Noosa Mining Investor Conference Presentation

Tanzanian graphite developer Black Rock Mining Limited (ASX:BKT) ( Black Rock or the Company ) is pleased to advise shareholders and investors that John de Vries, Managing Director, will present at the Noosa Mining Investor Conference on Friday 12[th] November, 2021.

Details for the event:

Date: 12[th] November, 2021 Time: Midday (Noosa) / 1.00pm (Sydney) / 10.00am (Perth) Location: Peppers Noosa Resort or watch Online Presenter: John de Vries, Managing Director – Black Rock Mining

The Company invites shareholders and investors to attend in person or virtually by registering using this link:

https://bit.ly/BKTNoosa

This ASX release was authorised on behalf of the Black Rock Board by:

John de Vries, Managing Director & CEO

For more information:

John de Vries Steuart McIntyre Elvis Jurcevic Chief Executive Officer GM Corporate Development Investor Relations Black Rock Mining Black Rock Mining IRX Advisors +61 438 356 590 +61 413 555 609 +61 408 268 271 [email protected] [email protected] [email protected]

Black Rock Mining Ltd ACN 094 551 336 ASX: BKT

Australian Office 45 Ventnor Avenue West Perth, WA 6005 Ph: +61 8 9389 4415

E: [email protected]

Tanzanian Office Mahenge Resources Ltd Msasani Towers Second floor Wing B Dar es Salaam Ph +255 719 382 631

Directors Richard Crookes - Chairman John de Vries - Managing Director & CEO Gabriel Chiappini - Non-Executive Director/Company Secretary Ian Murray - Non-Executive Director

www.blackrockmining.com.au

ASX ANNOUNCEMENT 12 November 2021

==> picture [153 x 44] intentionally omitted <==

About Black Rock

Black Rock Mining Limited is an Australian based company listed on the Australian Securities Exchange (ASX:BKT). The Company has a 100% interest in the Mahenge Graphite Project ( Project ) located in Tanzania. The Project has a JORC compliant Mineral Resource Estimate of 212m tonnes at 7.8% TGC. It also has Ore Reserves of 70m tonnes at 8.5% TGC. The Ore Reserves support a mine life of up to 350k tonnes of graphite per annum for a reserve life of 16 years. Since the release of the Mineral Resource Estimate, the Company confirms that it is not aware of any new information or data that materially affects the mineral resources estimate.

On 25 July 2019, the Company released an enhanced Definitive Feasibility Study (eDFS) for the Project. The eDFS for the Mahenge Graphite Mine envisages a four phase operation, ultimately producing 340,000 tpa of high-grade graphite, with exceptional financial metrics including:

  • Low Capex : Lowest peak capital expenditure of US$116M for phase one[*] ;

  • High Margin : AISC margin of 63.1%;

  • Low Technical Risk : Substantial pilot plant operations run of 110 tonnes; and

  • Superior Economics : IRR of 44.8% with NPV10 of US$1.16bn (A$1.65bn[**] )

Black Rock has obtained all Environmental approvals, Mining Licences and its Resettlement Action Plan with clear title to the eDFS project area.

In June 2020, the Company announced a Strategic Alliance with POSCO Group for the development of the Mahenge Graphite Mine. This included an equity investment of US$7.5M, signed in February 2021, and an offtake agreement, currently in progress, which includes a prepayment facility of up to US$20M. Black Rock has also allocated planned production through Pricing Framework Agreements (ASX release 8 May 2019) with five other offtake customers.

Following release of the enhanced DFS (eDFS) in July 2019, the Company confirms that it is not aware of any new data or information that materially affects the results of the eDFS and that all material assumptions and, in the case of estimates of Mineral Resources or Ore Reserves, technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.

The estimated Ore Reserves and Mineral Resources underpinning the production target has been prepared by competent persons in accordance with the requirements in Appendix 5A (JORC Code).

The Company is construction-ready subject to financing and confirmation of Tanzanian Government Free Carried Interest Agreement.

Interest Agreement. Interest Agreement. Interest Agreement. Interest Agreement.
JORC Compliant Mineral Resource Estimate and Ore Reserve***
Ore Reserves Tonnes (Mt) Grade (% TGC) Contained Graphite (Mt)
- Proven 0 0.0 0.0
- Probable 69.6 8.5 6.0
Total Ore Reserves 69.6 8.5 6.0
Mineral Resources
- Measured 25.5 8.6 2.2
- Indicated 88.1 7.9 6.9
Total M&I 113.6 8.1 9.1
- Inferred 98.3 7.6 7.4
Total M, I&I 211.9 7.8 16.6 Location of Black Rock’s Mahenge Graphite Project in Tanzania

For further information on Black Rock Mining Ltd, please visit www.blackrockmining.com.au

  • Forecast Capex has been classified as a Class 3 estimate with accuracy of ±10% as defined by AACE

  • ** AU$/US$ 0.70

*** Resource and Ore Reserve Estimates as released to ASX on 8 August 2017 Optimised PFS

Black Rock Mining Ltd Australian Office ACN 094 551 336 45 Ventnor Avenue ASX: BKT West Perth, WA 6005 Ph: +61 8 9389 4415

E: [email protected]

Tanzanian Office Mahenge Resources Ltd Msasani Towers Second floor Wing B Dar es Salaam Ph +255 719 382 631

Directors

Richard Crookes - Chairman John de Vries - Managing Director & CEO Gabriel Chiappini - Non-Executive Director/Company Secretary Ian Murray - Non-Executive Director

www.blackrockmining.com.au