FY2017 full ear results y
David Singleton, Chief Executive Officer Greg Jason, Chief Financial Officer
28 August 2017
FY2017 Highlights
==> picture [696 x 455] intentionally omitted <==
----- Start of picture text -----
14
2017 Revenue
10
$1.31 billion
Ships Delivered Ships under
Construction
2 x New Shipyards
PPB-R + Aulong
4,691 Sustainment Programs
FY2017 Vessel Programs
10
Employees
7
9
5
Ferries ordered
in last 18 months 2
----- End of picture text -----
FY2017 Financials
SHIPS SYSTEMS SUPPORT
3
Earnings in line with guidance
==> picture [92 x 45] intentionally omitted <==
| $m | FY2017 | FY2016 | Change |
|---|---|---|---|
| Revenue | 1,310.1 $ |
1,340.0 $ |
(29.8) $ |
| EBITDA | 77.1 | (91.0) | 168.0 |
| - Underlying | 90.2 | 65.0 | 25.2 |
| EBIT | 45.5 | (120.9) | 166.4 |
| - Underlying | 58.7 | 35.1 | 23.6 |
| NPAT | 15.3 | (84.2) | 99.5 |
| - Underlying | 32.7 | 25.0 | 7.7 |
| EPS | 4.4 | (24.2) | 28.6 |
| - Underlying | 9.5 | 7.2 | 2.3 |
-
Significant return to profitability underpinned by USA shipbuilding margin.
-
Underlying EBIT exceeded July 2016 guidance.
-
Accounting for irregular tax items had a significant impact on headline NPAT
-
Cash tax was a $12.2 million refund as depicted in the cash flow statement
-
Refer next slide for more discussion
FY2017 underlying earnings removes the impact of providing for a settlement of arbitration relating to a latent defect claim dating back to 2010.
FY2017 underlying NPAT also removes the non-cash impact of timing issues related to accounting recognition of tax losses and research & development credits.
FY2016 underlying earnings removes the impact of the LCS program write down of work in progress.
SHIPS SYSTEMS SUPPORT
4
Underlying NPAT breakdown
==> picture [92 x 45] intentionally omitted <==
$m
- After tax impact of legal settlement $(9.2) m
| EBIT - Underlying Net Finance Costs PBT - Underlying Tax-Underlying NPAT - Underlying Legal Settlement Irregular tax items NPAT - Headline ETR - Underlying |
Irregular tax outcome primarily driven by not recognising tax losses for the Australian consolidated tax Group: oAustralian Tax group includes Australia segment and majority of Group corporate overhead oEffective tax rate (ETR) also inflated by mix of USA profit and Australia loss Cash tax refund of $12.2 m despite high ETR oRefund from US FY2016 losses carried back to FY2014 & FY2015 oZero tax paid in Australia due to lax loss FY2018 cash tax outlook oAlternative minimum tax in USA (20%) due to losses and credits available for use oZero cash tax in Australia due to losses and credits carried forward and available for use 58.7 $ (5.7) $ 53.0 $ (20.3) $ 32.7 $ (9.2) $ (8.1) 15.3 $ 38% |
|---|---|
SHIPS SYSTEMS SUPPORT
5
Segment breakdown
==> picture [92 x 45] intentionally omitted <==
| $m | Concept | Ships | Systems | Support | Other | Total |
|---|---|---|---|---|---|---|
| USA | Revenue EBIT EBIT Margin % |
849.0 $ 57.6 6.8% |
200.1 $ 4.6 2.3% |
123.0 $ 16.3 13.3% |
- $ (2.4) - |
1,172.1 $ 76.1 6.5% |
| Australia | Revenue EBIT EBIT Margin % |
49.5 $ 0.6 1.2% |
- $ - - |
64.2 $ (2.7) (4.2%) |
- $ - - |
113.7 $ (2.1) (1.8%) |
| Philippines | Revenue EBIT EBIT Margin % |
33.8 $ 0.3 1.0% |
- $ - - |
- $ - - |
- $ - - |
33.8 $ 0.3 1.0% |
-
USA: Shipbuilding margin towards upper end of guidance range, support continues growth. US support includes benefit of FY2016 profit awarded during FY2017
-
Australia: Transition from final construction on CCPB 1-8 & High Speed Support Vessel in FY2016 to Mols & PPB with zero or low profit take up in FY2017, as expected.
-
Philippines: Throughput constrained by infrastructure, expansion plan in development
SHIPS SYSTEMS SUPPORT
6
Cash and debt
| $m Cashflow |
FY2017 | FY2017 | FY2017 | **FY2016 ** | Change |
|---|---|---|---|---|---|
| H1 | H2 | Total | Total | ||
| Operating | (43.8) $ |
6.0 $ |
(37.9) $ |
102.1 $ |
(140.0) $ |
| Investing | |||||
| Sustaining | (2.8) | (7.9) | (10.7) | (7.0) | (3.8) |
| CCPB 9 & 10 | (30.0) | (12.8) | (42.8) | (18.0) | (24.8) |
| Financing | |||||
| Debt | (11.7) | (1.8) | (13.5) | (12.0) | (1.5) |
| CCPB 9 & 10 | 18.9 | 19.2 | 38.1 | 23.0 | 15.0 |
| Dividends | (5.9) | (6.4) | (12.3) | (15.8) | 3.5 |
| FX differences | 4.4 | 0.8 | 5.2 | 3.5 | 1.7 |
| Net Movement | (70.9) $ |
(3.0) $ |
(73.8) $ |
75.9 $ |
(149.7) $ |
| Cash | Dec 16 | Jun 17 | Jun 17 | Jun 16 | Change |
| Cash @ bank | 153.5 $ |
150.5 $ |
150.5 $ |
224.3 $ |
(73.8) $ |
==> picture [92 x 45] intentionally omitted <==
-
Positive H2 operating cash flow
-
Working capital movements in USA during H1
-
Investing:
-
Typical sustaining capex
-
Completion of CCPB 9 & 10
-
Financing includes:
-
$(13.5) m of debt reduction
-
4 cps of dividends
-
oCCPB 9 & 10 finance
Cash
-
Strong cash position
-
Supports 2 cps final dividend
SHIPS SYSTEMS SUPPORT
7
Net cash / (debt) – subject to volatility in working capital
==> picture [92 x 45] intentionally omitted <==
==> picture [687 x 362] intentionally omitted <==
----- Start of picture text -----
Net Cash $19 m excluding
A$ M
CCPB 9 & 10 residual buyback guarantee
Jun 2016
$100
$52 M
Dec 2015
$31 M
$50
Dec 2016
Dec 2014
Jun 2015 $13 M
Cash
$7 M
$(4) M
$0
(Debt)
($50)
Dec 2013
Dec 2012 $(100) M Dec 2016
$(101) M $(33) M
($100)
Jun 2014 Jun 2017
$(78) M $(46) M
($150)
Jun 2013
$(137) M
($200)
Dec 2012 Jun 2013 Dec 2013 Jun 2014 Dec 2014 Jun 2015 Dec 2015 Jun 2016 Dec 2016 Jun 2017
----- End of picture text -----
End of quarter
SHIPS SYSTEMS SUPPORT
8
FY2017 operational performance
SHIPS SYSTEMS SUPPORT
9
USA operations
- Shipbuilding margin improvement
VESSEL PROGRAMS:
-
Littoral Combat Ship (~$6.4 bn program)
-
Turnaround developing well and confidence continues to grow.
-
LCS 10 delivered in the year.
==> picture [92 x 45] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
-
Awarded LCS 28 through a competitive tender.
- Vessel pricing reflects current known costs therefore expect normalised profit level.
-
LCS 30 award expected CY2017.
-
Expeditionary Fast Transport (~$2.5 bn program)
-
Continues to perform well.
==> picture [242 x 161] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
10
Australia operations
-
Shipbuilding as per guidance – at front-end design phase on two significant vessel programs throughout year but construction volume to increase in FY2018.
-
Pacific Patrol Boat (~$305 m, 19-ship program)
-
Strategically important; in line with budget and time.
-
Recognise profit from FY2019.
-
-
Mols (~ $90 m, 109 m vehicle / passenger ferry)
- Moved to construction phase late in H2.
==> picture [92 x 45] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
-
Major cost savings being demonstrated.
-
Cape Class Patrol Boats 9 & 10
-
3-year charter commenced late in FY2017.
-
Expect engage on charter extension over next 12 months.
Support contracts
-
CCPB in-service support: $3.2 m provision as more resources required than anticipated.
-
Armidale Class remediation: Performing well.
-
Major cost reduction drive underway. Targeting 20% labour and cumulative 5% procurement.
==> picture [242 x 161] intentionally omitted <==
- Significant technology investment underway to keep ferry capability ahead given strong market conditions.
SHIPS SYSTEMS SUPPORT
11
Philippines operations
-
Re-organised management team delivered profit turnaround in H2 FY2017, delivering:
-
Two 30 m ferries valued at $13 m and one 57 m offshore crew transfer boat at ~$26 m.
-
$16 m, 50 m ferry in July 2017.
-
$22 m, 56 m high-speed passenger ferry for FRS Group of Germany under construction.
-
$5.5 m, 30 m high speed passenger ferry for VS Ferries of Philippines just commenced.
VESSEL PROGRAMS:
-
Fjord Line (~ $108 m, 109 m vehicle passenger ferry)
-
Historic peak throughput in Philippines A$39 m p.a. Fjord Line and other orders will drive sales progressively higher unlocking profit potential.
-
Expand build & launch facilities in Philippines to support this and other pipeline opportunities. Investment circa US$30 m.
-
Other vessels under construction
-
2 x $5.6 m, 35 m high-speed catamarans in China (Aulong Joint Venture).
==> picture [92 x 45] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
2 Go Ferries
==> picture [242 x 161] intentionally omitted <==
Fjord Line 109m Ferry
SHIPS SYSTEMS SUPPORT
12
Strategy and Outlook
13
50 m Ferry for Seaspovill of South Korea on launch day
Strategy
==> picture [92 x 45] intentionally omitted <==
Retain our current market leading positions
Strengthen our product portfolio and operational productivity
==> picture [176 x 116] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 7] intentionally omitted <==
==> picture [176 x 6] intentionally omitted <==
==> picture [176 x 115] intentionally omitted <==
==> picture [176 x 115] intentionally omitted <==
Diversify
by growing our global sustainment footprint
Scale
by capturing Australian Defence opportunities
==> picture [179 x 115] intentionally omitted <==
==> picture [175 x 115] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
14
Outlook
==> picture [92 x 45] intentionally omitted <==
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
FY18 guidance
•
Revenue of ≥$1.3 billion (FX
dependent).
•
Improved US shipbuilding
margin of 6-8% – turnaround on
LCS well advanced, LCS 28 at
repriced level, and strong
performance on EPF.
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Defence
•
Good opportunity for award of
additional LCS.
•
OPV for Australia being bid now,
award expected end CY2017.
•
Frigate programme is the major
Australian opportunity. Austal an
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Commercial
•
Export opportunities from
Australian and Philippines
shipyards at record levels
compared to past decade.
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Support
•
Naval support business in
Australia & USA continuing to
grow at double digit rates.
•
Need to fix Cape support losses
in Australia.
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Group
•
Strong cash position funds
growth in Australia (OPV),
Philippines (commercial) and
working capital (USA).
----- End of picture text -----
15
Appendix Update on major vessel programs
SHIPS SYSTEMS SUPPORT
16
Austal remains strongly positioned in US
==> picture [92 x 45] intentionally omitted <==
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Austal won LCS competition and
therefore expects further orders
in FY2018 & FY2019.
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Force structure review proposes
to increase US Navy by 30% to
355 ships. If enacted should
support all US shipyards
including Mobile.
----- End of picture text -----
==> picture [214 x 129] intentionally omitted <==
----- Start of picture text -----
Support business for LCS
growing and exceeded $100m
revenue in FY2017 at expected
margin.
----- End of picture text -----
==> picture [214 x 128] intentionally omitted <==
----- Start of picture text -----
US Navy focused on transition of
vessel from LCS platform to
frigate configuration although
non LCS designs will be
considered. Program to deal
with criticism of lack of offensive
capability on LCS.
----- End of picture text -----
==> picture [214 x 128] intentionally omitted <==
----- Start of picture text -----
FY2018
One further LCS expected taking
program to 15 vessels to date.
----- End of picture text -----
==> picture [214 x 128] intentionally omitted <==
----- Start of picture text -----
Alabama yard is most modern in
the USA and directly employs
circa 4,000 people. Facility
supports major fleet expansion
ambitions of Navy & Congress.
----- End of picture text -----
SHIPS SYSTEMS SUPPORT
17
Significant milestones in the last 6 months
==> picture [92 x 45] intentionally omitted <==
-
Ceremonial keel laying of
-
• Delivery of second Cape first Pacific Patrol Boat Class Patrol Boat to RAN • Delivery of first high speed
-
• 6[th] Austal designed and passenger ferry to South built LCS USS Omaha Korea completes acceptance • Launch of 50m high speed trials ferry in Philippines
-
Official opening of the • First Cape Class Patrol • Delivery of second high PPB-R shipbuilding facility Boat for RAN officially speed passenger ferry to in Naval Base, WA named Cape Fourcroy 2GO Philippines
| April March |
June May 2017 |
August July |
|---|---|---|
| • Austal cuts steel on first | • Awarded contract to build | • Aulong Joint Venture wins |
| Pacific Patrol Boat | LCS28 for USN | second ferry contract in China |
-
Austal cuts steel on first • Awarded contract to build Pacific Patrol Boat LCS28 for USN Replacement vessel • Delivery of first of two high
-
Delivery of first of two high • VS Ferries Corporation ferry speed passenger ferries to contract signed 2GO Philippines • A$108m Fjord Line ferry
-
Construction commenced on speed passenger ferries to contract signed 109m high speed ferry for 2GO Philippines • A$108m Fjord Line ferry Mols linien • Austal partners with ASC contract signed
-
• Delivery of Cape Fourcroy to Shipbuilding for the build of RAN the SEA5000 future frigate
-
• Delivery of EPF 8 USNS program Yuma to USN • Tenth Cape Class Patrol Boat officially named Cape Inscription
-
SHIPS SYSTEMS SUPPORT
18
Pipeline
United States 1 Defence
Australia 2 Defence Global 3 Commercial
==> picture [138 x 64] intentionally omitted <==
----- Start of picture text -----
Middle East
4 Defence
----- End of picture text -----
==> picture [146 x 94] intentionally omitted <==
==> picture [146 x 93] intentionally omitted <==
==> picture [146 x 92] intentionally omitted <==
==> picture [148 x 95] intentionally omitted <==
==> picture [146 x 94] intentionally omitted <==
==> picture [148 x 92] intentionally omitted <==
==> picture [148 x 92] intentionally omitted <==
==> picture [148 x 94] intentionally omitted <==
==> picture [92 x 45] intentionally omitted <==
-
•Expect further LCS orders in FY2018 & FY2019 at normalised profit levels.
-
•US Frigate selection FY2020.
-
•Further EPF orders not visible yet.
-
•Competing steel vessels for the RAN’s fleet renewal programs; OPV (order end CY17) & Frigate (order end CY18)
-
•Strongest market conditions for a decade driving expansion in Philippines and Henderson
-
•Exports from Austal’s portfolio of aluminium high performance naval vessels including HSSV and CCPB variants
SHIPS SYSTEMS SUPPORT
19
Offshore Patrol Vessels (OPV) contract for Royal Australian Navy
==> picture [92 x 45] intentionally omitted <==
-
Part of Royal Australia Navy re-equipping program, contract value circa $3 billion (c $1bn vessels plus support) over 12 years. Austal 1 of 3 contenders.
-
60-80m steel patrol vessels, circa 2,000 tonnes.
-
Follows on from PPB steel making experience.
-
Constant base load for Henderson for minimum of 10 years commencing CY2020 at approximately 50% current workload level.
==> picture [209 x 152] intentionally omitted <==
-
First two vessels to be built in South Australia commencing CY2018 with next 10 in Henderson from CY2020.
-
Henderson will also build defence exports and large highly specified commercial vessels. OPV provides strong financial base on which to compete.
-
Austal has teamed with Fassmer of Germany who provide the high level design. Austal will carry out detailed design, most procurement and all shipbuilding and testing.
-
Bid submitted. Down select due late 2017 . Construction start H1 CY2018 in Adelaide.
==> picture [242 x 161] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
20
Frigate contract for Royal Australian Navy
==> picture [92 x 45] intentionally omitted <==
-
9 Frigates to be built in existing site in South Australia commencing 2020 at circa 1 per year.
-
3 foreign designs being considered from Navantia (Spain), Fincantieri (Italy) and BAE Systems (UK).
-
Initial contract value circa $10 billion plus support.
-
Shipbuilder could be the foreign design company, ASC or Austal but government focus on building a ‘Sovereign’ shipbuilding capability suggests an Australian solution preferred.
-
Austal teamed with ASC to provide Australian sovereign build option.
==> picture [150 x 92] intentionally omitted <==
Future Frigate
==> picture [88 x 27] intentionally omitted <==
- Major opportunity for Austal to build on steel shipbuilding capability of PPB and OPV to become significant ‘new world’ defence shipyard.
==> picture [128 x 20] intentionally omitted <==
- Down select to 1 bidder expected early CY2018.
==> picture [78 x 57] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
21
Commercial pipeline at strongest level since before 2008
==> picture [92 x 45] intentionally omitted <==
-
Six ferries sold in CY2016 exceeds five previous years combined. CY2017 could exceed this.
-
Current fast ferry bidding pipeline now the strongest since before 2008.
-
Philippines needs throughput in excess of $50 million p.a. (historic average $35m p.a.) Pipeline indicates FY2018 & FY2019 could be record throughput years.
-
Committed to yard upgrades with additional build and launch facilities investment circa US$30m. Will increase covered area 5 fold.
-
Mols Linien ferry (circa $90 million) commenced construction in Henderson in April 2017 delivery due early CY2019.
-
Fjord Line ferry will be build in Philippines, finished and commissioned in Henderson. Delivery January 2020.
-
Austal investing in vessel R&D to continue to lead market. Mols Linien ferry sets new standard in weight and efficiency.
==> picture [242 x 161] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
- Potential new sales of Trimarans being developed.
SHIPS SYSTEMS SUPPORT
22
US Navy – Littoral Combat Ship
-
11 ship contract awarded as prime contractor, worth approximately US$4.8 billion
-
LCS 6, 8 & 10 delivered
-
LCS 12 expect delivery this CY
-
LCS 14 expect delivery this CY
-
LCS 16 expect delivery this FY
==> picture [92 x 45] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
-
LCS 18, 20 & 22 under construction
-
LCS 24, 26 & 28 funded
-
Tender submitted mid February for additional ships.
-
LCS 28 funded in June 2017
-
Expectation of 1 more ship in CY2017
==> picture [242 x 161] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
23
US Navy – LCS program continues to mature
==> picture [92 x 45] intentionally omitted <==
-
Physical shock trials completed in July 2016, no significant issues identified, analysis by US Navy continues.
-
Ship modification program stabilising focus is on reducing costs of implementation vessel by vessel.
-
FY2017 shipbuilding EBIT margin towards upper end of guidance range provides confidence that LCS will meet costs to completion.
-
Cost claims have been submitted and are being progressed by Navy. Guidance is that any settlement will take at least 2 years with no material outcomes to date.
==> picture [273 x 182] intentionally omitted <==
Caption: The littoral combat ship USS Coronado (LCS 4) moors in Cam Ranh Bay during Naval Engagement Activity Vietnam 2017. The engagement provides an opportunity for Sailors from the U.S. Navy and Vietnam People's Navy to interact and share knowledge to enhance mutual capabilities and strengthen solid partnerships.
Credit: U.S. Navy photo by Mass Communication Specialist 3rd Class Deven Leigh Ellis/Released
SHIPS SYSTEMS SUPPORT
24
US Navy – Expeditionary Fast Transport
==> picture [92 x 45] intentionally omitted <==
-
12 ship award to Austal valued at US$2.2 billion (fully funded), securing work through to CY2022.
-
Program progressing well – matured into a phase of efficient production and predictable delivery.
-
EPF 8 – delivered in FY2017
-
EPF 9 – preparing for delivery
-
EPF 10 – under construction
-
EPF 11 & 12 – contract placed in September 2016
-
Austal focus on additional applications of EPF to extend program.
==> picture [242 x 371] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
25
Australian Government – Pacific Patrol Boat
==> picture [92 x 45] intentionally omitted <==
-
19 x 37 m Patrol Boats to be provided by Australia to 12 Pacific Island Nations.
-
Contract value $305 million includes 5 years support awarded May 2016. Building Cairns base to deliver support.
-
Austal’s first steel ship program extends company capability prior to bidding Offshore Patrol Vessels (OPV).
-
Program successfully passed Defence department Detailed Design Review in February 2017 on time and to specification. Key transition to production.
==> picture [242 x 161] intentionally omitted <==
-
Production commenced in April 2017 with first delivery in October 2018 and final deliveries in 2023.
-
Program is on time and meeting cost targets.
-
Austal is not recognising profit on this program until it matures in line with policy announced 12 months ago.
==> picture [242 x 161] intentionally omitted <==
SHIPS SYSTEMS SUPPORT
26
Systems and Support
-
Austal has invested extensively in sustainment capability in USA, Australia and overseas with new people, facilities and systems. EBIT increasing to circa 15% of group total.
-
USA:
-
Revenue expected to exceed $100 million for the first time in FY2017. Further growth expected.
-
Operations in Mobile, San Diego & Singapore.
-
Margin on programs trending up as expected.
==> picture [92 x 45] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
-
Australia:
-
CCPB sustainment for Border Force covers 8 ships plus 2 for Navy.
-
PPB sustainment for Navy won and will start late 2018 for initial 5 years.
-
Armidale Remediation (5 vessels) won and worth circa $50 million until end 2017.
-
Darwin revenue has increased 29% year on year with near perfect on-time & cost performance. Cairns base established to increase capability and to support PPB.
==> picture [242 x 161] intentionally omitted <==
- Turnover across group continues to increase significantly.
SHIPS SYSTEMS SUPPORT
27
Military Export vessel pipeline reasonable although limited to Middle East
==> picture [92 x 45] intentionally omitted <==
-
Austal has been down selected in 2 overseas contracts and is actively engaged in one other major campaign in Middle East
-
Nature of contracts makes predicting actual contractual order intake timing difficult
-
HSSV vessel (EPF variant) developing as a strong product line and gaining support
-
Government has significantly increased support for Australian defence exports. This is having an immediate impact and likely to improve Austal’s ability to win
==> picture [242 x 161] intentionally omitted <==
==> picture [242 x 161] intentionally omitted <==
28
Current order book
==> picture [92 x 45] intentionally omitted <==
-
Order book of $3.0 billion at 30 June 2017 secures revenue through into CY2022, including:
-
12 Littoral Combat Ships for US Navy
- 12 funded, with 3 delivered
-
12 Expeditionary Fast Transports vessels for US Navy
- 12 funded, with 8 delivered
-
6 Commercial vessels
-
2 109m high speed fast car and passenger ferries (Mols Linien and Fjord Line)
-
4 smaller high speed fast ferries (2 Philippines and 2 China)
-
-
Armidale Remediation & Upgrades
-
7 vessels due for remediation by circa end FY2018
-
3 vessels completed, 1 underway, 2 in future
-
SHIPS SYSTEMS SUPPORT
29
Disclaimer
==> picture [92 x 45] intentionally omitted <==
David Singleton, Chief Executive Officer
Telephone: +61 8 9410 1111
For further information visit www.austal.com
Disclaimer
This presentation and any oral presentation accompanying it has been prepared by Austal Limited (“Austal”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in Austal or as an inducement to make an offer or invitation with respect to those securities. No agreement to subscribe for securities in Austal will be entered into on the basis of this presentation.
Our presentation contains “forward-looking” statements or projections based on current expectations. These statements are not guarantees of future performance and are subject to risks and uncertainties. Actual results may differ materially due to: the availability of US government funding due to budgetary or debt ceiling constraints; changes in customer priorities; additional costs or schedule revisions. Actual results may also effect the capitalization changes on earnings per share; the allowability of costs under government cost accounting divestitures or joint ventures; the timing and availability of future impact of acquisitions; the timing and availability of future government awards; economic, business and regulatory conditions and other factors. We disclaim any duty to update forward looking statements to reflect new developments.
Accordingly, to the maximum extent permitted by applicable laws, Austal makes no representation and can give no assurance, guarantee or warrant, express or implied, as to, and takes not responsibility and assumes no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission, from any information, statement or opinion contained in this presentation.
You should not act or refrain from acting in reliance on this presentation material. This overview of Austal does not purport to be all inclusive or to contain all information which its recipients may require in order to make an informed assessment of Austal’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to the accuracy and completeness of the information, statements and opinions contained in this presentation before making any investment decision.
SHIPS SYSTEMS SUPPORT
30