BRIGHTSTAR RESOURCES LIMITED Capital/Financing Update 2008

Oct 26, 2008

64581_rns_2008-10-26_a9d0663f-c3e1-4415-bd48-f4400194414e.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 127] intentionally omitted <==

----- Start of picture text -----

AUSTRALIAN STOCK
EXCHANGE CODE AAM
Current Issued Capital: 108,541,861 Ordinary Fully Paid Shares Market Cap at 6 cents $6M Cash at Bank: $3.7M
----- End of picture text -----

27 October 2008

ASX ANNOUNCEMENT

DELTA GOLD DISCOVERYSUMMARY OF EXPLORATION FOR THE YEAR INCORPORATING THE LATEST RC DRILLING RESULTSPLANS FOR DEVELOPMENT

Latest Drilling Highlights: Delta Trend: CTA 269 11m @ 5.9g/t Au from 46metres (including 4m @ 12.9g/t from 46 metres) CTA 262 13m @ 2.5g/t Au from 62metres CTC 020 12m @ 3.7g/t Au from 66metres CTC 023 4m @ 4.8g/t Au from 74metres Central Zone: CTA 239 2m @ 27.8g/t Au from 38metres

INTRODUCTION

A1 Minerals Limited (ASX:AAM) is an emerging gold producer with its own exciting new discoveries in the prolific Laverton area of Western Australia. A1 has established a JORC compliant 1.01 million ounce gold resource in six deposits and recently purchased a CIP treatment plant planned to initially be processing at a rate of 250,000 tonnes per annum of ore. A significant resource upgrade is expected at Delta.

RC RESULTS

A1 is pleased to announce that the results of the complete set of assays from the latest reverse circulation drill holes at Delta have been received.

The RC drilling program was designed to extend near surface gold mineralisation. The objective was successfully achieved and it is evident the drilling is increasing the size and robustness of the gold resource at Delta.

Table.1 shows the latest RC results plus the extensive list of significant drill intercepts A1 Minerals has been able to achieve in its programs through the year at Delta.

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

PLANS FOR DEVELOPMENT

The continuing success at Delta and the projected potential for additional resources has led A1 to select the Delta area as the optimal site to locate its treatment plant. In particular A1 is encouraged by

  • The likelihood of multi-year mine life;

  • Delta is centrally located within A1’s tenements on the Duketon-Merolia greenstone belts;

  • Its proximity (30kms) to the regional centre of Laverton which services the surrounding mines;

  • The abundance of good quality water;

  • An existing 41-hectare Tailings Storage Facility (TSF) and other mining infrastructure.

==> picture [435 x 406] intentionally omitted <==

----- Start of picture text -----

PROPOSED TREATMENT PLANT
SITE AT DELTA
----- End of picture text -----

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

Development drilling is completed and management is now solely focussed on the transition to production.

The Company has commenced the process to obtain the necessary statutory approvals for the CIP treatment plant, TSF and mining permits at Delta and mining permits at satellite deposits.

In order to maximise the chance that self funding is achievable A1 will commence production in stages:

  • Construct processing plant on the basis of 250,000tpa

  • Initially mining from a number of near-surface high grade satellite deposits which are already defined;

  • Once near surface ore has contributed to the cash flow sufficiently an earthmoving contractor will be appointed to carry out waste stripping for multiple open-pit operation.

  • Increase plant throughput to 500,000tpa

The staged approach to development where mining is scaled up in steps should assist in minimising the risks associated with the transition to gold production. Management will be focussed on maintaining a healthy cash position without slowing down the progress to full scale mining.

Mining schedules are in the process of being finalised however it is anticipated that mining will commence prior to the completion in the first half of 2009 of the treatment plant refurbishment and construction.

The mining and construction schedules are very dependant on the governmental approvals process.

A1 Minerals initially expects to start producing gold at a rate of 30,000oz per annum. Cash costs are expected to be AUD$600 per ounce (US$ 420/oz).

Figure.2 Aerial View (to South) of Cork Tree Well Pits at Delta Prospect

==> picture [156 x 206] intentionally omitted <==

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

Figure.3 Aerial photograph with Plan of Significant Drilling Over 3km Delta Trend

==> picture [397 x 597] intentionally omitted <==

----- Start of picture text -----

10m @ 7.5g/t 15m @ 31.6g/t
21m @ 4.0g/t
15m @ 4.4g/t
2m @ 25.5g/t
12m @ 3.7g/t
5m @ 2.9g/t
2m @ 4.0 g/t
5m @ 3.6g/t
3m @ 2.7g/t
5m @ 2.4 g/t
11m @ 5.9g/t
13m @ 2.5g/t
4m @ 4.8g/t
7m @ 3.4g/t
7m @ 3.7g/t
----- End of picture text -----

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

Table.1 Summary of Significant Delta Drill Results for the Year

Delta : Oct 08 RC Drilling

Drillhole Grid N Grid E Dip Azim From m To m Thickness Grade
CTC020 7606 1205 -60 255 66 78 12 3.68
CTC020 7606 1205 -60 255 112 114 2 1.34
CTC021 7616 1272 -60 255 163 168 5 2.03
CTC022 7627 1239 -60 255 102 104 2 1.30
CTC022 7627 1239 -60 255 108 110 2 2.05
CTC022 7627 1239 -60 255 127 134 7 1.20
CTC022 7627 1239 -60 255 152 155 3 3.30
CTC023 5684 1563 -60 255 74 88 14 1.71
CTC023 5684 1563 -60 255 74 78 including4
4.80

Delta: Sept 08 Diamond Drilling

Drillhole Grid N Grid E Dip Azimuth From m To m Thickness Grade
CTD001 5580 1550 -60 255 164 166 2 31.90
CTD001 5580 1550 -60 255 177 181 4 2.41
CTD001 5580 1550 -60 255 199 208 9 4.70
CTD002 5615 1559 -60 255 159 164 5 1.17
CTD002 5615 1559 -60 255 275 277 2 1.72
CTD002 5615 1559 -60 255 325 334 9 2.06
325 327 Including 2 6.9
CTD002 5615 1559 -60 255 341 350 9 1.18

Delta: July 08 Phase

Drillhole Grid N Grid E Dip Azimuth From m To m Thickness Grade
CTA243 5000 1451 -60 255 0 3 3 1.09
CTA258 6236 1461 -60 255 28 30 2 2.20
CTA260 6303 1460 -60 255 57 68 11 0.90
CTA260 6303 1460 -60 255 71 73 2 1.89
CTA262 6336 1461 -60 255 62 75 13 2.51
CTA269 6519 1433 -60 255 46 57 11 5.95
46 50 Including4 12.9
CTA270 6555 1245 -60 255 85 89 4 1.59
CTA287 7053 1256 -60 255 67 69 2 1.08
CTA289 7330 1282 -60 255 19 21 2 0.76
CTA291 7690 1162 -60 255 53 54 1 2.68
CTA292 7699 1182 -60 255 36 37 1 0.94
CTA306 6197 1478 -60 255 42 44 2 1.42
CTA308 6372 1435 -60 255 34 36 2 1.48
CTA308 6372 1435 -60 255 41 44 3 2.65

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

Central Zone: July 08 Phase July 08 Phase
Drillhole Grid N Grid E Dip Azimuth From m To m Thickness Grade
CTA162 9170 2740 -60 270 58 61 3 1.62
CTA231 9056 2757 -60 270 27 29 2 2.37
CTA232 9060 2787 -60 270 56 59 3 3.47
CTA232 9060 2787 -60 270 65 68 3 2.10
CTA239 8947 2840 -60 270 38 40 2 27.80
CTA239 8947 2840 -60 270 67 70 3 1.00
Delta: March 2008 Phase Delta: March 2008 Phase Delta: March 2008 Phase
Drillhole GridmN GridmE Dip **Azimuth ** From To **Thickness ** Grade
CTA115 7592 1155 -60 255 37 58 21 4.03
CTA132 7609 1212 -60 255 69 71 2 25.50
CTA112 7618 1155 -60 255 19 24 5 8.78
CTA112 7618 1155 -60 255 37 51 14 2.92
CTA116 7597 1174 -60 255 28 31 3 10.92
CTA113 7624 1174 -60 255 49 51 2 14.39
CTA113 7624 1174 -60 255 34 43 9 2.63
CTA113 7624 1174 -60 255 60 72 12 2.46
CTA006 7100 1272 -60 255 94 99 5 3.64
CTA097 6292 1423 -60 255 15 21 6 2.92
CTA018 7339 1322 -60 255 68 73 5 2.75
CTA013 7288 1258 -60 255 59 64 5 2.96
CTA013 7288 1258 -60 255 82 84 2 3.96
CTA085 6570 1325 -60 255 43 48 5 2.43
CTA018 7339 1322 -60 255 96 101 5 1.62
CTA019 7354 1311 -60 255 92 100 8 0.75
CTA020 7408 1315 -60 255 80 98 18 0.84
CTA021 7429 1284 -60 255 39 42 3 2.10
CTA024 7460 1309 -60 255 59 61 2 5.45
CTA032 7625 1299 -60 255 58 64 6 1.13
CTA083 6647 1305 -60 255 17 26 9 1.19
CTA085 6570 1325 -60 255 41 49 8 1.73
CTA085 6570 1325 -60 255 60 62 2 3.56
CTA113 7624 1174 -60 255 34 40 6 3.72
CTA116 7597 1174 -60 255 37 40 3 3.33
CTA120 7625 1130 -60 255 41 48 7 1.50
CTA121 7666 1307 -60 255 42 47 5 1.83
CTA127 7720 1276 -60 255 40 45 5 2.79
CTA133 7575 1100 -60 255 0 2 2 5.52
CTA122 7705 2938 -60 255 56 59 3 3.26
CTA138 7570 1155 -60 255 34 39 5 1.19
CTA147 7368 1205 -60 255 33 39 6 1.83

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491

Historic Drilling Delta 2
Drillhole Grid N Grid E Dip Azimuth From To Thickness Grade
CTC01 5580 1550 -60 255 120 135 15 4.4
CT1 6020 1120 -60 255 29 34 5 10.1
CT2 5986 1094 -60 255 77 95 18 3.3
CT2 5986 1094 -60 255 110 115 5 4.4
CT6 5838 988 -60 255 49 67 18 1.55
CT7 5811 970 -60 255 48 63 15 31.6
CT14 5918 776 -60 255 43 53 10 7.5
CT15 5948 752 -60 255 61 66 5 6.89
CT16 5977 726 -60 255 63 69 6 1.92
CT16 5977 726 -60 255 79 85 6 1.85
CT20 6088 625 -60 255 89 92 3 4.21
CT21 6124 596 -60 255 65 75 10 2.62
CT32 7422 1246 -60 255 18 20 2 6.24
87CDE1 5510 1645 -60 255 155 169.5 14.5 2.6
Including7 3.4
87CDE2 5385 1685 -60 255 166.7 173.3 6.7 3.7
87CDE2 5385 1685 -60 255 170 173.3 3.3 5.5
87CDE2 5385 1685 -60 255 191 192 1 16.0
87CRE9 5365 1600 -60 255 86 103 17 3.3
87CRE9 5365 1600 -60 255 86 91 5 4.61
87CRE9 5365 1600 -60 255 96 100 4 7.1
CT33 4386 1895 -60 255 42 45 3 1.76

For more information please contact John Williams on 61 8 9244 1400 or visit the Company’s web site at www.a1minerals.com.au

John Williams Managing Director

The information in this report that relates to Exploration Results or Mineral Resources is based on data compiled by Mr John Williams who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Williams is a full time employee of A1 Minerals Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as Competent Persons as defined in the 2004 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Williams has consented to the inclusion in this report of the matters based on information in the form and context in which it appears. Mr Williams is a shareholders of A1 Minerals Limited.

Suite 34, 25 Walters Drive, Osborne Park WA 6017 Telephone (618) 9244 1400 Facsimile (618) 9244 1600 Email [email protected] Website www.a1minerals.com.au

ABN 44 100 727 491