Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

BEACH ENERGY LIMITED Management Reports 2017

Jul 4, 2017

64558_rns_2017-07-04_bc45fc3f-b381-404e-b5e4-c387b0c44c46.pdf

Management Reports

Open in viewer

Opens in your device viewer

==> picture [127 x 86] intentionally omitted <==

==> picture [262 x 263] intentionally omitted <==

----- Start of picture text ----- June 2017----- End of picture text -----

For immediate release – 5 July 2017

Ref. #032/17

ASX Ltd Companies Announcement Office Electronic Lodgement System

AUSTRALIA – COOPER AND EROMANGA BASINS

DEVELOPMENT

Western Flank Oil – ex PEL 92

(Beach 75% and operator, Cooper Energy 25%)

A five-well oil development and appraisal campaign was successfully completed in the Callawonga Field. The campaign was designed to develop new oil reserves in the McKinlay Member and appraise the extent and productivity of this reservoir. The Namur Sandstone was targeted as a secondary objective. The final wells of the campaign, Callawonga-15, -16 and -17, were drilled in June 2017 and cased and suspended as future producers.

The campaign proved successful with all five wells expected online in Q2 FY18. Four wells intersected oil columns high to prognosis, indicating extensions of field limits with expected 2P reserve additions. Namur columns were also intersected at three wells which will allow earlier connection and acceleration of production. The campaign also provided evidence to support additional in-fill development drilling, with planning of a future five-well program currently underway. Campaign results are summarised below.

Campaign Results High / (Low) Net Oil Pay Net Oil Pay Highlights
(metres) to Prognosis McKinlay Namur
Callawonga-14 1.5 1.0 Eastern field extension; 5.1 day drilltime (spud to rig release)
Callawonga-15 2.2 1.7 2.3 Secondary Namur column
Callawonga-16 (1.0) 2.0 1.8 Secondary Namur column
Callawonga-17 2.7 1.0 1.8 Secondary Namur column; highestoil intersection in field to date
Callawonga-18 1.8 2.1 Western field extension

Monthly Drilling Report – June 2017

==> picture [94 x 64] intentionally omitted <==

==> picture [246 x 299] intentionally omitted <==

As at 30 June 2017, Beach had a well stock of five drilled and uncompleted oil wells in ex PEL 92.

South Australian Gas – Cooper Basin JV

(Beach 20.21%, Santos 66.6% and operator, Origin 13.19%)

A two-well gas development campaign was completed in the Dullingari and Dullingari North fields, located approximately 65 kilometres east of the Moomba processing facility. The campaign utilised a workover rig and applied directional drilling techniques from existing wells. The primary objective was the Patchawarra Formation, with the Toolachee and Epsilon formations providing secondary targets. The second well of the campaign, Dullingari-42 DW1, was side-tracked from the nonproducing Dullingari-42 well. Dullingari-42 DW1 intersected approximately 62 metres of net gas pay in the Patchawarra Formation. The well was cased and suspended as a future producer. Further review of results will be undertaken to determine if directional drilling from existing non-producing wells can be applied to other development opportunities across the Cooper Basin.

EXPLORATION AND APPRAISAL

Western Flank Oil – ex PEL 91

(Beach 100%)

A two-well oil appraisal campaign commenced in the Chiton Field, located approximately two kilometres south of the Bauer Field. The campaign is designed to appraise the extent and productivity of the McKinlay Member to the south and east of currently producing wells, where there has been limited appraisal drilling to date. The first well of the campaign, Chiton-4, was plugged and abandoned due to lack of commercial pay.

As at 30 June 2017, Beach had a well stock of seven drilled and uncompleted oil wells in ex PEL 91.

Page 2 of 4

Monthly Drilling Report – June 2017

==> picture [94 x 64] intentionally omitted <==

Western Flank Oil – PEL 182

(Beach 43%; Senex 57% and operator)

A three-well oil exploration campaign was completed in PEL 182, located approximately 25 kilometres northeast of producing fields in ex PEL 104 / 111. The campaign tested the extent of hydrocarbon migration to the north of the Western Flank, with prospects targeting structural and stratigraphic plays in the Namur Sandstone (primary objective) and Birkhead and Murta formations (secondary objectives). The final well of the campaign, Immortals-1, was plugged and abandoned subsequent to month-end due to lack of commercial pay. The campaign improved definition of the Namur play fairway boundaries and provided encouragement for planned testing of the Birkhead Formation in FY18.

Queensland Gas – Cooper Basin JV

(Beach 23.2%, Santos 60.06% and operator, Origin 16.74%)

A six-well near-field gas exploration and appraisal campaign progressed in southwest Queensland. The fourth and fifth wells of the campaign, Cougar-1 and Snefru-1, are located within the Windorah Trough and follow successful exploration and infrastructure installations in the region in 2016. Both wells targeted the Toolachee Formation as a primary objective and the Patchawarra Formation and Nappamerri Group as secondary objectives. Cougar-1 was plugged and abandoned due to lack of commercial pay. Snefru-1 intersected approximately three metres of net gas pay in the Toolachee Formation and approximately three metres of net gas pay across the secondary targets. The well was cased and suspended as a future producer.

==> picture [455 x 152] intentionally omitted <==

==> picture [455 x 152] intentionally omitted <==

Page 3 of 4

Monthly Drilling Report – June 2017

==> picture [94 x 64] intentionally omitted <==

Monthly Drilling Report – Period ended 06:00, 1 July 2017

Monthly Drilling Report – Period ended 06:00, 1 July 2017 Monthly Drilling Report – Period ended 06:00, 1 July 2017 Monthly Drilling Report – Period ended 06:00, 1 July 2017 Monthly Drilling Report – Period ended 06:00, 1 July 2017
Well Participants Progress and Summary Primary Targets
Cooper Basin operated
Callawonga-15 BPT*75.00% Drilling this month:1,178 metres McKinlay Member
PPL 220Oil developmentC/E Basin,SA COE25.00% Current depth:1,440 metres (total depth)
Status:Cased and suspended as a future McKinlay Member oil
producer
Callawonga-16 BPT*75.00% Drilling this month:1,486 metres McKinlay Member
PPL 220Oil developmentC/E Basin,SA COE25.00% Current depth:1,486 metres (total depth)
Status:Cased and suspended as a future McKinlay Member oil
producer
Callawonga-17 BPT*75.00% Drilling this month:1,452 metres McKinlay Member
PPL 220Oil developmentC/E Basin,SA COE25.00% Current depth:1,452 metres (total depth)
Status:Cased and suspended as a future McKinlay Member oil
producer
Chiton-4 BPT* 100.00% Drilling this month:1,552 metres McKinlay Member
PRL 153Oil appraisalC/E Basin,SA Current depth:1,552 metres (total depth)
Status:Plugged and abandoned
Cooper Basin non-operated
Dullingari-42 DW1 BPT20.21% Drilling this month:1,648 metres Patchawarra Formation
PPL 12Gas developmentC/E Basin,SA STO*66.60% Current depth:2,948 metres (total depth)
ORG13.19% Status:Cased and suspended as a future Permian gas producer
Immortals-1 BPT43.00% Drilling this month:2,205 metres Namur Sandstone
PEL 182Oil explorationC/E Basin,SA SXY*57.00% Current depth:2,205 metres (total depth)
Status:Running wireline logs
Cougar-1 BPT23.20% Drilling this month:412 metres Toolachee Formation
ATP 1189Gas explorationC/E Basin, QLD STO*60.06% Current depth:3,168 metres (total depth)
ORG16.74% Status:Plugged and abandoned
Snefru-1 BPT23.20% Drilling this month:2,993 metres Toolachee Formation
ATP 1189Gas explorationC/E Basin, QLD STO*76.80% Current depth:2,993 metres (total depth)
Status:Cased and suspended as a future Permian gas producer

( * ) Operator BPT Beach Energy Ltd COE Cooper Energy Ltd

ORG Origin Energy Ltd STO Santos Ltd

SXY Senex Energy Ltd

==> picture [75 x 40] intentionally omitted <==

Jeff Schrull

Group Executive Exploration and Development

For more information please contact the following on +61 8 8338 2833

Corporate

Jeff Schrull Group Executive Exploration and Development

Investor Relations

Derek Piper Investor Relations Manager

Page 4 of 4