Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

BEACH ENERGY LIMITED Management Reports 2011

Feb 1, 2011

64558_rns_2011-02-01_7a1babb5-e715-4669-956c-c38ef47205d3.pdf

Management Reports

Open in viewer

Opens in your device viewer

==> picture [127 x 86] intentionally omitted <==

==> picture [262 x 263] intentionally omitted <==

----- Start of picture text ----- January 2011----- End of picture text -----

ASX RELEASE

For Immediate Release – 2 February 2011 Ref. #013/11

AUSTRALIA

Beach Operated Cooper-Eromanga Oil – Western Flank

The Ensign 30 rig has finished its drilling commitments with Santos and is currently being demobilised to the Moomba area. Beach will then mobilise the rig to the Western Flank where a two rig, minimum sixteen well exploration and development drilling program is expected to commence with back to back wells on the Parsons Field (Beach 75%) in mid-late February.

Beach Operated Cooper-Eromanga Basin Gas - PEL 106FI Block

Canunda-1 extended production testing will recommence this month after a workover to retrieve wireline and pressure gauges from the well and reconfigure production zones. Local rain has delayed mobilisation of the workover

==> picture [215 x 240] intentionally omitted <==

rig and it is now anticipated that testing will recommence in mid February. The evaluation is intended to define size and production characteristics of this high liquids gas field (Beach 50%).

Beach Operated Cooper Basin Shale Gas Exploration - PEL 218

Holdfast-1 (Beach 90%), the second of a two well back to back shale gas exploration program in the Nappamerri Trough spudded on 21 January. The target zone is expected to be intersected in mid to late February. The well will be extensively cored over the Roseneath-Epsilon-Murteree sequence and is expected to reach total depth in late March.

Page 1

Monthly Drilling Report – December 2010

==> picture [94 x 64] intentionally omitted <==

==> picture [280 x 223] intentionally omitted <==

Santos Operated Cooper Basin Oil and Gas Development

During the reporting period the drilling of Coonatie-15 (Beach 20.21%) has been completed with the well cased and suspended as a future gas producer and Tirrawarra-80 (Beach 20.21%) has been cased and suspended as a Patchawarra gas producer. The Ensign 32 rig now moves to the Kidman North-4 location. Ensign Rig-18 continues drilling on the Cook Field (Beach 20%) with Cook-18 cased and suspended as a Hutton oil producer and Cook-16 currently in the evaluation stage.

==> picture [236 x 237] intentionally omitted <==

Beach Operated Geothermal

- Paralana Project, Arrowie Basin

Information from the recent diagnostic fracture injection test at Paralana-2 (Beach 21%) is currently being interpreted. Once complete the results will be incorporated into the main fracture stimulation program planned for late in the first quarter.

==> picture [419 x 16] intentionally omitted <==

Page 2

Monthly Drilling Report – December 2010

==> picture [94 x 64] intentionally omitted <==

Beach Operated Gippsland Basin - PRL-2

Gauges have been successfully recovered from Wombat-2 in PRL-2 (Beach earning up to 33.33%) which has been shut in for pressure build up since late December following a two week flow test. The pressure data is currently being interpreted.

==> picture [250 x 184] intentionally omitted <==

INTERNATIONAL

Kuwait Energy Operated Western Desert Oil Exploration - Abu Sennan Concession, Egypt

The ZZ-4 well (Beach 22%), reached the end of the directional section at 2564m in the Khoman Formation on January 31. The operator has confirmed today that communication problems associated with recent events in Egypt have affected logistics resulting in the temporary suspension of operations. The situation is being monitored closely.

==> picture [208 x 213] intentionally omitted <==

==> picture [265 x 191] intentionally omitted <==

Non-operated Shale Oil Appraisal, South Antelope Prospect, Williston Basin - North Dakota, USA

Henderson Federal 4-26H (Beach 14.7% net revenue interest) multi-stage fracture stimulation operations were successfully completed. Post stimulation clean up operations commenced on 10 January and the well was handed over to production soon thereafter. The well was flowing strongly at the end of the month at a rate of 850 bopd.

==> picture [419 x 16] intentionally omitted <==

Page 3

Monthly Drilling Report – December 2010

==> picture [94 x 64] intentionally omitted <==

Drilling Report – Period ending 2 February 2011

==> picture [455 x 375] intentionally omitted <==

==> picture [200 x 65] intentionally omitted <==

Neil Gibbins Chief Operating Officer

For more information contact

Corporate

Reg Nelson Beach Energy Limited 08 8338 2833 Neil Gibbins Beach Energy Limited 08 8338 2833 Investor Relations Chris Jamieson Beach Energy Limited 08 8338 2833

Investor Relations

==> picture [419 x 16] intentionally omitted <==

Page 4