Report on payments to governments
Year ended 31 December 2019
2 Report on payments to governments 2019
CONTENTS
INTRODUCTION 3
BASIS OF PREPARATION 3
PAYMENTS OVERVIEW 6
PAYMENTS BY COUNTRY 7
OTHER SOURCES 30
INTRODUCTION
BP p.l.c. has prepared the following consolidated report ('Report') on payments to governments in accordance with the Reports on Payments to Governments Regulations 2014 (2014/3209), as amended by the Reports on Payments to Governments (Amendment) Regulations 2015 (2015/1928), (the 'Regulations'). The Report also addresses BP p.l.c.'s reporting obligations under DTR 4.3A of the Financial Conduct Authority Disclosure Guidance and Transparency Rules. The 'Basis of Preparation' section below contains information about the content of the Report, the types of payments included and the principles that have been applied in preparing the Report.
bp's socio-economic contribution
bp makes a broader socio-economic contribution to countries in which we operate in addition to the payments that are required to be reported under the Regulations. We also make payments to governments in connection with parts of our business other than the Upstream – for example in relation to the transporting, trading, manufacturing and marketing of oil and gas. As well as government payments, bp contributes to the economies of the countries in which we operate by providing jobs for employees and contractors, purchasing materials from local suppliers and undertaking social investment activities. See Other Resources section at the end of the report for more information on our socio-economic contribution and our position on tax and financial transparency.
bp's position on revenue transparency
bp supports the concept of transparency in revenue flows from oil and gas activities in resource-rich countries. It helps citizens of affected countries access the information they need to hold governments to account for the way they use funds received through taxes and other agreements.
BASIS OF PREPARATION
Under the Regulations, the directors of BP p.l.c. are required to prepare a consolidated report on payments made to governments for each financial year in relation to relevant activities of both BP p.l.c. and any of its subsidiary undertakings included in the consolidated group accounts. The term 'bp' is used interchangeably within this report to indicate BP p.l.c. or any subsidiary undertaking within the scope of the Report.
Activities within the scope of the Report
Payments made to governments that relate to bp's activities involving the exploration, prospection, discovery, development, and extraction of minerals, oil, natural gas deposits or other materials ('extractive activities') are included in this Report.
Payments made to governments that relate to trading, export (pipelines), refining and processing activities are not included in this Report as they are not within the scope of extractive activities as defined by the Regulations.
Where a payment relates to activities that are reportable under the Regulations as well as to activities which are not reportable, bp reports the payment in its entirety if it is not possible to disaggregate it.
Government
Under the Regulations, a 'government' is defined as any national, regional or local authority of a country, and includes a department, agency or undertaking that is a subsidiary undertaking controlled by such an authority. In some countries, certain local indigenous organizations fall within this definition of government. Where this is the case payments made to such organizations have been included in this Report. Where a state owned enterprise undertakes activities outside of its home jurisdiction, then it is not considered to be a government.
Cash basis
Payments are reported on a cash basis, meaning that they are reported in the period in which they are paid, as opposed to being reported on an accruals basis (which would mean that they were reported in the period for which the liabilities arise). Refunds are also reported in the period they are received by bp and are shown as negative amounts in the Report. Where payments in kind are made to a government they are valued and footnotes are included to help explain the valuation method and any related volumes.
3 Report on payments to governments 2019
Reporting principles
The Regulations require payments to be reported where they are made to governments by BP p.l.c. and its subsidiary undertakings in respect of extractive activities. In preparing a report, the Regulations also require the disclosure of payments to reflect the substance of each payment and the relevant activity or project concerned. In light of these requirements bp has assessed its reporting obligations to be as follows:
- Where bp has made a payment to a government, such payment is reported in full, whether made in bp's sole capacity or in bp's capacity as the operator of a joint venture. Payments made to governments in connection with joint ventures are included in the Report if and to the extent that bp makes the relevant payment. Typically such circumstances will arise where bp is the operator of the joint venture.
- Payments made by an incorporated joint venture which is not a subsidiary of bp are not included within this Report.
- In some instances, bp is a partner in unincorporated joint ventures where the role of operator is performed through a non-typical operatorship model whereby multiple entities contribute to bp unincorporated body which has the role of operator. In relation to such joint ventures, payments actually made by bp to the government are reported and payments for which bp has direct responsibility to the government, but which are paid on its behalf, are also reported.
- bp's equity-accounted investments such as Rosneft, Pan American Energy Group and Aker BP are not bp subsidiaries and therefore in accordance with the Regulations, payments made by such entities are not included in this Report.
Project definition
The Regulations require payments to be reported by project (as a sub category within a country). They define a 'project' as the operational activities which are governed by a single contract, licence, lease, concession or similar legal agreement, and form the basis for payment liabilities with a government. If these agreements are substantially interconnected, then they can be treated as a single project. Under the Regulations 'substantially interconnected' means forming a set of operationally and geographically integrated contracts, licences, leases or concessions or related agreements with substantially similar terms that are signed with a government, giving rise to payment liabilities. These agreements may themselves be governed by a single contract, joint venture, production-sharing agreement, or other overarching legal agreement. Factors used to determine whether contracts or licences are operationally and geographically integrated may include their common management framework, proximity and use of common infrastructure. The number of projects will depend on the contractual arrangements within a country and not necessarily on the scale of activities. Moreover, a project will only appear in this report where relevant payments occurred during the year in relation to that project.
The Regulations acknowledge that for some payments it may not be possible to attribute a payment to a single project and therefore such payments may be reported at the country level. Corporate income taxes, which are typically not levied at a project level, are an example of this.
Materiality threshold
The Regulations require that payments made as a single payment exceeding £86,000 or as part of a series of related payments within a financial year exceeding £86,000 be included in this Report.
Reporting currency
All payments have been reported in US dollars. Payments made in currencies other than US dollars are typically translated at the exchange rate at the date of payment.
Payment types
The Regulations define a "Payment" as an amount paid whether in money or in kind, for relevant activities where the payment is of any one of the types listed below:
Production entitlements
Under production-sharing agreements (PSAs) the production is shared between the host government and the other parties to the PSA. The host government typically receives its share or entitlement in kind rather than being paid in cash. In this Report such production entitlements volumes to the government are reported on a lifting basis i.e. when the government takes possession of its share of production. A market value is applied, usually using the valuation method from the relevant PSA. For joint ventures in which bp is the operator, government production entitlements are reported in their entirety, in accordance with the notes above. Where the national oil company (NOC) is also a partner in the joint venture, their production entitlement is reported in addition to the government share of production. The NOC's entitlement as a partner will include both their share of production as investor's return as well as their entitlement for the reimbursement of their costs.
Taxes
The Report includes taxes levied on income, production or profits or withheld from dividends, royalties and interest received by bp. In addition, taxes paid on behalf of bp by the NOC out of production entitlements are reported. Taxes levied on consumption, personnel, sales, procurement (contractor's withholding taxes), environmental, property, customs and excise are not reportable under the Regulations.
4 Report on payments to governments 2019
5 Report on payments to governments 2019
Royalties
These may be paid in cash or in kind (valued in the same way as production entitlement).
Fees
In preparing this Report bp has included licence fees, rental fees, entry fees and all other payments that are paid in consideration for new and existing licences and/or concessions. Fees paid to governments for administrative services are excluded.
Bonuses
Signature, discovery and production bonuses and other bonuses payable under licences or concession agreements are included in the Report.
Infrastructure improvements
Such payments include a road or a building provided by bp that forms part of the fundamental facilities and systems serving a community or area. These payments are included in the Report whether or not bp is contractually obliged to fund them, and are reported when the relevant assets are handed over to the government or the local community.
Dividends
These are dividends that are paid in lieu of production entitlements or royalties. Dividends paid by bp to a government as an ordinary shareholder are excluded. For the year ended 31 December 2019, there were no reportable dividend payments to a government.
Other considerations
The payments shown in this report are rounded to the nearest $0.1 million. In the following tables because of rounding, some totals may not agree exactly with the sum of their component parts. Amounts are shown to the nearest dollar in the data submitted and available on the UK Companies House website.
PAYMENTS OVERVIEW
The table below shows the relevant payments to governments made by bp in the year ended 31 December 2019 shown by country and payment type.
Of the seven payment types required by the UK regulations, bp did not pay any relevant dividends and therefore the category is not shown.
$ million
| Country | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Algeria | 127.6 | 0.1 | 127.8 | ||||
| Angola | 1,206.7 | 443.8 | 0.7 | 1651.2 | |||
| Argentina | 0.7 | 0.7 | |||||
| Australia | 349.0 | 129.4 | 478.4 | ||||
| Azerbaijan | 10,060.8 | 159.7 | 2.8 | 450.3 | 10,673.6 | ||
| Brazil | 2.1 | 9.3 | 225.8 | 237.2 | |||
| Canada | 16.6 | 1.7 | 18.2 | ||||
| Egypt | 455.9 | 4.4 | 1.0 | 461.3 | |||
| Gambia | 0.3 | 10.1 | 10.4 | ||||
| India | 0.2 | 0.2 | |||||
| Indonesia | 603.5 | 221.3 | 6.5 | 831.4 | |||
| Iraq | 112.3 | 1.2 | 1.9 | 115.4 | |||
| Madagascar | 0.8 | 0.8 | |||||
| Mauritania | 1.9 | 5.0 | 6.9 | ||||
| Mexico | 3.4 | 2.6 | 6.0 | ||||
| Oman | 858.2 | 176.6 | 0.6 | 0.9 | 1,036.3 | ||
| Russia | 104.3 | 104.3 | |||||
| São Tomé and Príncipe | 3.5 | 3.5 | |||||
| Senegal | 0.9 | 0.9 | |||||
| Trinidad and Tobago | 342.1 | 1.5 | 343.5 | ||||
| United Arab Emirates | 3,409.9 | 6.3 | 3,416.1 | ||||
| United Kingdom | (20.5) | 7.7 | (12.7) | ||||
| United States | 24.2 | 285.0 | 1,107.9 | 9.5 | 32.0 | 1,458.5 | |
| Total | 12,753.6 | 6,189.8 | 1,237.3 | 55.0 | 730.7 | 3.4 | 20,969.8 |
6 Report on payments to governments 2019
PAYMENTS BY COUNTRY
ALGERIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministère des Finances – Direction Générale des Impôts | (a)127.6 | 127.6 | |||||
| Sonatrach | 0.1 | 0.1 | |||||
| Total | 127.6 | 0.1 | 127.8 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| In Amenas | (b)55.3 | 0.1 | 55.4 | ||||
| In Salah | (c)72.4 | 72.4 | |||||
| Total | 127.6 | 0.1 | 127.8 |
(a) Includes $114.7 million of taxes settled by Sonatrach on bp's behalf out of entitlement, pursuant to the relevant agreements.
(b) Includes $42.4 million of taxes settled by Sonatrach on bp's behalf out of production entitlement, pursuant to the relevant agreements.
(c) Pursuant to the relevant agreements, Sonatrach paid these taxes on bp's behalf out of revenue entitlements.
7 Report on payments to governments 2019
ANGOLA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Administracao Geral Tributaria | 13.0 | 13.0 | |||||
| Finance Ministry | 424.3 | 424.3 | |||||
| Ministry of Petroleum | 6.5 | 6.5 | |||||
| Rise Angola | 0.7 | 0.7 | |||||
| Sonangol EP (Concessionaire) | (a)483.4 | 483.4 | |||||
| Sonangol P&P | (b)723.3 | 723.3 | |||||
| Total | 1,206.7 | 443.8 | 0.7 | 1,651.2 | |||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Block 15 | 97.2 | 97.2 | |||||
| Block 17 | 203.4 | 203.4 | |||||
| Block 18 | (c)340.4 | 61.5 | 0.3 | 402.3 | |||
| Block 31 | (d)866.3 | 81.7 | 0.3 | 948.3 | |||
| Total | 1,206.7 | 443.8 | 0.7 | 1,651.2 |
(a) Payments in kind for 7.5 million bbls of crude oil valued per the Production Sharing Agreement.
(b) Payments in kind for 11.7 million bbls of crude oil valued per the Production Sharing Agreement.
(c) Payments in kind for 5.2 million bbls of crude oil valued per the Production Sharing Agreement.
(d) Payments in kind for 14.0 million bbls of crude oil valued per the Production Sharing Agreement.
8 Report on payments to governments 2019
ARGENTINA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Administracion Federal de Ingresos Publicos (AFIP) | 0.7 | 0.7 | |||||
| Total | 0.7 | 0.7 | |||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Payments not attributable to projects | 0.7 | 0.7 | |||||
| Total | 0.7 | 0.7 |
Report on payments to governments 2019
AUSTRALIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Australian Taxation Office | 349.0 | 349.0 | |||||
| Department of Mines, Industry Regulation and Safety | 129.4 | 129.4 | |||||
| Total | 349.0 | 129.4 | 478.4 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| North West Shelf | 27.3 | 129.4 | 156.7 | ||||
| Payments not attributable to projects | 321.7 | 321.7 | |||||
| Total | 349.0 | 129.4 | 478.4 |
Report on payments to governments 2019
AZERBAIJAN
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Azerbaijan (ACG) Ltd. (SOCAR subsidiary) | (a)959.6 | 959.6 | |||||
| Azerbaijan (Shah Deniz) Ltd. (SOCAR subsidiary) | (b)330.3 | 330.3 | |||||
| Ministry of Taxes | 159.7 | 159.7 | |||||
| SGC Upstream LLC | (c)220.2 | 220.2 | |||||
| State Oil Company of Azerbaijan Republic (SOCAR) | (d)123.6 | 123.6 | |||||
| State Oil Fund of Azerbaijan (SOFAZ) | (e)8,427.1 | 2.8 | 450.3 | 8,880.1 | |||
| Total | 10,060.8 | 159.7 | 2.8 | 450.3 | 10,673.6 | ||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Azeri-Chirag-Deepwater | |||||||
| Guneshli – PSA | (f)8,728.3 | 159.7 | 450.0 | 9,338.0 | |||
| Shafag-Asiman – PSA | 2.1 | 2.1 | |||||
| Shah Deniz – PSA | (g)1,332.6 | 0.3 | 1,332.9 | ||||
| Shallow Water Absheron | |||||||
| Peninsula (SWAP) PSA | 0.6 | 0.6 | |||||
| Total | 10,060.8 | 159.7 | 2.8 | 450.3 | 10,673.6 |
(a) Payments in kind for 15.2 million bbls of crude oil valued at netback value per the Production Sharing Agreement.
(b) Includes payments in kind of $141.9 million for 2.3 million bbls of crude oil valued at netback value per the Production Sharing Agreement and the remaining production entitlement was paid in cash.
(c) Includes payments in kind of $94.5 million for 1.5 million bbls of crude oil valued at netback value per the Production Sharing Agreement and the remaining production entitlement was paid in cash.
(d) Payments in kind for 2.1 billion cubic meters of associated residue natural gas valued on the basis of gas prices realized in a similar Azerbaijani project.
(e) Includes payments in kind of $7,979.9 million for 126.6 million bbls of crude oil valued at netback value per the Production Sharing Agreement and the remaining production entitlement was paid in cash.
(f) Includes payments in kind of $8,604.6 million for 136.3 million bbls of crude oil valued at netback value per the Production Sharing Agreement and payments in kind of $123.6 million for 2.1 billion cubic meters of associated residue natural gas valued on the basis of gas prices realized in a similar Azerbaijani project.
(g) Includes payments in kind of $571.3 million for 9.3 million bbls of crude oil valued at netback value per the Production Sharing Agreement and the remaining production entitlement was paid in cash.
11 Report on payments to governments 2019
BRAZIL
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Agencia Nacional do Petroleo, Gas Natural e Biocombustíveis (ANP) | 9.3 | 225.8 | 235.1 | ||||
| Secretaria da Receita Federal | 2.1 | 2.1 | |||||
| Total | 2.1 | 9.3 | 225.8 | 237.2 | |||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| BM-C-35 | 0.3 | 0.3 | |||||
| BM-CAL-13 | 9.0 | 9.0 | |||||
| C-M-477 | 150.4 | 150.4 | |||||
| Payments not attributable to projects | 2.1 | 2.1 | |||||
| S-M-1500 | 75.4 | 75.4 | |||||
| Total | 2.1 | 9.3 | 225.8 | 237.2 |
12 Report on payments to governments 2019
CANADA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Canada Newfoundland and Labrador Offshore Petroleum Board (CNLOPB) | 0.1 | 0.1 | |||||
| Canada Nova Scotia Offshore Petroleum Board (CNSOPB) | 0.8 | 0.8 | |||||
| Government of Canada | (0.4) | (0.4) | |||||
| Natural Resources Canada | 0.3 | 0.3 | |||||
| Province of Alberta | 17.0 | 0.4 | 17.4 | ||||
| Total | 16.6 | 1.7 | 18.2 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Newfoundland Exploration | 0.3 | 0.3 | |||||
| Nova Scotia Exploration | 1.0 | 1.0 | |||||
| Terre De Grace | 0.4 | 0.4 | |||||
| Payments not attributable to projects | 16.6 | 16.6 | |||||
| Total | 16.6 | 1.7 | 18.2 |
13 Report on payments to governments 2019
EGYPT
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Egyptian General Petroleum Corporation (EGPC) | 4.0 | 4.0 | |||||
| Egyptian Natural Gas Holding Company (EGAS) | 0.4 | 1.0 | 1.4 | ||||
| Egyptian Tax Authority | (a)455.9 | 455.9 | |||||
| Total | 455.9 | 4.4 | 1.0 | 461.3 | |||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Baltim | (a)8.9 | 8.9 | |||||
| East Morgan | (a)6.5 | 6.5 | |||||
| East Tanka | (a)1.8 | 1.8 | |||||
| El Qaraa | (a)68.1 | 68.1 | |||||
| Gulf Of Suez | (a)176.0 | 176.0 | |||||
| LL 87 (Saqqara) | (a)19.5 | 19.5 | |||||
| North Damietta | (a)135.8 | 1.0 | 136.8 | ||||
| North Gamasa | 0.4 | 0.4 | |||||
| North October | (a)0.6 | 0.6 | |||||
| Ras El Bar | (a)23.3 | 23.3 | |||||
| South Belayim | (a)10.4 | 10.4 | |||||
| South Gharib | (a)4.9 | 4.9 | |||||
| West Nile Delta | 4.0 | 4.0 | |||||
| Total | 455.9 | 4.4 | 1.0 | 461.3 |
(a) Pursuant to the relevant agreements, Egyptian General Petroleum Corporation (EGPC) paid these taxes on bp's behalf out of production entitlement.
14 Report on payments to governments 2019
GAMBIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministry of Finance & Economic Affairs | 0.3 | 10.1 | 10.4 | ||||
| Total | 0.3 | 10.1 | 10.4 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| A1 | 0.3 | 10.1 | 10.4 | ||||
| Total | 0.3 | 10.1 | 10.4 |
15 Report on payments to governments 2019
INDIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministry of Petroleum & Natural Gas - Government of India | 0.2 | 0.2 | |||||
| Total | 0.2 | 0.2 | |||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| KG D6 KG-DWN-98/3 | 0.2 | 0.2 | |||||
| Total | 0.2 | 0.2 |
Report on payments to governments 2019
INDONESIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministry of Finance | (a)603.5 | 221.3 | 6.5 | 831.4 | |||
| Total | 603.5 | 221.3 | 6.5 | 831.4 | |||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Tangguh | (a)603.5 | 221.3 | 6.5 | 831.4 | |||
| Total | 603.5 | 221.3 | 6.5 | 831.4 |
(a) Includes payments in kind of $75.7 million for 1.4 million bbls of condensates valued per the Production Sharing Agreement and the remaining production entitlement for LNG was paid in cash.
17 Report on payments to governments 2019
IRAQ
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Basra Governorate | 1.9 | 1.9 | |||||
| Basra Oil Company | 0.9 | 0.9 | |||||
| General Commission for Taxes | 112.3 | 112.3 | |||||
| Ministry of Oil | 0.3 | 0.3 | |||||
| Total | 112.3 | 1.2 | 1.9 | 115.4 | |||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Rumaila | 112.3 | 1.2 | 1.9 | 115.4 | |||
| Total | 112.3 | 1.2 | 1.9 | 115.4 |
Report on payments to governments 2019
MADAGASCAR
$ million
| GOVERNMENTS | Production | Royalties | Fees | Bonuses | Infrastructure | ||
|---|---|---|---|---|---|---|---|
| Entitlements | Taxes | Improvements | Total | ||||
| Office des Mines Nationales et des Industries Strategiques (OMNIS) | 0.8 | 0.8 | |||||
| Total | 0.8 | 0.8 | |||||
| PROJECTS | Production | Royalties | Fees | Bonuses | Infrastructure | ||
| --- | --- | --- | --- | --- | --- | --- | --- |
| Entitlements | Taxes | Improvements | Total | ||||
| Block Ampasindava | 0.2 | 0.2 | |||||
| Block Cap Saint Andre | 0.2 | 0.2 | |||||
| Block Majunga Nord | 0.2 | 0.2 | |||||
| Block Majunga Sud | 0.2 | 0.2 | |||||
| Total | 0.8 | 0.8 |
Report on payments to governments 2019
MAURITANIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministry of Petroleum, Energy & Mines | 1.6 | 5.0 | 6.6 | ||||
| Société Mauritanienne des Hydrocarbures | 0.3 | 0.3 | |||||
| Total | 1.9 | 5.0 | 6.9 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Block C12 | 0.3 | 0.3 | |||||
| Block C13 | 0.3 | 5.0 | 5.3 | ||||
| Block C6 | 0.5 | 0.5 | |||||
| Block C8 | 0.7 | 0.7 | |||||
| Total | 1.9 | 6.9 |
Report on payments to governments 2019
MEXICO
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Fondo Mexicano del Petroleo | 2.6 | 2.6 | |||||
| Sistema de Administracion | |||||||
| Tributaria | 3.4 | 3.4 | |||||
| Total | 3.4 | 2.6 | 6.0 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Cuencas del Sureste 34 R3 | 0.8 | 0.6 | 1.4 | ||||
| Cuenca Salina 1 R1 | 2.6 | 2.0 | 4.6 | ||||
| Total | 3.4 | 2.6 | 6.0 |
Report on payments to governments 2019
OMAN
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| GPS | 0.9 | 0.9 | |||||
| Makarim Gas Development (MGD) | (a)561.5 | 561.5 | |||||
| Ministry of Oil & Gas | (b)296.7 | 0.6 | 297.3 | ||||
| Ministry of Finance | (c)176.6 | 176.6 | |||||
| Total | 858.2 | 176.6 | 0.6 | 0.9 | 1,036.3 | ||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Khazzan | (a)(b)858.2 | (c)176.6 | 0.6 | 0.9 | 1,036,3 | ||
| Total | 858.2 | 176.6 | 0.6 | 0.9 | 1,036.3 |
(a) Comprises payments in kind of $204.1 million for 3.2 million bbls of condensates valued at market prices; $356.1 million for 98.1 million mmBtu of gas valued per the Gas Sales Agreement and $1.2 million was paid in cash.
(b) Comprises payments in kind of $106.8 million for 1.7 million bbls of condensates valued at market prices; $189.2 million for 52.1 million mmBtu of gas valued per the Gas Sales Agreement and $0.6 million was paid in cash.
(c) Pursuant to the relevant agreements, the Ministry of Oil and Gas paid these taxes on bp's behalf out of their production entitlement.
Report on payments to governments 2019
RUSSIA
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Ministry of Finance – Moscow | 104.3 | 104.3 | |||||
| Total | 104.3 | 104.3 | |||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Investment in Rosneft | 86.0 | 86.0 | |||||
| Investment in TYNGD (Taas) | 17.6 | 17.6 | |||||
| Payments not attributable to projects | 0.7 | 0.7 | |||||
| Total | 104.3 | 104.3 |
Report on payments to governments 2019
SÃO TOMÉ AND PRÍNCIPE
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure | |
|---|---|---|---|---|---|---|---|
| Improvements | Total | ||||||
| Agência Nacional do Petróleo | 3.5 | 3.5 | |||||
| Total | 3.5 | 3.5 | |||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Block 10 | 1.5 | 1.5 | |||||
| Block 13 | 1.9 | 1.9 | |||||
| Total | 3.5 | 3.5 |
Report on payments to governments 2019
SENEGAL
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure | |
|---|---|---|---|---|---|---|---|
| Improvements | Total | ||||||
| Société des pétroles du Sénégal | 0.9 | 0.9 | |||||
| Total | 0.9 | 0.9 | |||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Block Cayar Profond | 0.4 | 0.4 | |||||
| Block St Louis Profond | 0.5 | 0.5 | |||||
| Total | 0.9 | 0.9 |
Report on payments to governments 2019
TRINIDAD AND TOBAGO
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Board of Inland Revenue | 53.5 | 53.5 | |||||
| Ministry of Energy and Energy Industries | 288.6 | 1.5 | 290.0 | ||||
| Total | 342.1 | 1.5 | 343.5 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Block 5B | 1.5 | 1.5 | |||||
| BPTT Blocks | 342.1 | 342.1 | |||||
| Total | 342.1 | 1.5 | 343.5 |
26 Report on payments to governments 2019
UNITED ARAB EMIRATES
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Department of Finance | |||||||
| Abu Dhabi | 3,409.9 | 4.0 | 3,413.9 | ||||
| ADNOC Onshore | 2.3 | 2.3 | |||||
| Total | 3,409.9 | 6.3 | 3,416.1 | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| ADNOC Onshore Concession | 3,409.9 | 6.3 | 3,416.1 | ||||
| Total | 3,409.9 | 6.3 | 3,416.1 |
27 Report on payments to governments 2019
UNITED KINGDOM
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| Crown Estate | 0.3 | 0.3 | |||||
| HM Revenue and Customs | (a)(20.5) | (20.5) | |||||
| Oil and gas Authority | 7.4 | 7.4 | |||||
| Total | (20.5) | 7.7 | (12.7) | ||||
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Andrew | 0.3 | 0.3 | |||||
| Clair | 1.2 | 1.2 | |||||
| Decommissioning | (a) (12.7) | (12.7) | |||||
| ETAP | 0.5 | 0.5 | |||||
| Exploration | 1.5 | 1.5 | |||||
| Foinaven | 3.3 | 3.3 | |||||
| Non-Operated | (a) (7.8) | 0.5 | (7.3) | ||||
| Pipelines | 0.1 | 0.1 | |||||
| Vorlich | 0.4 | 0.4 | |||||
| Total | (a) (20.5) | 7.7 | (12.7) |
(a) Net refunds result from the carry back of tax losses, resulting in a refund of taxes paid in prior years.
28 Report on payments to governments 2019
UNITED STATES (USA)
$ million
| GOVERNMENTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
|---|---|---|---|---|---|---|---|
| California State Controller's Office | (a)0.2 | 0.2 | |||||
| Colorado Dept Of Treasury | 0.8 | 0.8 | |||||
| Delaware Division of Revenue | (a)0.7 | 0.7 | |||||
| Federal Government | (b)(41.4) | (41.4) | |||||
| Office of Natural Resources Revenue | 803.9 | 8.0 | 32.0 | 843.9 | |||
| Office of Natural Resources Revenue – BIA | 1.8 | 0.9 | 2.6 | ||||
| Southern Ute Indian Tribe | (c)24.2 | 5.8 | 19.0 | 49.0 | |||
| State of Alaska | 164.9 | (d)214.9 | 0.3 | 380.1 | |||
| State of Colorado | 1.7 | 0.6 | 2.3 | ||||
| State of Louisiana | 36.9 | 7.6 | 44.5 | ||||
| State of New Mexico | 13.4 | 1.3 | 14.7 | ||||
| State of Oklahoma | 9.7 | 1.6 | 11.4 | ||||
| State of Texas | 84.3 | 54.7 | 0.4 | 139.3 | |||
| State of Wyoming | 9.6 | 0.8 | 10.4 | ||||
| Total | 24,2 | 285.0 | 1,107.9 | 9.5 | 32.0 | 1,458.5 | |
| PROJECTS | Production Entitlements | Taxes | Royalties | Fees | Bonuses | Infrastructure Improvements | Total |
| --- | --- | --- | --- | --- | --- | --- | --- |
| Alaska | 164.9 | (d)214.9 | 1.2 | 381.0 | |||
| Colorado | (c)24.2 | 7.5 | 21.9 | 53.5 | |||
| Gulf of Mexico - Central | 750.5 | 6.8 | 32.0 | 789.2 | |||
| Gulf of Mexico - Western | 25.1 | 0.8 | 25.9 | ||||
| Louisiana | 36.9 | 7.6 | 44.5 | ||||
| New Mexico | 13.4 | 1.4 | 14.9 | ||||
| Oklahoma | 9.7 | 1.8 | 11.5 | ||||
| Texas | 84.3 | 54.7 | 0.4 | 139.3 | |||
| Wyoming | 9.6 | 0.8 | 10.4 | ||||
| Payments not attributable to projects | (b) (41.4) | 29.2 | 0.4 | (11.7) | |||
| Total | 24.2 | 285.0 | 1,107.9 | 9.5 | 32.0 | 1,458.5 |
(a) Payments to states where bp has no extractive activities relate to Escheatment of Royalties.
(b) The negative amount reflects the cash payment of current year taxes for all legal entities which was more than offset by refunds of taxes for federal losses carried back to prior years.
(c) Payments in kind for 12.6 million mmBtu of gas valued on the basis of gas prices realized in the area.
(d) Includes payments in kind of $56.9 million for 1.0 million bbls of crude oil valued per the Royalty Settlement Agreement.
29 Report on payments to governments 2019
30 Report on payments to governments 2019
OTHER RESOURCES
BP PAYMENTS TO GOVERNMENTS 2019
Detailed data filed with UK Registrar - extractives.companieshouse.gov.uk
BP ANNUAL AND SUSTAINABILITY REPORTING
Sustainability Report – bp.com/sustainability
Annual Report and Form 20-F – bp.com/annualreport
Our positions on tax and transparency – bp.com/tax
BP ECONOMIC IMPACT REPORTS
US Economic Impact Report – bp.com/economicimpact-us
bp’s impact on the UK economy – bp.com/economicimpact-uk
CONTACTS
| London | Houston | |
|---|---|---|
| Press Office | David Nicholas | |
| +44 (0)20 7496 4708 | Brett Clanton | |
| +1 281 366 8346 |