Brockman Mining Limited Interim / Quarterly Report 2014

Jul 30, 2014

48994_rns_2014-07-30_d5f00dab-d152-4a13-8ad5-a97711e7637e.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [596 x 52] intentionally omitted <==

==> picture [292 x 70] intentionally omitted <==

Incorporated in Bermuda with limited liability SEHK Stock Code: 159 ASX Stock Code: BCK

==> picture [161 x 297] intentionally omitted <==

QUARTERLY REPORT For the quarter ended 30 June 2014

— 2 —

==> picture [596 x 490] intentionally omitted <==

----- Start of picture text -----

||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|QUARTERLY ACTIVITIES REPORT|30 June 2014|
|TABLE OF CONTENTS|
|1.|HIGHLIGHTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|3|
|2.|CORPORATE REVIEW|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|3.|MARILLANA IRON ORE PROJECT (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|3 .1|Rail and port infrastructure .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|4|
|4.|REGIONAL IRON ORE PROJECTS (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|5|
|4 .1|Ophthalmia exploration .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|5|
|4 .2|Ophthalmia development .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|10|
|4 .3|West Pilbara exploration .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|11|
|4 .4|Competent Person’s Statement .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|11|
|4 .5|JORC 2012 TABLE 1 .|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|12|
|5.|TENEMENTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|17|
|6.|DAMAJIANSHAN MINE (100% INTEREST)|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|19|
|7.|CORPORATE PROFILE|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|20|
|8.|GLOSSARY|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|21|
|9.|TABLE OF MATERIAL DRILL RESULTS|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|22|
|10.|APPENDIX 5B|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|.|26|

----- End of picture text -----

2

QUARTERLY ACTIVITIES REPORT 30 June 2014

1. HIGHLIGHTS

  • Brockman participated in a court-facilitated mediation, requested by The Pilbara Infrastructure Pty Ltd (TPI), to pursue a commercial resolution, which could include access or haulage on 8 May 2014 before the Hon Chief Justice Martin, the Chief Justice of the Supreme Court of Western Australia. The mediation was adjourned for the parties to consider their positions. The mediation is without prejudice to the status of the Supreme Court proceedings currently underway or to Brockman’s position regarding its access application .

  • A total of 137 holes for 9,668 m was RC drilled during the quarter at the Ophthalmia Project. It has been conducted to upgrade Inferred Mineral Resources to the Indicated category primarily at the Coondiner (Pallas and Castor deposits)and Kalgan Creek Deposits, with limited drilling also undertaken at the Three Pools prospect.

  • Results have largely confirmed the previously interpreted geological model, but with a thicker core of mineralisation encountered in some deposits. Better results include: Pallas Deposit

  • 126 m at 59 .5% Fe from 34 m in hole CNRC0270; and 124 m at 58 .9% Fe from 4 m in hole CNRC0293 .

Castor Deposit

  • 124 m at 58 .8% Fe from 28 m in hole CNRC0233;

  • 118 m at 59.2% Fe from 20 m in hole CNRC0229 (ended in mineralisation); and 102 m at 58 .9% Fe from 2 m in hole CNRC0291 .

Kalgan Creek Deposit

  • 116 m at 58.4% Fe from 10 m in hole KRC0118; and

  • 98 m at 60.1% Fe from 0 m in hole KRC0119.

  • Subsequent to the end of the quarter, Mr. Colin Paterson has been appointed as Chief Executive Officer of Brockman Mining Australia Pty Ltd upon the resignation by Mr Russell Tipper .

3

QUARTERLY ACTIVITIES REPORT 30 June 2014

2. CORPORATE REVIEW

Cash position

The consolidated cash position of the Group as at 30 June 2014 was HK$223.7 million .

Corporate

During the quarter, the Board welcomed Mr. Choi Yue Chun, Eugene as an independent non-executive director of the Company, with effect from 12 June 2014. Mr. Choi Yue Chun, Eugene, aged 41, holds a Bachelor of Laws degree from The University of Hong Kong, was admitted as a solicitor of the High Court of Hong Kong in 1997 and is a member of the Law Society of Hong Kong. He has over 15 years of experience in the legal field, specialising in corporate finance and compliance matters for listed companies in Hong Kong. Mr. Choi is currently the senior legal counsel of RUSAL Global Management B .V .

Subsequent to the end of the Quarter Brockman announced the resignation of Mr. Russell Tipper as Chief Executive Officer, Brockman Mining Australia Pty Ltd, a wholly-owned subsidiary of the Company, and the appointment of Mr . Colin Paterson as the new Chief Executive Officer of Brockman Mining Australia Pty Ltd with immediate effect .

Mr. Paterson, previously held the position of General Manager Resources and Business Development. He brings a wealth of project and strategic experience having been a founding Director of Brockman Resources Limited, acquired by the Company in 2012, and is an integral member of the team progressing infrastructure solutions for the project. Mr. Paterson has over 30 years’ experience in the resources sector covering a diverse range of geological environments

throughout Australia, but principally in Pilbara iron ore as well as gold and nickel exploration in the Archaean of Western Australia. He has extensive experience in the technical supervision of exploration projects; resource development, project generation and project evaluations.

3. M A R I L L A N A I R O N O R E PROJECT (100% INTEREST)

3.1 Rail and port infrastructure

Rail Access

Brockman is seeking access rights to The Pilbara Infrastructure Pty Ltd’s (“TPI’s”) below-rail infrastructure under the Western Australian Railways (Access) Code 2000 (“Code”), to allow it to haul up to 20 Mtpa of hematite iron ore product from its Marillana Iron Ore Project (“Marillana”), for a term of 20 years, to Port Hedland where North West Infrastructure (“NWI”) has a capacity allocation of 50 Mtpa for iron ore export from South West Creek in the Inner Harbour.

Brockman proposes to procure the necessary spur lines and associated infrastructure to connect Marillana with the TPI railway and the TPI railway to the proposed NWI facilities in Port Hedland, which will include unloading, stockpiling and ship loading facilities in South West Creek, Port Hedland.

Following determinations by the ERA, setting Floor and Ceiling Costs (“F&C Costs”) for the TPI railway and approving the conduct of negotiations between Brockman and TPI pursuant to section 10 of the Code, on 7 October 2013, TPI commenced legal proceedings in the WA Supreme Court, for a Judicial Review of the F&C Costs determination and the section 10 approval, and contemporaneously commenced an action challenging the

4

QUARTERLY ACTIVITIES REPORT 30 June 2014

validity of Brockman’s access proposal (Writ Action). The trial on both the Writ Action and the Judicial Review has been listed for hearing between 18 August and 22 August inclusive .

Brockman is continuing to advance the preparation of submissions to satisfy TPI’s request for further information, regarding Brockman’s managerial and financial capability (section 14) and the availability of capacity (sections 15), as required under the Code. As part of that process, Brockman lodged an application with the Supreme Court for a mandatory injunction, seeking orders that TPI properly comply with its statutory obligations under the ‘request for information’ process under the Code, to provide original data relating to train running times . During the quarter, TPI supplied certain data, subject to confidentiality orders, to Brockman’s experts for validation of the TPI rail capacity model.

Mediation

North West Infrastructure

NWI has continued to work with the Port Hedland Port Authority, on commercial terms for a lease and development agreement to govern the development of the proposed NWI port facilities in the Port Hedland harbour.

4. R E G I O N A L I R O N O R E PROJECTS (100% INTEREST)

4.1 Ophthalmia exploration

The Ophthalmia Project, located north of Newman in the East Pilbara region of Western Australia, is the most significant iron ore project for the company outside of its flagship Marillana project. Since iron ore was discovered in August 2011, Brockman has reported a total of 305 Mt of Indicated and Inferred Mineral Resources (Refer ASX announcement dated 10 March 2014 and Table 2) from three separate areas/deposits at Ophthalmia, i.e., Sirius, Coondiner and Kalgan Creek (Figure 1).

As part of the rail access proceedings, TPI had requested, and, subject to certain conditions, Brockman agreed to a courtfacilitated mediation, which occurred on 8 May 2014 before the Hon. Chief Justice Martin, the Chief Justice of the Supreme Court. The mediation, which remains subject to the confidentiality provisions of the Supreme Court, was adjourned for the parties to consider their positions . The mediation is without prejudice to the status of the Supreme Court proceedings currently underway or to Brockman's position regarding its access application .

5

QUARTERLY ACTIVITIES REPORT 30 June 2014

==> picture [385 x 282] intentionally omitted <==

Figure 1: General location map of Ophthalmia Iron Ore Project

A program of reverse circulation (RC) drilling at Ophthalmia, predominantly an infill and extension drilling programme at the Coondiner and Kalgan Creek Deposits, has been conducted to upgrade Inferred Mineral Resources to the Indicated category and close off existing zones of mineralisation . Limited exploration of other targets at Three Pools was also carried out. Drilling commenced in early April, with a total of 137 holes for 9,668 m drilled by the end of June. The total drilling includes 91 holes for 6,296 m at Coondiner, 35 holes for 2,442 m at Kalgan Creek and 11 holes for 930 m at Three Pools. Drilling was mostly carried out with a conventional truck-mounted RC drilling

rig, but a track-mounted rig was used for the drilling at Three Pools . Difficult site access and reliability issues with the track mounted drill rig meant that the drilling at Three Pools was only able to test targets in the southeast of the licence and could not test the immediate strike extensions of the existing Top Forge prospect . Drilling is expected to finish by late July, with preparation of new Mineral Resource estimates for Coondiner and Kalgan Creek to commence following final receipt of all assays.

6

QUARTERLY ACTIVITIES REPORT 30 June 2014

All significant intersections for the June quarter are listed in Table 1 and a complete list of drill holes and intersections is provided in Appendix A. Drill hole locations are shown in Figures 2 to 4.

==> picture [512 x 125] intentionally omitted <==

----- Start of picture text -----

Hole ID From To Width Fe CaFe + SiO2 Al2O3 P S LOI
(m) (m) (m) (%) (%) (%) (%) (%) (%) (%)
Coondiner Prospect
CNRC0229 20 138 118 59 .2 62 .97 3 .45 4 .73 0 .20 0 .01 6 .06
CNRC0230 20 96 76 59 .7 63 .39 4 .09 3 .74 0 .17 0 .00 5 .89
CNRC0233 28 152 124 58 .8 62 .19 4 .68 4 .52 0 .19 0 .00 5 .41
CNRC0234 22 92 70 60 .3 63 .29 4 .09 3 .93 0 .16 0 .00 4 .79
CNRC0235 20 70 50 59 .5 62 .72 5 .18 3 .78 0 .12 0 .00 5 .20
CNRC0237 24 74 50 56 .9 60 .81 6 .37 4 .88 0 .13 0 .01 6 .48
CNRC0268 28 118 90 59 .7 62 .76 4 .82 3 .94 0 .23 0 .00 4 .88
----- End of picture text -----

Hole ID From
(m)
To
(m)
Width
(m)
Fe
(%)
CaFe
+
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
S
(%)
LOI
(%)
Coondiner Prospect
CNRC0229 20 138 118 59 2 62 97 3 45 4 73 0 20 0 01 6 06
CNRC0230 20 96 76 59 7 63 39 4 09 3 74 0 17 0 00 5 89
CNRC0233 28 152 124 58 8 62 19 4 68 4 52 0 19 0 00 5 41
CNRC0234 22 92 70 60 3 63 29 4 09 3 93 0 16 0 00 4 79
CNRC0235 20 70 50 59 5 62 72 5 18 3 78 0 12 0 00 5 20
CNRC0237 24 74 50 56 9 60 81 6 37 4 88 0 13 0 01 6 48
CNRC0268 28 118 90 59 7 62 76 4 82 3 94 0 23 0 00 4 88
CNRC0270 34 160 126 59 5 62 71 4 58 4 30 0 19 0 00 5 11
CNRC0271 18 112 94 59 0 62 35 4 88 4 46 0 15 0 00 5 37
CNRC0272 14 88 74 57 9 61 27 5 17 5 34 0 21 0 00 5 44
CNRC0277 18 82 64 59 8 63 15 4 18 4 00 0 19 0 00 5 30
CNRC0278 16 110 94 59 7 62 98 3 65 4 76 0 20 0 00 5 24
CNRC0284* 18 109 91 59 5 63 60 4 03 3 55 0 17 0 00 6 40
CNRC0285 12 76 64 57 7 61 38 5 50 5 01 0 17 0 01 5 97
CNRC0287 10 100 90 57 8 61 21 5 93 5 04 0 16 0 00 5 52
CNRC0290 4 94 90 57 8 61 66 5 51 4 71 0 17 0 00 6 31
CNRC0291 2 104 102 58 9 62 55 5 12 3 91 0 19 0 00 5 86
CNRC0292 6 102 96 58 4 62 18 5 22 4 20 0 20 0 00 6 02
CNRC0293 4 128 124 58 9 62 48 4 86 4 30 0 19 0 00 5 72
CNRC0295 12 66 54 58 8 62 08 4 98 4 52 0 23 0 00 5 29
CNRC0317 14 86 72 59 6 62 43 5 56 3 86 0 19 0 01 4 61
Three Pools Prospect
TPRC0030 2 62 60 58 6 62 07 4 48 4 77 0 22 0 02 5 55
Kalgan Creek Prospect
KRC0118 10 126 116 58 4 61 80 4 91 4 93 0 18 0 00 5 48
KRC0119 0 98 98 60 1 63 68 2 53 4 68 0 22 0 01 5 54
KRC0123 2 74 72 61 1 64 13 2 99 3 85 0 19 0 01 4 79
KRC0126 12 62 50 59 2 62 75 4 25 4 47 0 16 0 01 5 67
KRC0129 24 78 54 59 7 63 37 3 67 4 23 0 17 0 01 5 84
KRC0131 28 94 66 60 2 64 00 2 72 4 30 0 19 0 01 5 96

Table1 Significant BID drill intersections at Ophthalmia for the June quarter 2014

  • CaFe represents calcined Fe and is calculated using the formula CaFe = Fe%/((100-LOI)/100) * hole ends in mineralisation

Notes: Intersections reported at 54% Fe lower cut-off grade, minimum thickness 50 m including a maximum of 4 m of internal waste. Analyses by Ultratrace Laboratories using XRF spectrometry.

7

==> picture [596 x 338] intentionally omitted <==

----- Start of picture text -----

QUARTERLY ACTIVITIES REPORT 30 June 2014
Deposit Class Tonnes Fe CaFe SiO2 Al2O3 S P LOI
(Mt) (%) (%) (%) (%) (%) (%) (%)
Indicated 12 .5 59 .25 62 .64 4 .02 4 .79 0 .007 0 .20 5 .41
Kalgan Creek1 Inferred 39 .7 59 .07 62 .55 4 .53 4 .55 0 .005 0 .17 5 .56
Sub Total 52.1 59.11 62.56 4.41 4.60 0.006 0.18 5.52
Coondiner Indicated 82 .5 58 .1 61 .7 5 .61 4 .48 0 .008 0 .17 5 .76
(Pallas and Inferred 46 .4 58 .7 62 .1 5 .37 4 .40 0 .006 0 .18 5 .44
Castor) Sub Total 128.9 58.3 61.8 5.52 4.45 0.008 0.17 5.64
Indicated 105 .0 60 .35 63 .67 3 .54 3 .97 0 .007 0 .18 5 .22
Sirius Inferred 19 .0 60 .15 63 .41 4 .09 3 .83 0 .009 0 .17 5 .14
Sub Total 124.0 60.32 63.63 3.62 3.95 0.007 0.18 5.20
Indicated 200 .0 59 .35 62 .77 4 .42 4 .23 0 .007 0 .18 5 .45
Ophthalmia
Inferred 105 .1 59 .10 62 .50 4 .82 4 .35 0 .006 0 .17 5 .43
Project
Total 305.0 59.27 62.68 4.56 4.27 0.007 0.17 5.45
----- End of picture text -----*

Table 2: Ophthalmia Mineral Resource (DSO) Summary

  • CaFe represents calcined Fe and is calculated by Brockman using the formula CaFe = Fe% / ((100-LOI)/100)

  • ** Tonnes may not add up due to rounding

Coondiner

Assay results have been received for all holes drilled at Coondiner . Results from the Pallas Deposit have largely confirmed the previously interpreted geological model, but have also demonstrated continuity of the south-eastern extension to the deposit first identified in late 2013 . Mineralisation has been outlined over a 600 m strike length, beyond the existing Mineral Resource boundary, having a central core over 100 m thick (Figure 2), including:

Drilling at the Castor Deposit has also confirmed the previous interpretation and extended the limits of the mineralisation by 400 m to the east (Figure 3). Results have also demonstrated that the deposit contains a central core over 100 m thick, with better intersections listed below:

124 m at 58.8% Fe from 28 m in hole CNRC0233;

118 m at 59.2% Fe from 20 m in hole CNRC0229 (ended in mineralisation), and 102 m at 58.9% Fe from 2 m in hole CNRC0291.

126 m at 59.5% Fe from 34 m in hole CNRC0270; and

124 m at 58.9% Fe from 4 m in hole CNRC0293.

  • 1 The Mineral Resources for Kalgan Creek and Coondiner were prepared and first disclosed under JORC Code 2004. Refer the ASX announcements made 16/10/2012 and 4/12/2012 respectively. Neither has been updated to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported. All material assumptions and technical parameters, underpinning the estimates, continue to apply and have not materially changed, nor have the Competent Person’s findings been materially modified.

8

QUARTERLY ACTIVITIES REPORT 30 June 2014

==> picture [426 x 297] intentionally omitted <==

Figure 2 Pallas Deposit drill hole locations and drilling results

==> picture [426 x 225] intentionally omitted <==

Figure 3 Castor Deposit and Three Pools area drill hole locations and drilling results

9

QUARTERLY ACTIVITIES REPORT 30 June 2014

Kalgan Creek

Results have been received for 15 of the 35 holes drilled at Kalgan Creek. Results are generally in line with expectations, except for holes KRC0118 and KRC0119 drilled at the western end of the main deposit (Figure 4), which intersected thicker than expected zones of mineralisation, including:

116 m at 58.4% Fe from 10 m in hole KRC0118; and 98 m at 60.1% Fe from 0 m in hole KRC0119.

Additional drilling has been planned for July, to further test the extent of this thick zone of near surface mineralisation.

==> picture [426 x 301] intentionally omitted <==

Figure 4 Kalgan Creek Deposit drill hole locations and drilling results

Three Pools

Encouraging results have also been received from the 11 holes drilled at Three Pools, where DSO grade mineralisation, up to a maximum thickness of 60 m, was intersected in each of three widely spaced traverses over a total strike length of 1,000 m (Figure 3). Problems with the trackmounted RC rig, required to drill in the hilly

terrain at Three Pools, prevented further drilling of these prospects in the current programme .

4.2 Ophthalmia development

Preliminary metallurgical test work has been carried out on core samples from the Sirius Deposit . A baseline pot grate sinter test, carried out at the China Iron & Steel

10

QUARTERLY ACTIVITIES REPORT 30 June 2014

Research Institute (CISRI), consisted of one substitution test for a Pilbara competitor’s iron ore fines product . The Ophthalmia ore produced a sinter product of comparable quality with similar yield, productivity and fuel consumption rates to that of the competitor product .

4.3 West Pilbara exploration

A programme of infill RC drilling has been planned for the coming quarter, to facilitate an upgrade of the Mineral Resources at the Duck Creek Deposit.

4.4 Competent Person’s Statement

Comminution testwork, performed by ALS Metallurgy, included unconfined compressive strength (UCS), crushing work index (CWi) and Bond abrasion index (Ai). The results of these tests have confirmed that the Ophthalmia ore is very weak, very soft, moderately abrasive and is likely to require low energy in the primary and secondary crushing circuits. Sizing analysis has shown that the ore grade is consistent across all of the size fractions, providing little opportunity to upgrade via conventional de-sliming processes.

The continuing positive exploration and testing results from Ophthalmia are particularly significant in supporting the development of rail and port infrastructure solutions for the Marillana Project.

As Ophthalmia is located only 80 km southeast of Marillana, there is the opportunity to either extend the proposed Marillana railway to Ophthalmia or to haul material by truck from Ophthalmia to Marillana for loading onto trains .

Following an in-house concept mining s t u d y o f t h e O p h t h a l m i a i r o n o r e deposits, that showed the Ophthalmia Project is potentially viable, Brockman has commenced a Pre-Feasibility Study for a 15 Mtpa DSO mining operation at Ophthalmia, predicated on the Company achieving a rail and port infrastructure solution for the Marillana Project. During the quarter, the Company appointed Scope Australia Pty Ltd as the lead engineering consultant in the Brockman integrated project team for implementation of the study.

The information in this report that relates to Mineral Resources at Coondiner and Kalgan Creek is based on information compiled by Mr James Farrell and Mr Aning Zhang .

Mr James Farrell, who is a Chartered P r o f e s s i o n a l a n d M e m b e r o f t h e Australasian Institute of Mining and Metallurgy and a full-time employee of Golder Associates Pty Ltd, produced the Mineral Resource estimates at Coondiner and Kalgan Creek based on the data and geological interpretations provided by Brockman. Mr Farrell has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’ . Mr Farrell consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .

Mr Aning Zhang, who is a Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of Brockman Mining Australia Pty Ltd, provided the geological interpretations and the drill hole data used for the Mineral Resource estimations at Coondiner and Kalgan Creek. Mr Zhang has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity that he is undertaking to qualify as a Competent Person as defined in the 2004 edition of

11

QUARTERLY ACTIVITIES REPORT 30 June 2014

the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves .’ Mr Zhang consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .

The information in this report that relates to Exploration Results is based on, and fairly represents information and supporting documentation compiled by Mr Aning Zhang. Mr Zhang, who is a Member of the Australasian Institute of Mining and Metallurgy and a full-time employee of

Brockman Mining Australia Pty Ltd, has sufficient experience that is relevant to the style of mineralisation, type of deposit under consideration and to the activity being undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration, Results, Mineral Resource and Ore Reserves’ . Mr Zhang consents to the inclusion in this report of the matters based on his information in the form and context that the information appears .

4.5 JORC 2012 TABLE 1

Section 1 Sampling Techniques and Data OPHTHALMIA PROJECT

==> picture [427 x 17] intentionally omitted <==

----- Start of picture text -----

Criteria Explanation
----- End of picture text -----

Criteria Explanation
Sampling techniques
Sampling carried out under Brockman protocols and QAQC
procedures as per industry best practice.

Reverse Circulation (RC) chip samples collected via a cone splitter
mounted on the side of the drill rig

For each two-metre interval the cone splitter produced two samples
(A and B) collected into pre-numbered calico bags and a bulk
sample collected in a pre-numbered polyweave bag_._

Quality of sampling during drilling was continuously monitored by an
experienced geologist and field assistant
Drilling techniques
Reverse Circulation (RC) drilling employed a 140mm diameter face-
sampling hammer

Drill holes are spaced on a nominal 200m (E-W) by 100m (N-S) grid
(Coondiner and Kalgan Creek).
Drill sample recovery
RC sample recovery is recorded as a percentage (to the nearest
10%) by the geologist and is based on how much of the sample is
returned from the cone splitter

A geologist and field assistant were present during drilling to ensure
that sample recovery was maximised and that samples were
representative. Any problems were immediately rectified.

No significant sample recovery problems were encountered.

Twinned RC and diamond drill holes show comparable assay results
indicating that wet drilling has not adversely affected the RC samples

Previous metallurgical testing shows that assay results are similar
across all size ranges.

12

QUARTERLY
Criteria Explanation
Logging
Logging of RC holes was at 1m intervals (Brockman procedure)
corresponding with 1m bulk samples recovered during drilling. This
level of detail supports appropriate Mineral Resource estimation,
mining studies and metallurgical studies

Geophysical data were collected from the RC holes (natural gamma,
gamma density, magnetic susceptibility & resistivity, and down-hole
deviation) by Surtron Technologies. Not all holes were open at depth,
which precluded 100% recovery of data from all of the drill holes.
Sub-sampling techniques
and sample preparation
Sampling technique — RC samples

Samples averaging about 3 kg each were collected from each two-
metre interval via a cone splitter

Samples were kept dry where possible.

The sample size is considered appropriate for correctly characterising
the mineralisation, based on the style of mineralisation (massive
goethite-hematite), the thickness and consistency of intersections,
the sampling methodology and percent value assay ranges for the
primary elements.
Sample preparation

Samples were dried at 105°C and weighed.

Samples were crushed to nominal -6.3 mm, with samples in excess of
2 kg being riffle split.

Samples were pulverised to 80% passing at 75 µm.
Quality control procedures

Field duplicate submitted every 25th sample (1:25).

‘Blind’ Certified Reference Material inserted every 25th sample (1:25).

Lab duplicates were randomly generated by a laboratory program,
typically about 1 in 20 samples (1:20).

Lab repeats were taken and standards inserted at a predetermined
level specified by the lab.

13

QUARTERLY
Criteria Explanation
Quality of assay data and
laboratory tests

All RC samples submitted to Nagrom Laboratory in Perth were
assayed for Fe, SiO2, Al2O3, TiO2, MnO, CaO, P, S, MgO, and K2O by
XRF and for LOI at 1000°C by thermogravimetric analysis (TGA).

Laboratory procedures are in line with ISO9001 Quality Management
System and appropriate for iron ore deposits.

Samples were dried at 105°C, weighed, crushed to a nominal -6.3mm
size, and then pulverised to 80% passing 75 micron.

A 0.8g sub-sample was collected and fused in 8g of 12:22 lithium
borate flux with 5% lithium nitrate additive. The resultant glass bead
was analysed by XRF.

Another 1–2g sub-sample was dried and ignited at 1000°C with LOI
calculated one constant mass was reached. LOI is the percentage
mass change due to igniting the dry sample.

There were no indications that samples were unrepresentative, with
all lab duplicate samples within 2.5% of the original sample value.

Samples have been collated, and will be sent to an umpire laboratory
as an independent check of the assay results.

Certified Reference Materials (CRMs) with a range of values
appropriate to the mineralisation were inserted at predefined intervals
by Brockman and randomly by the lab at set levels. Results from the
CRMs show that sample assay values are accurate and precise.

Analysis of field duplicate samples shows that greater than 95%
of pairs have less than 5% difference. Analysis of lab pulp repeats
indicates that the precision of samples is also within acceptable limits.
Verification of sampling
and assaying

Significant intersections have been independently verified by
alternative company personnel.

The Competent Person has visited site and inspected the sampling
process in the field, and has also inspected the laboratory.

Twinned RC and diamond drill holes show equivalent assay results.

Primary data are captured on Toughbook laptops using Ocris
software. The software has validation routines to prevent data entry
errors

All field data were sent by the geologist present during drilling to a
database management company (Expedio) in Perth and stored in a
secure SQL database.

Assay data were sent by the laboratory direct to Expedio and
uploaded into the SQL database.

No adjustments or calibrations were made to any assay data used in
the estimate

14

QUARTERLY
Criteria Explanation
Location of data points
All collars were initially surveyed by Brockman personnel using a
hand held GPS, and later by Bore Hole Geophysical Services using a
differential GPS with a nominal horizontal and vertical accuracy of
15cm

Down-hole gyroscopic surveys were conducted by Surtron
Technologies using a conventional gyroscope.

The grid system for Sirius is MGA_GDA94 Zone 50 and the vertical
datum is AHD.

A DEM for the project area was acquired by Fugro Spatial Solutions
with a quoted horizontal accuracy of 60 cm and a vertical accuracy
of 30 cm
Data spacing and
distribution

Drill holes are spaced on a nominal 200m (E-W) by 100m (N-S) grid
(Coondiner and Kalgan Creek).

This drill spacing is sufficient to establish the degree of geological and
grade continuity required under the 2012 JORC code.

Samples were collected at 2m intervals.
Orientation of data in
relation to geological
structure

Lithological units strike east-southeast and are folded about a series
of upright to slightly inclined, open to close folds. The mineralisation
envelope is also folded. All but two of the holes were drilled vertically,
with the other two holes drilled at 60° to the north in order to be
oriented perpendicular to mineralisation

Due to the varying intersection angles all results are defined as down-
hole widths.
Sample security
The chain of custody is managed by Brockman.

Samples were packed into polyweave bags and sealed, and then
placed inside Bulka Bags which were sealed by the geologist and
field assistant present during drilling

Samples were picked up from site by a local transport company and
deposited with Regal Transport, who delivered the samples to the
laboratory.

Once received at the laboratory, the samples were sorted and
securely stored until analysis.

The lab receipted samples received against the sample dispatch
documents
Audits or reviews
The database is maintained by an independent external consultant
(Expedio), who carried out routine checks and validations. Brockman
also conducted internal validation of the database Golder
conducted an external audit of the database with respect to
sampling and QAQC procedures in February 2014.

15

QUARTERLY
Criteria Explanation
Mineral tenement and
land tenure status

Exploration Prospects are located wholly within Exploration Leases
E47/1598, E47/1599, E47/2280 and E47/2291 which are 100% owned by
Brockman.

The tenements lie within the Nyiyaparli Native Title Claim (WC05/06).

At the time of reporting, there are no known impediments to
obtaining a licence to operate in the area, and the tenements are in
good standing
Exploration done by other
parties

No substantive previous exploration within E47/1598 and E47/1599 was
identified by Brockman. Previous RC drilling by Sheffield Resources on
E47/2280 identified BID mineralisation
Geology
Mineralisation on all four tenements consists of hematite-goethite ore
hosted within shaly BIF of the c. 2.49 Ga Boolgeeda Iron Formation
(upper Hamersley Group).

The prospects are located within the Ophthalmia Fold Belt about 20-
35 km northwest of Newman.
Drill hole information
Refer to the figures.
Data aggregation
methods

A nominal 54% Fe lower cut-off grade was used for reporting of
significant intercepts
Relationship between
mineralisation widths and
intercept lengths

Mineralisation at all Exploration Prospects defines a folded sub-
horizontal sheet. Overall, most holes were drilled perpendicular to
mineralisation, but because of the folding some holes are slightly or
moderately oblique to mineralisation. Therefore, all results are defined
as down-hole widths rather than true widths.
Diagrams
Maps of the deposits with interpretations of the stratigraphy and hole
collar positions are shown in Figures 2–4.
Balanced reporting
All results are reported.
Other substantive
exploration data

Detailed geological and structural mapping of the prospect has been
completed by Brockman geologists.

Cross-sections through Pallas, Castor, Kalgan Creek, and Three Pools
have been constructed in order to determine the structural and
stratigraphic controls on mineralisation

Preliminary metallurgical test work (size assaying and a single sinter
test) has been undertaken.
Further work
Updated Mineral Resources estimates will be prepared for Coondiner
and Kalgan Creek.

16

QUARTERLY
Project Location Type Tenement
number
Commodity Status Interest
held
Duck Creek West Pilbara E 47/1936 Iron Ore Granted 100%
Duck Creek West Pilbara E 47/3104 Iron Ore Application 100%
Ethel Creek East Pilbara E 46/0921 Iron Ore Granted 100%
Ethel Creek East Pilbara E 46/0979 Iron Ore Application 100%
Lalla Rookh North Pilbara E 45/3144 Iron Ore Granted 100%
Marillana East Pilbara E 47/2176 Iron Ore Application 100%
Mt Lockyer North Pilbara E 47/2650 Iron Ore Application 100%
Mt Stuart West Pilbara E 47/1845 Iron Ore Granted 100%
Ophthalmia East Pilbara E 47/2622 Iron Ore Application 100%
Ophthalmia East Pilbara E 47/2623 Iron Ore Application 100%
Tom Price West Pilbara E 47/2353 Iron Ore Application 100%
Tom Price West Pilbara E 47/2354 Iron Ore Application 100%
Tom Price West Pilbara E 47/2698 Iron Ore Application 100%

Tenements acquired during the Quarter

Project Location Type Tenement
number
Commodity Status Interest
held
Duck Creek West Pilbara E 47/3151 Iron Ore Application 100%
Duck Creek West Pilbara E 47/3152 Iron Ore Application 100%
Robertson Range West Pilbara E 45/4410 Iron Ore Application 100%

Tenements held at end of Quarter

==> picture [427 x 28] intentionally omitted <==

----- Start of picture text -----

Tenement Interest
Project Location Type number Commodity Status held
----- End of picture text -----

Project Location Type Tenement
number
Commodity Status Interest
held
Cheela Plains West Pilbara E 08/2264 Iron Ore Granted 100%
Chichester Range East Pilbara E 45/3693 Iron Ore Granted 100%
Duck Creek West Pilbara E 47/1725 Iron Ore Granted 100%
Duck Creek West Pilbara E 47/3151 Iron Ore Application 100%
Duck Creek West Pilbara E 47/3152 Iron Ore Application 100%
Fig Tree East Pilbara E 47/3023 Iron Ore Application 100%
Fig Tree East Pilbara E 47/3024 Iron Ore Application 100%
Fig Tree East Pilbara E 47/3025 Iron Ore Application 100%
Irwin Hills Goldfields E 39/1284 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields E 39/1307 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields E 39/1471 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields L 39/0163 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields P 39/4594 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields P 39/4595 Nickel/Cobalt Granted 40%
Irwin Hills Goldfields P 39/4682 Nickel/Cobalt Granted 40%

17

QUARTERLY
Project Location Type Tenement
number
Commodity Status Interest
held
Irwin Hills Goldfields M 39/1088 Nickel/Cobalt Application 40%
Irwin Hill Goldfields M 39/1090 Nickel/Cobalt Application 40%
Irwin Hill Goldfields M 39/1091 Nickel/Cobalt Application 40%
Irwin Hill Goldfields M 39/1092 Nickel/Cobalt Application 40%
Lalla Rookh North Pilbara E 45/3379 Iron Ore Granted 100%
Lalla Rookh North Pilbara E 45/3380 Iron Ore Granted 100%
Marillana East Pilbara E 47/1408 Iron Ore Granted 100%
Marillana East Pilbara L 45/0236 Iron Ore Application 100%
Marillana East Pilbara L 45/0238 Iron Ore Application 100%
Marillana East Pilbara L 46/0097 Iron Ore Application 100%
Marillana East Pilbara L 47/0369 Iron Ore Application 100%
Marillana East Pilbara L 47/0389 Iron Ore Application 100%
Marillana East Pilbara L 47/0408 Iron Ore Application 100%
Marillana East Pilbara L 47/0544 Iron Ore Application 100%
Marillana East Pilbara L 47/0566 Iron Ore Application 100%
Marillana East Pilbara L 47/0567 Iron Ore Application 100%
Marillana East Pilbara L 52/0124 Iron Ore Application 100%
Marillana East Pilbara M 47/1414 Iron Ore Granted 100%
Millstream Hill East Pilbara E 47/2766 Iron Ore Application 100%
Mt Goldsworthy North Pilbara E 45/3931 Iron Ore Granted 100%
Mt Stevenson West Pilbara E 47/3105 Iron Ore Application 100%
Mt Stuart West Pilbara E 47/1850 Iron Ore Granted 100%
Mt Stuart West Pilbara E 47/2215 Iron Ore Granted 100%
Mt Stuart West Pilbara E 47/2976 Iron Ore Application 100%
Mt Stuart West Pilbara E 47/2993 Iron Ore Application 100%
Mt Stuart West Pilbara E 47/2994 Iron Ore Application 100%
Mt Stuart West Pilbara P 47/1711 Iron Ore Application 100%
Mt Stuart West Pilbara P 47/1712 Iron Ore Application 100%
Mt Stuart West Pilbara P 47/1713 Iron Ore Application 100%
Mt Stuart West Pilbara P 47/1714 Iron Ore Application 100%
Nimingara North Pilbara E 45/4051 Iron Ore Application 100%
Ophthalmia East Pilbara E 47/1598 Iron Ore Granted 100%
Ophthalmia East Pilbara E 47/1599 Iron Ore Granted 100%
Ophthalmia East Pilbara E 47/2280 Iron Ore Granted 100%
Ophthalmia East Pilbara E 47/2291 Iron Ore Granted 100%
Ophthalmia East Pilbara E 47/2594 Iron Ore Granted 100%
Ophthalmia East Pilbara P 47/1715 Iron Ore Application 100%
Pannawonica West Pilbara E 47/2409 Iron Ore Granted 100%
Pannawonica West Pilbara E 47/2410 Iron Ore Granted 100%
Paraburdoo West Pilbara E 47/1942 Iron Ore Granted 100%
Paraburdoo West Pilbara E 47/2081 Iron Ore Granted 100%
Pippingarra North Pilbara E 45/3948 Iron Ore Granted 100%
Port Hedland North Pilbara E 45/3939 Iron Ore Application 100%
Port Hedland North Pilbara L 45/0296 Iron Ore Application 100%
Red Hill West Pilbara E 08/2011 Iron Ore Granted 100%

18

QUARTERLY
Project Location Type Tenement
number
Commodity Status Interest
held
Red Hill West Pilbara E 08/2297 Iron Ore Granted 100%
Red Hill West Pilbara P 08/0628 Iron Ore Granted 100%
Red Hill West Pilbara P 08/0629 Iron Ore Granted 100%
Robertson Range West Pilbara E 45/4410 Iron Ore Application 100%
Shovelanna East Pilbara E 46/0781 Iron Ore Granted 100%
Shovelanna East Pilbara E 52/2238 Iron Ore Granted 100%
Tom Price West Pilbara E 47/2098 Iron Ore Granted 100%
Tom Price West Pilbara E 47/2355 Iron Ore Application 100%
Tom Price West Pilbara E 47/2455 Iron Ore Application 100%
Tom Price West Pilbara E 47/2699 Iron Ore Application 100%
Tom Price West Pilbara E 47/2700 Iron Ore Application 100%
Vivash East Pilbara E 47/3064 Iron Ore Application 100%
Vivash East Pilbara E 47/3065 Iron Ore Application 100%
West Hamersley West Pilbara E 47/1603 Iron Ore Granted 100%
West Hamersley West Pilbara E 47/2667 Iron Ore Application 100%
West Hamersley West Pilbara E 47/2904 Iron Ore Application 100%
West Hamersley West Pilbara E 47/2905 Iron Ore Application 100%
West Hamersley West Pilbara E 47/3054 Iron Ore Application 100%
Western Gate
Well
West Pilbara E 45/4240 Iron Ore Application 100%

6. DAMAJIANSHAN MINE (100% INTEREST)

During the quarter ended 30 June 2014, cash receipts from product sales of approximately RMB6.7 million (RMB9.6 m i l l i o n , M a r c h 2 0 1 4 q u a r t e r ) w e r e recorded . The decrease in cash receipts from product sales mainly attributed from decrease in sales volume of copper concentrate as a result of seasonal reductions in production during the quarter ended 31 March 2014 .

Cash payments for production associated with mining operations during the quarter amounted to approximately RMB4.9 million (RMB6.6 million, March 2014 quarter).

Production activities resumed after the long holidays and a rise in productivity was recorded. Cash payments for exploration activities and development recorded at RMB1.3 million (RMB1.4 million, March 2014). Drilling activities were continued during the quarter with approximately 714m recorded (322m, March 2014 quarter).

Jun’ 14
Quarter
(Tonnes)
Mar’ 14
Quarter
(Tonnes)
Variance
%
Ore mined and delivered to stockpile 52,124 12,608 313%
Ore processed 26,206 7,864 233%
Concentrate produced (metal tonnes) 188 55 242%
Concentrate sold (metal tonnes) 72 126 (43)%

19

QUARTERLY ACTIVITIES REPORT 30 June 2014

Mining license

The mining right certificate has been obtained in June 2013, such license granted an extension of the mining right in Damajianshan Mine for one year which expired in June 2014 .

The renewal of the short-term mining right certificate is in progress and the management expects that such renewal will be granted soon.

With reference to an independent legal opinion received by Luchun Xingtai Mining Co., Ltd (“Luchun”) in February 2014, there is no legal barrier for Luchun to renew its mining right certificate when it expires. Accordingly, the Directors are of the opinion that the Group will be able to renew the mining right certificate continuously at minimal charge.

Branch Share Registrars and Transfer Office — Hong Kong

Tricor Secretaries Limited Level 22, Hopewell Centre 183 Queen’s Road East Hong Kong

Branch Share Registrars and Transfer Office — Australia

Computershare Investor Services Pty Limited

Reserve Bank Building Level 2, 45 St George’s Terrace Perth, Western Australia, 6000

Securities on issue at 30 June 2014 Quoted securities

8,381,982,131 fully paid shares on issue 15,000,000 options quoted, expiring 30 September 2014

Unquoted securities

420,000,000 unlisted options granted

7. CORPORATE PROFILE

Brockman Mining Limited

ARBN 143 211 867

Non-executive Directors: Kwai Sze Hoi (Chairman) Liu Zhengui (Vice Chairman) Ross Stewart Norgard

Executive Directors:

Luk Kin Peter Joseph (CEO) C h a n K a m K w a n J a s o n ( C o m p a n y Secretary)

Warren Talbot Beckwith Kwai Kwun Lawrence

Independent Non-executive Directors: Uwe Henke Von Parpart Yip Kwok Cheung Danny Yap Henry Fat Suan Choi Yue Chun Eugene (appointed 12 June 2014)

Registrars

  • 83,400,000 share options, expiring 13 December 2015 EX HK$0.72

  • 88,100,000 share options, expiring 14 January 2016 EX HK$0.717

  • 88,100,000 share options, expiring 14 January 2016 EX HK$0.967

  • 3,600,000 share options, expiring 28 February 2016 EX HK$0.717

  • 3,600,000 share options, expiring 28 February 2016 EX HK$0.967

  • 76,600,000 share options, expiring 20 May 2016 EX HK$0.717

  • 76,600,000 share options, expiring 20 May 2016 EX HK$0.967

There were no shares or options issued during the period .

The following options lapsed during the period:

  • 150,000 share options, expiring 28 February 2016 EX HK$0.717

  • 150,000 share options, expiring 28 February 2016 EX HK$0.967

Principal Share Registrars and Transfer Office

MUFG Fund Services (Bermuda) Limited The Belvedere Building 69 Pitts Bay Road Pembroke HM 08

By order of the Board of Directors of Brockman Mining Limited Chan Kam Kwan, Jason Company Secretary, Hong Kong

20

QUARTERLY ACTIVITIES REPORT 30 June 2014

8. GLOSSARY

“ASX”

“Board”

“Brockman” or “Company”

“Damajianshan Mine”

“DSO”

“ERA”

  • “Group”

“JORC”

“km”

“Marillana Project”

“m”

  • “Mt”

“NWI”

“Ophthalmia Project”

“Q”

“Stock Exchange”

  • “Supreme Court”

“T”

ASX Limited ACN 008 624 691, or the financial products market, The Australian Securities Exchange, as the situation requires

the Board of Directors

Brockman Mining Limited ARBN 143 211 867, a company incorporated in Bermuda and listed on the SEHK and ASX

A copper mine located in the Yunnan Province, PRC, in which the Company has 100% equity interest

Direct Shipping Ore

Western Australian Economic Regulation Authority

Brockman Mining Limited, its associates and subsidiaries

Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves

kilometres

The 100% owned Marillana iron ore project is Brockman’s flagship project located in the Hamersley Iron Province

metre

million tonnes

North West Infrastructure, the joint venture company which represents the interests of its three shareholder companies: Brockman Mining Australia Pty Ltd; Atlas Iron Limited and FerrAus Limited, to facilitate the construction of a port facility capable of annually exporting 50 million tonnes of iron ore from the South-West Creek location at the Inner Harbour at Port Hedland, Western Australia

The 100% owned Ophthalmia iron ore project is located 80 km south of the Marillana Project

Quarter (financial)

The Stock Exchange of Hong Kong Limited

Supreme Court of Western Australia

Tonne(s)

21

QUARTERLY
Project Hole ID MGA E MGA N AHD RL Dip Azimuth End
Depth
From To Width Fe SiO2 Al2O3 P S LOI
(m) (m) (m) (º) (º) (m) (m) (m) (m) (%) (%) (%) (%) (%) (%)
Coondiner CNRC0227 768208 7439608 690 0 -90 55 no significant intercepts
Coondiner CNRC0228 766396 7440150 656 0 -90 67
Coondiner CNRC0229 766651 7440153 673 0 -90 139 20 138 118 59 2 3 45 4 73 0 20 0 01 6 06
Coondiner CNRC0230 766652 7440305 673 0 -90 109 20 96 76 59 7 4 09 3 74 0 17 0 00 5 89
Coondiner CNRC0231 768213 7439895 651 0 -90 55 no significant intercepts
Coondiner CNRC0232 766802 7439952 654 0 -90 85 22 28 6 57 4 5 58 4 76 0 19 0 01 6 45
Coondiner CNRC0233 766803 7440052 659 0 -90 157 28 152 124 58 8 4 68 4 52 0 19 0 00 5 41
Coondiner CNRC0234 766794 7440180 670 0 -90 121 22 92 70 60 3 4 09 3 93 0 16 0 00 4 79
Coondiner CNRC0235 766801 7440251 648 0 -90 85 20 70 50 59 5 5 18 3 78 0 12 0 00 5 20
Coondiner CNRC0236 767003 7440096 671 0 -90 103 no significant intercepts
Coondiner CNRC0237 766995 7439904 607 0 -90 85 24 74 50 56 9 6 37 4 88 0 13 0 01 6 48
Coondiner CNRC0238 767204 7440114 665 0 -90 60 no significant intercepts
Coondiner CNRC0239 767201 7439952 682 0 -90 78 22 26 4 59 0 7 31 3 32 0 08 0 00 4 24
Coondiner CNRC0240 767197 7439905 610 0 -90 66 no significant intercepts
Coondiner CNRC0241 766952 7440602 608 0 -90 48
Coondiner CNRC0242 766949 7440700 652 0 -90 66
Coondiner CNRC0243 766594 7440965 645 0 -90 46 20 24 4 59 6 6 74 3 21 0 11 0 00 4 10
Coondiner CNRC0244 766590 7441053 641 0 -90 48 14 40 26 57 5 6 78 4 84 0 16 0 01 5 32
Coondiner CNRC0245 766491 7440812 637 0 -90 49 14 32 18 58 8 5 61 4 15 0 12 0 01 5 17
Coondiner CNRC0246 766489 7440892 657 31 holes abandoned
Coondiner CNRC0247 766488 7440896 642 7
Coondiner CNRC0248 766492 7440901 642 0 -90 49 28 42 14 58 8 5 96 3 85 0 15 0 00 5 33
Coondiner CNRC0249 766495 7441151 639 0 -90 61 10 52 42 58 6 5 53 4 38 0 18 0 00 5 44
Coondiner CNRC0250 766506 7441257 639 0 -90 34 no significant intercepts
Coondiner CNRC0251 766397 7441000 641 0 -90 37 20 30 10 56 5 8 50 4 69 0 15 0 00 5 25
Coondiner CNRC0252 766368 7441238 641 0 -90 43 no significant intercepts
Coondiner CNRC0253 766304 7441103 641 0 -90 60 12 52 40 56 6 6 39 4 91 0 20 0 01 6 80
Coondiner CNRC0254 766296 7441007 642 0 -90 55 18 22 4 57 1 7 10 5 20 0 07 0 01 5 41
Coondiner CNRC0255 766203 7441190 641 0 -90 60 20 46 26 57 1 7 86 4 64 0 15 0 00 5 03
Coondiner CNRC0256 766004 7441254 645 0 -90 60 no significant intercepts
Coondiner CNRC0257 765796 7441147 647 0 -90 55
Coondiner CNRC0258 765601 7441204 636 0 -90 75
Coondiner CNRC0259 765193 7440794 643 0 -90 73
Coondiner CNRC0260 764998 7440859 645 0 -90 37
Coondiner CNRC0261 764698 7441050 636 0 -90 49

22

QUARTERLY
Project Hole ID MGA E MGA N AHD RL Dip Azimuth End
Depth
From To Width Fe SiO2 Al2O3 P S LOI
(m) (m) (m) (º) (º) (m) (m) (m) (m) (%) (%) (%) (%) (%) (%)
Coondiner CNRC0262 764600 7440903 643 0 -90 73 18 22 4 55 2 6 31 4 97 0 18 0 02 8 30
Coondiner CNRC0263 764503 7441006 633 0 -90 37 no significant intercepts
Coondiner CNRC0264 764501 7440931 638 0 -90 31
Coondiner CNRC0265 765799 7441256 646 0 -90 37
Coondiner CNRC0266 765985 7441347 642 0 -90 43 14 30 16 57 3 6 15 5 17 0 16 0 01 5 88
Coondiner CNRC0267 770700 7440196 647 0 -90 61 22 28 6 61 9 3 40 2 83 0 15 0 01 4 41
Coondiner CNRC0268 770700 7439897 641 0 -90 133 28 118 90 59 7 4 82 3 94 0 23 0 00 4 88
Coondiner CNRC0269 770949 7440151 642 0 -90 52 no significant intercepts
Coondiner CNRC0270 770702 7439996 632 0 -90 169 34 160 126 59 5 4 58 4 30 0 19 0 00 5 11
Coondiner CNRC0271 770695 7440101 647 0 -90 120 18 112 94 59 0 4 88 4 46 0 15 0 00 5 37
Coondiner CNRC0272 770949 7440023 643 0 -90 97 14 88 74 57 9 5 17 5 34 0 21 0 00 5 44
Coondiner CNRC0273 770953 7439874 643 0 -90 60 24 28 4 58 6 8 32 3 05 0 09 0 01 4 21
Coondiner CNRC0274 770952 7439732 648 0 -90 55 12 16 4 56 1 8 34 4 12 0 10 0 01 6 20
Coondiner CNRC0275 771071 7439730 645 0 -90 55 no significant intercepts
Coondiner CNRC0276 771075 7439832 641 0 -90 79
Coondiner CNRC0277 771080 7439919 648 0 -90 100 18 82 64 59 8 4 18 4 00 0 19 0 00 5 30
Coondiner CNRC0278 771034 7440002 641 0 -90 118 16 110 94 59 7 3 65 4 76 0 20 0 00 5 24
Coondiner CNRC0279 771060 7440085 658 0 -90 67 18 26 8 61 3 4 00 2 89 0 12 0 02 4 69
Coondiner CNRC0280 771193 7439802 641 360 -60 72 no significant intercepts
Coondiner CNRC0281 770106 7439594 640 0 -90 65
Coondiner CNRC0282 770450 7439480 610 0 -90 67
Coondiner CNRC0283 770674 7439452 635 0 -90 55
Coondiner CNRC0284* 770819 7440055 645 0 -90 109 18 109 91 59 5 4 03 3 55 0 17 0 00 6 40
Coondiner CNRC0285 770827 7440099 650 0 -90 85 12 76 64 57 7 5 50 5 01 0 17 0 01 5 97
Coondiner CNRC0286 770822 7440159 590 0 -90 79 no significant intercepts
Coondiner CNRC0287 770836 7440001 613 0 -90 114 10 100 90 57 8 5 93 5 04 0 16 0 00 5 52
Coondiner CNRC0288 770824 7439950 610 0 -90 85 12 30 18 56 1 10 32 3 78 0 11 0 01 4 93
Coondiner CNRC0289 770553 7440200 603 0 -90 61 14 44 30 57 9 5 62 5 08 0 13 0 00 5 66
Coondiner CNRC0290 770552 7440145 625 0 -90 103 4 94 90 57 8 5 51 4 71 0 17 0 00 6 31
Coondiner CNRC0291 770541 7439999 649 0 -90 109 2 104 102 58 9 5 12 3 91 0 19 0 00 5 86
Coondiner CNRC0292 770551 7440049 622 0 -90 115 6 102 96 58 4 5 22 4 20 0 20 0 00 6 02
Coondiner CNRC0293 770548 7440097 644 0 -90 133 4 128 124 58 9 4 86 4 30 0 19 0 00 5 72
Coondiner CNRC0294 770199 7440250 680 0 -90 61 18 48 30 56 0 6 62 5 90 0 17 0 00 6 26
Coondiner CNRC0295 770201 7440197 656 0 -90 67 12 66 54 58 8 4 98 4 52 0 23 0 00 5 29
Coondiner CNRC0296 770200 7440154 644 0 -90 79 12 36 24 58 4 5 62 4 46 0 17 0 01 5 30
Coondiner CNRC0297 770190 7440095 621 0 -90 49 22 26 4 59 0 8 46 2 74 0 14 0 00 3 86
Coondiner CNRC0298* 770002 7440249 628 0 -90 54 14 54 40 57 1 6 27 5 44 0 18 0 00 5 67
Coondiner CNRC0299 769997 7440349 639 0 -90 37 12 20 8 58 1 6 44 3 68 0 17 0 01 5 64
Coondiner CNRC0300 769805 7440197 644 0 -90 55 no significant intercepts

23

QUARTERLY
Project Hole ID MGA E MGA N AHD RL Dip Azimuth End
Depth
From To Width Fe SiO2 Al2O3 P S LOI
(m) (m) (m) (º) (º) (m) (m) (m) (m) (%) (%) (%) (%) (%) (%)
Coondiner CNRC0301 769799 7440247 650 0 -90 85 14 58 44 56 8 7 51 4 71 0 16 0 00 5 61
Coondiner CNRC0302 769803 7440301 650 0 -90 60 16 28 12 57 1 6 04 5 61 0 19 0 00 5 58
Coondiner CNRC0303 769603 7440247 650 0 -90 49 no significant intercepts
Coondiner CNRC0304 769605 7440354 650 0 -90 49 18 26 8 56 8 6 58 5 38 0 17 0 01 5 71
Coondiner CNRC0305 769399 7440200 650 0 -90 37 no significant intercepts
Coondiner CNRC0306 769404 7440300 650 0 -90 60
Coondiner CNRC0307 769402 7440399 650 0 -90 49 16 30 14 55 5 7 29 6 06 0 17 0 01 6 29
Coondiner CNRC0308 770002 7440153 647 0 -90 55 10 18 8 55 9 9 22 4 24 0 08 0 01 5 82
Coondiner CNRC0309 771304 7439840 634 0 -90 37 4 18 14 56 6 6 49 5 65 0 16 0 00 5 95
Coondiner CNRC0310 771356 7439788 633 0 -90 37 2 22 20 57 8 5 66 4 81 0 16 0 02 5 65
Coondiner CNRC0311 771210 7439936 644 360 -60 36 no significant intercepts
Coondiner CNRC0312 767197 7439851 616 0 -90 60 26 30 4 55 6 8 08 5 94 0 07 0 01 5 51
Coondiner CNRC0313 766601 7441106 603 0 -90 55 24 42 18 56 6 8 33 4 54 0 17 0 00 5 23
Coondiner CNRC0314 764699 7440904 605 0 -90 79 48 62 14 58 7 4 78 3 98 0 21 0 00 6 03
Coondiner CNRC0315 766800 7440331 609 0 -90 55 no significant intercepts
Coondiner CNRC0316 770552 7440248 601 0 -90 31 18 26 8 56 4 7 10 5 37 0 14 0 01 5 93
Coondiner CNRC0317 770551 7439951 637 0 -90 109 14 86 72 59 6 5 56 3 86 0 19 0 01 4 61
Three Pools TPRC0026 771996 7439026 655 0 -90 97 no significant intercepts
Three Pools TPRC0027 774432 7437702 611 0 -90 67 6 24 18 56 7 6 03 5 53 0 16 0 02 6 24
Three Pools TPRC0028 774113 7437960 552 0 -90 120 no significant intercepts
Three Pools TPRC0029 774114 7437852 563 0 -90 93
Three Pools TPRC0030 774102 7437767 579 0 -90 85 2 62 60 58 6 4 48 4 77 0 22 0 02 5 55
Three Pools TPRC0031 773393 7437649 632 0 -90 91 no significant intercepts
Three Pools TPRC0032 773403 7437832 627 0 -90 79
Three Pools TPRC0033 773404 7437762 628 0 -90 79 8 54 46 57 6 6 06 5 17 0 19 0 01 5 48
Three Pools TPRC0034 773417 7438088 622 0 -90 66 no significant intercepts
Three Pools TPRC0035 772497 7438006 602 0 -90 73
Three Pools TPRC0036 772502 7437775 546 0 -90 79
Kalgan Creek KRC0117 782622 7433800 507 0 -90 85 0 6 6 60 0 4 20 2 20 0 10 0 02 5 79
Kalgan Creek KRC0118 782621 7433900 543 0 -90 139 10 126 116 58 4 4 91 4 93 0 18 0 00 5 48
Kalgan Creek KRC0119 782807 7433877 552 0 -90 109 0 98 98 60 1 2 53 4 68 0 22 0 01 5 54
Kalgan Creek KRC0120 782508 7433830 477 0 -90 37 4 12 8 56 6 7 13 3 61 0 16 0 02 6 60
Kalgan Creek KRC0121 782540 7433910 539 0 -90 109 48 92 44 57 7 6 30 4 93 0 18 0 01 4 96
Kalgan Creek KRC0122 782802 7433780 556 0 -90 55 0 12 12 60 4 4 75 3 39 0 12 0 12 4 21
Kalgan Creek KRC0123 782801 7433831 550 0 -90 100 2 74 72 61 1 2 99 3 85 0 19 0 01 4 79
Kalgan Creek KRC0124 783003 7433706 552 0 -90 67 2 30 28 58 8 3 35 4 33 0 24 0 01 6 44
Kalgan Creek KRC0125 783202 7433642 537 0 -90 61 0 36 36 59 9 3 93 3 72 0 15 0 01 5 46
Kalgan Creek KRC0126 783606 7433597 497 0 -90 73 12 62 50 59 2 4 25 4 47 0 16 0 01 5 67
Kalgan Creek KRC0127 784004 7433460 531 0 -90 55 14 46 32 56 9 6 26 4 40 0 13 0 01 7 25
Kalgan Creek KRC0128 784198 7433425 532 0 -90 91 26 70 44 59 3 4 33 4 06 0 17 0 01 5 93

24

QUARTERLY
Project Hole ID MGA E MGA N AHD RL Dip Azimuth End
Depth
From To Width Fe SiO2 Al2O3 P S LOI
(m) (m) (m) (º) (º) (m) (m) (m) (m) (%) (%) (%) (%) (%) (%)
Kalgan Creek KRC0129* 784405 7433374 527 0 -90 78 24 78 54 59 7 3 67 4 23 0 17 0 01 5 84
Kalgan Creek KRC0130 784396 7433336 528 0 -90 67 10 54 44 57 4 5 63 4 37 0 13 0 01 7 05
Kalgan Creek KRC0131 784804 7433230 505 0 -90 103 28 94 66 60 2 2 72 4 30 0 19 0 01 5 96
Kalgan Creek KRC0132 784802 7433186 544 0 -90 79 28 70 42 60 8 3 65 3 31 0 18 0 01 5 33
Kalgan Creek KRC0133 784804 7433140 532 0 -90 49 assays awaited
Kalgan Creek KRC0134 785002 7433110 525 0 -90 79
Kalgan Creek KRC0135 785202 7433092 526 0 -90 79
Kalgan Creek KRC0136 785200 7433051 519 0 -90 79
Kalgan Creek KRC0137 785402 7432955 529 0 -90 67
Kalgan Creek KRC0138 785193 7433002 537 0 -90 67
Kalgan Creek KRC0139 785607 7432960 484 0 -90 60
Kalgan Creek KRC0140 785607 7432917 473 0 -90 49
Kalgan Creek KRC0141 785818 7432842 529 0 -90 55
Kalgan Creek KRC0142 785996 7432778 524 0 -90 67
Kalgan Creek KRC0143 782608 7433763 553 0 -90 67
Kalgan Creek KRC0144 782808 7433732 557 0 -90 49
Kalgan Creek KRC0145 782600 7433340 541 0 -90 49
Kalgan Creek KRC0146 782433 7433367 476 0 -90 49
Kalgan Creek KRC0147 782448 7433417 485 0 -90 43
Kalgan Creek KRC0148 782802 7433245 534 0 -90 61
Kalgan Creek KRC0149 782796 7433299 474 0 -90 73
Kalgan Creek KRC0150 782805 7433343 493 0 -90 55
Kalgan Creek KRC0151 782998 7433205 530 0 -90 43
  • hole ends in mineralisation

25

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013

Name of entity

Name of entity
BROCKMAN MINING LIMITED
ABN
ARBN 143 211 867
ARBN 143 211 867 30 June 2014

Consolidated statement of cash flows

Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
1.3
1.4
1.5
1.6
1.7
Payments for
(a)
exploration & evaluation
(b)
development
(c)
production
(d)
administration
Dividends received
Interest and other items of a similar nature received
Interest and other costs of finance paid
Income taxes paid
Other (provide details if material)
1.7
(a)
Receipts from transport services
1.7
(b)
Net advance from related parties
Net operating cash flows
Current quarter
HK$’000
Restated
Year to date
(12 months)
HK$’000
8,425
(20,517)

(6,120)
(13,574)

389



802
54,641
(87,972)

(37,496)
(138,262)

5,164
(105)
854
72,972
2,087
(30,595) (128,117)
Cash flows related to investing activities
1.8
1.9
1.10
1.11
1.12
Payment for purchases of: (a)
prospects
(b)
equity investments
(c)
other fixed assets
Proceeds from sale of:
(a)
prospects
(b)
equity investments
(c)
other fixed assets
Loans to other entities
Loans repaid by other entities
Other (provide details if material)
Net investing cash flows


(119)
145





(81,469)
(1,744)
322
34,000
529


26 (48,362)
  • See chapter 19 for defined terms.

Appendix 5B Page 26

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

1.13
Total operating and investing cash flows (brought
forward)
(30,569) (176,479)
Cash flows related to financing activities
1.14
1.15
1.16
1.17
1.18
1.19
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
(a)
Acquisition of additional interest in a subsidiary
(b)
Proceeds from assignment of debt
(c)
Proceeds from issue of bond
(d)
Cash backed performance bond guarantee
Net financing cash flows








163,800


(4,998)

(45,000)
11,000
31,200
2,010
158,012
1.20
1.21
Net decrease in cash held
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
Cash and cash equivalents included in assets of
disposal group
1.22 Cash at end of quarter
(30,569)
253,744
521
(18,467)
252,564
(1,290)
(9,111)
223,696 223,696

Payments to directors of the entity, associates of the directors, related entities of the entity and associates of the related entities

1.23
Aggregate amount of payments to the parties included in item 1.2
1.24 Aggregate amount of loans to the parties included in item 1.10
Current quarter
HK$’000
2,261
  • 1.25 Explanation necessary for an understanding of the transactions

1.23 Being payment of executive directors’ salary and non-executive directors’ fees. 1.2(d) Includes human resources service fees of HK$72,000 paid to a company in which a director of the company has beneficial interest.

  • See chapter 19 for defined terms.

Appendix 5B Page 27

01/05/2013

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

Nil

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Nil

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standbyarrangements
Amount available
HK$’000
Amount used
HK$’000

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
HK$’000
(49,395)
(6,887)
(18,742)
Total (75,024)

Reconciliation of cash

Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current quarter
HK$’000
Previous quarter
HK$’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other(provide details)
158,030 176,874
65,666 76,870
Total: cash at end ofquarter(item 1.22) 223,696 253,744
  • See chapter 19 for defined terms.

Appendix 5B Page 28

01/05/2013

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Changes in interests in mining tenements and petroleum tenements

6.1
Interests in mining
tenements and
petroleum tenements
relinquished, reduced
or lapsed
6.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
Tenement
reference
and
location
Nature of interest
(note (2))
Interest at
beginning of
quarter

Interest
at end of
quarter
E47/1936
E47/3104
E46/921
E46/979
E45/3144
E47/2176
E47/2650
E47/1845
E47/2622
E47/2623
E47/2353
E47/2354
E47/2698
Tenement surrendered
Application withdrawn
Tenement surrendered
Tenement surrendered
Tenement surrendered
Application withdrawn
Application withdrawn
Tenement surrendered
Application withdrawn
Application withdrawn
Application withdrawn
Application withdrawn
Application withdrawn
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
E47/3151
E47/3152
E45/4410
Application lodged
Application lodged
Application lodged
0%
0%
0%
100%
100%
100%

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security (see
note 3) (cents)
Amount paid up
per security (see
note 3) (cents)
7.1
Preference
+securities
(description)
7.2
Changes during quarter
(a)
Increases through
issues
(b)
Decreases through
returns of capital,
buy-backs,
redemptions
7.3
+Ordinary securities
7.4
Changes during quarter
(a)
Increases through
issues
(b)
Decreases through
returns of capital,
buy-backs
8,381,982,131 8,381,982,131
  • See chapter 19 for defined terms.

Appendix 5B Page 29

01/05/2013

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

7.5
+Convertible debt
securities (description)
7.6
Changes during quarter
(a)
Increases through
issues
(b)
Decreases
through securities
matured,
converted
7.7
Options
(description and
conversion factor)
7.8
Issued during quarter
7.9
Exercised during
quarter
7.10 Expired during quarter
15,000,000
83,400,000
176,200,000
7,200,000
153,200,000
15,000,000 Exercise price
A$0.2
HK$0.72
HK$0.717-HK$0.967
HK$0.717-HK$0.967
HK$0.717-HK$0.967
Expiry date
30 September 2014
13 December 2015
14 January 2016
28 February 2016
20 May 2016
300,000 HK$0.717-HK$0.967 30 April 2014
7.11
Debentures
(totals only)
7.12 Unsecured notes
(totals only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

  • 2 This statement does / ~~does not* (delete one)~~ give a true and fair view of the matters disclosed.

  • See chapter 19 for defined terms. Appendix 5B Page 30

01/05/2013

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Sign here:

==> picture [120 x 79] intentionally omitted <==

Date: 30 July 2014

(Company secretary)

Print name: Chan Kam Kwan, Jason

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements and petroleum tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement or petroleum tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.

  • 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

  • See chapter 19 for defined terms. Appendix 5B Page 31

01/05/2013