AI assistant
AUSTIN METALS LIMITED — AGM Information 2012
Nov 27, 2012
64485_rns_2012-11-27_9cc6c554-9eb1-4621-88fe-295e02f15b35.pdf
AGM Information
Open in viewerOpens in your device viewer
ABN 68 130 933 309
Annual General Meeting November 28, 2012
1
Important Disclaimer
This material contains certain forecasts and forward-looking information, including information about possible or assumed future performance, exploration results, resources or potential growth of Silver City Minerals Limited (SCI), industry growth or other trend projections. Such forecasts and information are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors, many of which are beyond the control of Silver City Minerals Limited. Actual results and developments may differ materially from those expressed or implied by these forward-looking statements, depending on a variety of factors. Nothing in this material should be construed as the solicitation of an offer to buy or sell SCI securities.
Competent Person
Information in this document that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Christopher Torrey, who is the Managing Director and full-time employee to of Silver City Minerals Limited, and a Member of the Australian Institute of Geoscientists. Mr Torrey has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Torrey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
2
Snapshot of FY2011-2012
==> picture [332 x 250] intentionally omitted <==
==> picture [176 x 160] intentionally omitted <==
-
IPO JULY 2011 $10 MILLION RAISED
-
COMPLETED ALL WORK OUTLINED IN PROSPECTUS AND MORE….
-
DRILLED NINE PROJECTS
-
COMPLETED PLUS 16,000 METRES OF DRILLING
-
75% EXPLORATION BUDGET SPEND ON DRILLING
-
FOCUS NOW ON FOUR PROJECTS
-
ALLENDALE
-
RAZORBACK WEST
-
YALCOWINNA CREEK
-
MOUNT BROWN
-
NEW PHASE OF EXPLORATION ABOUT TO COMMENCE
3
==> picture [720 x 469] intentionally omitted <==
Re ional Settin 4 g g
==> picture [341 x 503] intentionally omitted <==
Silver City Minerals Tenements
-
Strong tenure position, strong focus.
-
Secure title with strong local partnerships (CBH, GCR)
-
No Native Title issues
-
Mining Centre – Broken Hill
-
Good infrastructure
-
Total area 1600 sq km
5
FIELD TEAM
==> picture [116 x 218] intentionally omitted <==
==> picture [291 x 218] intentionally omitted <==
==> picture [300 x 217] intentionally omitted <==
During the year we utilized our own staff and a number of specialist contractors
-
Currently have a full-time staff of five including the MD
-
Four geologists and one field operations manager
-
Admin subcontracted out to PlatSearch
6
Silver City Minerals Limited
ASX Code: SCI Issued Shares: 98 million Escrowed Shares: 14.4 million Listed Options: 29.2 million Unlisted Options: 19.8 million Escrowed Options 7.4 million Market Cap: $6.3 million Cash: $6.0 million
Major Shareholders: The Sentient Group: 17.45% PlatSearch Group: 14.58% Fitel Nominees: 6.53% Top 20 : 69.55% Share Price: High $0.21 Low $0.06
==> picture [307 x 410] intentionally omitted <==
7
==> picture [270 x 333] intentionally omitted <==
Where does one look for …..
…..elephants
8
==> picture [270 x 333] intentionally omitted <==
Where does one look for ….. + 1 Billion ounces Silver
Broken Hill
…..elephants
9
NEW FOCUS
ALLENDALE
-
Completed 8470 metres of drilling in 55 holes.
-
Identified multiple high grade lead-zinc-silver intersections of massive sulphide mineralisation.
-
Mineralisation is hosted in at least five east-dipping tabular zones.
-
There is a high degree of fault displacement and grade discontinuity.
-
Geological modeling ongoing.
-
Good indicators…..a lot of smoke
NEXT STEP
-
Identification of high grade fold nose or keel.
-
High resolution electromagnetic geophysical survey is planned
==> picture [316 x 489] intentionally omitted <==
Allendale Mine Drilling reported to date. Multiple high grade intersections.
-
10m at 4.1% Pb, 12% Zn, 29g/t Ag
-
2m at 8.4% Pb, 11.5% Zn, 39.2g/t Ag
-
2m at 5.0% Pb, 6.8% Zn, 44.3g/t Ag
-
3m at 4.0% Pb, 9.2% Zn, 31g/t Ag
-
7m at 2.5% Pb, 2.3% Zn, 21g/t Ag
-
9m at 2.5% Pb 3.1% Zn, 19.7g/t Ag
-
5m at 3.5% Pb, 5.8% Zn, 37 g/t Ag
-
10m at 3.4% Pb, 6.2% Zn, 26 g/t …NEW ZONE
Two drilling programs completed
11
==> picture [316 x 489] intentionally omitted <==
Allendale Mine Drilling reported to date. Multiple high grade intersections.
10m at 4.1% Pb, 12% Zn, 29g/t Ag
-
2m at 8.4% Pb, 11.5% Zn, 39.2g/t Ag
-
2m at 5.0% Pb, 6.8% Zn, 44.3g/t Ag
-
3m at 4.0% Pb, 9.2% Zn, 31g/t Ag
-
7m at 2.5% Pb, 2.3% Zn, 21g/t Ag
-
9m at 2.5% Pb 3.1% Zn, 19.7g/t Ag
-
5m at 3.5% Pb, 5.8% Zn, 37 g/t Ag
-
10m at 3.4% Pb, 6.2% Zn, 26 g/t …NEW ZONE
Two drilling programs completed
Razorback West
==> picture [313 x 428] intentionally omitted <==
-
Broken Hill dominated by large gravity anomaly
-
Broken Hill deposit located on western edge
-
Little Broken Hill/Native Dog located on eastern edge
Razorback West (under cover) located also on western edge, fault offset
Razorback West
==> picture [376 x 368] intentionally omitted <==
DRILLING RESULTS
-
Broad zones of anomalous zincmanganese and lead geochemistry
-
Extensive garnet and blue quartz alteration; presence of BIF
-
Iron sulphides widespread
Host rocks indicate a BHT setting
==> picture [32 x 45] intentionally omitted <==
==> picture [346 x 503] intentionally omitted <==
Razorback West
Large coincident Gravity and Geochemical Anomalies
Potential northern extension of Broken Hill Line of Lode. Offset along Stephens Creek Shear Zone
-
90% of anomaly under thin cover
-
Induced Polarisation (IP) program planned
==> picture [29 x 42] intentionally omitted <==
==> picture [29 x 41] intentionally omitted <==
==> picture [349 x 504] intentionally omitted <==
Mount Brown
-
Lode-rock corridor 1km long
-
gossan outcrops and old workings
-
Strong IP anomaly coincident with gossans
-
Magnetic anomaly
-
Large lead-zinc-copper soil anomaly
==> picture [349 x 502] intentionally omitted <==
Mount Brown
-
Surface rock samples have returned very high grades
-
Strong association with magnetite
-
Project has never been drill tested….
-
Drilling scheduled to commence early 2013
==> picture [349 x 504] intentionally omitted <==
Yalcowinna Creek
-
Widespread anomalous copper
-
50% of 60 rock samples returned greater that 0.5% copper
-
Historic RAB anomalies not yet explained
-
Potential for stratiform copper
-
RAB drilling has commenced
Schedule
ALLENDALE
-
Geological modeling and resource assessment Ongong
-
Downhole geophysics December 2012 Follow-up Drilling Feb-March 2013
RAZORBACK WEST
-
Induced Polarisation Survey
-
Follow-up Drilling
December2012 Feb-March 2013
MOUNT BROWN
Drilling
Feb –March 2013
OTHER PROJECTS….
YALCOWINNA WEST, YALCOWINNA CREEK, PARNELL
- RAB DRILLING
NOVEMBER 2012
Silver City Minerals
-
LARGE FOCUSED LAND TENURE POSITION, FIRST EVER CONSOLIDATION OF TENURE
-
WORLD CLASS MINING DISTRICT
-
POTENTIAL FOR HIGH GRADE GIANT BASEMETAL AND SILVER-RICH OREBODIES
-
EARLY POSITIVE DRILL RESULTS FROM ALLENDALE AND RAZORBACK WEST
-
NEW PROJECT PIPELINE………Mount Brown, Yalcowinna
-
EXPERIENCED TEAM
-
OUTSTANDING INFRASTRUCTURE
-
Large geophysical programs scheduled…..gearing up for a new round of drilling March 2013.
ABN 68 130 933 309
Level 1, 80 Chandos Street St Leonards NSW 2065 Australia +61 2 94371737
www.silvercityminerals.com.au