Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

BEACH ENERGY LIMITED Capital/Financing Update 2012

Oct 8, 2012

64558_rns_2012-10-08_5e873972-e87f-4e5f-ab04-7e15b4de1b1c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX / MEDIA RELEASE

==> picture [61 x 54] intentionally omitted <==

9 October 2012

Halifax 1 Shale and Basin Centred Gas Well Update

  • Drilling recommenced Tuesday October 9 toward total depth of 4130+ metres, current depth 4006 metres.

  • Roseneath Epsilon Murteree (REM) Formation is 460 metres thick

  • Good gas shows throughout the cored and drilled intervals

  • 300+TCF Gas In Place (estimated)

Icon Energy (ASX: ICN) wish to provide an update in relation to the drilling of the Halifax 1 well in ATP 855P, located in the Cooper Basin, Queensland.

Since the last Halifax 1 update on 2 October 2012, the drilling rig has undergone repairs to the generator. These repairs necessitated a replacement generator being sent from the east coast to the Cooper Basin. Work on the repairs has been completed and the current operation is drilling ahead to total depth while acquiring LWD data.

It is anticipated that the bottom of the Patchawarra Formation will be deeper than originally estimated and this is in line with the deeper REM Formation.

Interests in ATP 855P

Icon Energy 40%

Beach Energy 60%* (*40% interest subject to Farmin Agreement)

ends

Investor enquiries:

Mr Ray James Managing Director Office: 07 5554 7111

Mr Richard Holliday Commercial Manager Office: 07 5554 7111 Mobile: +61 438 105 460 E mail: [email protected]

==> picture [61 x 46] intentionally omitted <==

Icon Energy Limited ABN 61 058 454 569 PO Box 2004, Broadbeach Waters QLD 4218 Telephone: +61 7 5554 7111 Facsimile: +61 7 5554 7100 www.iconenergy.com