | 57 4 | 5 63 | 4 37 | 0 13 | 0 01 | 7 05 | |
| Kalgan Creek | KRC0131 | 784804 | 7433230 | 505 | 0 | -90 | 103 | 28 | 94 | 66 | 60 2 | 2 72 | 4 30 | 0 19 | 0 01 | 5 96 | |
| Kalgan Creek | KRC0132 | 784802 | 7433186 | 544 | 0 | -90 | 79 | 28 | 70 | 42 | 60 8 | 3 65 | 3 31 | 0 18 | 0 01 | 5 33 | |
| Kalgan Creek | KRC0133 | 784804 | 7433140 | 532 | 0 | -90 | 49 | assays awaited | |||||||||
| Kalgan Creek | KRC0134 | 785002 | 7433110 | 525 | 0 | -90 | 79 | ||||||||||
| Kalgan Creek | KRC0135 | 785202 | 7433092 | 526 | 0 | -90 | 79 | ||||||||||
| Kalgan Creek | KRC0136 | 785200 | 7433051 | 519 | 0 | -90 | 79 | ||||||||||
| Kalgan Creek | KRC0137 | 785402 | 7432955 | 529 | 0 | -90 | 67 | ||||||||||
| Kalgan Creek | KRC0138 | 785193 | 7433002 | 537 | 0 | -90 | 67 | ||||||||||
| Kalgan Creek | KRC0139 | 785607 | 7432960 | 484 | 0 | -90 | 60 | ||||||||||
| Kalgan Creek | KRC0140 | 785607 | 7432917 | 473 | 0 | -90 | 49 | ||||||||||
| Kalgan Creek | KRC0141 | 785818 | 7432842 | 529 | 0 | -90 | 55 | ||||||||||
| Kalgan Creek | KRC0142 | 785996 | 7432778 | 524 | 0 | -90 | 67 | ||||||||||
| Kalgan Creek | KRC0143 | 782608 | 7433763 | 553 | 0 | -90 | 67 | ||||||||||
| Kalgan Creek | KRC0144 | 782808 | 7433732 | 557 | 0 | -90 | 49 | ||||||||||
| Kalgan Creek | KRC0145 | 782600 | 7433340 | 541 | 0 | -90 | 49 | ||||||||||
| Kalgan Creek | KRC0146 | 782433 | 7433367 | 476 | 0 | -90 | 49 | ||||||||||
| Kalgan Creek | KRC0147 | 782448 | 7433417 | 485 | 0 | -90 | 43 | ||||||||||
| Kalgan Creek | KRC0148 | 782802 | 7433245 | 534 | 0 | -90 | 61 | ||||||||||
| Kalgan Creek | KRC0149 | 782796 | 7433299 | 474 | 0 | -90 | 73 | ||||||||||
| Kalgan Creek | KRC0150 | 782805 | 7433343 | 493 | 0 | -90 | 55 | ||||||||||
| Kalgan Creek | KRC0151 | 782998 | 7433205 | 530 | 0 | -90 | 43 |
- hole ends in mineralisation
25
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
| Name of entity | |
|---|---|
| BROCKMAN MINING LIMITED | |
| ABN ARBN 143 211 867 |
|
| ARBN 143 211 867 | 30 June 2014 |
Consolidated statement of cash flows
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 1.3 1.4 1.5 1.6 1.7 Payments for (a) exploration & evaluation (b) development (c) production (d) administration Dividends received Interest and other items of a similar nature received Interest and other costs of finance paid Income taxes paid Other (provide details if material) 1.7 (a) Receipts from transport services 1.7 (b) Net advance from related parties Net operating cash flows |
Current quarter HK$’000 |
Restated Year to date (12 months) HK$’000 |
|---|---|---|
| 8,425 (20,517) — (6,120) (13,574) — 389 — — — 802 |
54,641 (87,972) — (37,496) (138,262) — 5,164 (105) 854 72,972 2,087 |
|
| (30,595) | (128,117) | |
| Cash flows related to investing activities 1.8 1.9 1.10 1.11 1.12 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets Loans to other entities Loans repaid by other entities Other (provide details if material) Net investing cash flows |
— — (119) 145 — — — — — |
— (81,469) (1,744) 322 34,000 529 — — — |
| 26 | (48,362) |
- See chapter 19 for defined terms.
Appendix 5B Page 26
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
(30,569) | (176,479) |
|---|---|---|
| Cash flows related to financing activities 1.14 1.15 1.16 1.17 1.18 1.19 Proceeds from issues of shares, options, etc. Proceeds from sale of forfeited shares Proceeds from borrowings Repayment of borrowings Dividends paid Other (provide details if material) (a) Acquisition of additional interest in a subsidiary (b) Proceeds from assignment of debt (c) Proceeds from issue of bond (d) Cash backed performance bond guarantee Net financing cash flows |
— — — — — — — — — |
163,800 — — (4,998) — (45,000) 11,000 31,200 2,010 |
| — | 158,012 | |
| 1.20 1.21 Net decrease in cash held Cash at beginning of quarter/year to date Exchange rate adjustments to item 1.20 Cash and cash equivalents included in assets of disposal group 1.22 Cash at end of quarter |
(30,569) 253,744 521 — |
(18,467) 252,564 (1,290) (9,111) |
| 223,696 | 223,696 |
Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities
| 1.23 Aggregate amount of payments to the parties included in item 1.2 1.24 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter HK$’000 |
|---|---|
| 2,261 | |
| — |
- 1.25 Explanation necessary for an understanding of the transactions
1.23 Being payment of executive directors’ salary and non-executive directors’ fees. 1.2(d) Includes human resources service fees of HK$72,000 paid to a company in which a director of the company has beneficial interest.
- See chapter 19 for defined terms.
Appendix 5B Page 27
01/05/2013
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Non-cash financing and investing activities
- 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
Nil
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
Nil
Financing facilities available
Add notes as necessary for an understanding of the position.
| 3.1 Loan facilities 3.2 Credit standbyarrangements |
Amount available HK$’000 |
Amount used HK$’000 |
|---|---|---|
| — | — | |
| — | — |
Estimated cash outflows for next quarter
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
HK$’000 |
|---|---|
| (49,395) | |
| — | |
| (6,887) | |
| (18,742) | |
| Total | (75,024) |
Reconciliation of cash
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter HK$’000 |
Previous quarter HK$’000 |
|---|---|---|
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other(provide details) |
158,030 | 176,874 |
| 65,666 | 76,870 | |
| — | — | |
| — | — | |
| Total: cash at end ofquarter(item 1.22) | 223,696 | 253,744 |
- See chapter 19 for defined terms.
Appendix 5B Page 28
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
| 6.1 Interests in mining tenements and petroleum tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements and petroleum tenements acquired or increased |
Tenement reference and location |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| E47/1936 E47/3104 E46/921 E46/979 E45/3144 E47/2176 E47/2650 E47/1845 E47/2622 E47/2623 E47/2353 E47/2354 E47/2698 |
Tenement surrendered Application withdrawn Tenement surrendered Tenement surrendered Tenement surrendered Application withdrawn Application withdrawn Tenement surrendered Application withdrawn Application withdrawn Application withdrawn Application withdrawn Application withdrawn |
100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% |
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% |
|
| E47/3151 E47/3152 E45/4410 |
Application lodged Application lodged Application lodged |
0% 0% 0% |
100% 100% 100% |
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (description) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemptions |
||||
| 7.3 +Ordinary securities 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs |
8,381,982,131 | 8,381,982,131 | ||
- See chapter 19 for defined terms.
Appendix 5B Page 29
01/05/2013
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
||||
|---|---|---|---|---|
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
15,000,000 83,400,000 176,200,000 7,200,000 153,200,000 |
15,000,000 | Exercise price A$0.2 HK$0.72 HK$0.717-HK$0.967 HK$0.717-HK$0.967 HK$0.717-HK$0.967 |
Expiry date 30 September 2014 13 December 2015 14 January 2016 28 February 2016 20 May 2016 |
| 300,000 | HK$0.717-HK$0.967 | 30 April 2014 | ||
| 7.11 Debentures (totals only) |
||||
| 7.12 Unsecured notes (totals only) |
Compliance statement
-
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
-
2 This statement does / ~~does not* (delete one)~~ give a true and fair view of the matters disclosed.
-
See chapter 19 for defined terms. Appendix 5B Page 30
01/05/2013
Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report
Sign here:
==> picture [120 x 79] intentionally omitted <==
Date: 30 July 2014
(Company secretary)
Print name: Chan Kam Kwan, Jason
Notes
-
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
-
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
-
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.
-
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
-
5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
-
See chapter 19 for defined terms. Appendix 5B Page 31