AI assistant
BHP Group Limited — Capital/Financing Update 2012
Jun 12, 2012
14787_rns_2012-06-12_478a4192-bfcc-496d-b40f-f141bbe6060a.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [264 x 82] intentionally omitted <==
A.B.N. 45 066 383 971
==> picture [575 x 28] intentionally omitted <==
----- Start of picture text ----- 13 June 2012 PAGES (including this page): 3----- End of picture text -----
CUE ENERGY OVERVIEW
Company Announcements Office 10th Floor 20 Bond Street Sydney NSW 2000
Cue is an Australian based oil & gas company with projects in Australia, New Zealand, Indonesia and PNG.
THE COMPANY HAS:
-
Long life production
-
A strong balance sheet
-
An active exploration program
DRILLING PROGRAM
Banambu Deep-1 Well Drilling Update, WA-389-P
-
Naga Utara exp well Q1 12
-
Naga Selatan exp well Q2 12
-
WA-389-P exp well Q2 12
-
Maari appraisal well Q4 12
Attached please find Cue Energy Resources Limited release with respect to the above mentioned.
CUE ENERGY DIRECTORS
-
Richard Tweedie (Chairman)
-
Timothy Dibb
-
Geoffrey King
-
Steve Koroknay
-
Paul Moore
-
Leon Musca
-
Andrew Young
Yours faithfully
CUE ENERGY MANAGEMENT
- Mark Paton (CEO)
==> picture [131 x 73] intentionally omitted <==
Andrew M Knox
-
Andrew Knox (CFO)
-
David Whittam (Exp Man)
-
Alex Parks (CCO)
OFFICE
Level 21 114 William Street Melbourne Vic 3000
CONTACT DETAILS
Public Officer
Tel: +61 3 9670 8668 Fax: +61 3 9670 8661
WEBSITE
LISTINGS
ASX: CUE NZX: CUE POMSOX: CUE ADR/OTCQX: CUEYY
00/SP/PC02/FM01 – Rev 0
==> picture [596 x 61] intentionally omitted <==
A.B.N. 45 066 383 971
RELEASE
(ASX: CUE; NZX: CUE; POMSOX: CUE; ADR/OTC: CUEYY)
Banambu Deep-1 Well Drilling Update, WA-389-P
Cue Energy Resources Limited (ASX Code: CUE) provides the following update on the Banambu Deep exploration well in permit WA-389-P offshore Carnarvon Basin, Western Australia.
Progress
The operator has advised that current operations at 06:00hrs 13th June 2012 is pulling out of hole to change the bottom hole assembly (BHA) after drilling 311mm (12 ¼”) hole to a depth of 2573mMD. Since the last report the 445mm (17 ½”) hole was drilled to a depth of 2570mMD after which 340mm (13
==> picture [284 x 241] intentionally omitted <==
3/8”) casing was run and cemented, with the shoe set at 2563.6mMD. The blow-out preventer (BOP) was installed and tested prior to running in hole with a 311mm (12 ¼”) drilling assembly to drill and clean out cement to 2573mMD and perform a leak-off test.
Forward Plan
Run in hole with new BHA and continue drilling the 311mm (12 ¼”) hole section to the planned intermediate casing point at 4155mMD.
Figure 1: Location of Banambu Deep Prospect
Location / Proposed Depth
The Banambu Deep well is located in permit WA-389-P, in the Carnarvon Basin, Western Australia (Figure 1). The well is being drilled in 320m of water to a planned total depth of approximately 4712mMD in the primary Intra Mungaroo Formation target.
Upon completion of evaluation, the well will be plugged and abandoned in the normal course of offshore operations.
Cue will release reports of well progress initially on a weekly basis.
Participants
Following various JV and government approvals of the recent farm in transaction with BHP Billiton the participants and their respective interests in the permit will be:
| Woodside Burrup Pty Ltd (Operator) | 25% |
|---|---|
| Cue Exploration Pty Ltd | 35% |
| BHP Billiton (Australia) Pty Ltd | 40% |
Explanatory note: All measurements are expressed in metres measured depth from the Rotary Table (mMD)
Any queries regarding the announcement should be directed to the Company on (03) 9670 8668 or email [email protected]
Mark Paton Chief Executive Officer
13 June 2012