BHP Group Limited Earnings Release 2023

Oct 19, 2022

14787_er_2022-10-19_11e1c8f5-e9c8-44a3-94bf-5d13500576b7.html

Earnings Release

Open in viewer

Opens in your device viewer

National Storage Mechanism | Additional information

RNS Number : 3322D

BHP Group Limited

19 October 2022

Release Time IMMEDIATE
Date 19 October 2022
Release Number 35/22

BHP OPERATIONAL REVIEW

FOR THE QUARTER ENDED 30 SEPTEMBER 2022

·      We continued to deliver safe and reliable operational performance during the quarter.

·      All production and unit cost guidance1 remains unchanged for the 2023 financial year.

·      Jansen Stage 1 is tracking to plan, with civil and mechanical construction activities progressing at the Jansen site and at the port. We are targeting Jansen Stage 1 first production in the 2026 calendar year and have accelerated the Jansen Stage 2 study.

·      BHP announced the signing of a large-scale renewable Power Purchase Agreement (PPA) with Alinta Energy, which is expected to halve greenhouse gas (GHG) emissions from the electricity used in our Western Australian Iron Ore (WAIO) port facilities by the end of the 2024 calendar year.

BHP Chief Executive Officer, Mike Henry:

"We have started the new financial year strongly, achieving safe and reliable operating performance. The first quarter included significant planned major maintenance in Western Australia Iron Ore (WAIO), BHP Mitsubishi Alliance (BMA), and Olympic Dam.

Copper production was up nine per cent on the same quarter last year, with strong concentrator throughput at Escondida and record quarterly anode production at Olympic Dam. WAIO continued to perform strongly, with production up by 3% relative to the same period last year, and we managed through substantial rainfall and labour constraints in our coal assets with production only down marginally year on year. Our full year production and unit cost guidance is unchanged.

The South Flank iron ore ramp-up and the Jansen potash project are tracking well, with work ongoing to bring forward first production from Jansen Stage 1 and accelerate Jansen Stage 2.

During the quarter, BHP struck a new agreement to supply our WAIO port facilities with renewable electricity, which is expected to halve GHG emissions from the electricity used, signed an MoU with India's Tata Steel to collaborate on lower GHG emission steelmaking and announced a partnership with Pan Pacific Copper to reduce GHG emissions from maritime transportation, as we take further action to reduce GHG emissions from our operations and support decarbonisation of our suppliers and customers.

We expect global macro-economic uncertainty in the short term to continue to affect supply chains, energy costs, labour markets and equipment and materials availability. BHP remains well positioned, with a portfolio and balance sheet to withstand external challenges and a strategy positioned to benefit from the global mega-trends of decarbonisation and electrification."

1

Production Sep Q22

(vs Sep Q21)
Sep Q22

(vs Jun Q22)
Sep Q22 vs Jun Q22 commentary
Copper (kt) 410.1

9%
410.1

(11%)
Lower volumes at Escondida due to lower concentrator feed grade, lower ore stacked in prior months at Pampa Norte reducing cathode production, and lower volumes at Olympic Dam as a result of planned refinery maintenance.
Iron ore (Mt) 65.1

3%
65.1

1%
Strong operational performance at WAIO, partially offset by planned car dumper maintenance in the quarter.
Metallurgical coal (Mt) 6.7

(1%)
6.7

(19%)
Lower volumes due to significant wet weather in the quarter, mining higher strip ratio areas, a planned longwall move at Broadmeadow and planned wash plant maintenance at Blackwater, Goonyella and Saraji.
Energy coal (Mt) 2.6

(38%)
2.6

(33%)
Lower volumes due to significant wet weather in the quarter and ongoing labour shortages impacting stripping and mine productivity.
Nickel (kt) 20.7

16%
20.7

10%
Higher volumes due to unplanned downtime at the smelter in the prior period.

2

Summary

Operational performance

Production and guidance are summarised below.

Production Sep

Q22
Sep Q22

vs

Sep Q21
Sep Q22

vs

Jun Q22
Current

FY23

guidance
Copper (kt) 410.1 9% (11%) 1,635 - 1,825
Escondida (kt) 252.7 4% (13%) 1,080 - 1,180 Unchanged
Pampa Norte (kt) 70.6 5% (9%) 240 - 290 Unchanged
Olympic Dam (kt) 49.7 68% (11%) 195 - 215 Unchanged
Antamina (kt) 37.1 4% (6%) 120 - 140 Unchanged
Iron ore (Mt) 65.1 3% 1% 249 - 260
WAIO (Mt) 63.9 3% 1% 246 - 256 Unchanged
WAIO (100% basis) (Mt) 72.1 2% 1% 278 - 290 Unchanged
Samarco (Mt) 1.1 10% 15% 3 - 4 Unchanged
Metallurgical coal - BMA (Mt) 6.7 (1%) (19%) 29 - 32
Metallurgical coal - BMA (100% basis) (Mt) 13.3 (1%) (19%) 58 - 64 Unchanged
Energy coal - NSWEC (Mt) 2.6 (38%) (33%) 13 - 15 Unchanged
Nickel (kt) 20.7 16% 10% 80 - 90 Unchanged

Corporate update

Decarbonisation

Throughout the September 2022 quarter we've continued to make progress towards our decarbonisation targets and goals and supported efforts to reduce GHG emissions in our value chain.

·      BHP entered into a large-scale renewable Power Purchase Agreement (PPA) with Alinta Energy, which is expected to halve emissions from the electricity used in our WAIO port facilities by the end of 2024 based on current forecast demand and compared with FY2020 reported emissions. In addition, BHP and Alinta Energy have entered a Memorandum of Understanding (MoU) in relation to the development of the Shay Gap Wind Farm, currently planned to be 45MW capacity with a targeted first-generation date of 2027.

·      BHP signed an MoU with India's Tata Steel to jointly study and develop lower carbon iron and steelmaking technology. The technologies to be explored in this partnership seek to reduce GHG emission intensity of integrated steel mills by up to 30 per cent. The announcement of this partnership takes BHP to a total of five decarbonisation partnerships with steelmakers whose combined output accounts for over 13 per cent of reported global steel production.

·      BHP announced a partnership with Pan Pacific Copper (PPC) which aims to reduce GHG emissions from maritime transportation between BHP's mines in Chile and PPC's smelters in Japan through a retrofit installation of a push-button wind-assisted propulsion system on board the M/V Koryu vessel estimated to be around 10 times more efficient than a conventional sail and expected to make the M/V Koryu the lowest GHG emission intensity vessel in its category.

3

Copper

Production

Sep Q22 Sep Q22

vs

Sep Q21
Sep Q22

vs

Jun Q22
Copper (kt) 410.1 9% (11%)
Zinc (t) 32,685 (2%) 19%
Uranium (t) 817 54% 5%

Copper - Total copper production increased by nine per cent to 410 kt. Guidance for the 2023 financial year remains unchanged at between 1,635 and 1,825 kt.

Escondida copper production increased by four per cent to 253 kt primarily due to higher concentrator feed grade of 0.83 per cent compared to 0.73 per cent in the September 2021 quarter. Guidance for the 2023 financial year remains unchanged at between 1,080 and 1,180 kt, with production weighted toward the second half of the year. Medium term guidance of 1.2 Mtpa of copper production on average over the next five years remains unchanged.

Pampa Norte copper production increased by five per cent to 71 kt reflecting the continued ramp up of the Spence Growth Option (SGO). Guidance for the 2023 financial year remains unchanged at between 240 and 290 kt. This reflects plant design modification shutdowns at SGO and the continued transition towards the planned closure of Cerro Colorado at the end of the 2023 calendar year. The SGO plant modifications started in August 2022 and are planned to finish in the 2023 calendar year, with further studies ongoing for additional capacity uplift.

At Spence, we continue to closely monitor previously identified Tailings Storage Facility (TSF) anomalies. We have reduced the volume of water in the tailings facility and continue to work with the local regulatory agencies, including the implementation of a remediation plan for the TSF. The SGO concentrator continues to operate with no impact to production or market guidance. Spence is expected to reach an average of approximately 270 ktpa of production for four years (including cathodes) following the completion of the SGO plant modifications and remediation of TSF anomalies.

Olympic Dam copper production increased by 68 per cent to 50 kt primarily as a result of the September 2021 quarter having included the SCM21 major smelter maintenance campaign. Strong smelter performance resulted in record gross anode2 production in the September 2022 quarter, however copper cathode production was constrained by planned annual refinery maintenance. Near record gold production was also achieved in the quarter as a result of debottlenecking initiatives implemented in the prior year. Production guidance for the 2023 financial year remains unchanged at between 195 and 215 kt.

Antamina copper production increased by four per cent to 37 kt, reflecting higher concentrator throughput. Zinc production decreased by two per cent to 33 kt reflecting lower zinc head grades. Guidance remains unchanged for the 2023 financial year, with copper production of between 120 and 140 kt, and zinc production of between 115 and 135 kt.

4

Iron Ore

Production

Sep Q22 Sep Q22

vs

Sep Q21
Sep Q22

vs

Jun Q22
Iron ore production (kt) 65,073 3% 1%

Iron ore - Total iron ore production increased by three per cent to 65 Mt. Guidance for the 2023 financial year remains unchanged at between 249 and 260 Mt.

WAIO production increased by three per cent to 64 Mt (72 Mt on a 100 per cent basis), reflecting continued strong supply chain performance and lower COVID-19 related impacts than the prior period, partially offset by wet weather impacts. South Flank ramp up to full production capacity of 80 Mtpa (100 per cent basis) remains on track. Natural variability in the ore grade is expected as the mine progresses through the close to surface material, however this is expected to stabilise as we move deeper into the ore body and achieve full ramp up.

WAIO production guidance for the 2023 financial year remains unchanged at between 246 and 256 Mt (278 and 290 Mt on a 100 per cent basis) and reflects the tie-in of the port debottlenecking project (PDP1) as well as the continued ramp up of South Flank throughout the year.

Samarco production of 1.1 Mt (BHP share) reflected continued production of one concentrator, following the recommencement of iron ore pellet production in December 2020. Guidance for the 2023 financial year is unchanged at between 3 and 4 Mt (BHP share).

Coal

Production

Sep Q22 Sep Q22

vs

Sep Q21
Sep Q22

vs

Jun Q22
Metallurgical coal (kt) 6,662 (1%) (19%)
Energy coal (kt) 2,622 (38%) (33%)

Metallurgical coal - BMA production was marginally lower than the prior period at 7 Mt (13 Mt on a 100 per cent basis) despite record wet weather during the September 2022 quarter3 and ongoing labour shortages. These impacts have been largely offset by an inventory drawdown, and the continued ramp up of autonomous haul truck fleets at Goonyella. Maintenance activities completed in the quarter included a planned longwall move at Broadmeadow, planned wash plant maintenance at both Saraji and Blackwater, and the commencement of wash plant maintenance at Goonyella in September.

The near tripling of top end royalties by the Queensland Government remains a serious concern and threat to investment and jobs in that state. We see strong long-term demand from global steelmakers for Queensland's high-quality metallurgical coal. In the absence of fiscal terms that are both competitive and predictable, we are unable to make significant new investments in Queensland.

Guidance for the 2023 financial year remains unchanged at between 29 and 32 Mt (58 and 64 Mt on a 100 per cent basis).

Energy coal - New South Wales Energy Coal (NSWEC) production decreased by 38 per cent to 3 Mt, reflecting the ongoing impacts of significant wet weather with more than three times the amount of rainfall than the prior year,4 continued labour shortages impacting stripping performance and mine productivity, and an increased proportion of washed coal. Higher quality coals made up approximately 85 per cent of sales compared to approximately 70 per cent in the September 2021 quarter. Guidance for the 2023 financial year remains unchanged at between 13 and 15 Mt.'

5

Other

Nickel production

Sep Q22 Sep Q22

vs

Sep Q21
Sep Q22

vs

Jun Q22
Nickel (kt) 20.7 16% 10%

Nickel - Nickel West production increased by 16 per cent to 21 kt, reflecting the completion of planned maintenance across the supply chain in the prior period. Guidance for the 2023 financial year remains unchanged at between 80 and 90 kt, weighted to the second half of the year due to planned smelter maintenance in the December 2022 quarter.

Potash - Our major potash project under development is tracking to plan. For the 2023 financial year, we will continue to focus on civil and mechanical construction on the surface and underground, as well as equipment procurement and port construction.

Projects

Project and

ownership
Capital expenditure US$M Initial production target date Capacity Progress
Jansen Stage 1

(Canada)

100%
5,723 End-CY26 Design, engineering and construction of an underground potash mine and surface infrastructure, with capacity to produce 4.35 Mtpa. Approved in August 2021, project is 11% complete

Minerals exploration

Minerals exploration expenditure for the September 2022 quarter was US$73 million, of which US$58 million was expensed.

Following our agreement with Midland Exploration in April 2022 to fund a new nickel exploration program in Nunavik, Quebec, on 21 July 2022 we extended our strategic alliance for one year until August 2023, including agreement to provide additional funding for the program.

At Oak Dam in South Australia, BHP is continuing next stage resource definition drilling with six drill rigs. 

6

Variance analysis relates to the relative performance of BHP and/or its operations during the three months ended September 2022 compared with the three months ended September 2021, unless otherwise noted. Production volumes, sales volumes and capital and exploration expenditure from subsidiaries are reported on a 100 per cent basis; production and sales volumes from equity accounted investments and other operations are reported on a proportionate consolidation basis. Numbers presented may not add up precisely to the totals provided due to rounding.

The following footnotes apply to this Operational Review:

1          2023 financial year unit cost guidance: Escondida US$1.25-1.45/lb, WAIO US$18-19/t, and BMA of US$90-100/t; based on exchange rates of AUD/USD 0.72 and USD/CLP 830.

2          Anode is the product from the smelting process at Olympic Dam. Anode is converted to copper cathode through the refining process.

3          BMA experienced the wettest September quarter in 10 years with 212mm of rainfall recorded at Moranbah in the September 2022 quarter compared to 123mm in the September 2021 quarter.

4          Rainfall of 297mm was recorded at Muswellbrook in the September 2022 quarter, compared to 96mm in the September 2021 quarter.

The following abbreviations may have been used throughout this report: cost and freight (CFR); cost, insurance and freight (CIF); dry metric tonne unit (dmtu); free on board (FOB); grams per tonne (g/t); kilograms per tonne (kg/t); kilometre (km); megawatt (MW); metre (m); million tonnes (Mt); million tonnes per annum (Mtpa); ounces (oz); pounds (lb); thousand ounces (koz); thousand tonnes (kt); thousand tonnes per annum (ktpa); thousand tonnes per day (ktpd); tonnes (t); and wet metric tonnes (wmt).

In this release, the terms 'BHP', the 'Group', 'BHP Group', 'we', 'us', 'our' and 'ourselves' are used to refer to BHP Group Limited and, except where the context otherwise requires, our subsidiaries. Refer to note 28 'Subsidiaries' of the Financial Statements in BHP's 30 June 2022 Appendix 4E for a list of our significant subsidiaries. Those terms do not include non-operated assets. Notwithstanding that this release may include production, financial and other information from non-operated assets, non-operated assets are not included in the BHP Group and, as a result, statements regarding our operations, assets and values apply only to our operated assets unless stated otherwise. Our non-operated assets include Antamina and Samarco. BHP Group cautions against undue reliance on any forward-looking statement or guidance in this release, particularly in light of the current economic climate and significant volatility, uncertainty and disruption arising in connection with COVID-19. These forward-looking statements are based on information available as at the date of this release and are not guarantees or predictions of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond our control and which may cause actual results to differ materially from those expressed in the statements contained in this release.

7

Further information on BHP can be found at: bhp.com

Authorised for lodgement by:

Stefanie Wilkinson

Group Company Secretary

Media Relations

Email: [email protected]
Investor Relations

Email: [email protected]
Australia and Asia

Gabrielle Notley

Tel: +61 3 9609 3830  Mobile: +61 411 071 715

Europe, Middle East and Africa

Neil Burrows

Tel: +44 20 7802 7484  Mobile: +44 7786 661 683

Americas

Renata Fernandez

Mobile: +56 9 8229 5357
Australia and Asia

Dinesh Bishop

Mobile: +61 407 033 909

Europe, Middle East and Africa

James Bell

Tel: +44 20 7802 7144  Mobile: +44 7961 636 432

Americas

Monica Nettleton

Mobile: +1 416 518-6293
BHP Group Limited ABN 49 004 028 077

LEI WZE1WSENV6JSZFK0JC28

Registered in Australia

Registered Office: Level 18, 171 Collins Street

Melbourne Victoria 3000 Australia

Tel +61 1300 55 4757 Fax +61 3 9609 3015
BHP Group is headquartered in Australia

Follow us on social media

8

NEWS RELEASE

19 October 2022

BHP OPERATIONAL REVIEW

FOR THE QUARTER ENDED 30 SEPTEMBER 2022

Production and sales summary (Excel version)

www.bhp.com

9

Production summary

Quarter ended Year to date
BHP

interest
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Copper 1
Copper
Payable metal in concentrate (kt)
Escondida 2 57.5% 194.7 196.2 178.2 233.5 203.1 203.1 194.7
Pampa Norte 3 100.0% 26.4 24.2 32.4 28.2 28.6 28.6 26.4
Antamina 33.8% 35.8 38.4 36.1 39.6 37.1 37.1 35.8
Total 256.9 258.8 246.7 301.3 268.8 268.8 256.9
Cathode (kt)
Escondida 2 57.5% 49.0 48.4 48.2 55.8 49.6 49.6 49.0
Pampa Norte 3 100% 41.1 44.1 35.8 49.0 42.0 42.0 41.1
Olympic Dam 100% 29.5 14.2 39.0 55.7 49.7 49.7 29.5
Total 119.6 106.7 123.0 160.5 141.3 141.3 119.6
Total copper (kt) 376.5 365.5 369.7 461.8 410.1 410.1 376.5
Lead
Payable metal in concentrate (t)
Antamina 33.8% 378 277 282 181 228 228 378
Total 378 277 282 181 228 228 378
Zinc
Payable metal in concentrate (t)
Antamina 33.8% 33,289 29,603 32,732 27,576 32,685 32,685 33,289
Total 33,289 29,603 32,732 27,576 32,685 32,685 33,289
Gold
Payable metal in concentrate (troy oz)
Escondida 2 57.5% 41,962 42,937 36,303 45,770 38,236 38,236 41,962
Pampa Norte 3 100% 6,967 5,776 7,929 8,198 5,521 5,521 6,967
Olympic Dam (refined gold) 100% 26,277 37,805 29,355 26,080 47,184 47,184 26,277
Total 75,206 86,518 73,587 80,048 90,941 90,941 75,206
Silver
Payable metal in concentrate (troy koz)
Escondida 2 57.5% 1,291 1,462 1,270 1,311 1,210 1,210 1,291
Pampa Norte 3 100% 273 215 261 262 252 252 273
Antamina 33.8% 1,367 1,308 1,191 1,212 1,190 1,190 1,367
Olympic Dam (refined silver) 100% 191 258 149 145 295 295 191
Total 3,122 3,243 2,871 2,930 2,947 2,947 3,122

10

Production summary

Quarter ended Year to date
BHP

interest
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Uranium
Payable metal in concentrate (t)
Olympic Dam 100% 531 287 781 776 817 817 531
Total 531 287 781 776 817 817 531
Molybdenum
Payable metal in concentrate (t)
Pampa Norte 3 100% - - - 71 34 34 -
Antamina 33.8% 142 217 190 249 262 262 142
Total 142 217 190 320 296 296 142
Iron Ore
Iron Ore
Production (kt) 4
Newman 85% 16,461 14,577 11,940 14,063 14,053 14,053 16,461
Area C Joint Venture 85% 18,947 22,911 24,888 27,685 26,971 26,971 18,947
Yandi Joint Venture 85% 11,834 12,261 8,418 6,409 5,497 5,497 11,834
Jimblebar 5 85% 15,009 15,324 13,444 15,005 17,404 17,404 15,009
Samarco 50% 1,048 1,029 994 1,000 1,148 1,148 1,048
Total 63,299 66,102 59,684 64,162 65,073 65,073 63,299
Coal
Metallurgical coal
Production (kt) 6
BHP Mitsubishi Alliance (BMA) 50% 6,715 6,300 7,944 8,183 6,662 6,662 6,715
Total 6,715 6,300 7,944 8,183 6,662 6,662 6,715
Energy coal
Production (kt)
NSW Energy Coal 100% 4,238 2,967 2,577 3,919 2,622 2,622 4,238
Total 4,238 2,967 2,577 3,919 2,622 2,622 4,238
Other
Nickel
Saleable production (kt)
Nickel West 100% 17.8 21.5 18.7 18.8 20.7 20.7 17.8
Total 17.8 21.5 18.7 18.8 20.7 20.7 17.8
Cobalt
Saleable production (t)
Nickel West 100% 177 220 125 110 238 238 177
Total 177 220 125 110 238 238 177

1      Metal production is reported on the basis of payable metal.

2      Shown on a 100% basis. BHP interest in saleable production is 57.5%.

3      Includes Cerro Colorado and Spence.

4      Iron ore production is reported on a wet tonnes basis.

5      Shown on a 100% basis. BHP interest in saleable production is 85%.

6      Metallurgical coal production is reported on the basis of saleable product. Production figures may include some thermal coal.

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

11

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Copper
Metals production is payable metal unless otherwise stated.
Escondida, Chile 1
Material mined (kt) 113,874 117,284 107,676 115,409 110,248 110,248 113,874
Concentrator throughput (kt) 33,528 35,787 30,235 34,318 32,894 32,894 33,528
Average copper grade - concentrator (%) 0.73% 0.71% 0.80% 0.88% 0.83% 0.83% 0.73%
Production ex mill (kt) 201.2 203.6 191.5 239.5 214.6 214.6 201.2
Production
Payable copper (kt) 194.7 196.2 178.2 233.5 203.1 203.1 194.7
Copper cathode (EW) (kt) 49.0 48.4 48.2 55.8 49.6 49.6 49.0
- Oxide leach (kt) 14.8 13.1 12.2 17.5 15.2 15.2 14.8
- Sulphide leach (kt) 34.2 35.3 36.0 38.3 34.4 34.4 34.2
Total copper (kt) 243.7 244.6 226.4 289.3 252.7 252.7 243.7
Payable gold concentrate (troy oz) 41,962 42,937 36,303 45,770 38,236 38,236 41,962
Payable silver concentrate (troy koz) 1,291 1,462 1,270 1,311 1,210 1,210 1,291
Sales
Payable copper (kt) 190.5 200.2 177.0 230.4 196.7 196.7 190.5
Copper cathode (EW) (kt) 46.7 49.7 47.2 58.9 45.9 45.9 46.7
Payable gold concentrate (troy oz) 41,962 42,937 36,303 45,770 38,236 38,236 41,962
Payable silver concentrate (troy koz) 1,291 1,462 1,270 1,311 1,210 1,210 1,291

1      Shown on a 100% basis. BHP interest in saleable production is 57.5%.

12

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Pampa Norte, Chile
Cerro Colorado
Material mined (kt) 5,378 4,782 3,516 3,604 3,179 3,179 5,378
Ore stacked (kt) 3,566 4,029 3,181 4,259 4,373 4,373 3,566
Average copper grade - stacked (%) 0.60% 0.62% 0.53% 0.55% 0.54% 0.54% 0.60%
Production
Copper cathode (EW) (kt) 13.4 15.3 11.6 14.7 12.8 12.8 13.4
Sales
Copper cathode (EW) (kt) 12.1 16.0 10.5 16.2 13.3 13.3 12.1
Spence
Material mined (kt) 21,154 24,025 24,040 26,749 26,956 26,956 21,154
Ore stacked (kt) 5,258 5,071 5,055 5,099 5,577 5,577 5,258
Average copper grade - stacked (%) 0.64% 0.66% 0.67% 0.66% 0.70% 0.70% 0.64%
Concentrator throughput (kt) 5,786 6,234 6,512 6,311 6,433 6,433 5,786
Average copper grade - concentrator (%) 0.65% 0.60% 0.65% 0.66% 0.63% 0.63% 0.65%
Production
Payable copper (kt) 26.4 24.2 32.4 28.2 28.6 28.6 26.4
Copper cathode (EW) (kt) 27.7 28.8 24.2 34.3 29.2 29.2 27.7
Total copper (kt) 54.1 53.0 56.6 62.5 57.8 57.8 54.1
Payable gold concentrate (troy oz) 6,967 5,776 7,929 8,198 5,521 5,521 6,967
Payable silver concentrate (troy koz) 273 215 261 262 252 252 273
Payable molybdenum (t) - - - 71 34 34 -
Sales
Payable copper (kt) 28.4 24.9 28.1 28.1 26.0 26.0 28.4
Copper cathode (EW) (kt) 27.7 31.2 20.2 35.4 29.1 29.1 27.7
Payable gold concentrate (troy oz) 6,967 5,776 7,929 8,198 5,521 5,521 6,967
Payable silver concentrate (troy koz) 273 215 261 262 252 252 273
Payable molybdenum (t) - - - 25 25 25 -

13

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Copper (continued)
Metals production is payable metal unless otherwise stated.
Antamina, Peru
Material mined (100%) (kt) 66,581 58,179 58,118 64,026 63,865 63,865 66,581
Concentrator throughput (100%) (kt) 13,219 13,011 13,135 13,131 13,858 13,858 13,219
Average head grades
- Copper (%) 0.97% 1.00% 0.94% 1.02% 0.93% 0.93% 0.97%
- Zinc (%) 1.16% 1.11% 1.13% 1.05% 1.09% 1.09% 1.16%
Production
Payable copper (kt) 35.8 38.4 36.1 39.6 37.1 37.1 35.8
Payable zinc (t) 33,289 29,603 32,732 27,576 32,685 32,685 33,289
Payable silver (troy koz) 1,367 1,308 1,191 1,212 1,190 1,190 1,367
Payable lead (t) 378 277 282 181 228 228 378
Payable molybdenum (t) 142 217 190 249 262 262 142
Sales
Payable copper (kt) 32.7 41.9 32.9 40.7 37.6 37.6 32.7
Payable zinc (t) 32,635 32,513 29,920 30,847 33,820 33,820 32,635
Payable silver (troy koz) 1,103 1,405 1,078 1,230 1,015 1,015 1,103
Payable lead (t) 232 344 269 363 130 130 232
Payable molybdenum (t) 86 170 199 205 250 250 86
Olympic Dam, Australia
Material mined 1 (kt) 1,935 1,998 2,424 2,477 2,412 2,412 1,935
Ore milled (kt) 2,024 1,105 2,122 2,436 2,570 2,570 2,024
Average copper grade (%) 2.03% 2.17% 2.21% 2.15% 2.13% 2.13% 2.03%
Average uranium grade (kg/t) 0.55 0.55 0.62 0.56 0.58 0.58 0.55
Production
Copper cathode (ER and EW) (kt) 29.5 14.2 39.0 55.7 49.7 49.7 29.5
Payable uranium (t) 531 287 781 776 817 817 531
Refined gold (troy oz) 26,277 37,805 29,355 26,080 47,184 47,184 26,277
Refined silver (troy koz) 191 258 149 145 295 295 191
Sales
Copper cathode (ER and EW) (kt) 29.1 17.9 36.3 55.8 45.9 45.9 29.1
Payable uranium (t) 536 541 236 1,031 272 272 536
Refined gold (troy oz) 24,654 38,768 30,935 24,622 49,542 49,542 24,654
Refined silver (troy koz) 126 290 182 87 320 320 126

1      Material mined refers to underground ore mined, subsequently hoisted or trucked to surface.

14

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Iron Ore
Iron ore production and sales are reported on a wet tonnes basis.
Western Australia Iron Ore, Australia
Production
Newman (kt) 16,461 14,577 11,940 14,063 14,053 14,053 16,461
Area C Joint Venture (kt) 18,947 22,911 24,888 27,685 26,971 26,971 18,947
Yandi Joint Venture (kt) 11,834 12,261 8,418 6,409 5,497 5,497 11,834
Jimblebar 1 (kt) 15,009 15,324 13,444 15,005 17,404 17,404 15,009
Total production (kt) 62,251 65,073 58,690 63,162 63,925 63,925 62,251
Total production (100%) (kt) 70,587 73,852 66,674 71,660 72,135 72,135 70,587
Sales
Lump (kt) 17,546 17,827 16,966 20,006 19,561 19,561 17,546
Fines (kt) 45,039 46,809 42,187 44,308 42,696 42,696 45,039
Total (kt) 62,585 64,636 59,153 64,314 62,257 62,257 62,585
Total sales (100%) (kt) 70,815 73,222 67,110 72,796 70,276 70,276 70,815

1      Shown on a 100% basis. BHP interest in saleable production is 85%.

Samarco, Brazil
Production (kt) 1,048 1,029 994 1,000 1,148 1,148 1,048
Sales (kt) 1,111 950 943 991 1,146 1,146 1,111

15

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Coal
Coal production is reported on the basis of saleable product.
BHP Mitsubishi Alliance (BMA), Australia
Production 1
Blackwater (kt) 1,403 1,202 1,478 1,751 1,283 1,283 1,403
Goonyella (kt) 1,798 1,797 2,336 2,429 1,780 1,780 1,798
Peak Downs (kt) 1,223 960 1,395 1,366 1,325 1,325 1,223
Saraji (kt) 999 1,081 1,366 1,168 1,020 1,020 999
Daunia (kt) 377 304 338 472 324 324 377
Caval Ridge (kt) 915 956 1,031 997 930 930 915
Total production (kt) 6,715 6,300 7,944 8,183 6,662 6,662 6,715
Total production (100%) (kt) 13,430 12,600 15,888 16,366 13,324 13,324 13,430
Sales
Coking coal (kt) 5,415 4,875 6,334 6,734 5,615 5,615 5,415
Weak coking coal (kt) 734 754 805 1,118 600 600 734
Thermal coal (kt) 576 455 484 765 267 267 576
Total sales (kt) 6,725 6,084 7,623 8,617 6,482 6,482 6,725
Total sales (100%) (kt) 13,450 12,168 15,246 17,234 12,964 12,964 13,450

1      Production figures include some thermal coal.

16

Production and sales report

Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
NSW Energy Coal, Australia
Production (kt) 4,238 2,967 2,577 3,919 2,622 2,622 4,238
Sales (kt) 3,780 3,718 2,703 3,923 2,441 2,441 3,780
Quarter ended Year to date
Sep

2021
Dec

2021
Mar

2022
Jun

2022
Sep

2022
Sep

2022
Sep

2021
Other
Nickel production is reported on the basis of saleable product
Nickel West, Australia
Mt Keith
Nickel concentrate (kt) 53.7 47.0 47.1 48.0 42.6 42.6 53.7
Average nickel grade (%) 14.6 13.2 14.4 16.1 17.0 17.0 14.6
Leinster
Nickel concentrate (kt) 73.8 77.4 78.0 76.0 66.8 66.8 73.8
Average nickel grade (%) 8.9 9.1 8.9 10.3 9.9 9.9 8.9
Saleable production
Refined nickel 1 (kt) 14.4 18.2 13.3 11.7 17.5 17.5 14.4
Nickel sulphate 2 (kt) - 0.4 0.7 0.5 1.2 1.2 -
Intermediates and nickel by-products 3 (kt) 3.4 2.9 4.7 6.6 2.0 2.0 3.4
Total nickel (kt) 17.8 21.5 18.7 18.8 20.7 20.7 17.8
Cobalt by-products (t) 177 220 125 110 238 238 177
Sales
Refined nickel 1 (kt) 13.8 16.9 15.3 11.7 18.1 18.1 13.8
Nickel sulphate 2 (kt) - 0.1 0.7 0.5 0.8 0.8 -
Intermediates and nickel by-products 3 (kt) 3.9 3.1 2.7 6.4 1.8 1.8 3.9
Total nickel (kt) 17.7 20.1 18.7 18.6 20.7 20.7 17.7
Cobalt by-products (t) 177 220 125 110 238 238 177

1      High quality refined nickel metal, including briquettes and powder.

2      Nickel sulphate crystals produced from nickel powder.

3      Nickel contained in matte and by-product streams.

17

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.