April 2017

For immediate release – 3 May 2017

Ref. #025/17

ASX Ltd Companies Announcement Office Electronic Lodgement System

AUSTRALIA – COOPER AND EROMANGA BASINS

EXPLORATION AND APPRAISAL

Western Flank Oil – PEL 630

(Beach operator and farming into 50% interest with Bridgeport)

A two-well oil exploration campaign commenced in the western block of the PEL 630 permit, located approximately 60 kilometres northeast of the Bauer Field. The wells are located outboard of existing oil discoveries with the intention to prove an extension of the Namur and Birkhead play fairways. Butterfish-1 was drilled to intersect the mapped crest of an anticlinal structure within the Namur Sandstone. Trace oil shows were detected within the Birkhead Formation, however the Namur Sandstone primary target was water bearing. The well was plugged and abandoned due to insufficient commercial pay. The second well of the campaign, Harvey’s Return-1, spudded subsequent to month-end.

Queensland Gas – Cooper Basin JV

(Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)

A six-well near-field gas exploration campaign progressed in southwest Queensland. Gallan-1 and Hector South-1, the second and third wells of the campaign, were drilled on the southern flank of the Nappamerri Trough. Gallan-1 targeted the Toolachee and Patchawarra formations as primary objectives and the Epsilon Formation as a secondary objective. The well intersected insufficient commercial pay and was plugged and abandoned. Hector South-1 targeted the Toolachee Formation as a primary objective and the Epsilon and Patchawarra formations as secondary objectives. The well intersected 6.7 metres of net gas pay across a 148 metre gross section in the primary target, which was in-line with pre-drill estimates. Hector South-1 was cased and suspended as a future producer.

The Inca-1 DW1 project, which involved deepening the Inca-1 well (previously cased and suspended as a potential Eromanga oil producer) to appraise gas potential of the Toolachee Formation, was completed. The well was cased and suspended as a future Toolachee Formation gas producer with results considered to be in-line with pre-drill estimates.

Monthly Drilling Report – April 2017

==> picture [94 x 64] intentionally omitted <==

DEVELOPMENT

Western Flank Oil – ex PEL 91

(Beach 100%)

A two-well oil development campaign was completed in the Pennington Field, located approximately 10 kilometres east of the Bauer Field. Reservoir simulation modelling identified potential for improved field commerciality through in-fill drilling to accelerate production. The wells targeted the Namur Sandstone as a primary objective and the McKinlay Member and Mid Namur Sandstone as secondary objectives. Pennington-6, the second well of the campaign, was cased and suspended as a future producer following intersection of four metres of net oil pay in the Namur Sandstone, 3.6 metres of net oil pay in the overlying McKinlay Member, and 0.8 metres of net oil pay in the midNamur Sandstone.

Monthly Drilling Report – Period ended 06:00, 1 May 2017

Well Participants Progress and Summary Primary Targets
Cooper Basin Operated
Butterfish-1 BPT*
50.00%
Drilling this month:
2,191 metres
Namur Sandstone
PEL 630
Oil exploration
C/E Basin,SA
BEL
50.00%
Current depth:
2,191 metres (total depth)
Status:
Plugged and abandoned
Pennington-6 BPT* 100.00% Drilling this month:
1,802 metres
Namur Sandstone
PPL 261
Oil development
C/E Basin,SA
Current depth:
1,802 metres (total depth)
Status:
Cased and suspended as a future Namur Sandstone oil
producer
Cooper Basin Non-operated
Gallan-1 BPT
23.20%
Drilling this month:
2,436 metres
Toolachee Formation
Patchawarra Formation
ATP 1189
Gas exploration
C/E Basin, QLD
STO*
60.06%
Current depth:
2,436 metres (total depth)
ORG
16.74%
Status:
Plugged and abandoned
Hector South-1 BPT
23.20%
Drilling this month:
2,396 metres
Toolachee Formation
ATP 1189
Gas exploration
C/E Basin, QLD
STO*
60.06%
Current depth:
2,396 metres (total depth)
ORG
16.74%
Status:
Cased and suspended as a future Permian gas producer
Inca-1 DW1 BPT
23.20%
Drilling this month:
120 metres
Toolachee Formation
ATP 1189
Gas appraisal
C/E Basin, QLD
STO*
60.06%
Current depth:
2,006 metres (total depth)
ORG
16.74%
Status:
Cased and suspended as a future Permian gas producer

( * ) Operator BPT Beach Energy Ltd BEL Bridgeport Pty Ltd ORG Origin Energy Ltd STO Santos Ltd

Page 2 of 3

Monthly Drilling Report – April 2017

==> picture [94 x 64] intentionally omitted <==

==> picture [455 x 152] intentionally omitted <==

==> picture [455 x 152] intentionally omitted <==

==> picture [75 x 40] intentionally omitted <==

Jeff Schrull

Group Executive Exploration and Development