AI assistant
AUSQUEST LIMITED — Capital/Financing Update 2009
Aug 16, 2009
64406_rns_2009-08-16_9ce39c10-be02-4210-a1bf-08924edddcc2.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [721 x 89] intentionally omitted <==
Investor Update
August 2009
Capital Structure
-
Listed securities
-
Listed Options
-
Unlisted Options
-
Major shareholders
-
Cash Position
227m
104m (20c in November 2009)
55m (incl 48m options to Cliffs @ 40c in May 2011, & 7m staff options)
Cliffs 30%, Passport Capital 6.5%, Hamersley 4.6%, C Ellis 4.7%
A$26M (June 2009)
Summary Exploration Progress
-
Table Hill Mn & Base metals - “a work in progress”
-
High grade Mn exposed at Wolfe – Drilling September.
-
Base metal targets (Cu-Au, Ni) at Plenty River – Drilling early Sept.
-
Infill drilling extends channel Iron at Rocklea – Revised resource estimates due August.
-
New opportunities on the radar – third party discussions underway
AusQuest Projects
==> picture [721 x 451] intentionally omitted <==
----- Start of picture text -----
Wolfe Mn
Wolfe Mn
Rocklea Fe
Rocklea Fe
Plenty River Ni
Plenty River Ni
Table Hill Mn, Ni
Table Hill Mn, Ni
Diamantina Cu-Au
Diamantina Cu-Au
Dundas Au
Dundas Au
Large tenement holdings across Australia
----- End of picture text -----
==> picture [721 x 541] intentionally omitted <==
----- Start of picture text -----
Table Hill – Regional GEOTEM Survey
New targets Identified by
2009 GEOTEM survey
Clay alteration
[email protected]%Mn
Fe +/- Mn
+ 200m Ba
Prospects drilled
----- End of picture text -----
Table Hill – MN1 Manganese Corridor
==> picture [661 x 441] intentionally omitted <==
----- Start of picture text -----
Clay alteration
1.9m @ 7.8%Mn, 23.2%Fe
4m @ 47.5%Mn
New Targets
Mn corridor inferred from
2009 drilling and GEOTEM
GEOTEM Channel 20 Geology
----- End of picture text -----
Table Hill – MN5 Prospect – Ground EM
==> picture [664 x 377] intentionally omitted <==
Drilling provides evidence for widespread hydrothermal activity – influx of Fe+/- Mn
Table Hill – MN5 Core
==> picture [652 x 454] intentionally omitted <==
----- Start of picture text -----
Mn
Hematite (Fe)
----- End of picture text -----
Table Hill – MN6 Prospect - Ground EM
==> picture [684 x 450] intentionally omitted <==
----- Start of picture text -----
Drilling intersects >200 metres of
anomalous Ba (av 2% - up to max
14%) – hydrothermal alteration?
THD 31
THD 32
----- End of picture text -----
Table Hill – Future 2009 program
-
Focus manganese exploration within MN1 corridor
-
Geochemical sampling to prioritise EM targets for drilling
-
Review base metal potential of the basin in light of results from MN5 and MN6 drilling
-
Geochemical sampling along selected structures to assess base metal potential
==> picture [721 x 541] intentionally omitted <==
----- Start of picture text -----
Wolfe Manganese Project – Drill target
Ruby Plains Prospect
Ruby Plains Prospect
A B
Ruby Plains Prospect
New Tenement applications
A B
Mn Drill Target
0
200
1km
----- End of picture text -----
Wolfe – Potential base metal targets
==> picture [694 x 451] intentionally omitted <==
----- Start of picture text -----
VTEM Survey
Channel 25 Image
EM Targets
Priority Mn Target area
EM Target
----- End of picture text -----
Wolfe - Future 2009 Program
-
Site clearance and access preparation for drilling
-
RC drilling (2000m) down dip from surface manganese occurrences planned for September
-
RC drilling of selected EM targets to test for base metal mineralisation
Plenty River – Prospect Locations
==> picture [649 x 444] intentionally omitted <==
==> picture [721 x 541] intentionally omitted <==
----- Start of picture text -----
Caroline Prospect – Drill Target
Section A-B
A
Proposed drill holes
•Discrete (offset) gravity / magnetic
anomalies beneath sediment cover
B
•Several km² in size
•Potential base metal target – (Cu-Au)
•Funding assistance from NT Govt
----- End of picture text -----
White Gums Prospect – Drill target
==> picture [672 x 411] intentionally omitted <==
----- Start of picture text -----
Magnetic Contours
EM Image
----- End of picture text -----
Strong EM response and coincident magnetic anomaly – Ni sulphide target
Plenty River – Future 2009 Program
-
Site Clearance and access preparations
-
Diamond drilling Gravity/magnetic target at Caroline (potential base metal target (Cu-Au)) scheduled for September
-
Diamond drilling EM targets at White Gums (potential Ni-S targets) scheduled for early September
Rocklea CID Resource (2008)
==> picture [698 x 437] intentionally omitted <==
----- Start of picture text -----
----- End of picture text -----
- Resources as reported to the ASX on August 13, 2008.
Rocklea CID – Infill Drilling (2009)
Infill drilling in 2009 intersects thick channel iron mineralisation Revised resource estimate due August 2009 (2008)
* Resources as reported to the ASX on August 13, 2008.
Future 2009 Programme Summary
| Project | Activity | Timing |
|---|---|---|
| TABLE HILL (Mn) MN1 Corridor Other Targets |
Geochem sampling Geochem sampling |
Sept-Oct Sept-Oct |
| WOLFE (Mn) | RC Drilling (~2000m) | Sept-Oct* |
| PLENTY RIVER (Cu- Au, Ni) |
Diamond Drilling (~2000m) |
Sept-Oct* |
| ROCKLEA (iron) | Revised Resource Estimate |
August |
| DUNDAS (gold) | Geochem sampling | August-Oct |
| NEW OPPORTUNITIES |
Asset acquisition | August-Dec |
- Subject to clearances and rig availability