ASX / MEDIA RELEASE

==> picture [121 x 55] intentionally omitted <==

29 January 2016

ST GEORGE COMPLETES ACQUISITION OF MT ALEXANDER PROJECT

HIGHLIGHTS:

  • St George finalises acquisition of 75% interest in the high grade nickel‐copper sulphide Mt Alexander Project from BHP Billiton

  • Western Areas retains a 25% interest in the Project and has also become a shareholder in St George

  • A high quality addition to St George’s growing WA project portfolio

  • Drilling programme planned by St George in 2016

HIGH GRADE NICKEL‐COPPER SULPHIDE PROJECT – ACQUISITION COMPLETED

St George Mining Limited (ASX: SGQ ) (‘St George’ or ‘the Company’) is pleased to announce it has completed the previously announced acquisition of a 75% interest in the Mt Alexander Project from BHP Billiton Nickel West Pty Ltd (“Nickel West”).

The completion of the acquisition follows satisfaction of all conditions precedent under the Sale Agreement signed by the parties. The acquisition by St George includes all technical and exploration data for the Project from Nickel West.

St George has also allotted 3,500,000 ordinary shares to Western Areas Limited, which agreed to not exercise its right of pre‐emption over Nickel West’s interest in the Mt Alexander Project. For further details of the terms for the acquisition of the Mt Alexander Project, see our ASX Release dated 17 December 2015 “New High Grade Nickel‐Copper Sulphide Project” .

St George Mining Executive Chairman, John Prineas said:

“This is an important strategic acquisition for St George which we believe will deliver significant value for our shareholders.

“Very impressive intersections of shallow high grade nickel‐copper sulphides have already been discovered by drilling at Mt Alexander.

”We are looking forward to our first drilling campaign at Mt Alexander, and the opportunity to make further significant discoveries of high grade mineralisation.”

The Mt Alexander Project is an outstanding low‐risk exploration project in a world class nickel region of Western Australia, and offers tremendous exploration upside for St George.

The Project is located 120km south‐southwest of the Agnew‐Wiluna belt which hosts numerous world class nickel deposits. St George will be the Manager of the Project with Western Areas retaining a 25% non‐ contributing interest in the Project until there is a decision to mine.

1

ASX / MEDIA RELEASE

==> picture [121 x 55] intentionally omitted <==

High grade nickel‐copper sulphides were discovered at the Mt Alexander Project in 2008 from drilling at the Cathedrals Prospect. The nickel‐copper sulphides were discovered by drill testing below isolated nickel‐iron gossans hosted in granites.

Follow‐up drilling targeting electromagnetic (EM) conductors at Cathedrals resulted in further significant high grade nickel‐copper sulphide intersections including:

  • 4m @ 4.9%Ni, 1.7%Cu and 3.9g/t total PGEs from 91.4m in drill hole MAD12

  • 3m @ 3.8%Ni, 1.6%Cu and 2.7g/t total PGEs from 56.3m in drill hole MAD13

  • 6m @ 3.3%Ni, 1.5%Cu and 2.7g/t total PGEs from 60m in drill hole MARC49

The drill holes intersected massive, matrix and disseminated sulphides at shallow depth. Figures 1 and 2 show sections of the drill core from MAD12 and MAD13 with massive nickel‐copper sulphides in komatiite ultramafics.

The Cathedrals Fault that hosts the mineralised komatiites remains largely untested along strike from the Cathedrals Prospect.

==> picture [424 x 231] intentionally omitted <==

Figure 1 – high grade nickel‐copper sulphides in komatiite ultramafic in MAD12

==> picture [425 x 120] intentionally omitted <==

Figure 2 – high grade nickel‐copper sulphides in komatiite ultramafic on contact with granite in MAD13

2

ASX / MEDIA RELEASE

==> picture [121 x 55] intentionally omitted <==

St George has initiated a detailed geological review of the exploration data for the Mt Alexander Project. The first joint venture meeting with Western Areas’ technical team will take place next week, with a view to preparing a multi‐phase exploration programme for Mt Alexander in 2016. A further announcement regarding proposed exploration at Mt Alexander, including the next drill programme to test nickel sulphide targets, will be made soon.

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [396 x 33] intentionally omitted <==

==> picture [395 x 32] intentionally omitted <==

Figure 3 – a map showing the location of Mt Alexander Project over TMI magnetics. The Hawaii Project was also recently acquired by St George from Nickel West.

In October 2015, St George completed the 100% acquisition of exploration licence E29/548 from Nickel West which covers 45.12 sq km. In addition, St George has lodged an application for exploration licence E29/954 which covers 41.72 sq km.

3

ASX / MEDIA RELEASE

==> picture [121 x 55] intentionally omitted <==

These two tenements are owned 100% by St George, with E29/638 – the tenement that hosts the Cathedrals Prospect – being a joint venture between Western Areas (25%) and St George (75%).

All three tenements are contiguous and provide St George with approximately 165 sq km of highly prospective ground in this under‐explored area.

TRANSACTION TERMS

The consideration payable to Nickel West by St George for the acquisition of the 75% interest in the Mt Alexander Project is $300,000.

Other key commercial terms of the acquisition are:

  • 1) Nickel West has off‐take rights to St George’s share of any nickel produced from the Project;

  • 2) Nickel West may charge a base royalty of 1% of the proceeds from St George’s share of any mineral production at the Project; and

  • 3) Nickel West may charge an additional royalty of 1% of the proceeds from St George’s share of any nickel produced from the Project provided that the additional royalty is only payable if a minimum measured and indicated JORC resource of at least 25,000 tonnes of contained nickel is defined at the Project and payments of the additional royalty start 12 months after commercial production from the Project.

For further information, please contact:

John Prineas Colin Hay Executive Chairman Professional Public Relations St George Mining Limited (+61) 08 9388 0944 mob 0404 683 355 (+61) 411 421 253 [email protected] [email protected]

Competent Person Statement:

The information in this report that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Matthew McCarthy, a Competent Person who is a Member of The Australasian Institute of Geoscientists. Mr McCarthy is employed by St George Mining Limited.

Mr McCarthy has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McCarthy consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

4

The following sections are provided for compliance with requirements for the reporting of exploration results under the JORC Code, 2012 Edition.

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut This ASX Release dated 29 January 2016 reports on the acquisition
techniques channels, random chips, or specific specialised by St George Mining Limited (“St George”) of a majority 75% interest
industry
standard
measurement
tools
in the Mt Alexander Project which is encompassed in E29/638.
appropriate
to
the
minerals
under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting
This ASX Release refers only to historic exploration drilling and does
not report any new drilling results, assay or other sampling
exploration work.
the broad meaning of sampling.
Include reference to measures taken to ensure This ASX Release refers only to historic exploration drilling and does
sample representivity and the appropriate not report any new drilling results, assay or other sampling
calibration of any measurement tools or exploration work.
systems used.
Aspects of the determination of mineralisation This ASX Release refers only to historic exploration drilling and does
that are Material to the Public Report. not report any new drilling results, assay or other sampling
In cases where ‘industry standard’ work has exploration work.
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may
warrant
disclosure
of
detailed
information.
Drilling Drill type (eg core, reverse circulation, open‐ This ASX Release refers only to historic exploration drilling and does
techniques hole hammer, rotary air blast, auger, Bangka, not report any new drilling results, assay or other sampling
sonic, etc) and details (eg core diameter, triple exploration work.
or standard tube, depth of diamond tails, face‐
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
References to reverse circulation and diamond drilling on E29/638
are to drilling conducted by BHP Billiton Nickel West Pty Ltd (“Nickel
West”), the party from which St George has acquired its 75%
majority interest in the tenement (see Section:Exploration Done by
Other Parties)
Drill sample Method of recording and assessing core and This ASX Release refers only to historic exploration drilling and does
recovery chip sample recoveries and results assessed. not report any new drilling results, assay or other sampling
exploration work.
Measures taken to maximise sample recovery This ASX Release refers only to historic exploration drilling and does
and ensure representative nature of the not report any new drilling results, assay or other sampling
samples. exploration work.

1

Criteria JORC Code explanation Commentary
Whether a relationship exists between sample This ASX Release refers only to historic exploration drilling and does
recovery and grade and whether sample bias not report any new drilling results, assay or other sampling
may have occurred due to preferential exploration work.
loss/gain of fine/coarse material.
Logging Whether core and chip samples have been This ASX Release refers only to historic exploration drilling and does
geologically and geotechnically logged to a not report any new drilling results, assay or other sampling
level of detail to support appropriate Mineral exploration work.
Resource estimation, mining studies and
metallurgical studies.
Whether logging is qualitative or quantitative This ASX Release refers only to historic exploration drilling and does
in nature. Core (or costean, channel, etc) not report any new drilling results, assay or other sampling
photography. exploration work.
The total length and percentage of the relevant This ASX Release refers only to historic exploration drilling and does
intersections logged. not report any new drilling results, assay or other sampling
exploration work.
Sub‐sampling If core, whether cut or sawn and whether This ASX Release refers only to historic exploration drilling and does
techniques and quarter, half or all core taken. not report any new drilling results, assay or other sampling
sample exploration work.
preparation
If non‐core, whether riffled, tube sampled, This ASX Release refers only to historic exploration drilling and does
rotary split, etc and whether sampled wet or not report any new drilling results, assay or other sampling
dry. exploration work.
For all sample types, the nature, quality and This ASX Release refers only to historic exploration drilling and does
appropriateness of the sample preparation not report any new drilling results, assay or other sampling
technique. exploration work.
Quality control procedures adopted for all sub‐ This ASX Release refers only to historic exploration drilling and does
sampling stages to maximise representivity of not report any new drilling results, assay or other sampling
samples. exploration work.
Measures taken to ensure that the sampling is This ASX Release refers only to historic exploration drilling and does
representative of the in situ material collected, not report any new drilling results, assay or other sampling
including for instance results for field exploration work.
duplicate/second‐half sampling.
Whether sample sizes are appropriate to the This ASX Release refers only to historic exploration drilling and does
grain size of the material being sampled. not report any new drilling results, assay or other sampling
exploration work.
Quality of The nature, quality and appropriateness of the This ASX Release refers only to historic exploration drilling and does
assay data and assaying and laboratory procedures used and not report any new drilling results, assay or other sampling
laboratory whether the technique is considered partial or exploration work.
tests total.

2

Criteria JORC Code explanation Commentary
For geophysical tools, spectrometers, handheld
This ASX Release refers only to historic exploration drilling and does
XRF instruments, etc, the parameters used in
not report any new drilling results, assay or other sampling
determining the analysis including instrument
exploration work.
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
This ASX Release refers only to historic exploration drilling and does
(eg standards, blanks, duplicates, external
not report any new drilling results, assay or other sampling
laboratory checks) and whether acceptable
exploration work.
levels of accuracy (i.e. lack of bias) and
precision have been established.
Verification of The verification of significant intersections by
This ASX Release refers only to historic exploration drilling and does
sampling and either independent or alternative company
not report any new drilling results, assay or other sampling
assaying personnel. exploration work.
Significant intersections discussed in this ASX release were checked
by St George personnel using assay data supplied by Nickel West.
The use of twinned holes. This ASX Release refers only to historic exploration drilling and does
not report any new drilling results, assay or other sampling
exploration work.
Documentation of primary data, data entry This ASX Release refers only to historic exploration drilling and does
procedures, data verification, data storage not report any new drilling results, assay or other sampling
(physical and electronic) protocols. exploration work.
Discuss any adjustment to assay data. This ASX Release refers only to historic exploration drilling and does
not report any new drilling results, assay or other sampling
exploration work.
Location of Accuracy and quality of surveys used to locate
This ASX Release refers only to historic exploration drilling and does
data points drill holes (collar and down‐hole surveys),
not report any new drilling results, assay or other sampling
trenches, mine workings and other locations
exploration work.
used in Mineral Resource estimation.
Specification of the grid system used. The grid system used at the Mt Alexander project is GDA94 (MGA),
zone 51.
Quality and adequacy of topographic control. This ASX Release refers only to historic exploration drilling and does
not report any new drilling results, assay or other sampling
exploration work.
Data spacing Data spacing for reporting of Exploration This ASX Release refers only to historic exploration drilling and does
and Results. not report any new drilling results, assay or other sampling
distribution exploration work.
Whether the data spacing and distribution is
This ASX Release refers only to historic exploration drilling and does
sufficient to establish the degree of geological
not report any new drilling results, assay or other sampling
and grade continuity appropriate for the
exploration work.
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been applied.
This ASX Release refers only to historic exploration drilling and does
not report any new drilling results, assay or other sampling
exploration work.

3

Criteria JORC Code explanation Commentary
Orientation of Whether the orientation of sampling achieves This ASX Release refers only to historic exploration drilling and does
data in relation unbiased sampling of possible structures and not report any new drilling results, assay or other sampling
to geological the extent to which this is known, considering exploration work.
structure the deposit type.
If the relationship between the drilling This ASX Release refers only to historic exploration drilling and does
orientation and the orientation of key not report any new drilling results, assay or other sampling
mineralised structures is considered to have exploration work.
introduced a sampling bias, this should be
assessed and reported if material.
Sample The measures taken to ensure sample security. This ASX Release refers only to historic exploration drilling and does
security not report any new drilling results, assay or other sampling
exploration work.
Audits or The results of any audits or reviews of sampling
This ASX Release refers only to historic exploration drilling and does
reviews techniques and data. not report any new drilling results, assay or other sampling
exploration work.

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral Type, name/reference number, location and
The Mt Alexander Project is comprised of two granted Exploration
Tenement and ownership including agreements or material
Licences (E29/638 and E29/548). Tenement E29/638 will be a Joint
Land Status issues with third parties including joint
Venture between St George (75% interest) and Western Areas (25%
ventures, partnerships, overriding royalties,
interest). Both tenements are subject to a royalty in favour of a third
native title interests, historical sites, wilderness
party that is outlined in the ASX Release dated 17 December 2015
or national park and environmental settings. (as regards E29/638) and the ASX release dated 18 September 2015
(as regards E29/548).
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.


No environmentally sensitive sites have been identified on the
tenements. A registered Heritage site known as Willsmore 1 (DAA
identification 3087) straddles tenements E29/548 and E29/638.
The newly acquired tenement E29/638, as well as E29/548, are in
good standing and no known impediments exist.
Exploration Acknowledgment and appraisal of exploration Exploration on tenement E29/638 has been largely for komatiite‐
Done by Other by other parties. hosted nickel sulphides both in the Mt Alexander Greenstone Belt,
Parties and at the Cathedrals Prospect in the northern section of the
tenement.
The target lithological unit in the Mt Alexander Greenstone belt has
been the Central Ultramafic Unit, which has been explored by a
number of parties, most recently by Nickel West.
High grade nickel‐copper sulphides were discovered at the Mt
Alexander Project in 2008. Drilling was completed to test co‐incident
electromagnetic (EM) and magnetic anomalies associated with
nickel‐PGE enriched gossans. The drilling identified high grade Ni‐Cu
mineralisation and the discovery was named the Cathedrals
Prospect. The tenement remains underexplored.
Geology Deposit type, geological setting and style of The Mt Alexander Project is at the northern end of a western
mineralisation bifurcation of the Mt Ida Greenstones. The greenstones are bound
to the west by the Ida Fault, a significant Craton‐scale structure that
marks the boundary between the Kalgoorlie Terrane (and Eastern
Goldfields Superterrane) to the east and the Youanmi Terrane to the
west.
The Mt Alexander Project is prospective for further high‐grade
komatiite‐hosted
nickel‐copper‐PGE
mineralisation
and
also
precious metal mineralisation (i.e. orogenic gold) that is typified
elsewhere in the Yilgarn Craton.

4

Criteria JORC Code explanation Commentary
Drill hole A summary of all information material to the This ASX Release refers only to historic exploration drilling and does
information understanding of the exploration results not report any new drilling results, assay or other sampling
including
tabulation
of
the
following
exploration work.
information for all Material drill holes: Table 1 to this JORC Section contains drill hole information on the
• Easting and northing of the drill hole collar historic drilling that is discussed in this ASX Release. This historic
•Elevation or RL (Reduced Level – elevation drilling was reported by Western Areas Limited in its ASX Release
above sea level in meters) of the drill hole collar
• Dip and azimuth of the hole
dated 2 April 2008_‘Assays Confirm High Grade Nickel/Copper/PGE_
Discovery at Mt Alexander Joint Venture’.
• Down hole length and interception depth
• Hole length
Data In reporting Exploration Results, weighting This ASX Release refers only to historic exploration drilling and does
aggregation averaging
techniques,
maximum
and/or
not report any new drilling results, assay or other sampling
methods minimum grade truncations (e.g. cutting of exploration work.
high grades) and cut‐off grades are usually
Material and should be stated.
Where aggregated intercepts incorporate short This ASX Release refers only to historic exploration drilling and does
lengths of high grade results and longer not report any new drilling results, assay or other sampling
lengths of low grade results, the procedure exploration work.
used for such aggregation should be stated and
some typical examples of such aggregations
should be shown in detail.
The assumptions used for any reporting of This ASX Release refers only to historic exploration drilling and does
metal equivalent values should be clearly not report any new drilling results, assay or other sampling
stated. exploration work.
Relationship These relationships are particularly important This ASX Release refers only to historic exploration drilling and does
between in the reporting of exploration results. not report any new drilling results, assay or other sampling
mineralisation
widths and
intercept
lengths
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported. If it is not known
and only the down hole lengths are reported,
exploration work. Historical assay intersections are reported as
down hole lengths. The relationship of down hole width to true
width will be reviewed by St George upon assessment of the newly
acquired technical data.
there should be a clear statement to this effect
(e.g. down hole length, true width not known).
Diagrams Appropriate maps and sections (with scales) Relevant scaled and oriented maps are included in the body of the
and tabulations of intercepts should be ASX Release.
included for any significant discovery being
reported. These should include, but not be
limited to a plane view of drill hole collar
locations and appropriate sectional views.
Balanced Where
comprehensive
reporting
of
all
This ASX Release refers only to historic exploration drilling and does
Reporting Exploration
Results
is
not
practical,
not report any new drilling results, assay or other sampling
representative reporting of both low and high exploration work. Comprehensive reporting of all exploration results
grades and/or widths should be practiced to is not required for the scope of this ASX release and will be
avoid misleading reporting Exploration Results. tabulated upon detailed evaluation of the newly acquired project
database.
Other Other exploration data, if meaningful and This ASX Release refers only to historic exploration drilling and does
substantive material, should be reported including (but not not report any new drilling results, assay or other sampling
exploration limited to): geological observation; geophysical exploration work.
data survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical
test
results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.

5

Criteria JORC Code explanation Commentary
Further Work The nature and scale of planned further work Further exploration on E29/638 will be planned once all newly
(e.g. tests for lateral extensions or depth acquired technical data has been reviewed. Details of further work
extensions or large – scale step – out drilling). at the tenement will be announced after completion of the
Diagrams clearly highlighting the areas of acquisition, scheduled for 28 January 2016, occurs.
possible
extensions,
including
the
main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
HOLE ID EASTING NORTHING DIP AZM DEPTH FROM TO WIDTH Ni Cu Total
PGEs
(m) (m) (deg) (deg) (m) (m) (m) (m) (%) (%) (g/t)
MAD012 233885 6806995 ‐70 170 111.5 81.5 95.5 14 1.9 0.8 1.8
incl. 91.4 95.4 4 4.9 1.7 3.9
MAD013 233805 6806955 ‐70 170 93.3 56.3 59.3 3 3.8 1.6 2.7
incl. 57.6 59 1.4 7.1 3.0 2.9

Table 1 to 2012 JORC Section – Significant intersections at the Cathedrals Prospect within E29/638

6