AI Terminal

MODULE: AI_ANALYST
Interactive Q&A, Risk Assessment, Summarization
MODULE: DATA_EXTRACT
Excel Export, XBRL Parsing, Table Digitization
MODULE: PEER_COMP
Sector Benchmarking, Sentiment Analysis
SYSTEM ACCESS LOCKED
Authenticate / Register Log In

BOTSWANA DIAMONDS PLC

Business and Financial Review Apr 21, 2016

7526_rns_2016-04-21_cbcb20b0-522e-415c-bc3f-c8ba69b17146.html

Business and Financial Review

Open in Viewer

Opens in native device viewer

National Storage Mechanism | Additional information

You don't have Javascript enabled. For full functionality this page requires javascript to be enabled.

RNS Number : 9206V

Botswana Diamonds PLC

21 April 2016

21st April 2016

Botswana Diamonds PLC

("Botswana Diamonds" or the "Company")

Update on Exploration in Botswana from March to April 2016

The Directors of Botswana Diamonds (AIM: BOD) are pleased to provide an update on their ongoing diamond exploration campaign in Botswana.  The campaign is part of the 50/50 joint venture between Botswana Diamonds and Alrosa, the world's leading diamond producer. 

1.         EXPLORATION IN  ORAPA

Prospecting License (PL) 085, PL 210

1)      Heavy concentrate sampling (30-50 litres) on detailed sites, selected according to the results of mineralogical research. Sampling grids - 200 x 200 m and 400 x 400 m.

2)      Washing of heavy concentrate samples.

3)      Mineralogical analyses of heavy concentrate samples in the field laboratory.

4)      Sampling and washing are completed.  Drilling will begin in early May.

PL 260

1)      Diamond drilling on kimberlite pipe AK-21 of two boreholes to a total depth of 423 m.

2)      Heavy concentrate sampling (30-50 litre) on detailed sites selected by the results of the airborne magnetic survey.

3)      Complex of ground geophysical surveys (magnetic, electric) to delineate anomalies connected with kimberlites.

4)      Transient Electro Magnetic soundings (TEM) on kimberlite pipes AK-22 and AK-23 in order to get definitions of sizes and morphology to a depth of 300 m.

5)      Ground geophysical TEM works on kimberlite pipe AK-21 in order to specify the morphology of the body to a depth of 150-300 m.

6)      Studying the core of the boreholes.

7)      Hard rock sampling of the core and selection of specimens for various analyses.

8)      Hard rock samples treatment and washing.

9)      Mineralogical analyses of the heavy concentrate and hard rock samples in the field laboratory.

10)    Diamond drilling, early core analyses and TEM works are completed as is much of the heavy concentrate sampling.  Reverse Circulation Drilling and sampling will continue into May.

2.         EXPLORATION IN GOPE

PL135, PL136, PL137 AND PL 235

1)      Ground geophysical works and TEM soundings on anomalies.

2)      Heavy concentrate sampling (250 litre) on geophysical anomalies.

3)      Washing of heavy concentrate samples.

4)      Mineralogical analyses of heavy concentrate samples in the field laboratory.

5)      This work is ongoing.

The Alrosa-led team is applying state-of-the-art technology in an innovative way.  Mineralogical analyses of heavy concentrate samples in the field laboratory allows us to accelerate results so that our experts can focus the drill programme.

__________         _                                              ___________________________________________________________

This release has been approved by Benjamin Mosigi, MSc (Mineral Exploration and Mining Geology), who is a member of the Geological Society of South Africa.

_________                                           _              ___________________________________________________                        

Enquiries:

Botswana Diamonds PLC
John Teeling, Chairman +353 1 833 2833
Jim Finn, Director
Dipti Mehta
Northland Capital Partners Limited
David Hignell/Gerry Beaney (Corporate Finance) +44 (0) 203 861 6625
John Howes (Broking)
Dowgate Capital Stockbrokers Limited
Jason Robertson +44 (0) 129 351 7744
Blytheweigh +44 (0) 207 138 3204
Camilla Horsfall +44 (0) 781 784 1793
PSG Plus
Colm Heatley +353 (0) 1 661 4055
Alan Tyrrell +353 (0) 1 661 4055

www.botswanadiamonds.co.uk

This information is provided by RNS

The company news service from the London Stock Exchange

END

DRLIBMMTMBMTBBF

Talk to a Data Expert

Have a question? We'll get back to you promptly.