BHP Group Limited — Interim / Quarterly Report 2013
Oct 16, 2012
14787_rns_2012-10-16_d151107a-af84-46f7-a603-0cc6b3dd7f49.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
NEWS RELEASE
Release Time
IMMEDIATE
==> picture [144 x 118] intentionally omitted <==
Date
17 October 2012
Number
25/12
BHP BILLITON PRODUCTION REPORT FOR THE QUARTER ENDED 30 SEPTEMBER 2012
-
The release of latent capacity and robust operating performance across our diversified portfolio continues to underpin strong growth in our high margin businesses.
-
Petroleum production averaged a record 666 thousand barrels of oil equivalent per day during the September 2012 quarter as the Atlantis and Mad Dog facilities in the Gulf of Mexico successfully recommenced production.
-
Queensland Coal volumes rose by 20% during the September 2012 quarter as BMA production increased to over 80% of supply chain capacity.
-
Western Australia Iron Ore achieved another significant milestone with first ore loaded from the two recently installed shiploaders at Nelson Point as part of the Inner Harbour Expansion project.
-
Escondida copper production remains on track to increase by 20% in the 2013 financial year following the completion of scheduled maintenance and tie-in activities in the September 2012 quarter.
Petroleum
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Crude oil, condensate and natural gas liquids (‘000 boe) | 22,765 | 4% | 17% |
| Natural gas (bcf) | 230.89 | 30% | 4% |
| Total petroleum products (million boe) | 61.25 | 19% | 9% |
Total petroleum production – Petroleum production averaged a record 666 thousand barrels of oil equivalent per day during the September 2012 quarter.
Crude oil, condensate and natural gas liquids – Liquids production increased by 17 per cent from the June 2012 quarter as the Atlantis and Mad Dog facilities in the Gulf of Mexico (US) successfully recommenced production. Reduced levels of planned maintenance at Bass Strait and the North West Shelf (both Australia) and development drilling at Shenzi (US) and Pyrenees (Australia) also contributed to the strong result.
Onshore US liquids production increased to a record 3.9 million barrels of oil equivalent (MMboe) during the September 2012 quarter. With the drilling program running ahead of infrastructure development, robust growth is anticipated over the remainder of the 2013 financial year as pipeline capacity is installed and additional wells are brought online.
Petroleum production guidance for the 2013 financial year remains unchanged at 240 MMboe and includes an expected 15 per cent increase in valuable liquids production, largely attributable to our Onshore US business and Gulf of Mexico facilities.
Natural gas – Seasonally high gas demand at Bass Strait and strong operational performance at North West Shelf underpinned a quarterly production record for natural gas in the September 2012 quarter.
Aluminium
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Alumina ('000 tonnes) | 1,170 | 10% | 13% |
| Aluminium ('000 tonnes) | 270 | -14% | 9% |
Alumina – The ramp up of the Worsley Efficiency & Growth project (Australia) and continued strong operating performance at the Alumar refinery (Brazil) contributed to record alumina production in the September 2012 quarter.
Aluminium – Production was higher than the June 2012 quarter as potline capacity at Hillside (South Africa) recovered following a major unplanned outage in the March 2012 quarter. Operations are expected to progressively return to full technical capacity by the end of the 2012 calendar year.
Base Metals
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Copper (‘000 tonnes) | 273.9 | 24% | -12% |
| Lead (tonnes) | 52,183 | -6% | -18% |
| Zinc (tonnes) | 25,922 | 11% | -16% |
| Silver (‘000 ounces) | 9,165 | 0% | -21% |
| Uranium oxide concentrate (Uranium) (tonnes) | 1,042 | 4% | -4% |
Copper – A 24 per cent increase in production from the September 2011 quarter reflected the mining of higher grade ore at Escondida (Chile) and the impact of industrial action in the corresponding period. Record quarterly production was achieved at Antamina (Peru) as milling rates continued to exceed recently expanded ore processing capacity.
A reduction in smelter throughput affected Olympic Dam (Australia) production in the September 2012 quarter. A 27 day smelter outage is scheduled for the December 2012 quarter.
Escondida copper production remains on track to increase by 20 per cent in the 2013 financial year following the completion of scheduled maintenance and tie-in activities in the September 2012 quarter.
Lead/silver – Lower head grades at Cannington (Australia) contributed to a reduction in lead and silver production in the September 2012 quarter.
Zinc – Zinc production at Antamina declined during the September 2012 quarter as mining progressed through a copper-rich ore zone.
Uranium – Production for the September 2012 quarter was broadly in line with all comparable periods.
BHP Billiton Production Report for the quarter ended 30 September 2012
2
Diamonds & Specialty Products
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Diamonds (‘000 carats) | 313 | -32% | -24% |
Diamonds – Production was lower than all comparable periods and reflected temporarily restricted mining conditions and unscheduled maintenance at EKATI (Canada). While production is expected to recover in the December 2012 quarter, it is forecast to remain constrained in the medium term as the operation extracts lower grade material, consistent with the mine plan.
The sale of BHP Billiton’s 37 per cent non-operated interest in Richards Bay Minerals (South Africa) to Rio Tinto was completed during the September 2012 quarter. The review of BHP Billiton’s diamonds business is continuing.
Nickel
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Nickel ('000 tonnes) | 37.0 | 5% | -13% |
Nickel – An increase in nickel metal production in the September 2012 quarter reflected strong operating performance at both Cerro Matoso (Colombia) and the Nickel West Kwinana refinery (Australia). Total saleable production declined as nickel matte was stockpiled in advance of planned maintenance at the Nickel West Kalgoorlie smelter in the December 2012 quarter.
Iron Ore
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Iron ore (‘000 tonnes) | 39,772 | 1% | -3% |
Iron ore – Western Australia Iron Ore (WAIO) sustained strong performance in the September 2012 quarter despite the impact of a planned shutdown associated with the Inner Harbour Expansion project. Our Pilbara operations achieved another significant milestone during the quarter with first ore loaded from two recently installed shiploaders at Nelson Point.
WAIO production guidance remains unchanged with a five per cent increase anticipated in the 2013 financial year.
Samarco’s (Brazil) three pellet plants continued to operate at capacity during the period.
Manganese
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Manganese ore (‘000 tonnes) | 2,146 | 6% | 4% |
| Manganese alloy (‘000 tonnes) | 130 | -33% | 73% |
Manganese ore – Consistently strong operating performance and improved plant availability at GEMCO (Australia) contributed to record ore production in the September 2012 quarter.
Manganese alloy – The resumption of production at TEMCO (Australia) in July 2012 led to a substantial increase in alloy production from the June 2012 quarter. The decline in alloy production from the September 2011 quarter reflected the permanent closure of energy intensive silicomanganese production at Metalloys (South Africa) in January 2012.
BHP Billiton Production Report for the quarter ended 30 September 2012
3
Metallurgical Coal
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Metallurgical coal (‘000 tonnes) | 8,938 | -4% | 10% |
Metallurgical coal – Queensland Coal (Australia) production increased by 20 per cent during the September 2012 quarter as significant latent capacity was released across the supply chain. Production at BMA benefited from a reduction in industrial activity with no significant work stoppages experienced since July 2012. A ballot on the BMA Enterprise Agreement will be conducted during October 2012. During the September 2012 quarter, BMA announced it would cease production at its Gregory open-cut mine following a review of the mine’s profitability.
A planned longwall move at the Appin mine led to lower production at Illawarra Coal (Australia) during the September 2012 quarter. A longwall move at the Dendrobium mine is expected to commence at the end of the December 2012 quarter.
Energy Coal
| SEP | SEP Q12 | SEP Q12 | |
|---|---|---|---|
| 2012 | vs | vs | |
| QTR | SEP Q11 | JUN Q12 | |
| Energy coal (‘000 tonnes) | 19,607 | 6% | 6% |
Energy coal – Production was higher than all comparable periods and reflected strong operating performance across the BHP Billiton Energy Coal portfolio. New South Wales Energy Coal (Australia) achieved record quarterly production following the completion of the RX1 project in the June 2012 quarter, ahead of schedule. In addition, the San Juan Coal mine (US) benefited from a full quarter of production following the resumption of longwall mining activity in the June 2012 quarter.
This report, together with the Exploration and Development Report, represents the Interim Management Statement for the purposes of the UK Listing Authority’s Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 30 September 2012.
Further information on BHP Billiton can be found at: www.bhpbilliton.com
BHP Billiton Production Report for the quarter ended 30 September 2012
4
Media Relations
Investor Relations
Australia
Australia
James Agar Tel: +61 3 9609 2222 Mobile: +61 467 807 064 email: [email protected]
Antonios Papaspiropoulos Tel: +61 3 9609 3830 Mobile: +61 477 325 803 email: [email protected]
Andrew Gunn Tel: +61 3 9609 3575 Mobile: +61 439 558 454 email: [email protected]
Fiona Hadley Tel: +61 3 9609 2211 Mobile: +61 427 777 908 email: [email protected]
United Kingdom and South Africa
Eleanor Nichols Tel: +61 3 9609 2360 Mobile: +61 407 064 748 email: [email protected]
Tara Dines Tel: +44 20 7802 7113 Mobile: +44 7825 342 232 Email: [email protected]
United Kingdom
Americas
Ruban Yogarajah Tel: +44 20 7802 4033 Mobile: +44 7827 082 022 email: [email protected]
Brendan Harris
Tel: +44 20 7802 4131 Mobile: +44 7990 527 726 email: [email protected]
Americas
Jaryl Strong Tel: +1 713 499 5548 Mobile: +1 281 222 6627 email: [email protected]
Matt Chism
Tel: +1 71 359 96158 Mobile: +1 281 782 2238 email: [email protected]
BHP Billiton Limited ABN 49 004 028 077 Registered in Australia Registered Office: 180 Lonsdale Street Melbourne Victoria 3000 Australia Tel +61 1300 55 4757 Fax +61 3 9609 3015 Members of the BHP Billiton Group which is headquartered in Australia
BHP Billiton Plc Registration number 3196209 Registered in England and Wales Registered Office: Neathouse Place London SW1V 1BH United Kingdom Tel +44 20 7802 4000 Fax +44 20 7802 4111
BHP Billiton Production Report for the quarter ended 30 September 2012
5
BHP BILLITON PRODUCTION SUMMARY
| QUARTER ENDED SEP JUN SEP 2011 2012 2012 |
YEAR TO DATE SEP SEP 2012 2011 |
% CHANGE | |
|---|---|---|---|
| SEP Q12 SEP Q12 vs vs SEP Q11 JUN Q12 |
|||
| PETROLEUM | 18,482 15,726 18,413 177.35 221.25 230.89 3,356 3,758 4,352 51.40 56.36 61.25 1,060 1,039 1,170 315 248 270 220.3 312.5 273.9 55,659 63,667 52,183 23,444 30,748 25,922 39,439 40,569 32,436 9,151 11,539 9,165 1,000 1,080 1,042 595 464 454 457 413 313 35.1 42.7 37.0 39,572 40,891 39,772 2,019 2,066 2,146 194 75 130 9,291 8,109 8,938 18,460 18,484 19,607 |
18,413 18,482 230.89 177.35 4,352 3,356 61.25 51.40 1,170 1,060 270 315 273.9 220.3 52,183 55,659 25,922 23,444 32,436 39,439 9,165 9,151 1,042 1,000 454 595 313 457 37.0 35.1 39,772 39,572 2,146 2,019 130 194 8,938 9,291 19,607 18,460 |
0% 17% 30% 4% 30% 16% 19% 9% 10% 13% -14% 9% 24% -12% -6% -18% 11% -16% -18% -20% 0% -21% 4% -4% -24% -2% -32% -24% 5% -13% 1% -3% 6% 4% -33% 73% -4% 10% 6% 6% |
| Crude oil & condensate ('000 bbl) Natural gas (bcf) NGL ('000 boe) Total petroleum products (million boe) |
|||
| ALUMINIUM | |||
| Alumina ('000 tonnes) Aluminium ('000 tonnes) |
|||
| BASE METALS | |||
| Copper ('000 tonnes) Lead (tonnes) Zinc (tonnes) Gold (ounces) Silver ('000 ounces) Uranium oxide concentrate (tonnes) Molybdenum (tonnes) |
|||
| DIAMONDS AND SPECIALTY PRODUCTS | |||
| Diamonds ('000 carats) |
|||
| NICKEL | |||
| Nickel ('000 tonnes) |
|||
| IRON ORE | |||
| Iron ore ('000 tonnes) |
|||
| MANGANESE | |||
| Manganese ore ('000 tonnes) Manganese alloy ('000 tonnes) |
|||
| METALLURGICAL COAL | |||
| Metallurgical coal ('000 tonnes) |
|||
| ENERGY COAL | |||
| Energy coal ('000 tonnes) |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 1
BHP BILLITON ATTRIBUTABLE PRODUCTION
| BHP Billiton Interest |
SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE |
|---|---|---|
| SEP SEP 2012 2011 |
||
| PETROLEUM | 18,482 18,866 18,127 15,726 18,413 177.35 214.49 209.17 221.25 230.89 3,356 3,362 3,609 3,758 4,352 51.40 57.98 56.60 56.36 61.25 |
18,413 18,482 230.89 177.35 4,352 3,356 |
| Production Crude oil & condensate ('000 bbl) Natural gas (bcf) NGL ('000 boe) (a) Total petroleum products (million boe) |
||
| 61.25 51.40 |
||
| ALUMINIUM | 752 694 741 730 859 308 307 311 309 311 1,060 1,001 1,052 1,039 1,170 |
859 752 311 308 |
| ALUMINA Production ('000 tonnes) Worsley 86% Alumar 36% Total |
||
| 1,170 1,060 |
||
| ALUMINIUM Production ('000 tonnes) Hillside 100% Bayside 100% Alumar 40% Mozal 47% Total |
180 180 144 117 139 25 24 26 23 25 44 42 42 42 39 66 67 65 66 67 315 313 277 248 270 |
139 180 25 25 39 44 67 66 |
| 270 315 |
||
| BASE METALS (b) | 49.9 80.4 87.7 115.8 101.2 30.3 30.9 30.9 34.9 40.2 80.2 111.3 118.6 150.7 141.4 32.9 43.0 47.4 48.7 41.6 65.4 70.0 66.2 62.1 52.7 1.4 1.4 1.4 1.2 1.2 40.4 54.6 47.8 49.8 37.0 140.1 169.0 162.8 161.8 132.5 |
101.2 49.9 40.2 30.3 |
| COPPER Payable metal in concentrate ('000 tonnes) Escondida 57.5% Antamina 33.8% Total Cathode ('000 tonnes) Escondida 57.5% Pampa Norte (c) 100% Pinto Valley 100% Olympic Dam 100% Total |
||
| 141.4 80.2 |
||
| 41.6 32.9 52.7 65.4 1.2 1.4 37.0 40.4 |
||
| 132.5 140.1 |
||
| LEAD Payable metal in concentrate (tonnes) Cannington 100% Antamina 33.8% Total |
55,557 66,787 53,412 63,334 51,923 102 205 148 333 260 55,659 66,992 53,560 63,667 52,183 |
51,923 55,557 260 102 |
| 52,183 55,659 |
||
| ZINC Payable metal in concentrate (tonnes) Cannington 100% Antamina 33.8% Total |
14,488 14,745 12,904 12,540 11,408 8,956 13,553 16,823 18,208 14,514 23,444 28,298 29,727 30,748 25,922 |
11,408 14,488 14,514 8,956 |
| 25,922 23,444 |
Refer footnotes on page 4.
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 2
| BHP BILLITON ATTRIBUTABLE PRODUCTION BHP Billiton SEP DEC MAR JUN SEP Interest 2011 2011 2012 2012 2012 QUARTER ENDED |
BHP BILLITON ATTRIBUTABLE PRODUCTION BHP Billiton SEP DEC MAR JUN SEP Interest 2011 2011 2012 2012 2012 QUARTER ENDED |
|
|---|---|---|
| BHP Billiton Interest |
||
| YEAR TO DATE | ||
| SEP SEP 2012 2011 |
||
| BASE METALS (continued) | 11,063 14,242 12,732 12,817 9,419 28,376 29,765 31,952 27,752 23,017 39,439 44,007 44,684 40,569 32,436 |
9,419 11,063 23,017 28,376 |
| GOLD Payable metal in concentrate (ounces) Escondida 57.5% Olympic Dam (refined gold) 100% Total |
||
| 32,436 39,439 |
||
| SILVER Payable metal in concentrate ('000 ounces) Escondida 57.5% Antamina 33.8% Cannington 100% Olympic Dam (refined silver) 100% Total |
403 549 481 488 350 972 1,087 1,170 1,043 919 7,559 9,056 7,836 9,757 7,689 217 211 228 251 207 9,151 10,903 9,715 11,539 9,165 |
350 403 919 972 7,689 7,559 207 217 |
| 9,165 9,151 |
||
| URANIUM OXIDE CONCENTRATE Payable metal in concentrate (tonnes) Olympic Dam 100% Total |
1,000 909 896 1,080 1,042 1,000 909 896 1,080 1,042 |
1,042 1,000 |
| 1,042 1,000 |
||
| MOLYBDENUM Payable metal in concentrate (tonnes) Antamina 33.8% Total |
595 766 521 464 454 595 766 521 464 454 |
454 595 |
| 454 595 |
||
| DIAMONDS AND SPECIALTY PRODUCTS | 457 481 433 413 313 |
313 457 |
| DIAMONDS Production ('000 carats) EKATI™ 80% |
||
| NICKEL | 10.4 12.3 13.4 12.8 13.3 24.7 26.1 28.3 29.9 23.7 35.1 38.4 41.7 42.7 37.0 |
13.3 10.4 23.7 24.7 |
| NICKEL Production ('000 tonnes) CMSA 99.9% Nickel West 100% Total |
||
| 37.0 35.1 |
Refer footnotes on page 4.
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 3
| BHP BILLITON ATTRIBUTABLE PRODUCTION BHP Billiton SEP DEC MAR JUN SEP Interest 2011 2011 2012 2012 2012 QUARTER ENDED |
BHP BILLITON ATTRIBUTABLE PRODUCTION BHP Billiton SEP DEC MAR JUN SEP Interest 2011 2011 2012 2012 2012 QUARTER ENDED |
|
|---|---|---|
| BHP Billiton Interest |
||
| YEAR TO DATE | ||
| SEP SEP 2012 2011 |
||
| IRON ORE | 13,158 13,247 11,789 13,132 11,752 254 334 37 143 432 10,479 10,437 10,343 11,166 10,937 12,708 14,170 13,063 13,595 13,771 2,973 2,884 2,711 2,855 2,880 39,572 41,072 37,943 40,891 39,772 |
11,752 13,158 432 254 10,937 10,479 13,771 12,708 2,880 2,973 |
| Production ('000 tonnes) (d) Newman (e) 85% Goldsworthy Joint Venture 85% Area C Joint Venture 85% Yandi Joint Venture 85% Samarco 50% Total |
||
| 39,772 39,572 |
||
| MANGANESE | 911 808 917 989 858 1,108 998 1,123 1,077 1,288 2,019 1,806 2,040 2,066 2,146 |
858 911 1,288 1,108 |
| MANGANESE ORES Saleable production ('000 tonnes) South Africa (f) 44.4% Australia (f) 60% Total |
||
| 2,146 2,019 |
||
| MANGANESE ALLOYS Saleable production ('000 tonnes) South Africa (f) (g) 60% Australia (f) 60% Total |
124 124 81 75 93 70 71 57 - 37 194 195 138 75 130 |
93 124 37 70 |
| 130 194 |
||
| METALLURGICAL COAL | 5,274 5,006 4,226 4,105 5,182 1,803 1,580 1,649 1,661 1,766 2,214 1,907 1,462 2,343 1,990 9,291 8,493 7,337 8,109 8,938 |
5,182 5,274 1,766 1,803 1,990 2,214 |
| Production ('000 tonnes) (h) BMA 50% BHP Mitsui Coal (i) 80% Illawarra 100% Total |
||
| 8,938 9,291 |
||
| ENERGY COAL | 9,095 7,976 7,895 8,313 8,454 2,467 2,163 2,109 2,673 3,871 4,046 4,027 4,291 4,393 4,453 2,852 2,753 2,953 3,105 2,829 18,460 16,919 17,248 18,484 19,607 |
8,454 9,095 3,871 2,467 4,453 4,046 2,829 2,852 |
| Production ('000 tonnes) South Africa 100% USA 100% Australia 100% Colombia 33% Total |
||
| 19,607 18,460 |
(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Includes Cerro Colorado and Spence.
(d) Iron ore production is reported on a wet tonnes basis.
(e) Newman includes Mt Newman Joint Venture and Jimblebar.
(f) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(g) Production includes Medium Carbon Ferro Manganese.
(h) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 4
PRODUCTION AND SALES REPORT
| PRODUCTION AND SALES REPORT | ||
|---|---|---|
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE | |
| SEP SEP 2012 2011 |
||
| PETROLEUM | 2,659 2,527 1,844 1,400 534 1,171 2,605 3,901 17 13 1,586 2,081 377 - 4,035 3,848 2,358 672 397 466 367 373 252 447 1,309 1,498 73 85 |
|
| 18,413 18,482 |
||
| 39.39 31.88 35.41 32.97 6.20 4.45 0.50 0.64 0.06 - 0.96 0.62 122.59 77.59 9.08 9.31 0.35 1.19 3.33 3.91 13.02 14.79 |
||
| 230.89 177.35 |
||
| 2,074 1,823 394 423 37 120 9 - 309 296 1,516 416 13 41 - 18 - 219 |
||
| 4,352 3,356 |
||
| 61.25 51.40 |
||
(a) Other Australia includes Minerva.
(b) Gulf of Mexico volumes are net of royalties.
(c) The Genghis Khan operation is reported in Shenzi.
(d) Fayetteville shale acquisition completed on 31 March 2011. Petrohawk Energy Corporation acquisition completed on 20 August 2011. Onshore US volumes are net of mineral holder royalties.
(e) Other Americas includes Neptune, West Cameron 76, Genesis and Starlifter. West Cameron 76 and Starlifter were divested in May 2012.
(f) Algeria includes ROD and Ohanet. The Ohanet Risk Sharing Contract expired in October 2011.
(g) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 5
PRODUCTION AND SALES REPORT
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE |
|---|---|
| SEP SEP 2012 2011 |
ALUMINIUM
| ALUMINIUM | ALUMINIUM | |
|---|---|---|
| BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) ALUMINA Saleable production Worsley, Australia 752 694 741 730 859 Alumar, Brazil 308 307 311 309 311 Total 1,060 1,001 1,052 1,039 1,170 Sales Worsley, Australia 720 745 713 750 820 Alumar, Brazil 280 349 216 356 352 Total 1,000 1,094 929 1,106 1,172 |
859 752 311 308 |
|
| 1,170 1,060 |
||
| 820 720 352 280 |
||
| 1,172 1,000 |
||
| ALUMINIUM Production Hillside, South Africa Bayside, South Africa Alumar, Brazil Mozal, Mozambique Total Sales Hillside, South Africa Bayside, South Africa Alumar, Brazil Mozal, Mozambique Total |
180 180 144 117 139 25 24 26 23 25 44 42 42 42 39 66 67 65 66 67 315 313 277 248 270 163 186 141 126 139 24 25 27 21 26 44 43 31 45 46 60 85 66 54 58 291 339 265 246 269 |
139 180 25 25 39 44 67 66 |
| 270 315 |
||
| 139 163 26 24 46 44 58 60 |
||
| 269 291 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 6
PRODUCTION AND SALES REPORT
| QUARTER ENDED | QUARTER ENDED | YEAR TO | DATE | |||||
|---|---|---|---|---|---|---|---|---|
| SEP | DEC | MAR | JUN | SEP | SEP | SEP | ||
| 2011 | 2011 | 2012 | 2012 | 2012 | 2012 | 2011 | ||
| BASE METALS | ||||||||
| BHP Billiton attributable production and sales unless otherwise stated. Metals production | is payable metal unless | otherwise stated. | ||||||
| Escondida, Chile | ||||||||
| Material mined (100%) | ('000 tonnes) | 69,006 | 96,152 | 103,321 | 109,724 | 102,499 | 102,499 | 69,006 |
| Sulphide ore milled (100%) | ('000 tonnes) | 12,029 | 18,663 | 16,449 | 18,640 | 16,850 | 16,850 | 12,029 |
| Average copper grade | (%) | 0.97% | 0.97% | 1.14% | 1.37% | 1.35% | 1.35% | 0.97% |
| Production ex mill (100%) | ('000 tonnes) | 91.9 | 144.3 | 153.1 | 211.7 | 185.2 | 185.2 | 91.9 |
| Production | ||||||||
| Payable copper | ('000 tonnes) | 49.9 | 80.4 | 87.7 | 115.8 | 101.2 | 101.2 | 49.9 |
| Payable gold concentrate | (fine ounces) | 11,063 | 14,242 | 12,732 | 12,817 | 9,419 | 9,419 | 11,063 |
| Copper cathode (EW) | ('000 tonnes) | 32.9 | 43.0 | 47.4 | 48.7 | 41.6 | 41.6 | 32.9 |
| Payable silver concentrate | ('000 ounces) | 403 | 549 | 481 | 488 | 350 | 350 | 403 |
| Sales | ||||||||
| Payable copper | ('000 tonnes) | 49.2 | 82.1 | 82.6 | 113.1 | 95.7 | 95.7 | 49.2 |
| Payable gold concentrate | (fine ounces) | 10,974 | 14,435 | 11,998 | 12,683 | 8,999 | 8,999 | 10,974 |
| Copper cathode (EW) | ('000 tonnes) | 25.7 | 45.3 | 44.3 | 53.4 | 38.8 | 38.8 | 25.7 |
| Payable silver concentrate | ('000 ounces) | 404 | 558 | 454 | 483 | 324 | 324 | 404 |
| Pampa Norte, Chile | ||||||||
| Cerro Colorado | ||||||||
| Material mined | ('000 tonnes) | 14,736 | 16,792 | 16,320 | 16,246 | 16,067 | 16,067 | 14,736 |
| Ore milled | ('000 tonnes) | 4,608 | 4,601 | 4,300 | 4,388 | 4,505 | 4,505 | 4,608 |
| Average copper grade | (%) | 0.72% | 0.71% | 0.72% | 0.61% | 0.55% | 0.55% | 0.72% |
| Production | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 22.5 | 23.5 | 18.7 | 18.7 | 17.8 | 17.8 | 22.5 |
| Sales | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 22.4 | 23.8 | 20.2 | 19.1 | 16.1 | 16.1 | 22.4 |
| Spence | ||||||||
| Material mined | ('000 tonnes) | 19,816 | 26,511 | 29,982 | 28,594 | 27,541 | 27,541 | 19,816 |
| Ore milled | ('000 tonnes) | 3,862 | 4,909 | 4,279 | 3,604 | 3,752 | 3,752 | 3,862 |
| Average copper grade | (%) | 1.30% | 1.46% | 1.20% | 1.28% | 1.17% | 1.17% | 1.30% |
| Production | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 42.9 | 46.5 | 47.5 | 43.4 | 34.9 | 34.9 | 42.9 |
| Sales | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 43.2 | 46.6 | 44.1 | 51.3 | 31.1 | 31.1 | 43.2 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 7
PRODUCTION AND SALES REPORT
| QUARTER ENDED | QUARTER ENDED | YEAR TO | DATE | |||||
|---|---|---|---|---|---|---|---|---|
| SEP | DEC | MAR | JUN | SEP | SEP | SEP | ||
| 2011 | 2011 | 2012 | 2012 | 2012 | 2012 | 2011 | ||
| BASE METALS | ||||||||
| BHP Billiton attributable production and sales unless otherwise stated. Metals production | is payable metal unless | otherwise stated. | ||||||
| Antamina, Peru | ||||||||
| Material mined (100%) | ('000 tonnes) | 44,212 | 38,759 | 41,474 | 48,256 | 54,482 | 54,482 | 44,212 |
| Sulphide ore milled (100%) | ('000 tonnes) | 9,396 | 9,656 | 10,162 | 12,295 | 12,274 | 12,274 | 9,396 |
| Average head grades | ||||||||
| - Copper | (%) | 1.11% | 1.15% | 1.10% | 1.01% | 1.15% | 1.15% | 1.11% |
| - Zinc | (%) | 0.68% | 0.72% | 0.84% | 0.80% | 0.66% | 0.66% | 0.68% |
| Production | ||||||||
| Payable copper | ('000 tonnes) | 30.3 | 30.9 | 30.9 | 34.9 | 40.2 | 40.2 | 30.3 |
| Payable zinc | (tonnes) | 8,956 | 13,553 | 16,823 | 18,208 | 14,514 | 14,514 | 8,956 |
| Payable silver | ('000 ounces) | 972 | 1,087 | 1,170 | 1,043 | 919 | 919 | 972 |
| Payable lead | (tonnes) | 102 | 205 | 148 | 333 | 260 | 260 | 102 |
| Payable molybdenum | (tonnes) | 595 | 766 | 521 | 464 | 454 | 454 | 595 |
| Sales | ||||||||
| Payable copper | ('000 tonnes) | 28.2 | 31.7 | 30.7 | 32.7 | 39.7 | 39.7 | 28.2 |
| Payable zinc | (tonnes) | 9,586 | 12,654 | 13,464 | 18,174 | 15,519 | 15,519 | 9,586 |
| Payable silver | ('000 ounces) | 833 | 940 | 1,114 | 896 | 849 | 849 | 833 |
| Payable lead | (tonnes) | 91 | 139 | 200 | 48 | 330 | 330 | 91 |
| Payable molybdenum | (tonnes) | 549 | 591 | 669 | 488 | 536 | 536 | 549 |
| Cannington, Australia | ||||||||
| Material mined | ('000 tonnes) | 819 | 778 | 756 | 880 | 717 | 717 | 819 |
| Ore milled | ('000 tonnes) | 826 | 888 | 778 | 845 | 773 | 773 | 826 |
| Average head grades | ||||||||
| - Silver | (g/t) | 332 | 370 | 367 | 417 | 355 | 355 | 332 |
| - Lead | (%) | 7.9% | 8.8% | 8.0% | 8.6% | 7.6% | 7.6% | 7.9% |
| - Zinc | (%) | 2.9% | 2.9% | 2.7% | 2.5% | 2.5% | 2.5% | 2.9% |
| Production | ||||||||
| Payable silver | ('000 ounces) | 7,559 | 9,056 | 7,836 | 9,757 | 7,689 | 7,689 | 7,559 |
| Payable lead | (tonnes) | 55,557 | 66,787 | 53,412 | 63,334 | 51,923 | 51,923 | 55,557 |
| Payable zinc | (tonnes) | 14,488 | 14,745 | 12,904 | 12,540 | 11,408 | 11,408 | 14,488 |
| Sales | ||||||||
| Payable silver | ('000 ounces) | 6,434 | 8,960 | 7,081 | 10,784 | 8,506 | 8,506 | 6,434 |
| Payable lead | (tonnes) | 48,258 | 66,657 | 49,027 | 73,400 | 59,042 | 59,042 | 48,258 |
| Payable zinc | (tonnes) | 15,734 | 14,078 | 10,780 | 14,399 | 10,379 | 10,379 | 15,734 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 8
PRODUCTION AND SALES REPORT
| QUARTER ENDED | QUARTER ENDED | YEAR TO | DATE | |||||
|---|---|---|---|---|---|---|---|---|
| SEP | DEC | MAR | JUN | SEP | SEP | SEP | ||
| 2011 | 2011 | 2012 | 2012 | 2012 | 2012 | 2011 | ||
| BASE METALS | ||||||||
| BHP Billiton attributable production and sales unless otherwise stated. Metals production | is payable metal unless | otherwise stated. | ||||||
| Olympic Dam, Australia | ||||||||
| Material mined (a) | ('000 tonnes) | 2,543 | 2,440 | 2,389 | 2,629 | 2,226 | 2,226 | 2,543 |
| Ore milled | ('000 tonnes) | 2,471 | 2,440 | 2,195 | 2,475 | 2,471 | 2,471 | 2,471 |
| Average copper grade | (%) | 1.98% | 2.08% | 2.01% | 1.86% | 1.90% | 1.90% | 1.98% |
| Average uranium grade | (kg/t) | 0.54 | 0.50 | 0.57 | 0.55 | 0.54 | 0.54 | 0.54 |
| Production | ||||||||
| Copper cathode (ER) | ('000 tonnes) | 37.6 | 51.5 | 45.2 | 46.0 | 34.0 | 34.0 | 37.6 |
| Copper cathode (EW) | ('000 tonnes) | 2.8 | 3.1 | 2.6 | 3.8 | 3.0 | 3.0 | 2.8 |
| Uranium oxide concentrate | (tonnes) | 1,000 | 909 | 896 | 1,080 | 1,042 | 1,042 | 1,000 |
| Refined gold | (fine ounces) | 28,376 | 29,765 | 31,952 | 27,752 | 23,017 | 23,017 | 28,376 |
| Refined silver | ('000 ounces) | 217 | 211 | 228 | 251 | 207 | 207 | 217 |
| Sales | ||||||||
| Copper cathode (ER) | ('000 tonnes) | 36.4 | 51.7 | 44.4 | 47.8 | 35.1 | 35.1 | 36.4 |
| Copper cathode (EW) | ('000 tonnes) | 3.5 | 2.5 | 3.0 | 3.1 | 3.4 | 3.4 | 3.5 |
| Uranium oxide concentrate | (tonnes) | 910 | 1,126 | 640 | 1,252 | 615 | 615 | 910 |
| Refined gold | (fine ounces) | 28,979 | 24,327 | 36,832 | 29,257 | 20,949 | 20,949 | 28,979 |
| Refined silver | ('000 ounces) | 289 | 155 | 268 | 200 | 265 | 265 | 289 |
| (a) Material mined refers to run of mine ore mined and hoisted. | ||||||||
| Pinto Valley, USA | ||||||||
| Production | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 1.4 | 1.4 | 1.4 | 1.2 | 1.2 | 1.2 | 1.4 |
| Sales | ||||||||
| Copper cathode (EW) | ('000 tonnes) | 1.7 | 1.2 | 1.2 | 1.2 | 1.2 | 1.2 | 1.7 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 9
PRODUCTION AND SALES REPORT
| PRODUCTION AND SALES REPORT | ||
|---|---|---|
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE | |
| SEP SEP 2012 2011 |
||
| DIAMONDS AND SPECIALTY PRODUCTS | 1,042 1,177 313 457 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 10
| PRODUCTION AND SALES REPORT | SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
|
|---|---|---|
| YEAR TO DATE | ||
| SEP SEP 2012 2011 |
||
| NICKEL | 13.3 10.4 12.3 7.7 |
|
| Nickel West, Australia Saleable production Nickel contained in concentrate Nickel contained in finished matte Nickel metal Nickel production Sales Nickel contained in concentrate Nickel contained in finished matte Nickel metal Nickel sales |
2.6 1.8 2.3 2.3 1.3 9.0 15.2 10.5 14.2 5.8 13.1 9.1 15.5 13.4 16.6 24.7 26.1 28.3 29.9 23.7 1.2 2.6 1.5 3.6 1.6 10.1 13.9 10.2 16.7 6.7 9.4 10.9 14.2 15.7 14.2 20.7 27.4 25.9 36.0 22.5 |
1.3 2.6 5.8 9.0 16.6 13.1 |
| 23.7 24.7 |
||
| 1.6 1.2 6.7 10.1 14.2 9.4 |
||
| 22.5 20.7 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 11
PRODUCTION AND SALES REPORT
| PRODUCTION AND SALES REPORT | ||
|---|---|---|
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE | |
| SEP SEP 2012 2011 |
||
| IRON ORE | 11,752 13,158 432 254 10,937 10,479 13,771 12,708 |
|
| 36,892 36,599 |
||
| 43,403 43,058 8,338 7,744 28,718 29,311 |
||
| 37,056 37,055 |
||
| 43,595 43,594 |
||
| Samarco, Brazil Production 2,973 2,884 2,711 2,855 2,880 Sales 2,926 2,961 2,453 2,778 2,622 |
2,880 2,973 2,622 2,926 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 12
| PRODUCTION AND SALES REPORT | SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
|
|---|---|---|
| YEAR TO DATE | ||
| SEP SEP 2012 2011 |
||
| MANGANESE | 858 911 702 861 |
|
| Australia (a) Saleable production 1,108 998 1,123 1,077 1,288 Sales 1,094 876 1,115 1,343 1,054 |
1,288 1,108 1,054 1,094 |
|
| MANGANESE ALLOY South Africa (a) (b) Saleable production 124 124 81 75 93 Sales 95 138 122 104 74 |
93 124 74 95 |
|
| Australia (a) Saleable production 70 71 57 - 37 Sales 91 58 57 23 46 |
37 70 46 91 |
(a) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(b) Production includes Medium Carbon Ferro Manganese.
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 13
PRODUCTION AND SALES REPORT
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE |
|---|---|
| SEP SEP 2012 2011 |
METALLURGICAL COAL
BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes)
METALLURGICAL COAL (a)
Queensland, Australia
| Production BMA Blackwater Goonyella Peak Downs Saraji Norwich Park Gregory Joint Venture BMA total BHP Mitsui Coal (b) South Walker Creek Poitrel BHP Mitsui Coal total Queensland total Sales Coking coal Weak coking coal Thermal coal Total |
1,367 1,122 955 991 1,148 1,463 1,375 1,153 1,012 1,535 971 992 788 783 1,029 802 900 627 724 773 365 369 248 193 - 306 248 455 402 697 5,274 5,006 4,226 4,105 5,182 1,106 901 1,040 1,034 1,084 697 679 609 627 682 1,803 1,580 1,649 1,661 1,766 7,077 6,586 5,875 5,766 6,948 5,066 4,845 4,522 4,007 4,058 1,691 1,747 1,595 1,512 1,545 176 20 111 90 239 6,933 6,612 6,228 5,609 5,842 |
1,148 1,367 1,535 1,463 1,029 971 773 802 - 365 697 306 |
|---|---|---|
| 5,182 5,274 |
||
| 1,084 1,106 682 697 |
||
| 1,766 1,803 |
||
| 6,948 7,077 |
||
| 4,058 5,066 1,545 1,691 239 176 |
||
| 5,842 6,933 |
(a) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(b) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
| Illawarra, Australia Production Sales Coking coal Thermal coal Total |
2,214 1,907 1,462 2,343 1,990 1,673 1,255 1,460 1,845 1,775 159 441 219 279 502 1,832 1,696 1,679 2,124 2,277 |
1,990 2,214 1,775 1,673 502 159 |
|---|---|---|
| 2,277 1,832 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 14
PRODUCTION AND SALES REPORT
| SEP DEC MAR JUN SEP 2011 2011 2012 2012 2012 QUARTER ENDED |
YEAR TO DATE |
|---|---|
| SEP SEP 2012 2011 |
ENERGY COAL
| ENERGY COAL | ENERGY COAL | |
|---|---|---|
| BHP Billiton attributable production and sales unless otherwise stated. ('000 tonnes) South Africa Production 9,095 7,976 7,895 8,313 8,454 Sales Export 3,439 3,546 3,807 3,314 3,385 Local utility 5,622 4,582 4,397 4,571 4,869 Inland 85 165 124 74 38 Total 9,146 8,293 8,328 7,959 8,292 |
8,454 9,095 3,385 3,439 4,869 5,622 38 85 |
|
| 8,292 9,146 |
||
| New Mexico, USA Production Navajo Coal San Juan Coal Total Sales - local utility |
1,178 2,060 1,913 1,853 1,804 1,289 103 196 820 2,067 2,467 2,163 2,109 2,673 3,871 3,630 3,108 3,057 2,773 3,420 |
1,804 1,178 2,067 1,289 |
| 3,871 2,467 |
||
| 3,420 3,630 |
||
| NSW Energy Coal, Australia Production Sales Export Inland Total |
4,046 4,027 4,291 4,393 4,453 3,523 3,566 3,160 4,388 4,488 625 333 297 404 250 4,148 3,899 3,457 4,792 4,738 |
4,453 4,046 4,488 3,523 250 625 |
| 4,738 4,148 |
||
| Cerrejon Coal, Colombia Production Sales - export |
2,852 2,753 2,953 3,105 2,829 2,901 2,784 2,652 2,942 2,630 |
2,829 2,852 2,630 2,901 |
BHP Billiton Production Report for the quarter ended 30 September 2012
Page 15