Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.

BROCKMAN MINING LIMITED 布萊克萬礦業有限公司[*]

(incorporated in Bermuda with limited liability)

(SEHK Stock Code: 159) (ASX Stock Code: BCK)

ANNUAL RESULTS ANNOUNCEMENT FOR THE YEAR ENDED 30 JUNE 2015

The board of directors (the “Board”) of Brockman Mining Limited (the “Company”) announces the consolidated results of the Company and its subsidiaries (the “Group”) for the year ended 30 June 2015, together with the comparative figures for the year ended 30 June 2014.

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

For the year ended 30 June 2015

Note
Continuing operations
Revenue
4
Cost of sales
11
Gross (loss)/profit
Other income
7
Other (losses)/gains, net
8
Selling and administrative expenses
11
Exploration and evaluation expenses
11
Impairment losses
9
Share of losses of joint ventures
Operating loss
Finance costs
10
Loss before income tax
Income tax credit
12
Loss for the year from continuing operations
Year ended 30 June
2015
2014
HK$’000
HK$’000
36,525
38,739
(38,497)
(34,170)
(1,972)
4,569
1,954
5,388
(6,878)
1,984
(73,479)
(88,933)
(76,560)
(87,188)
(1,441,618)
(40,000)
(5,031)
(8,090)
(1,603,584)
(212,270)

(804)
(1,603,584)
(213,074)
367,036

(1,236,548)
(213,074)
  • For identification purposes only

– 1 –

Note
Discontinued operation
Profit for the year from discontinued operation
6
Loss for the year
Other comprehensive (loss)/income:
Items that may be reclassified to profit or loss
Exchange differences arising on translation of
foreign operations
Release of translation reserve arising from
disposal of subsidiaries
Other comprehensive (loss)/income for the year
Total comprehensive loss for the year
Loss for the year attributable to:
Equity holders of the Company
Non-controlling interests
Loss for the year attributable to equity holders
of the Company arising from:
Continuing operations
Discontinued operation
Total comprehensive loss attributable to:
Equity holders of the Company
Non-controlling interests
Total comprehensive (loss)/income attributable
to equity holders of the Company arising
from:
Continuing operations
Discontinued operation
Year ended 30 June
2015
2014
HK$’000
HK$’000

3,973
(1,236,548)
(209,101)
(380,776)
63,880

(2,717)
(380,776)
61,163
(1,617,324)
(147,938)
(1,236,548)
(207,098)

(2,003)
(1,236,548)
(209,101)
(1,236,548)
(211,071)

3,973
(1,236,548)
(207,098)
(1,617,324)
(146,447)

(1,491)
(1,617,324)
(147,938)
(1,617,324)
(148,491)

2,044
(1,617,324)
(146,447)

– 2 –

Note
(Loss)/earnings per share attributable to the
equity holders of the Company during
the year
Basic (loss)/earnings per share from:
Continuing operations
14
Discontinued operation
14
Diluted (loss)/earnings per share from:
Continuing operations
14
Discontinued operation
14
Year ended 30 June
2015
2014
HK cents
HK cents
(14.75)
(2.61)

0.05
(14.75)
(2.56)
(14.75)
(2.61)

0.05
(14.75)
(2.56)

– 3 –

CONSOLIDATED BALANCE SHEET

As at 30 June 2015

Note
Non-current assets
Mining properties
15
Property, plant and equipment
Interests in joint ventures
Other non-current assets
Current assets
Inventories
Other receivables, deposits and prepayments
Amounts due from related parties
Cash and cash equivalents
Total assets
Equity
Share capital
17
Reserves
Total equity
Non-current liabilities
Other payables
Deferred income tax liabilities
Provisions
Current liabilities
Trade payables
16
Other payables and accrued charges
Amounts due to related parties
Total liabilities
Total equity and liabilities
Net current assets
Total assets less current liabilities
As at 30 June
2015
2014
HK$’000
HK$’000
1,504,573
3,536,267
27,815
33,242
288
1,264
14,377
14,488
1,547,053
3,585,261
4,274
11,857
5,480
8,117
2,358
2,993
98,297
223,698
110,409
246,665
1,657,462
3,831,926
838,198
838,198
315,607
1,941,198
1,153,805
2,779,396
26,995
26,865
381,510
920,561
940
1,660
409,445
949,086
10,201
9,540
83,842
91,070
169
2,834
94,212
103,444
503,657
1,052,530
1,657,462
3,831,926
16,197
143,221
1,563,250
3,728,482
As at 30 June
2015
2014
HK$’000
HK$’000
1,504,573
3,536,267
27,815
33,242
288
1,264
14,377
14,488
1,547,053
3,585,261
4,274
11,857
5,480
8,117
2,358
2,993
98,297
223,698
110,409
246,665
1,657,462
3,831,926
838,198
838,198
315,607
1,941,198
1,153,805
2,779,396
26,995
26,865
381,510
920,561
940
1,660
409,445
949,086
10,201
9,540
83,842
91,070
169
2,834
94,212
103,444
503,657
1,052,530
1,657,462
3,831,926
16,197
143,221
1,563,250
3,728,482
3,585,261
11,857
8,117
2,993
223,698
246,665
3,831,926
838,198
1,941,198
2,779,396
26,865
920,561
1,660
949,086
9,540
91,070
2,834
103,444
1,052,530
3,831,926
143,221
3,728,482

– 4 –

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

1. GENERAL INFORMATION

Brockman Mining Limited (the “Company”) and its subsidiaries (collectively, the “Group”) principally engage in the acquisition, exploration and towards future development of iron ore project in Australia; and in the exploitation, processing and sales of mineral resources, including copper ore concentrates and other mineral ore products in the People’s Republic of China (“PRC”).

The Company is a public limited company incorporated in Bermuda as an exempted company with limited liability and its shares are listed on The Stock Exchange of Hong Kong Limited (the “SEHK”) and Australian Securities Exchange (the “ASX”). The address of its registered office is Clarendon House, 2 Church Street, Hamilton HM11, Bermuda.

These consolidated financial statements are presented in thousands of Hong Kong dollars (“HK$”), unless otherwise stated.

2. BASIS OF PREPARATION

The consolidated financial statements of the Group have been prepared in accordance with International Financial Reporting Standards (“IFRSs”) and with the applicable disclosure requirements of the Hong Kong Companies Ordinance. The consolidated financial statements have been prepared under the historical cost convention.

The consolidated financial statements are prepared in accordance with the applicable requirements of the predecessor Companies Ordinance (Cap. 32) for this financial year and the comparative period.

The preparation of financial statements in conformity with IFRS requires the use of certain critical accounting estimates. It also requires management to exercise its judgement in the process of applying the Group’s accounting policies.

Going concern

During the year ended 30 June 2015, the Group incurred net operating cash outflows of HK$114,415,000, and the cash and cash equivalents of the Group reduced to HK$98,297,000 as at 30 June 2015 from HK$223,698,000 as at 30 June 2014.

In view of these circumstances, the directors of the Company are taking certain measures to mitigate the liquidity pressure and to improve the financial performance which include, but not limited to the reduction in exploration and evaluation activities and the implementation of other cost-saving measures.

The directors have reviewed the Group’s cash flow projections which cover a period of not less than twelve months from 30 June 2015. Based on these projections, the Group’s cash outflows will be reduced through the implementation of the measures described above. On this basis, the directors of the Company consider that, taking into account the Group’s operating performance, reduction of exploration and evaluation activities, and the successful implementation of cost saving measures mentioned above, the Group is expected to have sufficient financial resources to satisfy its future working capital requirements, and to meet its financial obligations as and when required for the next twelve months from the balance sheet date. Accordingly, the directors consider that it is appropriate to prepare the Group’s consolidated financial statements on a going concern basis.

– 5 –

3. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

The principal accounting policies applied in the preparation of these consolidated financial statements are set out below. These policies have been consistently applied to all the years presented, unless otherwise stated.

(a) Amended standards and interpretation adopted by the Group

The Group adopted the following amended standards and interpretation which are mandatory for the Group’s financial ended 30 June 2015. The adoption of these amendments to standards and interpretation does not have any significant impact to the results and financial position of the Group.

IAS 19 (2011) (Amendment) Employee Benefits
IAS 32 (Amendment) Financial Instruments: Presentation — Offsetting Financial
Assets and Financial Liabilities
IAS 36 (Amendment) Impairments of Assets
IAS 39 (Amendment) Financial Instruments: Recognition and Measurement
IFRIC-Int 21 Levies
IFRS 10, IFRS 12 and IAS 27 Investment Entities
(Revised 2011) (Amendment)
Annual Improvements Project 2012 Annual Improvements 2010–2012 Cycle
Annual Improvements Project 2013 Annual Improvements 2011–2013 Cycle
  • (b) New and amended standards have been issued but are not effective for the Group’s financial year ended 30 June 2015 and have not been early adopted

The following new standards and amendments to standards have been issued, but are not effective for the Group’s financial year ended 30 June 2015 and have not been early adopted:

Effective for
annual periods
beginning on
or after
Annual Improvements Project 2014 Annual Improvements 2012–2014 Cycle 1 January 2016
IAS 1 (Amendment) The Disclosure Initiative 1 January 2016
IAS 16 and IAS 38 (Amendment) Classification of Acceptable Methods of 1 January 2016
Depreciation and Amortisation
IAS 16 and IAS 41 (Amendment) Agriculture: Bearer Plants 1 January 2016
IAS 27 (Amendment) Equity Method in Separate Financial 1 January 2016
Statements
IFRS 10, IFRS 12 and IAS 28 Investment Entities: Applying 1 January 2016
(Amendment) the Consolidation Exception
IFRS 10 and IAS 28 (Amendment) Sale or Contribution of Assets between an 1 January 2016
Investor and Its associate or Joint Venture
IFRS 11 (Amendment) Accounting for Acquisitions of Interests in 1 January 2016
Joint Operations
IFRS 14 Regulatory Deferral Accounts 1 January 2016
IFRS 15 Revenue from Contracts with Customers 1 January 2017
IFRS 9 Financial Instruments 1 January 2018

The Group is in the process of making an assessment of the impact of the above new standards and amendments to standards and is not yet in a position to state the impact on the Group’s results of operations and financial position.

– 6 –

(c) New Hong Kong Companies Ordinance (Cap. 622)

In addition, the requirements of Part 9 “Accounts and Audit” of the new Hong Kong Companies Ordinance (Cap. 622) come into operation as from the Company’s first financial year ending 30 June 2015 in accordance with section 358 of that Ordinance. The Group is in the process of making an assessment of expected impact of the changes in the Companies Ordinance on the consolidated financial statements in the period of initial application of Part 9 of the new Hong Kong Companies Ordinance (Cap. 622). So far, it has concluded that the impact is unlikely to be significant and only the presentation and the disclosure of information in the consolidated financial statements will be affected.

4. REVENUE

Revenue represents the amounts received and receivable for sales of mineral ore products for the year. An analysis of the Group’s revenue for the year is as follows:

Continuing operations:
Sales of copper ore concentrates
Discontinued operation:
Income from provision of transportation services
Year ended 30 June
2015
2014
HK$’000
HK$’000
36,525
38,739

73,124
Year ended 30 June
2015
2014
HK$’000
HK$’000
36,525
38,739

73,124
73,124

Turnover consists of sales from mining operation in the PRC of HK$36,525,000 for the year ended 30 June 2015 (2014: HK$38,739,000).

5. SEGMENT INFORMATION

Operating segments are reported in a manner consistent with internal reporting provided to executive directors of the Company who are responsible for allocating resources and assessing performance of the operating segments. The executive directors consider the performance of the Group from a business perspective.

(a) Business segments

The Group’s reportable operating segments are as follows:

Mineral tenements in Australia — tenements acquisition, exploration and towards future
development of iron ore project in Western Australia
Mining operations in the PRC — exploitation, processing and sales of copper ore concentrates
in the PRC
Discontinued operation — — provision of limousine rental services in Hong Kong and the
Transportation services_(Note 6)_ PRC and provision of airport shuttle bus services in Hong
Kong

Others primarily relate to the provision of corporate services for investment holding companies. These activities are excluded from the reportable operating segments and are presented to reconcile to the totals included in the Group’s consolidated statement of comprehensive income and consolidated balance sheet.

The Group’s chief operating decision-maker assesses the performance of the operating segments based on adjusted operating profit/(loss). Finance costs are not included in the result for each operating segment that is reviewed by executive directors of the Company.

Segment assets reported to executive directors of the Company are measured in a manner consistent with that in the consolidated balance sheet.

– 7 –

The following is an analysis of the Group’s revenue and results by business segment:

For the year ended 30 June 2015:
Segment revenue from
external customers
Segment results
Share of losses of joint ventures
Loss before income tax
Other information:
Depreciation of property,
plant and equipment
Impairment of mining properties
(Note 15)
Amortisation of mining properties
Relinquishment of mining properties
Exploration and evaluation expenses
Income tax credit
For the year ended 30 June 2014:
Segment revenue from
external customers
Segment results
Share of losses of joint ventures
Finance costs
(Loss)/profit before income tax
Other information:
Gain on disposal of subsidiaries
Depreciation of property,
plant and equipment
Impairment of mining properties
(Note 15)
Amortisation of mining properties
Exploration and evaluation expenses
Finance costs
Income tax credit
Continuing operations
Mineral
tenements
in Australia
Mining
operation
in the PRC
Others
HK$’000
HK$’000
HK$’000

36,525

(1,326,318)
(252,635)
(19,600)
(910)
(5,442)
(761)
(1,216,618)
(225,000)


(10,884)

(6,833)


(60,640)
(15,920)

367,036



38,739

(90,233)
(59,099)
(54,848)



(796)
(5,425)
(751)

(40,000)


(12,205)

(75,094)
(12,094)



(804)


Discontinued
operation
Sub-total
Transportation
services
HK$’000
HK$’000
36,525

(1,598,553)

(5,031)
(1,603,584)
(7,113)

(1,441,618)

(10,884)

(6,833)

(76,560)

367,036

38,739
73,124
(204,180)
3,781
(8,090)

(804)
(567)
(213,074)
3,214

2,822
(6,972)
(9,380)
(40,000)

(12,205)

(87,188)

(804)
(567)

759
Total
HK$’000
36,525
(1,598,553)
(5,031)
(1,603,584)
(7,113)
(1,441,618)
(10,884)
(6,833)
(76,560)
367,036
111,863
(200,399)
(8,090)
(1,371)
(209,860)
2,822
(16,352)
(40,000)
(12,205)
(87,188)
(1,371)
759

The revenue from external parties reported to executive directors of the Company is measured in a manner consistent with that in the consolidated statement of comprehensive income. Revenue from mining operation in the PRC amounting to HK$36,525,000 (2014: HK$38,739,000) represents sales to a single customer.

– 8 –

The following is an analysis of the Group’s assets by business segment as at the respective balance sheet dates:

As at 30 June 2015:
Segment assets
Total segment assets include:
Interests in joint ventures
Additions to property,
plant and equipment
Relinquishment of mining properties
As at 30 June 2014:
Segment assets
Total segment assets include:
Interests in joint ventures
Additions to property,
plant and equipment
Additions to mining properties
Continuing operations
Mineral
tenements
in Australia
Mining
operation
in the PRC
Others
HK$’000
HK$’000
HK$’000
1,285,073
274,764
97,625
288


252
1,551
177
(6,833)


3,114,123
521,442
196,361
1,264


518
2,133
39
141

Discontinued
operation
Sub-total
Transportation
services
HK$’000
HK$’000
1,657,462

288

1,980

(6,833)

3,831,926

1,264

2,690
2,489
141
Total
HK$’000
1,657,462
288
1,980
(6,833)
3,831,926
1,264
5,179
141

(b) Geographical information

The transportation services are provided in Hong Kong and the PRC. The mining operation is located in the PRC and the mineral tenements are located in Australia.

The following table provides an analysis of the Group’s revenue by geographical market, based on the origin of the services:

Year ended 30 June Year ended 30 June
2015 2014
HK$’000 HK$’000
For continuing operations:
PRC 36,525 38,739
For discontinued operation:
PRC 15,817
Hong Kong 57,307
73,124

– 9 –

The following is an analysis of the carrying amounts of the Group’s mining properties, property, plant and equipment and other non-current assets (excluding financial assets) analysed by geographical area in which the assets are located:

For continuing operations:
PRC
Hong Kong
Australia
As at 30 June
2015
2014
HK$’000
HK$’000
265,910
503,078
872
1,493
1,279,283
3,079,527
1,546,065
3,584,098
As at 30 June
2015
2014
HK$’000
HK$’000
265,910
503,078
872
1,493
1,279,283
3,079,527
1,546,065
3,584,098
3,584,098

6. DISPOSAL OF SUBSIDIARIES

On 24 October 2013, the Company and Mr. Leung Chi Yan, Danny (“Mr. Leung”), a director of Perryville Group, entered into a sale and purchase agreement pursuant to which the Company agreed to sell the entire equity interest in Perryville Group Limited and its subsidiaries (“Perryville Group”) to Mr. Leung at a consideration of HK$45,000,000 (“Disposal”). Perryville Group is principally engaged in the provision of limousine and airport shuttle transportation services which represents the reportable segment of transportation services.

As part of the Disposal, the payable by Perryville Group to the Company of HK$11,000,000 was assigned to Mr. Leung, the adjusted consideration amounted to HK$34,000,000 which represents the consideration for the Company’s equity interest in Perryville Group at the date of Disposal.

The Disposal was completed on 19 February 2014 and the Company ceased to have any control and equity interests in Perryville Group.

The results of Perryville Group are presented in the consolidated financial statements as discontinued operation in accordance with IFRS 5 “Non-current Assets Held for Sale and Discontinued Operations”. The consolidated statement of comprehensive income and consolidated statement of cash flows distinguish discontinued operation from continuing operations.

– 10 –

(a) Profit from discontinued operation

An analysis of the result of discontinued operation, and the result recognised on the re-measurement of assets or disposal group, is as follows:

Revenue
Cost of sales
Other income
Other losses, net
Selling and administrative expenses
Finance costs
Profit before income tax
Income tax credit
Profit for the year from operating activities
Gain on disposal of subsidiaries
Profit for the year from discontinued operation
Profit for the year from discontinued operation attributable to:
— Equity holders of the Company
Analysis of the cash flows from discontinued operation
Net cash generated from operating activities
Net cash used in investing activities
Net cash used in financing activities
Year ended
30 June
2014
HK$’000
73,124
(58,644)
14,480
107
(198)
(13,430)
(567)
392
759
1,151
2,822
3,973
3,973
Year ended
30 June
2014
HK$’000
7,720
(1,807)
(7,954)
(2,041)

(b) Analysis of the cash flows from discontinued operation

– 11 –

The effect on the consolidated balance sheet, the total considerations received and gain on disposal of subsidiaries are as follows:

Net assets of the disposal group:
Property, plant and equipment
Trade receivables
Other receivables, deposits and prepayments
Cash and cash equivalents
Trade payables
Other payable and accrued charges
Bank borrowings
Obligations under finance leases
Deferred income tax liabilities
Provisions
Total net assets disposed
Legal and professional fee paid
Release of translation reserve
Gain on disposal
Consideration, net of direct costs
Cash consideration
Legal and professional fee paid
Cash and bank balances disposed of
Total cash inflows from the disposal
2014
HK$’000
44,238
23,861
4,549
9,112
(7,627)
(8,492)
(5,623)
(12,206)
(2,654)
(1,061)
44,097
798
(2,717)
2,822
45,000
45,000
(798)
(9,112)
35,090

7. OTHER INCOME

Year ended 30 June Year ended 30 June
2015 2014
HK$’000 HK$’000
Interest on bank deposits 1,014 3,895
Government grant_(Note)_ 862 869
Others 78 624
1,954 5,388

Note: Government grant mainly represents incentive credits provided by the Australia Federal government, for research and development activities carried out in Australia.

– 12 –

8. OTHER (LOSSES)/GAINS, NET

Loss on disposal of property, plant and equipment
Effect of discounting on initial recognition of a long-term payable_(Note)
Relinquishment of mining properties
(Note 15)_
Others
Year ended 30 June
2015
2014
HK$’000
HK$’000
(48)
(109)

2,093
(6,833)

3

(6,878)
1,984
Year ended 30 June
2015
2014
HK$’000
HK$’000
(48)
(109)

2,093
(6,833)

3

(6,878)
1,984
1,984

Note: The amount represents the gain arising from discounting the interest-free other payable (classified as non-current liabilities) to present value on the initial recognition date.

9. IMPAIRMENT LOSSES

Impairment of mining properties_(Note 15)_
10. FINANCE COSTS
Interest on fixed rate bonds
11. EXPENSES BY NATURE
Amortisation of mining properties (included in cost of sales)
Auditor’s remuneration
— Audit services
— Non-audit services
Cost of inventories
Depreciation of property, plant and equipment
Equity-settled share-based compensation for consultants
Operating lease rentals
Staff costs (including directors’ emoluments)
Exploration and evaluation expenses
(excluding staff costs and rental expenses)
Year ended 30 June
2015
2014
HK$’000
HK$’000
1,441,618
40,000
Year ended 30 June
2015
2014
HK$’000
HK$’000

804
Year ended 30 June
2015
2014
HK$’000
HK$’000
10,884
12,205
1,612
2,401
720
1,176
11,284
5,456
7,113
6,972
(1,105)
896
10,557
11,351
51,901
99,518
57,328
61,736

– 13 –

Staff costs (including directors’ emoluments) include:

Wages, salaries and welfares
Retirement benefit scheme contributions
Share-based compensation
Year ended 30 June
2015
2014
HK$’000
HK$’000
56,551
75,628
2,512
3,345
(7,162)
20,545
51,901
99,518
Year ended 30 June
2015
2014
HK$’000
HK$’000
56,551
75,628
2,512
3,345
(7,162)
20,545
51,901
99,518
99,518

12. INCOME TAX CREDIT

Hong Kong profits tax has been provided at the rate of 16.5% (2014: 16.5%) on the estimated assessable profit for the year. Overseas income tax has been provided at the prevailing rates ranging from 25% to 30% (2014: 25% to 30%) on the estimated assessable profit applicable to the Company’s subsidiaries established in the PRC and Australia.

Year ended 30 June Year ended 30 June
2015 2014
HK$’000 HK$’000
Deferred income tax (367,036)

The income tax on the Group’s loss before income tax differs from the theoretical amount that would arise using the enacted tax rate of the consolidated entities as follows:

Loss before income tax
Notional tax at the applicable tax rate of 16.5% (2014: 16.5%)
Effect of different tax rates of subsidiaries operating overseas
Income not subject to tax
Expenses not deductible for tax purposes
Tax losses for which no deferred income tax asset was recognised
Year ended 30 June
2015
2014
HK$’000
HK$’000
(1,603,584)
(213,074
(264,591)
(35,157
(210,532)
(42,238
(147)
(1,544
39,128
16,464
69,106
62,475
(367,036)
Year ended 30 June
2015
2014
HK$’000
HK$’000
(1,603,584)
(213,074
(264,591)
(35,157
(210,532)
(42,238
(147)
(1,544
39,128
16,464
69,106
62,475
(367,036)
(35,157
(42,238
(1,544
16,464
62,475

13. DIVIDEND

No dividend was paid or proposed during the year ended 30 June 2015, nor has any dividend been proposed since the balance sheet date (2014: Nil).

– 14 –

14. LOSS PER SHARE

Basic loss per share is calculated by dividing the loss attributable to the equity holders of the Company by the weighted average number of ordinary shares in issue during the year. Diluted loss per share is calculated by adjusting the weighted average number of ordinary shares outstanding to assume conversion of all dilutive potential ordinary shares.

Year ended 30 June Year ended 30 June
2015 2014
(Loss)/profit for the year attributable to the equity holders of
the Company_(HK$’000)_
— Continuing operations (1,236,548) (211,071)
— Discontinued operation 3,973
(1,236,548) (207,098)
Weighted average number of ordinary shares for the purpose of
calculating the basic and diluted loss per share_(thousands)_ 8,381,982 8,078,797
(Loss)/earnings per share attributable to the equity holders
of the Company
Basic_(HK cents)_
— Continuing operations (14.75) (2.61)
— Discontinued operation 0.05
(14.75) (2.56)
Diluted_(HK cents)_
— Continuing operations (14.75) (2.61)
— Discontinued operation 0.05
(14.75) (2.56)

Diluted loss per share is the same as basic loss per share for the year ended 30 June 2015 and 2014 because the effect of the assumed exercise of share options of the Company during these years was anti-dilutive.

– 15 –

15. MINING PROPERTIES

Mining
Mining right properties
in the PRC in Australia Total
HK$’000 HK$’000 HK$’000
At 1 July 2013 510,171 2,984,261 3,494,432
Additions 141 141
Amortisation (12,382) (12,382)
Impairment losses_(Note 9)_ (40,000) (40,000)
Exchange differences 2,266 91,810 94,076
At 30 June 2014 460,055 3,076,212 3,536,267
Amortisation (10,202) (10,202)
Relinquishment (6,833) (6,833)
Impairment losses_(Note 9)_ (225,000) (1,216,618) (1,441,618)
Exchange differences 1,782 (574,823) (573,041)
At 30 June 2015 226,635 1,277,938 1,504,573

Mining right in the PRC

Mining right in the PRC represents the right to conduct mining activities in Damajianshan, Honghe Zhou, Luchun County, Yunnan. The mine is located on land in the PRC to which the Group has no formal title. Yunnan State Land Resources Bureau issued the mining right certificate to Luchun in January 2005. After such, Luchun renewed the certificates for a few times. In June 2013, Yunnan State Land Resources Bureau granted Luchun a mining right certificate for one year which expired in June 2014. In July 2014, the mining right certificate was renewed for a period of two years expiring in July 2016.

With reference to an independent legal opinion received by Luchun, there is no legal barrier for Luchun to renew its mining right certificate when it expires. The independent legal opinion also confirmed that there was no illegal activity undertaken by Luchun and there was no penalty exerted or will be exerted by the government regarding Luchun’s mining operation.

Accordingly, the directors of the Company are of the opinion that the Group will be able to continuously renew the mining right and the business licenses of respective mining subsidiaries at minimal charges.

The mining right in the PRC is amortised using the units of production method based on the proven and probable mineral reserves under the assumption that the Group can renew the mining right in the future until all proven and probable reserves have been mined.

As at 30 June 2015, the Group assessed and concluded that the downturn of global economy and recent sustained copper price weakness are considered to be impairment indicators and therefore an impairment assessment have been performed by the directors. The directors have taken into consideration fair value less costs of disposal and value-in-use calculations to determine the recoverable amount of the mining right. As at 30 June 2015, the recoverable amount is determined by the value-in-use calculation.

– 16 –

Key assumptions adopted by management are summarised as follows:

As at 30 June As at 30 June
2015 2014
Copper price assumption 2015: US$5,761/t 2014: US$7,020/t
(with reference to forecast by industry experts) 2016: US$4,827/t 2015: US$7,053/t
2017: US$5,500/t 2016: US$7,183/t
2018: US$6,000/t 2017: US$7,466/t
2019: US$6,080/t 2018: US$7,531/t
2020 onwards: US$6,200/t 2019 onwards: US$7,419/t
Discount rate 18.2% 17.8%
800 tonnes to 1,300 800 tonnes to 1,300
Production capacity tonnes per day tonnes per day

Based on the above impairment assessment, an impairment of approximately HK$225,000,000 (2014: HK$40,000,000) was recognised for the year.

These calculations use cash flow projections based on financial projections approved by management. The fair value of the mining right is highly sensitive to these assumptions adopted in the valuation.

  • If the long-term copper price adopted in the valuation had been 5% lower, the recoverable amount would have reduced by approximately HK$13,065,000 and further impairment of HK$13,065,000 would be required.

  • If the production volume adopted in discounted cash flow calculation had been 5% lower than management’s estimates at 30 June 2015, the recoverable amount of the mining right recognised would have decreased by HK$15,920,000 and further impairment of HK$15,920,000 would be recognised.

Mining properties in Australia

The mining properties in Australia represent the carrying value of mining and exploration projects in Australia (including the Marillana iron ore project) acquired by the Group.

During the year ended 30 June 2015, the Group has relinquished two tenements located in West Pilbara to the Government of Western Australia. As a result, a loss of HK$6,833,000 has been recognised in the consolidated statement of comprehensive income (Note 8).

As at 30 June 2015, the Group assessed and concluded that the downturn of global economy and recent sustained iron ore price weakness are considered to be impairment indicators and therefore an impairment assessment have been performed by the directors. As at 30 June 2015, the recoverable amount is determined by the fair value less cost of disposal approach.

Key assumptions adopted by management are summarised as follows:

30 June 2015
Estimated mine life 25 years from 2020
Average production 18 million tonnes per year
Long-term iron ore price (per dry metric tonne unit (“dmtu”)) US¢97/dmtu
Exchange rate of AUD to USD 0.72
Discount rate 13%

– 17 –

Based on the above impairment assessment, an impairment of approximately HK$1,216,618,000 (2014: Nil) was recognised for the year. The impairment reduces the deferred income tax liability brought to account following the business combination relating to the value attributed to the mining properties acquired. The reduction in the deferred income tax liability as a result of the impairment is HK$364,986,000 (2014: Nil).

The impairment assessment has made reference to industry experts’ long term iron ore price forecasts, discount rate and exchange rate. The fair value of the Australian projects is highly sensitive to these assumptions adopted in the valuation.

  • If the long-term iron ore price adopted in the valuation had been 1% lower, the recoverable amount would be reduced by approximately HK$249,000,000. Further impairment loss of HK$356,000,000 and a reversal of deferred income tax liabilities of HK$107,000,000 would be required.

  • If the discount rate adopted in the valuation had been 0.5% higher, the recoverable amount would be reduced by approximately HK$285,000,000. Further impairment loss of HK$407,000,000 and a reversal of deferred income tax liabilities of HK$122,000,000 would be required.

  • If the exchange rate adopted in the valuation had been 1% higher, the recoverable amount would be reduced by approximately HK$244,000,000. Further impairment loss of HK$349,000,000 and a reversal of deferred income tax liabilities of HK$105,000,000 would be required.

The ultimate recoupment of the carrying value of mining properties is dependent on the successful development and commercial exploitation of, or sale of interests in, the mining properties.

16. TRADE PAYABLES

Trade payables of the Group principally represent amounts outstanding to suppliers. The normal credit period is between 30 days and 90 days. In certain circumstances, the credit period has been extended to over 90 days. The following is an ageing analysis of trade payables of the Group at the balance sheet date:

2015 2014
HK$’000 HK$’000
0–30 days 4,470 4,538
31–60 days 78 157
61–90 days 199 191
Over 90 days 5,454 4,654
10,201 9,540
SHARE CAPITAL
Number of
shares Share capital
’000 HK$’000
Ordinary shares of HK$0.1 each
Authorised:
At 30 June 2014 and 2015 10,000,000 1,000,000
Issued and fully paid:
At 1 July 2013 7,894,482 789,448
Issue of shares_(Note (a))_ 409,500 40,950
Issue of shares in settlement of a fixed rate bond_(Note (b))_ 78,000 7,800
As at 30 June 2014 and 2015 8,381,982 838,198

17. SHARE CAPITAL

– 18 –

Notes:

  • (a) On 13 February 2014, a total of 195,000,000 ordinary shares were issued to China Guoyin at an issue price of HK$0.40 per share, raising net proceeds of approximately HK$78 million.

  • On the same day, a total of 214,500,000 ordinary shares were issued to Ocean Line, a substantial shareholder of the Company, at issue price of HK$0.40 per share with net proceeds from share subscription at HK$85.8 million.

  • (b) Pursuant to the share subscription agreement with Ocean Line, the Company redeemed a fixed rate bond in full by issuing a total of 78,000,000 ordinary shares to Ocean Line on 13 February 2014 at the issue price of HK$0.40 per share.

All the new shares issued rank pari passu in respect of the then existing shares.

18. EVENTS OCCURRING AFTER THE REPORTING PERIOD

There is no significant event occurred subsequently after the balance sheet date.

– 19 –

MANAGEMENT DISCUSSION AND ANALYSIS

Iron Ore Operations — Western Australia

This segment of the business is comprised of the 100% owned Marillana Iron Ore Project (“Marillana” or “the Project”), the Ophthalmia Iron Ore Project (“Ophthalmia”) and other regional exploration.

The net operating loss before income tax expense for the period for this segment and attributable to the Group was HK$1,326.3 million (2014: HK$90.2 million). Total expenditure associated with mineral exploration for the period ended 30 June 2015 amounted to HK$60.6 million (2014: HK$75.1 million).

Total expenditure associated with mineral exploration and evaluation by each of the projects in Western Australia for the financial periods were summarised as follows:

Project
Marillana
Ophthalmia
West Pilbara
Year ended 30 June
2015
2014
HK$’000
HK$’000
24,357
11,330
28,494
54,153
7,789
9,611
60,640
75,094
Year ended 30 June
2015
2014
HK$’000
HK$’000
24,357
11,330
28,494
54,153
7,789
9,611
60,640
75,094
75,094

The Group is yet to make a final investment decision toward commencing development of any of its iron ore projects in Western Australia. Accordingly, no development expenditures have been recognised in the financial statements during the year ended 30 June 2015 (year ended 30 June 2014: Nil).

Total capital expenditures for each of the projects in Western Australia for the financial periods were summarised as follows:

Project
Marillana
Ophthalmia
Year ended 30 June
2015
2014
HK$’000
HK$’000
Addition to
property, plant
and equipment
Addition to
mining
properties
Addition to
property, plant
and equipment
Addition to
mining
properties
252

31



487
141
252

518
141
Year ended 30 June
2015
2014
HK$’000
HK$’000
Addition to
property, plant
and equipment
Addition to
mining
properties
Addition to
property, plant
and equipment
Addition to
mining
properties
252

31



487
141
252

518
141
141

– 20 –

Impairment Loss

The recent volatility of iron ore price and material reductions in long term iron ore price forecasts during the year are considered to be impairment indicators which triggered the need to perform an impairment assessment. Based on the assessment, an impairment of approximately HK$1,216,618,000 was recognised for the year (2014: Nil). The impairment reduces the deferred income tax liability brought to account following the business combination relating to the value attributed to the mining properties acquired. The reduction in the deferred income tax liability as a result of the impairment is HK$364,986,000 (2014: Nil).

Marillana Iron Ore Project Overview

The 100% owned Marillana Iron Ore Project (“Marillana” or “the Project”) is Brockman’s flagship project located in the Hamersley Iron Province within the Pilbara region of Western Australia, approximately 100 km north-west of the township of Newman. The Project is located within mining lease M47/1414.

The Project area covers 82 km[2] bordering the Hamersley Range, where extensive areas of supergene iron ore mineralisation have developed within the dissected Brockman Iron Formation that caps the Range.

The ultimate delivery of Marillana’s first commercial production is dependent upon securing, funding, and developing suitable rail and port infrastructure. The Company will provide guidance on the timing for delivery of the Project once the infrastructure solution is secured.

Figure 1: Project location map — Brockman tenements

==> picture [482 x 295] intentionally omitted <==

– 21 –

Rail and Port Access and Infrastructure

The key to unlocking the value of the Group’s highly prospective iron ore mineral tenements relies on securing a rail and port infrastructure solution and funding.

The Company continues to actively pursue various infrastructure alternatives.

Rail Access

In May 2013, Brockman commenced seeking access rights to The Pilbara Infrastructure Pty Ltd’s (“TPI’s”) below-rail infrastructure under the Western Australian Railways (Access) Code 2000 (WA) (“Code”), to allow it to haul up to 20 Mtpa of hematite iron ore product from its Marillana Project, for a term of 20 years (“Access Proposal”). The access sought proposed to exit the TPI mainline at Port Hedland where North West Infrastructure (“NWI”) has a capacity allocation of 50 Mtpa at the proposed SP3 and the SP4 berths for iron ore export from South West Creek in the Inner Harbour.

As part of the Access Proposal Brockman will procure the necessary spur lines and associated infrastructure to connect Marillana with the TPI railway and to connect it to the proposed NWI facilities in Port Hedland, which will include unloading, stockpiling and ship loading facilities in South West Creek, Port Hedland.

On 4 October 2013, TPI commenced proceedings in the WA Supreme Court challenging the validity of the Access Proposal. The trial was held in August 2014 and on 26 September 2014 the Honorable Justice James Edelman handed down his decision, which supported Brockman’s position finding that the Access Proposal was valid and complied with the requirements of s 8 of the Access Code. TPI’s action was wholly dismissed, with TPI ordered to pay Brockman’s costs of the action. TPI have appealed this decision and that appeal was heard in late August, 2015, and the finding is expected to be handed down soon.

As part of the decision by Justice Edelman, the ERA was required to review the consideration of ‘contingencies’ and ‘asset lives’ for the purposes of the calculation of GRV which is a primary input into the determination of the Floor and Ceiling Costs. The ERA published a remade determination of the Floor and Ceiling Costs in January 2015. The remade determination is similar to the earlier determination of Floor and Ceiling Costs.

Following the successful Supreme Court decision, Brockman has continued to progress the required information for the Access Proposal under sections 14 (financial and managerial capability) and 15 (capacity) of the Code.

North West Infrastructure

Brockman, as a foundation member of the North West Infrastructure joint venture (NWI), has a potential port solution through the Western Australian State Government conferral of 50Mtpa export capacity to NWI and the related potential port stock yards and berth locations (SP3 and SP4 in South West Creek in the Port Hedland inner harbour) set aside by the Pilbara Ports Authority. The NWI opportunity is reliant on securing a viable rail solution to connect potential users mines with the port.

– 22 –

NWI has completed a cost review and reduced outflows during this market cycle awaiting resolution of the rail solution. Brockman remains focussed on protecting its foundation shareholding position in NWI and remains vigilant to the opportunity for other aspirant Pilbara based junior developers and miners to support the future port development.

Mine Development

Feasibility Study

Brockman has invested in a number of feasibility and subsidiary studies on the Marillana Project, in conjunction with ongoing resource development, metallurgical test work and approvals processes. These studies include:

  1. Scoping Study in 2007–2008;

  2. Preliminary Feasibility Study (“PFS”) in 2009; and

  3. Definitive Feasibility Study (“DFS”) in 2010.

The project studies have been advanced ahead of resolution of an infrastructure solution. Consequently, Brockman’s current focus is almost entirely on resolving the rail solution for Marillana and advancing the NWI port solution towards its development decision. Upon finalising a rail solution, Brockman will complete an updated DFS to a bankable standard in conjunction with relevant rail and port studies, to support the final investment decision and project financing.

Brockman has also focussed its efforts on optimisation studies for the Marillana project. The current economic climate has presented cost saving opportunities and the project team is investigating the likely beneficial impact on previous capital and operating cost estimates for the Marillana project under the existing cost environment, in readiness for when an infrastructure solution is secured.

The Company is also re-evaluating the mine plan to reduce haul distances, increase product yields in the early mine life and minimise rehandling of waste materials, all of which is anticipated to have a positive impact on mining costs.

Approvals

The Project, including the entire deposit and all proposed infrastructure areas, is contained within the granted Mining Lease M47/1414 over an area of 82.5 km[2] . All required environmental baseline and impact assessment studies and cultural heritage surveys have been completed and key State and Commonwealth environmental approvals have been received for the Project. The remaining secondary approvals will be obtained in parallel with the completion of the updated DFS.

– 23 –

Metallurgy

During the year, limited dust extinction moisture testwork was conducted on Marillana iron ore fines. In addition an internal review was conducted on the mass and iron recovery for the -45 and +32 run of mine size fractions. The results of these studies indicated that it was not cost effective to recover these size fractions.

Mining Business — Yunnan, PRC

Our copper mining business comprises processing and sales of copper, silver and other mineral resources in the Yunnan Province of the PRC, through the operation of a subsidiary of the Company — Luchun Xingtai Mining Co., Ltd (“Luchun”) which is the mine operator of the Damajianshan Mine. The Damajianshan Mine is located in Qimaba Township, Luchun County of Yunnan Province in the PRC. It is near the border between the PRC and Vietnam.

Production and operation results for the year ended 30 June 2014 and 2015 were summarised as follows:

2015 2014
Copper ore processed 182,485 tonnes 146,655 tonnes
Production of Copper Ore Concentrates 794 Metal (t) 861 Metal (t)
Sales of Copper Ore Concentrates 884 Metal (t) 842 Metal (t)
Average selling price per Metal (t) (without VAT) RMB32,746 RMB36,469

During the year, turnover of this segment was approximately HK$36.5 million (2014: HK$38.7 million), and the segment loss before interest, tax, amortisation and impairment of mining right was approximately HK$16.8 million (2014: HK$6.9 million).

Copper ore processed increased by 24% to 182,485 tonnes in 2015, However, lower grades, depleting reserves and higher costs are likely to impact future production. Current reserves are being replaced by lower-grade and higher-cost operations in geographically difficult locations. This will ultimately impact the cost curve and realised copper price.

In 2015, global copper supply outstripped demand for the fourth consecutive year. This, together with concerns about the growth of the Chinese economy and lower oil prices, continued to weigh on copper prices. The average realised copper price decreased by 10% to RMB32,746 in 2015.

Impairment Loss

The downturn of global economy and the recent sustained copper price weakness are considered to be the impairment indicators which triggered the need to perform an impairment assessment. Base on the impairment assessment, an impairment loss of approximately HK$225,000,000 has been recognised in the consolidated income statement (2014: HK$40,000,000).

– 24 –

Summary of Expenditure

The cost of sales of the mining segment mainly included mining, processing and refining, ore transportation and waste disposal costs.

Total expenditure associated with the mining operation (excluding amortisation and impairment of mining right) in the PRC during the year amounted to approximately HK$53.5 million (2014: HK$47.7 million). Expenditure associated with exploration activities amounted to approximately HK$15.9 million (2014: HK$12.1 million).

During the year ended 30 June 2015, capital expenditures of HK1.6 million has been capitalised as property, plant and equipment (30 June 2014: HK$2.1 million).

Exploration

Exploration activities and tunnelling works continued during the reporting period. The exploration activities are aimed to find additional resources in order to support the Group’s further expansion plan. New drilling works and detailed prospecting and scoping plans are now being planned to better define the lithology, grade and assemblage within the mining lease.

Liquidity and Financial Resources

The Group monitors and maintains a level of cash and cash equivalents deemed adequate by management to finance the Group’s operations and mitigate the effects of fluctuations in cash flows.

The Group generally finances its short term funding requirement with cash generated from operations and equity funding. The Group’s ability to achieve its Marillana iron ore project development schedule is reliant on access to appropriate and timely funding.

The current ratio is measured at 1.17 times as at 30 June 2015 compared to 2.38 times as at 30 June 2014.

The gearing ratio of the Group (long term debts over equity and long term debts) is measured at 0.02 (2014: 0.01).

During the reporting period, the Group did not engage in the use of any financial instruments for hedging purposes, and there is no outstanding hedging instrument as at 30 June 2015.

– 25 –

CAPITAL STRUCTURE

The Company has no changes in its issued share capital for year.

As at the date of the announcement, the total number of issued shares outstanding for the Company amounted to 8,381,982,131 shares.

Shares Details

Shares on issue

As at 30 June 2015:

  • 8,381,982,131 fully paid shares on issue

Unquoted securities

As at 30 June 2015:

the total number of unlisted options outstanding is 316,500,000, including:

316,500,000 unlisted options granted

  • 61,400,000 share options, expiring 13 December 2015 EX HK$0.72

  • 46,600,000 share options, expiring 14 January 2016 EX HK$0.717

  • 46,600,000 share options, expiring 14 January 2016 EX HK$0.967

  • 3,600,000 share options, expiring 28 February 2016 EX HK$0.717

  • 3,600,000 share options, expiring 28 February 2016 EX HK$0.967

  • 73,350,000 share options, expiring 20 May 2016 EX HK$0.717

  • 73,350,000 share options, expiring 20 May 2016 EX HK$0.967

  • 8,000,000 share options, expiring 18 January 2018 EX HK$0.45

The following options were lapsed during the period:

  • 22,000,000 share options, expiring 13 December 2015 Exercise price: HK$0.72

  • 41,500,000 share options, expiring 14 January 2016 Exercise price: HK$0.717

  • 41,500,000 share options, expiring 14 January 2016 Exercise price: HK$0.967

  • 3,250,000 share options, expiring 20 May 2016 Exercise price: HK$0.717

  • 3,250,000 share options, expiring 20 May 2016 Exercise price: HK$0.967

During the year, a total of 8,000,000 share options with an exercise price of HK$0.45 were issued, expiring 18 January 2018. In addition to the above, 15,000,000 options quoted on the ASX were lapsed on 30 September 2014.

– 26 –

Risk Disclosure

Market risk

The Group is exposed to various types of market risks, including fluctuations in copper price and exchange rates.

(a) Commodities Price Risk

Copper Ore Concentrate Price Risk

The Group’s turnover and profit of the mining business during the year were affected by fluctuations in the copper prices. All of our mining products were sold at market prices and the fluctuation of the price were beyond the control of the Group.

Iron Ore Price Risk

The fair value of the Group’s mining properties in Australia are exposed to fluctuations in the expected future iron ore price.

We have not used any commodity derivative instruments or futures for speculation or hedging purposes. The management will review the market condition from time to time and determine the best strategy to deal with the fluctuation of copper ore concentrate price and iron ore price.

  • (b) Exchange Rate Risk

The Group is exposed to exchange rate risk primarily in relation to our mineral tenements that are denominated in Australian dollar. Depreciation in Australian dollar may adversely affect our net asset value and earnings when the value of such assets is converted to Hong Kong dollars. During the year, no financial instrument was used for hedging purpose.

Financial Guarantee

At 30 June 2014 and 2015, the Company did not have any financial guarantees.

Contingent Liabilities

The Group did not have any contingent liabilities as at 30 June 2015.

– 27 –

Staff and Remuneration

As at 30 June 2015, the Group employed 238 full time employees (2014: 409 employees), of which 212 employees were in the PRC (2014: 365 employees), and 9 employees were in Australia (2014: 26). The remuneration of employees includes salary, discretionary bonus and share based compensation.

The remuneration policy and packages of the Group’s employees, senior management and directors are maintained at market level and reviewed annually and when appropriate by the management and the remuneration committee.

PURCHASE, REDEMPTION OR SALE OF LISTED SECURITIES

During the period, neither the Company nor any of its subsidiaries purchased, redeemed or sold any of the listed securities of the Company.

COMPLIANCE OF THE CODE ON CORPORATE GOVERNANCE PRACTICES

The Company is listed on both the Australian Securities Exchange (“ASX”) and on the SEHK. The Company’s corporate governance policies have been formulated to ensure that it is a responsible corporate citizen. The Company complies with all aspects of the Corporate Governance Code as set out in Appendix 14 of the Rules Governing the Listing of Securities on the SEHK, except for the deviation from Code Provision A.2.1, which requires the roles of chairman and chief executive should be separate and should not be performed by the same individual. The position for the chief executive officer at the Group level has been vacant during the period. Nonetheless, Mr. Colin Paterson, who serves as the chief executive officer at Brockman Mining Australia Pty Ltd (a wholly-owned subsidiary of the Company), is responsible for the oversight of the core iron ore business operation.

The Company will continue to seek for the appropriate candidate to fill the vacant position when appropriate.

MODEL CODE FOR SECURITIES TRANSACTIONS BY DIRECTORS

The Company has adopted a Securities Trading Policy which applies, inter alia, to all Directors and Key Management Personnel. The Securities Trading Policy complies with the ASX Listing Rules and the Model Code for Securities Transactions by Directors of Listed Issuers (the “Model Code”) as set out in Appendix 10 of the HK Listing Rules. A copy of the Company’s Securities Trading Policy is available on the website of the Company.

– 28 –

AUDIT COMMITTEE

The Audit Committee comprises of three independent non-executive directors namely, Messrs. Yap Fat Suan, Henry, Uwe Henke Von Parpart and Yip Kwok Cheung, Danny. Mr. Yap Fat Suan, Henry is the chairman of the Audit Committee as at 30 June 2015. The Audit Committee has adopted the terms of references which are in line with the Corporate Governance Code. The Audit Committee has reviewed the Group’s annual results for the year ended 30 June 2015.

APPRECIATION

The Board wishes to take this opportunity to express gratitude to our employees for their contribution and dedication to the Group. We also thank our shareholders, customers and suppliers for their continuous support.

By order of the Board Brockman Mining Limited Kwai Sze Hoi Chairman

30 September 2015, Hong Kong

As at the date of this announcement, the board of directors of the Company comprises Mr. Kwai Sze Hoi (Chairman), Mr. Liu Zhengui (Vice Chairman) and Mr. Ross Stewart Norgard as non-executive directors; Mr. Chan Kam Kwan, Jason (Company Secretary), Mr. Kwai Kwun Lawrence and Mr. Colin Paterson as executive directors; Mr. Yap Fat Suan, Henry, Mr. Uwe Henke Von Parpart, Mr. Yip Kwok Cheung, Danny and Mr. Choi Yue Chun, Eugene as independent non-executive directors.