Interim Report, January-September 2007
Weaker US dollar and lower production affected profits
Q3 2007
- Revenues fell to SEK 8,166 million (SEK 9,299 m).
- The operating profit totalled SEK 1,332 million (SEK 2,095 m).
- The profit for the period was SEK 900 million (SEK 1,541 m).
- Earnings per share totalled SEK 3.20 (SEK 5.32).
- Cash flow from operating activities totalled SEK 592 million (SEK 1,681 m).
- The cost of the buy-back of shares totalled approximately SEK 1.4 billion.
Nine months, 2007
- Revenues rose to SEK 25,913 million (SEK 25,485 m).
- The operating profit fell to SEK 4,838 million (SEK 6,297 m).
- The profit for the period was SEK 3,423 million (SEK 4,518 m).
- Earnings per share totalled SEK 11.96 (SEK 15.61).
- Cash flow from operating activities totalled SEK 3,221 million (SEK 5,063 m).
- The cost of dividends paid and the redemption and buy-back of shares totalled approximately SEK 6.6 billion.
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| Q3 | Q3 | months | months | |||
| 2007 | 2006 | Change in | 2007 | 2006 | Change in | |
| SEK m | SEK m | % | SEK m | SEK m | % | |
| Revenues | 8 166 | 9 299 | -12 | 25 913 | 25 485 | 2 |
| Operating profit before | ||||||
| depreciation (EBITDA) | 1 686 | 2 421 | -30 | 5 887 | 7 280 | -19 |
| Operating profit (EBIT) | 1 332 | 2 095 | -36 | 4 838 | 6 297 | -23 |
| Profit before tax | 1 234 | 2 067 | -40 | 4 687 | 6 128 | -24 |
| Profit for the period | 900 | 1 541 | -42 | 3 423 | 4 518 | -24 |
| Cash flow from operating | ||||||
| activities | 592 | 1 681 | -65 | 3 221 | 5 063 | -36 |
| Earnings per share, SEK | ||||||
| before and after dilution | 3.20 | 5.32 | -40 | 11.96 | 15.61 | -23 |
| Return on capital employed, % | 29 | 51 | 35 | 52 | ||
| Net debt/shareholders' equity, % | 40 | 16 | 40 | 16 |
Key ratios
THE GROUP
Revenues
Boliden's revenues for the third quarter fell to SEK 8,166 million (SEK 9,299 m) in comparison with the same period last year. Revenues were negatively affected by lower volumes and a lower US dollar exchange rate.
Revenues have increased during the first nine months of the year to SEK 25,913 million (SEK 25,485 m).
Profit performance
The operating profit (EBIT) fell by SEK 763 million to SEK 1,332 million (SEK 2,095 m) during the third quarter and by SEK 1,459 million to SEK 4,838 million (SEK 6,297 m) during the first nine months of the year in comparison with corresponding periods last year. A profit analysis is provided in the table below.
| Profit analysis, EBIT, SEK m | Q3 2007 – | 9 months 2007 – |
|---|---|---|
| Q3 2006 | 9 months 2006 | |
| Exchange rate effects | -316 | -1 042 |
| Other prices and terms | 118 | 681 |
| Volume variation, Segment Mines | -222 | -647 |
| Volume variation, Segment Smelters | -163 | -38 |
| Costs | -147 | -376 |
| Other | -33 | -37 |
| Change in operating profit | -763 | -1 459 |
The combined stock result was SEK -74 million (SEK 193 m) during the third quarter, giving a net change of SEK -267 million in comparison with the same period in 2006. The monthly correction (MAMA) in July of preliminarily priced metal sales from the second quarter boosted the profit by SEK 78 million (SEK 57 m). The net change (MAMA) in comparison with 2006 was SEK 21 million. Maintenance shutdowns during the third quarter had a negative effect on the operating profit of SEK 380 million (SEK 74 m), which in comparison with 2006, gives a change of SEK -306 million.
The operating profit (EBIT) for the third quarter of SEK 1,332 million (SEK 2,095 m) breaks down into SEK 691 million (SEK 716 m) from Mines and SEK 617 (SEK 1,406 m) from Smelters, and into SEK 24 million (SEK -27 m) from Other. The corresponding profit for the first nine months of the year were SEK 2,599 million (SEK 2,221 m) for Mines, SEK 2,297 million (SEK 4,140 m) for Smelters, and SEK -58 million (SEK -64 m) for Other.
The profit before tax was SEK 1,234 million (SEK 2,067 m) for the third quarter and SEK 4,687 million (SEK 6,128 m) for the first nine months of the year.
Cash flow
The cash flow from operating activities fell to SEK 592 million (SEK 1,681 m) during the third quarter, primarily due to the lower operating profit and a higher tax payments. The cash flow for the first nine months of the year was SEK 3,221 million (SEK 5,063 m).
Capital tied up in working capital rose during the third quarter by SEK 747 million (SEK 708 m), primarily due to an increase in concentrate stocks at the smelters. The increase for the first nine months of the year was SEK 1,449 million (SEK 1,981 m) in comparison with the corresponding period last year.
Investments during the first nine months of the year totalled SEK 1,591 million (SEK 1,273 m), with the majority of the increase resulting from the expansion projects at Aitik and Harjavalta.
Boliden has bought back its own shares at a total cost of SEK 1,430 million during the third quarter. The total cost of share buy-backs during the first nine months of the year was SEK 2,020 million.
The buy-back of the company's own shares has been financed, in part, through loans. Net borrowing during the third quarter totalled SEK 668 million.
Taxes
The reported tax expense for the first nine months of the year was SEK 1,264 million (SEK 1,610 m), corresponding to 27 per cent (26%) of the result before tax. Taxes paid totalled SEK 766 million (SEK 228 m).
Financial position
A further SEK 1,430 million was redistributed to the shareholders during the third quarter in the form of share buy-backs. A total of SEK 6,642 million has been returned to the shareholders during the year in the form of a dividend payment totalling SEK 1,158 million, the redemption of shares for a total cost of SEK 3,464 million, and the buy-back of the company's own shares at a total cost of SEK 2,020 million. By the end of the third quarter, Boliden had a net debt/equity ratio of 40 per cent (16%).
The net market valuation of currency and raw material derivatives, after fiscal effects, had a total negative effect on shareholders' equity of SEK 1,359 million by the end of the third quarter.
MARKET
The copper and zinc market
Global copper production during the third quarter totalled approximately 4.4 million tonnes, while copper consumption totalled 4.5 million tonnes. Copper consumption grew over the first nine months of the year by 4 per cent, with the traditional industrialised countries reporting a negative growth rate during the period, whereas Asia in general and China in particular continued to account for the major part of the growth.
The trend in falling copper stocks continued during the third quarter, reinforcing the high copper price. China's net import levels continued high, compared with last year.
Combined official LME/Comex/SHFE copper stocks totalled 197,000 tonnes at the end of the third quarter, corresponding to 4.0 days' global consumption. This is a reduction during the quarter of 26,000 tonnes.
The global zinc market was balanced during the third quarter, with production and consumption both totalling approximately 2.8 million tonnes.
Low and falling zinc stocks notwithstanding, the price of zinc has fallen during the third quarter. The price of zinc is still, however, at an historically high levels. China was again a net exporter of zinc at the beginning of the quarter.
Combined official LME/SHFE zinc stocks totalled 89,000 tonnes at the end of the third quarter, corresponding to a mere 2.8 days' global consumption. This was a reduction during the quarter of 29,000 tonnes.
Copper price (spot) and stocks (LME), Jan 2003 – Sep 2007
Zink price (spot) and stocks (LME), Jan 2003 - Sep 2007
Metal prices
A rise of 1 per cent was noted in the price of copper and a fall of 4 per cent in the price of zinc during the third quarter, in comparison with the corresponding period in 2006. The price of lead continued to be further strengthened during the third quarter with a rice of 164 per cent.
All metal prices performed favourably during the first nine months of the year. Rises of 7 per cent, 16 per cent and 102 per cent were reported for copper, zinc and lead, respectively, in comparison with last year.
The price of zinc has fallen by 12 per cent in comparison with the second quarter this year, while the price of copper remained largely unchanged, increasing by 1 per cent.
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| Metal prices | Q3 | Q3 | months | months | ||
| (average LME/LBMA) | 2007 | 2006 | Change in % | 2007 | 2006 | Change in % |
| Copper (USD/tonne) | 7 714 | 7 670 | 1 | 7 089 | 6 612 | 7 |
| Zinc (USD/tonne) | 3 238 | 3 363 | -4 | 3 452 | 2 966 | 16 |
| Lead (USD/tonne) | 3 141 | 1 189 | 164 | 2 373 | 1 176 | 102 |
| Gold (USD/troy oz) | 679 | 622 | 9 | 666 | 601 | 11 |
| Silver (USD/troy oz) | 12.70 | 11.70 | 9 | 13.10 | 11.21 | 17 |
Metal price hedging
The following table contains a summary of Boliden's metal price hedging for copper, lead, gold and silver on 30th September 2007 with regard to forecast metal price exposure.
| Metal futures | Copper | Lead | Gold | Silver | |
|---|---|---|---|---|---|
| Percentage of price | |||||
| Maturity year 2007 | exposure hedged | 78% | 37% | 79% | 55% |
| Price¹ | 6 105 | 1 371 | 690 | 12.11 | |
| Percentage of price | |||||
| Maturity year 2008 | exposure hedged | 70% | 50% | 70% | 70% |
| Price¹ | 6 394 | 1 315 | 665 | 13.15 | |
| Percentage of price | |||||
| Maturity year 2009 | exposure hedged | 70% | 50% | 70% | 70% |
| Price¹ | 5 920 | 1 252 | 702 | 14.59 | |
| Market value of outstanding contracts, SEK m | -854 | -988 | -137 | -64 |
1) Price USD/tonne for copper and lead, USD/tr.oz for gold and silver
Price escalation clauses have been excluded in their entirety for 2008-2009 as has been, therefore, the percentage hedged. The level of escalators in purchasing contracts during 2008-2009 may affect the hedged percentage for these years.
Treatment charges/Refining charges (TC/RC)
Copper
Global mining production of copper rose by just under 5 per cent during the first half of the year, which is higher than the corresponding period in 2006. The increase notwithstanding, there is still a shortage of copper concentrate as a result of the expansion of smelter capacity in China. China's imports of copper concentrate and copper scrap have increased by approximately 36 per cent and 18 per cent, respectively, during the first eight months of the year. TC/RC have fallen during the year and the half-yearly benchmark negotiations resulted in a deterioration in terms to benchmark prices of USD 52.5/tonne and USc 5.25/lb without price escalators, from USD 60/tonne and USc 6.0/lb, which are the benchmarks for the 2007 calendar year. Negotiations with regard to the 2008 benchmark terms will begin in Q4 2007.
Codelco's benchmark price for the 2008 copper premium in Europe (CIF) has been set at USD 115/tonne.
Zinc
The high price of zinc is now being clearly reflected in global mining production, which rose by approximately 8 per cent during the first half of the year. This increased the availability of zinc concentrate, resulting in continued high spot treatment prices during the third quarter. The zinc concentrate trade does not conduct half-yearly benchmark negotiations. Towards the end of the quarter, spot treatment charges were between USD 300 and USD 340/tonne, without price escalators. The 2008 benchmark negotiations have just begun, but no conclusion is expected before next year. China's zinc concentrate imports increased by approximately 160 per cent during the first eight months of the year as a result of the expansion in the country's smelter capacity.
High imports of cast zinc to Europe have put pressure on the zinc premium during the first nine months of the year, but the premium in Europe is still more than twice as high as those in the USA and Asia.
Lead
Despite a number of production disturbances, the market for lead concentrate in the West is now, unlike before, showing a surplus, due to a reduction in China's imports caused by the very high price of lead at the LME. The market surplus of lead concentrate is the reason for rising TC/RC. Spot treatment charges were around USD 250/tonne without price escalators at the end of the third quarter, corresponding to an increase of approximately USD 200/tonne during a 12-month period.
The 2007 benchmark negotiations have now concluded, but no consensus benchmark was established, because the market is too small and the variation in the quality of the lead concentrate is too great. One estimate suggests that the TC/RC for 2007 was USD 158/tonne with a base for price escalators of USD 1,500/tonne and an escalator size of +7/-5 per cent.
Exchange rates
In comparison with last year, the US dollar has weakened against both the Swedish krona and the Norwegian krone, and against the euro, during both the third quarter and the first nine months of the year. The Swedish krona has remained largely unchanged against the euro.
The US dollar weakened against the Swedish krona by 2 per cent during the quarter in comparison with Q2 2007.
| Exchange rate | Q3 | Q3 | Nine months |
Nine months |
||
|---|---|---|---|---|---|---|
| (average) | 2007 | 2006 | Change in % | 2007 | 2006 Change in % | |
| USD/SEK | 6.75 | 7.24 | -7 | 6.88 | 7.47 | -8 |
| EUR/USD | 1.37 | 1.27 | 8 | 1.34 | 1.24 | 8 |
| EUR/SEK | 9.27 | 9.23 | 0 | 9.24 | 9.29 | -1 |
| USD/NOK | 5.76 | 6.32 | -9 | 6.00 | 6.41 | -6 |
Currency hedging
Currency contracts on 30th September 2007 in respect of the hedging of forecast commercial payment flows in USD/SEK are shown in summarized form in the table below. Boliden's other currency risks in respect of forecast exposure are, essentially, unhedged.
The hedge coverage rates for exposure to USD/SEK are 40, 40 and 42 per cent, respectively, for 2007, 2008 and 2009, calculated on the basis of price assumptions in the Sensitivity Analysis table.
| Currency options (floor) | ||
|---|---|---|
| Maturity year 2007 | amount, sold, USD m | 120 |
| rate¹ | 6.96 | |
| Maturity year 2008 | amount, sold, USD m | 444 |
| rate¹ | 6.70 | |
| Maturity year 2009 | amount, sold, USD m | 452 |
| rate¹ | 6.00 | |
| Total unrealised contracts | 1 016 | |
| Market value of outstanding contracts, SEK m | 266 |
1) Refers to strike rates for currency options.
The floors in the options portfolios are spread between USD/SEK 6.00 – 7.15
Sensitivity analysis
The following table shows an estimate of the effects on the operating profit of changes in market conditions for the next year, calculated from 30th September 2007. The estimate is based on closing day prices on 30th September 2007 and on planned production volumes. The sensitivity analysis does not take into account the effect of contracted TC/RC.
| Effect on op. | ||||||
|---|---|---|---|---|---|---|
| Change in | Effect on | profit incl. | Change in | Effect on | Change in | Effect on |
| metal prices | op. profit | hedge | USD | op. profit | TC/RC | op. profit |
| +10% | SEK m | SEK m | +10% | SEK m | +10% | SEK m |
| Copper | 310 | 87 | USD/SEK | 780 | TC/RC Copper | 75 |
| Zinc | 690 | 690 | EUR/USD | 460 | TC Zinc | 65 |
| Lead | 160 | 101 | USD/NOK | 120 | TC Lead | -12 |
| Gold | 55 | 12 | ||||
| Silver | 65 | 23 |
SEGMENT MINES
Segment Mines comprises the operations of the Aitik, Boliden Area and Garpenberg mines in Sweden and the Tara mine in Ireland. Aitik produces copper concentrate with some gold and silver content. The other Swedish mines produce zinc, copper and lead concentrates as well as some gold and silver. Tara produces zinc and lead concentrates.
| Metal production | Q3 2007 |
Q3 2006 |
Change in % | Nine months 2007 |
Nine months 2006 |
Change in % |
|---|---|---|---|---|---|---|
| Zinc, tonnes | 76 100 | 76 288 | 0 | 251 813 | 245 603 | 3 |
| Copper, tonnes | 13 675 | 19 858 | -31 | 44 976 | 67 309 | -33 |
| Lead, tonnes | 13 141 | 12 160 | 8 | 40 629 | 35 172 | 16 |
| Gold, kgs | 570 | 1 001 | -43 | 2 192 | 3 313 | -34 |
| Silver, kgs | 58 024 | 47 493 | 22 | 178 537 | 155 663 | 15 |
Aitik
Copper metal production was, as planned, considerably lower during the third quarter than during the corresponding period last year, totalling 11,453 tonnes (15,132 tonnes). Milled tonnage figures were also down on those for 2006. The average head grade of the ore mined was 0.32 per cent (0.36%). The mill throughput has, furthermore, been negatively affected by lower grindability. The grade is expected to be slightly higher than the average grade of the ore reserves, which is 0.28 per cent, for the rest of the year.
Aitik 36 million tonnes
The expansion project at the Aitik mine, entailing a doubling of its annual ore production capacity up to 36 million tonnes, is proceeding according to plan both in terms of costs and schedule. In October, the Environmental Court announced that Boliden had been granted a permit to commence the expansion of the Aitik mine to 36 million tones. The main proceedings with regard to conditions and economic guarantees for reclamation costs will be held on 7th and 8th November this year.
The Boliden Area
Milled tonnage was considerably higher during the third quarter than in the corresponding period last year. A changed ore mix in the Boliden Area resulted in increased production of lead and silver, largely unchanged zinc production, and a sharp reduction in copper and gold production during the first nine months of the year. Zinc, copper and gold head grades have fallen during both the third quarter and the first nine months of the year in comparison with corresponding periods last year. Head grades for the rest of the year are expected to be lower than the average grade for the ore reserve.
Operations at the Storliden mine have been extended and mining will continue until the end of Q1 2008, due to continued high metal prices that enable good profitability to be achieved from mining marginal ore positions.
Production at the Boliden Area concentrator will fall, starting in April 2008, due to a delay in granting permits for the expansion of the Hötjärn tailings pond.
Garpenberg
Garpenberg's milled tonnage was high and metal production levels for its principal metals – zinc, lead and silver – were high during the first nine months of the year. Zinc production increased by 14 per cent, lead by 19 per cent and silver by 10 per cent in comparison with last year. The main reasons for the increases are better head grades and a higher mill throughput.
A pre-study investigating the potential for increasing production is currently being conducted at Garpenberg.
Tara
Metal production at Tara during the third quarter was more or less on a par with levels last year, but milled tonnage was down. Head grades are expected to be below the ore reserves' average grade during the fourth quarter.
During the third quarter, the Board decided to invest approximately SEK 250 million in a new autogenous grinding circuit at the concentrator, which will halve operating costs for grinding. This, coupled with previous investments in Tara, e.g. in dewatering, will reduce the concentrator's total operating costs by 30 per cent. Boliden anticipates that the replacement of the existing crushing and grinding system with a new autogenous grinding circuit will improve not only the zinc yield but the working environment. The project is scheduled for completion at the end of 2009.
| Revenues, results and investments | ||||
|---|---|---|---|---|
| ----------------------------------- | -- | -- | -- | -- |
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| SEK m | Q3 | Q3 | months | months | ||
| 2007 | 2006 | Change in % | 2007 | 2006 | Change in % | |
| Revenues | 1 667 | 1 741 | -4 | 5 831 | 5 395 | 8 |
| Operating profit | 691 | 716 | -3 | 2 599 | 2 221 | 17 |
| Investments | 310 | 293 | 6 | 900 | 718 | 25 |
| Capital employed | 4 859 | 4 344 | 12 | 4 859 | 4 344 | 12 |
The operating profit of Mines for the third quarter totalled SEK 691 million (SEK 716 m). The discrepancy between this year's figure and last year's is due to improvements in prices and terms primarily attributable to higher metal prices and totalling SEK 289 million, which were countered by a negative volume variation of SEK 222 million and increased costs totalling SEK 106 million. The operating profit during the third quarter includes realised metal price hedging totalling SEK -350 million (SEK -673 m).
The operating profit for the first nine months of the year increased to SEK 2,599 million (SEK 2,221 m) including realised metal price hedging totalling SEK -1,370 million (SEK -1,666 m). The discrepancy between this period's figures and those for same period last year is due to prices and terms, which have increased by SEK 1,214 million, primarily due to metal prices. Volume variations, primarily attributable to lower metal production at Aitik, accounted for SEK -647 million and costs increased by SEK 188 million.
The concentrators at Tara and Garpenberg implemented planned maintenance shutdowns during the third quarter. The effect on the operating profit was SEK -140 million (SEK -10 m) in comparison with the same period in 2006. No major maintenance shutdowns will be implemented during the fourth quarter, during which time only normal maintenance will take place.
SEGMENT SMELTERS
Segment Smelters comprises the Rönnskär and Harjavalta copper smelters and the Bergsöe lead smelter. These smelters mainly produce copper, gold, silver, lead and lead alloys, and sulphuric acid. These smelters also recycle electronic waste and smelt nickel. The segment also includes the Kokkola and Odda zinc smelters, which mainly produce zinc, but also produce aluminium fluoride. Segment Smelters also includes Business Area Market.
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| Metal production | Q3 | Q3 | months | months | ||
| 2007 | 2006 Change in % | 2007 | 2006 | Change in % | ||
| Copper, tonnes | 66 605 | 87 843 | -24 | 235 053 | 265 739 | -12 |
| Gold, kgs | 2 998 | 5 315 | -44 | 11 734 | 15 158 | -23 |
| Silver, kgs | 76 502 | 95 846 | -20 | 289 432 | 311 413 | -7 |
| Lead, tonnes | 4 760 | 3 111 | 53 | 20 074 | 17 783 | 13 |
| Lead alloys, tonnes (Bergsöe) | 7 986 | 7 110 | 12 | 32 010 | 32 666 | -2 |
| Zinc, tonnes | 117 476 | 112 814 | 4 | 349 966 | 330 835 | 6 |
| Aluminium fluoride, tonnes | 7 244 | 5 040 | 44 | 26 610 | 21 131 | 26 |
Rönnskär
Rönnskär implemented a planned maintenance shutdown during the third quarter, which had a negative effect on the production of copper cathodes. The maintenance shutdown in 2006 took place in the second quarter, which affects the quarterly comparison. This year's maintenance shutdown was the most extensive in ten years.
Volumes of concentrate processed were high during the first nine months of the year, but copper head grades were lower than during the corresponding period last year, which is another reason why copper production levels fell. The operating profit was hardly affected as the refining charges relate to the tonnage of concentrate processed.
A pre-study for a possibility to double the capacity for recycling electronic scrap at the Rönnskär copper smelter is currently taking place. The pre-study is scheduled for completion at the end of the year.
Harjavalta
Harjavalta has experienced start-up problems since the expansion project and has also suffered problems with the quality of its input concentrate, leading to lower processing and lower anode and cathode production levels, both during the third quarter and for the first nine months of the year as a whole. As a result of the start-up problems, Harjavalta has increased concentrate stocks and the amount of capital tied up at the end of the third quarter was, therefore, higher than at the corresponding period last year.
The expansion and efficiency-boosting project, which aimed to achieve production increases of 30 per cent and 20 per cent, respectively, for anode and cathode production, will be phased up during the fourth quarter, with full production capacity achieved at the beginning of 2008.
Nickel smelting continued to perform very well and the levels achieved during the first nine months of the year were far higher than those achieved during the same period in 2006.
Bergsöe
Bergsöe's production of lead during the third quarter was higher, but production levels during the first nine months of the year were marginally below those for the corresponding period in 2006.
Kokkola
Zinc metal production levels at Kokkola remained high during the third quarter and production levels during the first nine months of the year were 10 per cent higher than levels during the corresponding period last year.
Odda
Processing and production of zinc metal was on a par with levels in 2006, both during the third quarter and during the first nine months of the year.
Aluminium fluoride production during the third quarter substantially exceeded last year's production due to the plant achieving full capacity after the expansion project.
Revenues, results and investments
| SEK m | Q3 | Q3 | Nine months |
Nine months |
||
|---|---|---|---|---|---|---|
| 2007 | 2006 | Change in % | 2007 | 2006 | Change in % | |
| Revenues | 8 492 | 9 999 | -15 | 27 323 | 27 166 | 1 |
| Operating profit | 617 | 1 406 | -56 | 2 297 | 4 140 | -45 |
| Investments | 220 | 138 | 59 | 692 | 558 | 24 |
| Capital employed | 16 589 | 14 920 | 11 | 16 589 | 14 920 | 11 |
The operating profit of Smelters fell to SEK 617 million (SEK 1,406 m) including realised metal price hedging totalling SEK -61 million (SEK -11 m) during the third quarter. Changes to prices and terms collectively accounted for deterioration in the operating profit of SEK 575 million in comparison with the third quarter of 2006. This was due, partly, to lower realised TC/RC, a lower exchange rate against the US dollar and a less positive stock revaluation, and partly to a lower monthly correction in July of preliminarily
priced metals sales from the second quarter. Lower production reduced the operating profit by SEK 163 million. The cost increase during the third quarter in comparison with the same period in 2006 was SEK 51 million.
The operating profit during the first nine months of the year totalled SEK 2,297 million (SEK 4,140 m). The difference can be attributed to poorer prices and terms, totalling SEK -1,622 million, as a result of lower realised TC/RC, lower exchange rates, a less positive stock revaluation and a negative monthly correction in January of preliminarily priced metals sales from the fourth quarter of 2006. Costs increased by SEK 203 million due to, among other things, salary increases, maintenance work and increases in energy prices. There was a negative volume variation in comparison with the corresponding period in 2006 totalling SEK 38 million. The operating profit during the first nine months of the year included realised metalprice hedging totalling SEK -117 million (SEK -30 m).
Rönnskär and Odda implemented planned maintenance shutdowns during the third quarter. Harjavalta also experienced a production shutdown during the quarter. The overall effect on the operating profit was SEK -240 million (SEK -64 m), in comparison with the corresponding period last year. Minor maintenance shutdowns are planned for the fourth quarter at Rönnskär, Kokkola and Bergsöe and these, coupled with the start-up activities at Harjavalta, are expected to have a total negative effect on the operating profit of approximately SEK 100 million.
EXPLORATION
Boliden's exploration budget for the year is SEK 300 million. Exploration costs during the first nine months of the year totalled SEK 177 million (SEK 110 m), corresponding to an increase of 61 per cent in comparison with last year. Drilling, drift mining, and geophysical ground survey activities all proceeded according to plan during the third quarter and have yielded good results in all areas for exploration activities.
Mine-site exploration
Boliden continued to record interesting results from all of its mine-site exploration projects during the third quarter. In the Boliden area, the L-zone, with good zinc, gold and copper grades, is being developed at the Kristineberg mine, while at the Renström mine, new mineralised zones have been discovered, with good grades at the 1,450 m level both around the main ore body (Julia) and to the east of the Simon ore body. A new high grade mineralised zone has been drilled out at Åkulla Östra and will generate additional mineral resources for the mining project.
A wide mineralisation has been discovered at the 1,200 m level in the Garpenberg mining area, underneath the Dammsjö ore body.
In Ireland, in the Navan area, survey work in the form of electromagnetic measurements and follow-up drilling work, is being carried out to both the north and the south-west of currently known ore areas.
Field exploration
Boliden's field exploration in Sweden is concentrated on base metals and gold exploration in the Skellefte field and on base metals in Dorotea, Norrbotten and Bergslagen. Some 20 projects are currently being investigated using geochemical sampling, deep-penetrating electromagnetic geophysics and diamond drilling.
Drilling work has been carried out in a number of locations in the Skellefte field during the third quarter. Diamond drilling has continued in the Boliden Area in order to investigate a potential mineralisation in the bedrock under the town of Boliden. Drilling in Maurliden Östra has also shown additional potential and the aim is to have evaluated the deposit thoroughly by the end of the year. Gold exploration in the Skellefte field is still focusing on the Älgträsk area (Jörn), where drilling continues and an evaluation of the deposit and its potential has begun.
Drilling continues in the Dorotea area (Ursvattnet, Långmyran and Havsnäs), as does the drilling of the Rockliden deposit in Ångermanland.
Good results have been achieved in Norrbotten, including to the south of Aitik, where core drilling has revealed a new trend.
Exploration work is taking place in Ireland in the eastern section of the Limerick and Wexford areas. Data processing, already in progress for the Longford area, has now also begun for these areas.
SUSTAINABLE DEVELOPMENT
Employees
The average number of employees in Boliden during the third quarter was 4,509. Of these, 2,330 work in Sweden, 1,077 in Finland, 683 in Ireland, 393 in Norway and 26 in other countries. This represents a decrease of 10 in comparison with 2006 as a whole, when the average number of employees was 4,519.
Absence due to sick leave during the third quarter totalled 4.0 per cent, which represents a reduction in comparison with the second quarter, when the absence due to sick leave figure was 4.5 per cent. Boliden's goal is for absence due to sick leave to be under 4.8 per cent by the end of 2008.
The accident frequency during the third quarter was 10.3 accidents per million hours worked. This represents a decrease in comparison with the second quarter when the corresponding figure was 10.8. Boliden has adopted a zero vision with regard to accidents and the goal is to reduce the frequency to under 5.0 accidents per million hours worked by the end of 2011.
Environment
Work on introducing ISO 14001-compliant environmental management systems continued during the third quarter. The Tara zinc mine has completed its certification audit, resulting in a recommendation for certification. This will mean that by the end of 2007, six of Boliden's nine production units will have certified environmental management systems in place. The goal is for all of the production units to be certified in accordance with ISO 14001 by the end of 2008.
Proceedings concerning the final conditions for operation, reclamation and economic guarantees for reclamation costs in respect of the planned tailings pond, Hötjärnsmagasinet, in the Boliden Area, were held between 24th and 26th September in the Environmental Court. The Environmental Court will issue its ruling on 21st November.
On 5th October, the Environmental Court issued a so-called planning ruling with regard to the expansion of the Aitik mine. In its ruling, the Environmental Court declared that the operation for which Boliden had sought a permit was permissible, and granted Boliden permission to start work immediately on constructing certain roads and carrying out foundation work for industrial areas, etc. The main proceedings in relation to Boliden's application for Aitik will be held on 7th and 8th November 2007, after which, the Environmental Court will decide on conditions for emissions, noise and other environmental impact from the expanded operations. A ruling will also be made at that time regarding reclamation and the issue of economic guarantees for reclamation costs.
The Norwegian Pollution Control Authority (SFT) has increased the Odda zinc smelter's permit for emissions to water of, among others, zinc in 2007. This was triggered by the inadequate treatment capacity noted in conjunction with heavy rainfall in the spring of 2007 and the incident in May that led to zinc emissions. Changes aimed at improving the treatment capacity will be implemented in late 2007. SFT's report on the incident is now complete and a police investigation of the course of events has begun.
THE PARENT COMPANY
The Parent Company, Boliden AB, conducts no operations and has no employees. The Parent Company's Income Statements and Balance Sheets can be found on page 22 of this Report.
OTHER
Risks and uncertainties
The Group's and Parent Company's significant risks and uncertainties include commercial risks and financial risks, mainly price risks related to currencies and metals. No significant risks, other than those described in Boliden's Annual Report (see Notes 18 and 22) and those described below, are deemed to have arisen.
In June 2007, and in connection with the bankruptcy proceedings of Boliden's Spanish subsidiary, Apirsa, the local Commercial Court of Seville issued a preliminary injunction for the seizure of assets belonging to Boliden AB and Boliden Mineral AB up to a value of EUR 141 million as security for alleged claims relating to the dam breach accident in Spain in 1998. Boliden disputes the court's order.
Boliden has previously stated its view that the Company will suffer no substantial financial damage as a result of the legal proceedings against it relating to the dam breach accident in Spain. The preliminary injunction issued by the Commercial Court of Seville has not changed Boliden's view.
President and CEO
In September, Jan Johansson announced that he would be leaving Boliden after six years with the Group. Boliden's Board of Directors has appointed Svante Nilsson Acting President and CEO.
Preparation principles for the Interim Report
The Interim Report has been prepared in accordance with IAS 34, Interim Reporting. The accounting principles remain unchanged from the annual accounts for 2006.
IFRS 7, Financial instruments: Disclosures, and IAS 1, Presentation of Financial Statements, are also applied from 1st January 2007. IFRIC 7, 8, 9, and 10 are also, as a complement to the above, applicable from 1st January 2007. These recommendations and interpretations are not expected to have any effect on the consolidated accounts, other than in terms of the structuring and scope of the supplementary disclosures made in the financial statements.
Nomination Committee
Boliden's Nomination Committee for the 2008 Annual General Meeting of the company's shareholders, comprises Mats Guldbrand of AMF (Nomination Committee Chairman), Anders Algotsson of AFA, Lars-Erik Forsgårdh and Björn Franzon of Fjärde AP-fonden, Björn Lind of SEB fonder/SEB Trygg Liv, Åsa Nisell of Swedbank Robur Fonder, and Anders Ullberg (Chairman of the Board).
Interim Reports and Annual General Meeting
The Preliminary Financial Statement for 2007 will be published on 7th February 2008 The Interim Report for January-March 2008 will be published on 8th May 2008 The Annual General Meeting will be held in Garpenberg on 8th May 2008 The Interim Report for January-June 2008 will be published on 21st July 2008 The Interim Report for January-September 2008 will be published on 28th October 2008
Stockholm, 30th October 2007
Svante Nilsson Acting President & CEO
AUDITORS' REVIEW REPORT FOR THE INTERIM REPORT
Introduction
We have reviewed the interim report for the period 1st January 2007 to 30th September 2007 for Boliden AB (publ). The Board of Directors and Chief Executive Officer are responsible for the preparation and presentation of this interim report in accordance with IAS 34 and the Swedish Annual Reports Act. Our responsibility is to express a conclusion on this interim report based on our review.
The focus and scope of the review
We conducted our review in accordance with the Standard on Review Engagements SÖG 2410, "Review of Interim Financial Information Performed by the Independent Auditor of the Entity". A review consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than and the focus is different from that of an audit conducted in accordance with the Standards on Auditing in Sweden (RS) and other generally accepted auditing practices. The procedures performed in a review do not enable us to obtain a level of assurance that would make us aware of all significant matters that might be identified in an audit. Therefore, the conclusion expressed based on a review does not give the same level of assurance as a conclusion expressed based on an audit.
Conclusion
Based on our review, nothing has come to our attention that causes us to believe that the interim report has not been prepared, in all material respects, in accordance with IAS 34 and with the Swedish Annual Reports Act.
Stockholm, 30th October 2007
Hans Pihl Björn Sundkvist Authorised Public Accountant Authorised Public Accountant
Conference call (30th October) and lunch presentation (31st October)
Conference call (in English): 30th October
With reference to this Interim Report, the capital market is hereby invited to participate in a conference call on Tuesday, 30th October, with Boliden's Acting President & CEO, Svante Nilsson, and members of the Group Management.
The conference call starts at 4 p.m. (CET 16:00).
- To participate in the conference call, please dial:
- from Sweden: 08-50 52 01 14 (remember to dial the area code)
- from abroad: +44 (0)207 162 01 25
- a couple of minutes before the conference call starts.
A presentation will be available on Boliden's website at www.boliden.com in conjunction with the publication of the Quarterly Report. The conference call can be followed "live" using the presentation images on the website.
Lunch presentation (in Swedish): 31st October
The lunch presentation begins at 12:00 noon (CET 12:00) at Operaterrassen, Karl XII:s torg, Stockholm, Sweden. Please notify Boliden of your intention to attend the lunch presentation by e-mailing us at [email protected]. The lunch presentation can also be followed from Boliden's website.
A recording of the conference call and the lunch presentation will be available at www.boliden.com.
Contact persons for information:
| Svante Nilsson, Acting President & CEO | Tel | +46 8 610 15 27 |
|---|---|---|
| [email protected] | Mobile | +46 70 583 32 78 |
| Eva Kaijser, SVP Investor Relations & Group Communications | Tel | +46 8 610 15 60 |
| [email protected] | Mobile | +46 70 932 09 01 |
| Carina Wång, Acting CFO | Tel | +46 8 610 15 21 |
| [email protected] | Mobile | +46 70 539 72 23 |
INCOME STATEMENTS
| Nine | Nine | ||||
|---|---|---|---|---|---|
| Q3 | Q3 | months | months | Full year | |
| SEK m | 2007 | 2006 | 2007 | 2006 | 2006 |
| Revenues | 8 166 | 9 299 | 25 913 | 25 485 | 35 213 |
| Cost of goods sold | -6 598 | -7 050 | -20 352 | -18 592 | -25 831 |
| Gross profit | 1 568 | 2 249 | 5 561 | 6 893 | 9 382 |
| Selling expenses | -106 | -96 | -297 | -295 | -404 |
| Administrative expenses | -94 | -80 | -297 | -275 | -409 |
| Research and development costs | -70 | -45 | -214 | -147 | -215 |
| Other operating income and expenses | 31 | 63 | 82 | 118 | 151 |
| Results from participations in associated companies |
3 | 4 | 3 | 3 | 17 |
| Operating profit | 1 332 | 2 095 | 4 838 | 6 297 | 8 522 |
| Financial income | 11 | 28 | 70 | 69 | 85 |
| Financial expenses | -109 | -56 | -221 | -238 | -294 |
| Profit before tax | 1 234 | 2 067 | 4 687 | 6 128 | 8 313 |
| Income tax expense | -334 | -526 | -1 264 | -1 610 | -2 045 |
| Profit for the period | 900 | 1 541 | 3 423 | 4 518 | 6 268 |
| Earnings per share, SEK | 3.20 | 5.32 | 11.96 | 15.61 | 21.66 |
| Earnings per share after | |||||
| dilution, SEK | 3.20 | 5.32 | 11.96 | 15.61 | 21.66 |
| Shareholders' equity per share, SEK | 44.19 | 46.38 | 44.19 | 46.38 | 55.58 |
| Number of shares | 275 301 169 | 289 457 169 | 275 301 169 | 289 457 169 | 289 457 169 |
| Average number of shares | 281 579 256 | 289 457 169 | 286 343 001 | 289 419 733 | 289 429 169 |
| Average number of shares after dilution | 281 579 256 | 289 457 169 | 286 343 001 | 289 419 733 | 289 429 169 |
| Number of own shares held | 14 156 000 | – | 14 156 000 | – | – |
| Nine | Nine | ||||
|---|---|---|---|---|---|
| Other key ratios | Q3 | Q3 | months | months | Full year |
| 2007 | 2006 | 2007 | 2006 | 2006 | |
| Return on capital employed, % | 29 | 51 | 35 | 52 | 52 |
| Return on shareholders' equity, % | 28 | 49 | 30 | 53 | 51 |
| Equity/assets ratio, % | 45 | 54 | 45 | 54 | 60 |
| Net debt/shareholders' equity, % | 40 | 16 | 40 | 16 | -1 |
| Depreciation, SEK m | 354 | 326 | 1 049 | 983 | 1 309 |
| Investments, SEK m | 530 | 431 | 1 591 | 1 276 | 1 847 |
| Capital employed, SEK m | 19 004 | 16 705 | 19 004 | 16 705 | 17 667 |
| Net debt, SEK m | 4 844 | 2 200 | 4 844 | 2 200 | -195 |
BALANCE SHEETS
| 30th Sept. | 30th Sept. | 31st Dec. | |
|---|---|---|---|
| SEK m | 2007 | 2006 | 2006 |
| Intangible fixed assets | 3 171 | 3 130 | 3 077 |
| Tangible fixed assets | 12 786 | 11 975 | 12 062 |
| Interest-bearing assets | 23 | 21 | 21 |
| Other financial fixed assets | 42 | 34 | 46 |
| Inventories | 7 307 | 5 119 | 5 351 |
| Interest-bearing current receivables | 7 | – | – |
| Other receivables | 3 065 | 3 363 | 3 176 |
| Liquid assets | 594 | 1 433 | 3 196 |
| Total assets | 26 995 | 25 075 | 26 929 |
| Shareholders' equity | 12 165 | 13 424 | 16 089 |
| Pension provisions | 504 | 497 | 493 |
| Deferred tax provisions | 1 298 | 695 | 1 277 |
| Other provisions | 1 036 | 957 | 1 016 |
| Interest-bearing long-term liabilities | 3 282 | 2 419 | 2 302 |
| Interest-bearing current liabilities | 1 681 | 737 | 228 |
| Other current liabilities | 7 029 | 6 346 | 5 524 |
| Total liabilities and shareholders' equity | 26 995 | 25 075 | 26 929 |
| Specification of change in shareholders' equity |
30th Sept. | 30th Sept. | 31st Dec. |
|---|---|---|---|
| SEK m | 2007 | 2006 | 2006 |
| Opening balance | 16 089 | 10 289 | 10 289 |
| New share issue | – | 2 | 2 |
| Dividend | -1 158 | -579 | -579 |
| Share redemption | -3 464 | – | – |
| Buy-back of own shares | -2 020 | – | – |
| Profit for the period | 3 423 | 4 518 | 6 268 |
| Market valuation of financial instruments, after fiscal effect | -701 | -800 | 124 |
| Translation differences | -4 | -6 | -15 |
| Closing balance | 12 165 | 13 424 | 16 089 |
On 30th September 2007, the market valuation of financial instruments, after fiscal effect, amounted to SEK -1,359 million.
STATEMENTS OF CASH FLOW
| Nine | Nine | ||||
|---|---|---|---|---|---|
| SEK m | Q3 2007 |
Q3 2006 |
months 2007 |
months 2006 |
Full year 2006 |
| Cash flow from operating activities before changes in operating capital |
1 339 | 2 389 | 4 670 | 7 044 | 9 646 |
| Cash flow from changes in operating capital | -747 | -708 | -1 449 | -1 981 | -1 636 |
| Cash flow from operating activities | 592 | 1 681 | 3 221 | 5 063 | 8 010 |
| Investment activities | |||||
| - Acquisition of tangible fixed assets | -530 | -428 | -1 591 | -1 273 | -1 843 |
| - Other | – | 105 | – | 105 | 104 |
| Cash flow from investment activities | -530 | -323 | -1 591 | -1 168 | -1 739 |
| Cash flow before financing activities | 62 | 1 358 | 1 630 | 3 895 | 6 271 |
| Dividend | – | – | -1 158 | -579 | -579 |
| Share redemption | – | – | -3 464 | – | – |
| Buy-back of own shares | -1 430 | – | -2 020 | – | – |
| Other financing activities | 668 | -1 101 | 2 409 | -3 402 | -4 014 |
| Cash flow from financing activities | -762 | -1 101 | -4 233 | -3 981 | -4 593 |
| Cash flow for the period | -700 | 257 | -2 603 | -86 | 1 678 |
| Exchange rate difference on liquid assets | – | – | 1 | -1 | -2 |
| Change in liquid assets | -700 | 257 | -2 602 | -87 | 1 676 |
INFORMATION PER SEGMENT – BUSINESS AREAS
SEK m
| Q3 2007 | ||||
|---|---|---|---|---|
| Mines | Smelters | Other | The Group | |
| Revenues | 1 667 | 8 492 | -1 993 | 8 166 |
| Operating profit | 691 | 617 | 24 | 1 332 |
| Depreciation | 163 | 191 | – | 354 |
| Investments | 310 | 220 | – | 530 |
| Capital employed | 4 859 | 16 589 | -2 444 | 19 004 |
| Q3 2006 | Mines | Smelters | Other | The Group |
| Revenues | 1 741 | 9 999 | -2 441 | 9 299 |
| Operating profit | 716 | 1 406 | -27 | 2 095 |
| Depreciation | 138 | 189 | -1 | 326 |
| Investments | 293 | 138 | – | 431 |
| Capital employed | 4 344 | 14 920 | -2 559 | 16 705 |
| Nine months, 2007 | ||||
| Mines | Smelters | Other | The Group | |
| Revenues | 5 831 | 27 323 | -7 241 | 25 913 |
| Operating profit | 2 599 | 2 297 | -58 | 4 838 |
| Depreciation | 471 | 578 | – | 1 049 |
| Investments | 900 | 692 | -1 | 1 591 |
| Capital employed | 4 859 | 16 589 | -2 444 | 19 004 |
| Nine months, 2006 | ||||
| Mines | Smelters | Other | The Group | |
| Revenues | 5 395 | 27 166 | -7 076 | 25 485 |
| Operating profit | 2 221 | 4 140 | -64 | 6 297 |
| Depreciation | 415 | 567 | 1 | 983 |
| Investments | 718 | 558 | – | 1 276 |
| Capital employed | 4 344 | 14 920 | -2 559 | 16 705 |
| Full year, 2006 | ||||
| Mines | Smelters | Other | The Group | |
| Revenues | 7 261 | 37 514 | -9 562 | 35 213 |
| Operating profit | 3 010 | 5 652 | -140 | 8 522 |
| Depreciation | 543 | 765 | 1 | 1 309 |
| Investments | 1 065 | 782 | – | 1 847 |
| Capital employed | 4 393 | 14 474 | -1 199 | 17 667 |
Capital employed reported under Other refers mainly to market valuation of hedge.
| MINES | Q3 | Q3 | Nine months |
Nine months |
||
|---|---|---|---|---|---|---|
| 2007 | 2006 | Change in % |
2007 | 2006 | Change in % |
|
| AITIK | ||||||
| Refined tonnage, ktonnes | 4 097 | 4 611 | -11 | 13 412 | 13 776 | -3 |
| Head grades | ||||||
| Copper (%) | 0.32 | 0.36 | -11 | 0.31 | 0.42 | -26 |
| Gold (g/tonne) | 0.14 | 0.23 | -39 | 0.14 | 0.26 | -46 |
| Silver (g/tonne) | 3.87 | 2.37 | 63 | 3.58 | 2.69 | 33 |
| Metal production | ||||||
| Copper, tonnes | 11 453 | 15 132 | -24 | 35 573 | 51 286 | -31 |
| Gold, kgs | 235 | 568 | -59 | 874 | 1 802 | -51 |
| Silver, kgs | 10 191 | 8 080 | 26 | 30 144 | 26 736 | 13 |
| THE BOLIDEN AREA | ||||||
| Refined tonnage, ktonnes | 479 | 380 | 26 | 1 389 | 1 228 | 13 |
| Head grades | ||||||
| Zinc (%) | 4.0 | 5.6 | -29 | 4.8 | 5.9 | -19 |
| Copper (%) | 0.6 | 1.7 | -65 | 0.8 | 1.7 | -53 |
| Lead (%) | 0.5 | 0.4 | 25 | 0.5 | 0.5 | 0 |
| Gold (g/tonne) | 1.5 | 1.7 | -12 | 1.6 | 1.7 | -6 |
| Silver (g/tonne) | 60 | 56 | 7 | 67 | 67 | 0 |
| Metal production | ||||||
| Zinc, tonnes | 15 334 | 14 979 | 2 | 53 332 | 54 801 | -3 |
| Copper, tonnes | 2 026 | 4 565 | -56 | 8 878 | 15 545 | -43 |
| Lead, tonnes | 800 | 374 | 114 | 2 625 | 1 486 | 77 |
| Gold, kgs | 258 | 377 | -32 | 1 126 | 1 312 | -14 |
| Silver, kgs | 17 494 | 11 217 | 56 | 60 261 | 50 027 | 20 |
| GARPENBERG | ||||||
| Refined tonnage, ktonnes | 319 | 322 | -1 | 927 | 877 | 6 |
| Head grades | ||||||
| Zinc (%) | 6.0 | 6.0 | 0 | 6.1 | 5.6 | 9 |
| Copper (%) | 0.1 | 0.1 | 0 | 0.1 | 0.1 | 0 |
| Lead (%) | 2.4 | 2.2 | 9 | 2.4 | 2.2 | 9 |
| Gold (g/tonne) | 0.3 | 0.3 | 0 | 0.3 | 0.4 | -25 |
| Silver (g/tonne) | 124 | 119 | 4 | 125 | 121 | 3 |
| Metal production | ||||||
| Zinc, tonnes | 17 562 | 17 793 | -1 | 51 258 | 44 820 | 14 |
| Copper, tonnes | 196 | 161 | 22 | 524 | 478 | 10 |
| Lead, tonnes | 6 291 | 5 686 | 11 | 18 189 | 15 346 | 19 |
| Gold, kgs | 78 | 57 | 37 | 193 | 199 | -3 |
| Silver, kgs | 29 545 | 28 196 | 5 | 86 701 | 78 900 | 10 |
| TARA | ||||||
| Refined tonnage, ktonnes | 653 | 710 | -8 | 1 999 | 2 097 | -5 |
| Head grades | ||||||
| Zinc (%) | 7.1 | 6.7 | 6 | 7.9 | 7.6 | 4 |
| Lead (%) | 1.4 | 1.3 | 8 | 1.5 | 1.4 | 7 |
| Metal production | ||||||
| Zinc, tonnes | 43 204 | 43 516 | -1 | 147 223 | 145 982 | 1 |
| Lead, tonnes | 6 050 | 6 100 | -1 | 19 815 | 18 340 | 8 |
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| SMELTERS | Q3 | Q3 | months | months | ||
| 2007 | 2006 | Change in % |
2007 | 2006 | Change in % |
|
| RÖNNSKÄR | ||||||
| Smelted material, tonnes | ||||||
| Copper, tonnes | ||||||
| Primary | 143 669 | 148 477 | -3 | 443 210 | 431 610 | 3 |
| Secondary | 37 126 | 42 830 | -13 | 116 476 | 115 141 | 1 |
| Total | 180 795 | 191 307 | -5 | 559 686 | 546 751 | 2 |
| Production | ||||||
| Cathode copper, tonnes | 48 228 | 56 226 | -14 | 159 953 | 170 162 | -6 |
| Lead, tonnes | 4 760 | 3 111 | 53 | 20 074 | 17 783 | 13 |
| Zinc clinker, tonnes | 6 269 | 9 406 | -33 | 24 765 | 24 043 | 3 |
| Gold, kgs | 2 627 | 4 244 | -38 | 9 569 | 12 024 | -20 |
| Silver, kgs | 70 622 | 86 950 | -19 | 264 432 | 282 284 | -6 |
| HARJAVALTA | ||||||
| Smelted material, tonnes | ||||||
| Copper concentrate | 115 710 | 146 325 | -21 | 332 643 | 407 131 | -18 |
| Production, tonnes | ||||||
| Cathode copper | 18 377 | 31 617 | -42 | 75 100 | 95 577 | -21 |
| Gold, kgs | 371 | 1 071 | -65 | 2 165 | 3 134 | -31 |
| Silver, kgs | 5 880 | 8 896 | -34 | 25 000 | 29 129 | -14 |
| BERGSÖE | ||||||
| Production, tonnes | ||||||
| Lead alloys | 7 986 | 7 110 | 12 | 32 010 | 32 666 | -2 |
| Tin alloys | 152 | 161 | -6 | 583 | 647 | -10 |
| KOKKOLA | ||||||
| Smelted material, tonnes | ||||||
| Zinc concentrate | 143 536 | 142 976 | 0 | 431 815 | 404 218 | 7 |
| Production, tonnes | ||||||
| Zinc, tonnes | 77 052 | 72 420 | 6 | 231 046 | 210 805 | 10 |
| ODDA | ||||||
| Smelted material, tonnes | ||||||
| Zinc concentrate, incl. | ||||||
| zinc clinker | 71 357 | 71 936 | -1 | 216 286 | 219 368 | -1 |
| Production, tonnes | ||||||
| Zinc, tonnes | 40 424 | 40 394 | 0 | 118 920 | 120 030 | -1 |
| of which reprocessed zinc | 100 | 763 | 1 629 | 1 773 | ||
| Aluminium fluoride, tonnes | 7 244 | 5 040 | 44 | 26 610 | 21 131 | 26 |
QUARTERLY DATA
| Q4 2005 Q1 2006 | Q2 2006 | Q3 2006 | Q4 2006 | Q1 2007 Q2 2007 | Q3 2007 | |||
|---|---|---|---|---|---|---|---|---|
| Metal prices | ||||||||
| Copper (USD/tonne) | 4 299 | 4 944 | 7 251 | 7 670 | 7 087 | 5 941 | 7 635 | 7 714 |
| Zinc (USD/tonne) | 1 631 | 2 248 | 3 301 | 3 363 | 4 194 | 3 460 | 3 664 | 3 238 |
| Lead (USD/tonne) | 1 058 | 1 240 | 1 095 | 1 189 | 1 622 | 1 787 | 2 182 | 3 141 |
| Gold (USD/oz) | 485 | 554 | 629 | 622 | 614 | 650 | 668 | 679 |
| Silver (USD/oz) | 8.05 | 9.71 | 12.25 | 11.70 | 12.58 | 13.29 | 13.33 | 12.70 |
| Exchange rates | ||||||||
| USD/SEK | 7.93 | 7.78 | 7.40 | 7.24 | 7.08 | 7.01 | 6.87 | 6.75 |
| EUR/USD | 1.19 | 1.20 | 1.26 | 1.27 | 1.29 | 1.31 | 1.35 | 1.37 |
| EUR/SEK | 9.46 | 9.35 | 9.30 | 9.23 | 9.13 | 9.19 | 9.26 | 9.27 |
| USD/NOK | 6.61 | 6.67 | 6.23 | 6.32 | 6.41 | 6.23 | 6.01 | 5.76 |
| Metal production, Mines | ||||||||
| Zinc, tonnes | 87 548 | 89 225 | 80 090 | 76 288 | 82 040 | 89 031 | 86 682 | 76 100 |
| Copper, tonnes | 27 161 | 25 617 | 21 835 | 19 858 | 19 515 | 14 703 | 16 598 | 13 675 |
| Lead, tonnes | 12 864 | 12 233 | 10 779 | 12 160 | 13 606 | 13 288 | 14 200 | 13 141 |
| Gold, kgs | 1 349 | 1 139 | 1 172 | 1 001 | 1 198 | 739 | 883 | 570 |
| Silver, kgs | 54 629 | 55 470 | 52 700 | 47 493 | 55 977 | 62 303 | 58 210 | 58 024 |
| Metal production, Smelters | ||||||||
| Copper, tonnes | 89 429 | 90 029 | 87 866 | 87 843 | 90 653 | 90 072 | 78 377 | 66 605 |
| Gold, kgs | 4 715 | 5 606 | 4 238 | 5 315 | 4 535 | 4 512 | 4 224 | 2 998 |
| Silver, kgs | 91 492 | 113 591 | 101 976 | 95 846 | 102 989 | 108 253 | 104 677 | 76 502 |
| Lead, tonnes | 8 156 | 7 763 | 6 909 | 3 111 | 7 765 | 8 229 | 7 085 | 4 760 |
| Lead alloys, tonnes | ||||||||
| (Bergsöe) | 12 053 | 12 633 | 12 923 | 7 110 | 12 025 | 12 062 | 11 962 | 7 986 |
| Zinc, tonnes | 112 537 | 108 455 | 109 566 | 112 814 | 112 073 | 114 759 | 117 731 | 117 476 |
| Aluminium fluoride, tonnes |
8 203 | 8 200 | 7 891 | 5 040 | 7 631 | 8 980 | 10 386 | 7 244 |
| Revenues | 6 372 | 7 337 | 8 850 | 9 299 | 9 728 | 8 455 | 9 292 | 8 166 |
| Operating profit before | ||||||||
| depreciation (EBITDA) | 1 949 | 2 079 | 2 779 | 2 421 | 2 551 | 1 637 | 2 564 | 1 686 |
| Operating profit (EBIT) | 1 634 | 1 750 | 2 451 | 2 095 | 2 225 | 1 286 | 2 220 | 1 332 |
| Profit before tax | 1 581 | 1 697 | 2 364 | 2 067 | 2 185 | 1 261 | 2 191 | 1 234 |
| Profit for the period | 1 189 | 1 239 | 1 738 | 1 541 | 1 750 | 921 | 1 602 | 900 |
| Cash flow from operating | ||||||||
| activities | 947 | 999 | 2 383 | 1 681 | 2 947 | 1 490 | 1 139 | 592 |
| Earnings per share, SEK Return on capital employed, |
4.11 | 4.28 | 6.01 | 5.32 | 6.04 | 3.18 | 5.56 | 3.20 |
| % | 42 | 44 | 62 | 51 | 51 | 28 | 49 | 29 |
| Net debt/shareholders' | ||||||||
| equity, % | 54 | 45 | 30 | 16 | -1 | -8 | 27 | 40 |
INCOME STATEMENTS, PARENT COMPANY
| Nine | Nine | |||||
|---|---|---|---|---|---|---|
| Q3 | Q3 | months | months | |||
| SEK m | 2007 | 2006 | 2007 | 2006 | Dec. 2006 | |
| Dividends from subsidiaries | - | 1 997 | - | 1 997 | 6 531 | |
| Profit before tax | - | 1 997 | - | 1 997 | 6 531 | |
| Taxes | - | - | - | - | - | |
| Profit for the period | - | 1 997 | - | 1 997 | 6 531 |
The operations of Boliden AB are conducted on commission from Boliden Mineral AB, and hence the results of the operations are reported under Boliden Mineral AB.
| BALANCE SHEETS, PARENT COMPANY | |||||||
|---|---|---|---|---|---|---|---|
| 30th Sept. | 30th Sept. | 31st Dec. | |||||
| SEK m | 2007 | 2006 | 2006 | ||||
| Participations in Group companies | 3 911 | 4 097 | 3 911 | ||||
| Long-term financial receivables, Group companies | 2 233 | 4 033 | 4 219 | ||||
| Current financial receivables, Group companies | 1 480 | 734 | 4 733 | ||||
| Total assets | 7 624 | 8 864 | 12 863 | ||||
| Shareholders' equity | 6 022 | 8 130 | 12 664 | ||||
| Current liabilities to credit institutions | 1 480 | 734 | 199 | ||||
| Other current liabilities | 122 | - | - | ||||
| Total liabilities and shareholders' equity | 7 624 | 8 864 | 12 863 |