AI assistant
BEACH ENERGY LIMITED — Capital/Financing Update 2012
Nov 27, 2012
64558_rns_2012-11-27_e7c42029-b2ec-434f-a769-6d5271c08aac.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [133 x 46] intentionally omitted <==
ASX Announcement
Senex confirms new oil field discovery at Spitfire on the western flank of the Cooper Basin
Release Date: 28 November 2012
Senex Energy Limited (Senex) is pleased to advise that successful exploration on the western flank of the Cooper Basin has confirmed the presence of an oil field at Spitfire.
Key points
-
The Spitfire-2 exploration well has confirmed the discovery of a new oil field updip of Spitfire-1.
-
Analysis of wireline logs confirms that the well intersected 6.5 metres of net oil pay in the mid-Birkhead Formation.
-
Spitfire-2 has been cased and suspended as a future oil producer.
The Spitfire-2 deviated oil exploration well targeted the mid-Birkhead Formation. It is located 530 metres north west of the Spitfire-1 oil exploration well in PEL 104 and approximately two kilometres west of the Growler oil field in PRL 15 (Senex 60% and Operator; Beach Energy Limited 40% in both permits). It was designed as a follow-up well to the Spitfire-1 exploration well, which delivered good oil shows but was plugged and abandoned as uncommercial in February 2012.
Ensign Rig 48 commenced drilling on 17 November 2012 and reached total depth of 1,900 metres on 23 November 2012. Wireline logs confirmed the presence of a gross oil column of nearly seven metres (vertical thickness) in the Birkhead Formation over the interval 1,713.9 metres to 1,720.7 metres (vertical depth) with interpreted net oil pay of 6.5 metres (vertical thickness).
For further information contact:
Ian Davies Managing Director Senex Energy Limited Phone: (07) 3837 9900
Senex Energy Limited Head Office ABN 50 008 942 827 Level 11, 144 Edward St, Brisbane Qld 4000 T +61 7 3837 9900 GPO Box 2233, Brisbane Qld 4001 F +61 7 3837 9999
[email protected] senexenergy.com.au
Page 1 of 2
==> picture [133 x 46] intentionally omitted <==
ASX Announcement
Figure 1: Location of Spitfire oil field
==> picture [462 x 468] intentionally omitted <==
Competent persons statement
Unless otherwise indicated, the statements contained in this drilling report about Senex’s reserves estimates have been compiled by Dr Steven Scott BSc (Hons), PhD, who is General Manager – Exploration, a full time employee of Senex, in accordance with the definitions and guidelines in the 2007 Petroleum Resources Management System approved by the Society of Petroleum Engineers (SPE PRMS). Dr Scott consents to the inclusion of the estimates in the form and context in which they appear. Senex’s reserves and resources are consistent with the SPE PRMS.
Senex Energy Limited Head Office ABN 50 008 942 827 Level 11, 144 Edward St, Brisbane Qld 4000 GPO Box 2233, Brisbane Qld 4001
T +61 7 3837 9900 [email protected] F +61 7 3837 9999 senexenergy.com.au
Page 2 of 2