Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

BEACH ENERGY LIMITED Capital/Financing Update 2012

Sep 17, 2012

64558_rns_2012-09-17_a8ec8e60-3827-4002-ac5a-0d2da11c71b7.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX / MEDIA RELEASE

==> picture [61 x 54] intentionally omitted <==

18 September 2012

Halifax 1 Shale Gas Well Update

  • Halifax 1 well drilled to 3860 meters; planned total depth 4130 meters

  • The first core taken in the Epsilon Formation

  • Drilling ahead in the Patchawarra Formation

  • 300 TCF Gas in Place (estimated)

Icon Energy (ASX: ICN) wish to provide an update in relation to the drilling of the Halifax1 well in ATP 855P, located in the Cooper Basin, Queensland.

We have been advised that the Halifax-1 well has reached a drilled depth of 3,860 meters.

Since last advice to the market on 11 September the well has drilled a further 534 meters and has penetrated the Patchawarra formation.

A 24-metre core was cut in the Epsilon Formation in the early hours of Saturday 15[th] September. An ongoing evaluation of the core is continuing.

==> picture [452 x 155] intentionally omitted <==

Halifax 1 Core Sample Epsilon Formation

Halifax 1 will evaluate the basin-centred shale gas potential in the REM and Patchawarra Formation intervals within the Queensland portion of the Nappamerri Trough with a planned total depth of 4130 meters.

Interests in ATP 855P

Icon Energy 40%

Beach Energy 60%* (*40% interest subject to Farmout agreement)

ends

Investor enquiries: Mr Ray James Managing Director Office: 07 5554 7111

Mr Richard Holliday Commercial Manager Office 07 5554 7111 Mobile 0438 105460

Icon Energy Limited ABN 61 058 454 569 PO Box 2004, Broadbeach Waters QLD 4218 Telephone: +61 7 5554 7111 Facsimile: +61 7 5554 7100 www.iconenergy.com

==> picture [61 x 46] intentionally omitted <==