AI assistant
Borr Drilling — Investor Presentation 2021
Aug 31, 2021
6241_rns_2021-08-31_f9c9736f-60d8-4d44-b867-824dd08a86c3.pdf
Investor Presentation
Open in viewerOpens in your device viewer
Fleet Status Report
31st August 2021
Borr Drilling Limited S.E Pearman Building, 2nd Fl, 9 Par-la-Ville Road, Hamilton HM11, Bermuda
+971 4 4487501
Prospector 1
| Bo Dr illi rr ng st A Fle Sta Re 31 t 2 02 1 et tus rt - po ug us |
|---|
| Ne w C / E nsi s / Am end tra cts xte nts on on me |
| No rve • S Co ct ( fro OI) Ga ign ed ntra m L : D mb er 2 021 to Ap ril 2 022 Va alc bon ece o, , |
| Gu lod nn • O tion s E cis ed: Se ber 20 21 to O ber 20 21, PT TE P, Ma lay sia tem cto p xer p |
| Sa ga • S ign ed Co ntra ct ( fro m L OA ): Se tem ber 20 21 to A st 2 022 He Ma lay sia p ugu ss, , |
| Rig TB C • S ign ed Co ct ( fro m L OI) : Ju ly 202 2 to No ber 20 22, W inte rsh all, Me xic o. R ig s ele ctio be nfir d in Q4 20 21. ntra n to vem co me |
| Let f A rd / L of Int / N tiat ion ter ett ent s o wa ers ego s |
| Gu lod nn • LO A: Oc tob er 2 021 Feb 202 2, Un dis clo sed Ma lay sia to rua ry , |
| Fri gg • LO I: D mb er 2 021 / J 20 22 to D mb er 2 022 Un dis clo sed We st A fric ece anu ary ece a , , |
| Na tt • LO to O fric A: No ber 20 21 cto ber 20 22, Un dis clo sed We st A vem a , |
| Oth De vel nts er op me |
| Pro cto r 1 spe • C lud ed rati wi th N tun nd d w ith Kis tos in Jul 202 1. T he rig wil l re ctiv itie ith Ne tun leti Kis tos rks onc ope ons ep e a com me nce y sum e a s w p e u pon co mp ng wo cop e |
| Idu n • C lud ed rati wi th V igo in late Ma 202 1 a nd d o atio wit h P (a ssi ) in J 20 21 est etro ent onc ope ons y com me nce per ns nas gnm une |
| Sa ga • C lud ed rati wi th J X N ipp (as sig ent ) an d re ont t w ith PT TE P M ala ia i n M 202 1. onc ope ons on nm sum e c rac ys ay |
Saga
This summary is provided as a courtesy and is not intended to replace a detailed review of the Fleet Status Report. This summary contains information on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations may not result in an actual drilling contract.
| Rig Na me |
Rig De sig n |
Rig ter Dep Wa th ( ft) |
Yea r B uilt |
Cus / St tom atu er s |
Co ct S ntra tart |
Co ntra ct E nd |
Loc atio n |
Co ent mm s |
|
|---|---|---|---|---|---|---|---|---|---|
| Pre miu m J ack -Up s |
|||||||||
| PTT EP |
Sep tem ber - 20 20 |
Oct obe r - 2 021 |
Mal ia ays |
Ope ratin g |
|||||
| Gun nlod |
cific Cla PPL Pa ss 4 00 |
ft 400 |
201 8 |
Und iscl d ose |
Oct obe r - 2 021 |
Feb 202 2 rua ry - |
Mal ia ays |
LOA | |
| Idun | KFE LS Sup er B Big foot Cla ss |
350 ft |
201 3 |
Pet rona s |
Jun 202 1 e - |
Jan - 2 022 uary |
Mal ia ays |
Ope ratin g |
|
| PTT EP |
Sep tem ber- 202 0 |
Sep tem ber - 20 21 |
Mal ia ays |
Ope ratin g |
|||||
| Sag a |
LS Sup foot Cla KFE er B Big ss |
ft 400 |
201 8 |
Hes s |
Sep tem ber - 20 21 |
Aug ust - 20 22 |
Mal ia ays |
Com mitt ed |
|
| Ska ld |
KFE LS Sup er B Big foot Cla ss |
400 ft |
201 8 |
PTT EP |
Jun 202 1 e - |
Jun 202 4 e - |
Tha ilan d |
Ope ratin ith o ptio n to ext end g w |
|
| Ava ilab le |
Cam ero on |
Wa Sta cke d rm |
|||||||
| 1 Frig g |
LS Sup KFE er A |
ft 400 |
201 3 |
Und iscl d ose |
Dec ber - 20 21 / em Jan - 2 022 |
Dec ber - 20 22 em |
We st A frica |
LOI | |
| Orie ntal |
May - 2 021 |
Oct obe r - 2 021 |
Nig eria |
Ope ratin ith o ptio n to ext end g w |
|||||
| Nat t |
cific Cla PPL Pa ss 4 00 |
ft 400 |
201 8 |
Und iscl d ose |
Nov ber - 20 21 em |
Oct obe r - 2 022 |
We st A frica |
LOA | |
| BW E |
Apr il - 2 021 |
Sep ber - 20 21 tem |
Gab on |
Ope ratin g |
|||||
| Nor ve |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 1 |
Vaa lco |
Dec ber - 20 21 em |
Apr il - 2 022 |
Gab on |
Com mitt ed w ith o ptio end n to ext |
|
| 1 | F&G , JU 200 0E |
400 ft |
Kist os |
July - 2 021 |
Nov ber - 20 21 em |
Net her land s |
Ope ratin g |
||
| Pro ctor 1 spe |
201 3 |
Nep tune |
Dec ber - 20 21 em |
Mar ch - 202 2 |
Net her land s |
Com mite d w ith o ptio end n to ext |
|||
| 1 Pro ctor 5 spe |
F&G , JU 200 0E |
400 ft |
201 4 |
CN OO C |
Nov ber - 20 20 em |
Feb 202 2 rua ry - |
Uni ted King dom |
Ope ratin ith o ptio end n to ext g w |
|
| Gal ar |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 7 |
PEM EX |
Apr il - 2 020 |
Dec ber - 20 22 em |
Mex ico |
Ope ratin g |
|
| Ger i sem |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 8 |
PEM EX |
Aug - 20 19 ust |
Dec ber - 20 22 em |
Mex ico |
Ope ratin g |
|
| Grid | cific Cla 00 PPL Pa ss 4 |
400 ft |
201 8 |
PEM EX |
- 20 19 Aug ust |
- 20 22 Dec ber em |
Mex ico |
Ope ratin g |
|
| Njo rd |
cific Cla PPL Pa ss 4 00 |
ft 400 |
201 9 |
PEM EX |
Jun 202 0 e - |
Dec ber - 20 22 em |
Mex ico |
Ope ratin g |
|
| Odi n |
LS Sup foot Cla KFE er B Big ss |
ft 350 |
201 3 |
PEM EX |
Mar ch - 202 0 |
Dec ber - 20 22 em |
Mex ico |
Ope ratin g |
|
| Mis t |
LS Sup foot Cla KFE er B Big ss |
ft 350 |
201 3 |
Ava ilab le |
Mal ia ays |
Sta Wa cke d rm |
|||
| Gym e |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 8 |
Ava ilab le |
Sin gap ore |
Wa Sta cke d rm |
|||
| Her mod |
KFE LS B C lass |
400 ft |
201 9 |
Ava ilab le |
Sin gap ore |
Wa Sta cke d rm |
|||
| Hei mda l |
KFE LS B C lass |
400 ft |
202 0 |
Ava ilab le |
Sin gap ore |
Wa Sta cke d rm |
|||
| Hil d |
KFE LS Sup er B Cla ss |
400 ft |
202 0 |
Ava ilab le |
Sin gap ore |
Wa Sta cke d rm |
|||
| Tho r |
KFE LS Sup er B Big foot Cla ss |
400 ft |
201 9 |
Ava ilab le |
Sin gap ore |
Wa Sta cke d rm |
|||
| Ger d |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 8 |
Ava ilab le |
Cam ero on |
Wa Sta cke d rm |
|||
| Gro a |
PPL Pa cific Cla ss 4 00 |
400 ft |
201 8 |
Ava ilab le |
Cam ero on |
Wa Sta cke d rm |
|||
| 1 Ran |
KFE LS Sup er A |
400 ft |
201 3 |
Ava ilab le |
Uni ted King dom |
Wa Sta cke d rm |
Borr Drilling
Fleet Status Report - 31st August 2021
Borr Drilling
Fleet Status Report - 31st August 2021
| Rig Na me |
Rig De sig n |
Rig ter Dep Wa th ( ft) |
Yea r B uilt |
Cus tom / St atu er s |
Co ntra ct S tart |
Co ntra ct E nd |
Loc atio n |
Co ent mm s |
|---|---|---|---|---|---|---|---|---|
| Jac k-U Und er C ps |
tru ctio ons n |
|||||||
| Tiva r |
KFE LS Sup er B Big foot Cla ss |
400 ft |
Und er C tion truc ons |
KFE LS ship yard , Si nga pore |
Rig De live ry in Ma y - 2 023 |
|||
| Val e |
LS Sup foot Cla KFE er B Big ss |
400 ft |
er C Und truc tion ons |
LS , Si KFE ship yard nga pore |
y - 2 023 Rig De live ry in Jul |
|||
| Var | LS Sup foot Cla KFE er B Big ss |
ft 400 |
er C Und truc tion ons |
LS , Si KFE ship yard nga pore |
Se Rig De live ry in ptem ber - 20 23 |
|||
| Hul dra |
LS Bigf B C KFE oot lass |
ft 400 |
er C Und truc tion ons |
LS , Si KFE ship yard nga pore |
Oc Rig De live ry in tobe r - 2 023 |
|||
| Hei dru n |
LS Bigf B C KFE oot lass |
ft 400 |
er C Und truc tion ons |
LS , Si KFE ship yard nga pore |
Rig De live ry in De ber - 20 23 cem |
|||
| 1 - H D/HE Cap abilit y. |
Operating / Committed Cold Stack Under Construction 28 14 0 5 28 14 0 5 AvailablePremium Jack-UpsTotal Fleet 99
| ocation | Comments |
|---|---|
| pyard, Singapore | Rig Delivery in May - 2023 |
| pyard, Singapore | Rig Delivery in July - 2023 |
| pyard, Singapore | Rig Delivery in September - 2023 |
| pyard, Singapore | Rig Delivery in October - 2023 |
| pyard, Singapore | Rig Delivery in December - 2023 |
| Id Stack | Under Construction |
|---|---|
| Na | atio | 202 | 1 | 202 | 2 | 202 3 |
202 | 4 | |||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Rig me |
Loc n |
Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 | Q1 | Q2 | Q3 | Q4 |
| Pre | miu m J ack -Up |
s | |||||||||||||||
| Gun nlod |
Ma lays ia |
PTT EP |
LOA | ||||||||||||||
| Idu n |
Ma lays ia |
Ves | tigo Pet |
ron as |
|||||||||||||
| Sag a |
Ma lays ia |
JX Nip pon |
PTT | EP | Hes s |
||||||||||||
| Ska ld |
Tha ilan d |
PTT | EP | ||||||||||||||
| 1 Frig g |
We st A fric a |
Wa Sta cke rm |
d | LO | I | LO | I Op tion |
||||||||||
| Nat t |
Nig eria |
Firs t E& P |
Orie l nta |
LOA | LOA Op |
tion | |||||||||||
| Nor ve |
Gab on |
BW E |
Vaa | lco | Opt ion |
||||||||||||
| 1 Pro r 1 cto spe |
Net her land s |
One -Dy as |
Nep tun |
eKi stos |
Nep | tun e |
Opt ion |
||||||||||
| 1 Pro cto r 5 spe |
Uni ted Kin gdo m |
CN OO C |
Opt | ion | |||||||||||||
| Gal ar |
Mex ico |
PEM EX |
|||||||||||||||
| Ger i sem |
Mex ico |
PEM EX |
|||||||||||||||
| Grid | Mex ico |
PEM EX |
|||||||||||||||
| Njo rd |
Mex ico |
PEM EX |
|||||||||||||||
| Od in |
Mex ico |
PEM EX |
|||||||||||||||
| Mis t |
Ma lays ia |
RO C O il |
Wa | Sta cke d rm |
|||||||||||||
| Gym e |
Sin gap ore |
Wa Sta cke rm |
d | ||||||||||||||
| Hei mda l |
Sin gap ore |
Wa Sta cke rm |
d | ||||||||||||||
| Her mod |
Sin gap ore |
Wa Sta cke rm |
d | ||||||||||||||
| Hild | Sin gap ore |
Wa Sta cke rm |
d | ||||||||||||||
| Tho r |
Sin gap ore |
Sta Wa cke rm |
d | ||||||||||||||
| Ger d |
Cam ero on |
Sta Wa cke rm |
d | ||||||||||||||
| Gro a |
Cam ero on |
Sta Wa cke rm |
d | ||||||||||||||
| 1 Ran |
Uni ted Kin gdo m |
Sta Wa cke rm |
d | ||||||||||||||
| Jac k-U |
Un der Co nst ps |
tio ruc n |
|||||||||||||||
| Tiva r |
KFE LS ship d, S inga yar por e |
Rig Del iver y in |
Ma y - 2 023 |
||||||||||||||
| Val e |
KFE LS ship d, S inga yar por e |
Rig Del iver y in |
Jul y - 2 023 |
||||||||||||||
| Var | KFE LS ship d, S inga yar por e |
Rig Del iver y in |
Se ptem ber |
- 20 23 |
|||||||||||||
| Hul dra |
LS d, S KFE ship inga yar por e |
Rig Del iver y in |
Oc tobe r - |
202 3 |
|||||||||||||
| Hei dru n |
KFE LS ship d, S inga yar por e |
Rig Del iver y in |
De ber cem |
- 20 23 |
|||||||||||||
| Firm | Opt ion |
Ava | ilab le |
Und er C |
tion truc ons |
Borr Drilling
Fleet Status Report - 31st August 2021
1 - HD/HE Capability
| 202 | 4 | ||
|---|---|---|---|
| Q4 | |||
Forward Looking Statements:
The statements described in this status report that are not historical facts are "Forward Looking Statements".
Forward Looking Statements reflect management's current expectations and assumptions, and are subject to inherent uncertainties, risks and changes in circumstances that are difficult to predict. No assurance can be given that the expectations expressed in these Forward-Looking Statements will prove to be correct. Actual results could differ materially from expectations expressed in, or implied by, the Forward-Looking Statements if one or more of the underlying assumptions or expectations proves to be inaccurate or is unrealised. These include, but are not limited to, changes to commencement dates, contract duration, earned day rates, locations and other contractual terms; risks relating to the delivery of drilling rigs under construction; sale and purchase of drilling units; oil and gas prices; and risks associated with international operations generally.
No Forward-Looking Statement contained in herein or expressed elsewhere should be relied upon as predicting future events. We undertake no obligation to update or revise any Forward-Looking Statements to reflect events or circumstances that occur, or which we become aware of, after the date hereof, except as otherwise may be required by law.
This summary contains information on letters of intent/award and advanced negotiations. Letters of intent/award or advanced negotiations may not result in an actual drilling contract.