AI assistant
AUREKA LIMITED — Capital/Financing Update 2019
Jun 30, 2019
64352_rns_2019-06-30_1a110623-5f08-470b-b2fa-1673ad1f694b.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX Announcement (ASX:NML) N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t 1 July 2019 P a g e | 1
==> picture [136 x 64] intentionally omitted <==
HIGH-GRADE GOLD UP TO 131 g/t IN EXPANSION DRILLING AT TANDARRA GOLD PROJECT, VICTORIA
-
Significant new high-grade gold results from 10,000m drilling program highlight potential for a large-scale gold system at the Tandarra Gold Project
-
The Tandarra Gold Project is located immediately south, on-strike of the Four Eagles Project, jointly owned by Hancock Prospecting Pty Ltd and Catalyst Metals Ltd and 50km northwest of Kirkland Lake Gold’s world-class Fosterville Gold Mine
-
New reverse circulation (RC) and air-core (AC) results include:
Tomorrow prospect
-
3m @ 44.6 g/t gold from 111m, including 1m @ 131.0 g/t gold (RCT233)
-
6m @ 14.3 g/t gold from within a broader zone of 24m @ 4.2 g/t gold from 100m (RCT249)
-
8m @ 3.6 g/t gold from 149m, including 1m @ 22.1 g/t gold (RCT249)
-
6m @ 2.7 g/t gold from 166m, including 1m @ 14.0 g/t gold (RCT249)
-
10m @ 2.7 g/t gold from 79m, including 1m @ 10.3 g/t gold (RCT252)
-
5m @ 4.7 g/t gold from 84m (ACT338)
-
Drilling expands strike length of gold mineralisation on the Tomorrow structure by 300m to approximately 1.1 kilometres, which remains open to the south
-
Results provide evidence of vertical repetition of shallowly plunging gold mineralisation
-
Diamond drilling program continues to test depth extensions on the Tomorrow prospect
Navarre Minerals Limited ( Navarre ; ASX: NML ) is pleased to report encouraging high-grade gold assay results from the Tomorrow and Macnaughtan prospects as part of an ongoing 10,000m AC, RC and diamond drilling program at the Company’s 49%-owned Tandarra Gold Project (RL006660), 40km north of the 22Moz Bendigo Goldfield and 50km northwest of the world-class Fosterville Gold Mine (Figure 1).
Significant new high-grade gold assays have been received from step-out RC drilling on the southern end of the Tomorrow prospect which have resulted in a 300m extension in the strike length of the mineralised quartz structure to approximately 1.1km, which remains open to the south (Figures 2 – 4).
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 2
New drill intersections returned to date from this latest phase of drilling include (see Table 1b & 1d):
-
3m @ 44.6 g/t Au , including 1m @ 131.0 g/t Au , from 111m down hole in RCT233
-
6m @ 14.3 g/t Au from within a broader zone of 24m @ 4.2 g/t Au from 100m down hole in RCT249
-
8m @ 3.6 g/t Au , including 1m @ 22.1 g/t Au , from 149m down hole in RCT249
-
6m @ 2.7 g/t Au , including 1m @ 14.0 g/t Au , from 166m down hole in RCT249
-
1m @ 11.4 g/t Au from 33m down hole in RCT249
-
1m @ 14.3 g/t Au from 144m down hole in RCT246
-
10m @ 2.7 g/t Au , including 1m @ 10.3 g/t Au , from 79m down hole in RCT252
-
6m @ 2.6 g/t Au from 34m down hole in RCT248
-
5m @ 4.7 g/t Au from 84m down hole in ACT338
Drilling at the southern end of the Tomorrow prospect has also provided evidence for a vertical repetition or “stacking” of the shallowly plunging gold mineralisation in a pattern similar to that observed at both the Fosterville Gold Mine and numerous historical mines at Bendigo. The best example of “stacking” is recorded in drill hole RCT249 which contains four significant gold zones (see Figures 4, 5 & Table 1d).
The Tandarra Gold Project is operated under joint venture (JV) with operator, Catalyst Metals Limited (ASX:CYL) (Catalyst) who earned a 51%-interest in the project during 2018. In this ASX release Navarre has relied on information provided by the JV operator Catalyst, including drilling data and Figures 2 - 5.
The 2019 Tandarra exploration campaign commenced late in Q1 2019 and comprises a 10,000m AC, RC and diamond drilling program including:
-
step-out and reconnaissance AC drilling targeting the southern and northern extensions of the Macnaughtan and Tomorrow gold mineralisation trends;
-
RC drilling testing the southern and northern extensions of the Tomorrow prospect; and
-
Diamond drilling testing for “stacked” quartz reef positions at depth on the Tomorrow prospect.
RC AND AC DRILLING: TOMORROW PROSPECT
The 2019 RC drilling program has concluded following completion of 24 holes for a total of 3,615m. RC drilling tested the northern and southern extensions of the Tomorrow gold structure as shown on Figures 2, 3, 4 and 5. Although the AC drilling program was focussed on the Macnaughtan prospect and regional targets, several holes complemented the RC program on the Tomorrow prospect.
The program has been successful in extending the strike length of the Tomorrow prospect to the south by about 300 metres with significant gold intersections recorded in two holes:
-
3m @ 44.6 g/t Au, including 1m @ 131.0 g/t Au , from 111m in RCT233
-
5m @ 4.7 g/t Au from 84m in ACT338
The RC drilling has also confirmed multiple zones or vertical “stacking” of gold mineralisation intersected previously in diamond hole DDT018, with one hole (RCT249) intersecting four separate zones of gold:
- 1m @ 11.4 g/t Au from 33m
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 3
-
24m @ 4.2 g/t Au, including 6m @ 14.3 g/t Au , from 100m
-
8m @ 3.6 g/t Au, including 1m @ 22.1 g/t Au , from 149m
-
6m @ 2.7 g/t Au , including 1m @ 14.0 g/t Au , from 166m
The potential for new gold shoots in the vicinity of DDT018 was also supported by other RC intersections:
-
10m @ 2.7 g/t Au , including 1m @ 10.3 g/t Au , from 79m in RCT252
-
6m @ 2.6 g/t Au from 34m in RCT248
-
1m @ 5.3 g/t Au from 66m in RCT247
At the northern end of the Tomorrow prospect, drill hole RCT246 ( 1m @ 14.3 g/t Au from 144m) may have intersected the upper projection of a deeper zone of gold mineralisation present in DDT018 ( 2m @ 17.4 g/t Au). This is illustrated on the longitudinal projection in Figure 4.
Other than the intersection in RCT233, which has been confirmed by bulk cyanide leach assaying, all of the 2019 results quoted above are from 25-gram aqua regia assays. Bulk cyanide leach assays on larger 2-kilogram samples is expected to be carried out on all anomalous gold intervals to confirm the original aqua regia results.
Full location data on the RC blade and AC holes are shown in Appendix 1 on Tables 1a and 1c and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are also tabulated at the back of this release. Previous intersections shown on Figures 2, 3 and 4 have been reported under the 2004 JORC Code (see CYL’s ASX release of 1 July 2019). Maximum gold values in each hole are tabulated in Tables 1b and 1d of Appendix 1.
AC DRILLING AT MACNAUGHTAN PROSPECT AND REGIONAL TANDARRA GRAVITY TARGETS
The AC drilling program tested the southern extension of the Macnaughtan prospect as well as testing regional gravity targets and the northern extension of the Tomorrow Trend (Figure 2). In total, 36 AC holes for 4,563m were drilled (Tables 1a & 1b). The AC drilling program was concluded to coincide with the sowing of grain crops in May 2019.
The best AC results came from drill traverse 5971438N on the southern end of the Macnaughtan gold trend where two, one-metre samples assaying 3.9 g/t Au and 5.1 g/t Au were returned from drill hole ACT333. On the same drill traverse, drill hole ACT331 also returned anomalous gold results over a 3m interval from 129m within a range of 0.02 – 15.55 g/t Au . Follow-up re-assaying of the composite assay of 3m @ 15.55 g/t Au, using one-metre drill sample residues, was unable to replicate the original result. As a consequence, the range of gold assays results has been reported for this intercept (see Table 1b). Overall, these intersections are encouraging at this early stage of exploration and justify further AC drilling at the Macnaughtan prospect, which has considerable untested potential to the north as previous drilling is sparse on traverses that are nominally 500m apart.
Other regional AC holes in the recently completed program produced low-level anomalous gold values (see Table 1b).
Other than the intersections in ACT331, which has undergone bulk cyanide leach, all AC results contained in this release are derived from 25 gram aqua regia assays. Because AC samples are often wet and grab sampled at 3 metre intervals, aqua regia assays should be treated cautiously until more representative bulk cyanide leach assays based on 2 kilogram samples have been completed.
Overall the 2019 AC and RC drilling programs have highlighted the gold potential of the southern extensions of the Tomorrow and Macnaughtan trends which are untested over the next one kilometre of strike length (Figure 4). Further AC drilling will be necessary on the 1 kilometre of strike of the Macnaughtan trend, north of ACT331 and ACT333.
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 4
DIAMOND DRILLING AT TOMORROW GOLD ZONE
A four hole (DDT019 to DDT022) diamond drilling program commenced at the Tomorrow prospect in mid-May 2019 with the objective of testing the potential for ‘stacked’ zones of gold mineralisation to the north and south of DDT018 as shown on Figure 4. Results from the diamond drilling are expected to become available in August 2019.
For further information, please visit www.navarre.com.au or contact:
Geoff McDermott Managing Director Navarre Minerals Limited
Colin Naylor Director & Company Secretary Navarre Minerals Limited
T: +61 (0)3 5358 8625
JORC Reporting of Tandarra JV Exploration Results
Exploration programs conducted at the Tandarra Gold Project are undertaken by manager and operator, Catalyst Metals Limited on behalf of the Joint Venture (JV) parties (Navarre 49%: Catalyst 51%). Navarre has had to make assumptions on how the exploration data was collected at the Tandarra Gold Project, based on the information provided by the JV operator, to comply with the JORC 2012 Code.
In this report Navarre has relied on information provided by JV operator Catalyst, including drilling data and Figures 2 - 5. Full location data on the Tandarra drill holes and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are included in the Appendix at the back of this report.
Competent Person Declaration
The information in this release that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Geoff McDermott, who is a Member of the Australian Institute of Geoscientists and who is Managing Director of Navarre Minerals Limited. Mr McDermott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr McDermott consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 5
==> picture [456 x 672] intentionally omitted <==
Figure 1: Map showing location of Navarre’s 49%-owned Tandarra Gold Project (RL006660) relative to the Bendigo Goldfield and Fosterville Gold Mine
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 6
==> picture [354 x 664] intentionally omitted <==
Figure 2: Tandarra Gold Project Plan showing interpreted gold trends and location of 2019 air core drill holes (source: Catalyst Metals Limited).
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 7
==> picture [439 x 663] intentionally omitted <==
Figure 3: Plan View of Tomorrow and Macnaughtans Gold Zones showing location of 2019 air core and RC drill holes (source: Catalyst Metals Limited).
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
P a g e | 8
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t
==> picture [745 x 370] intentionally omitted <==
Figure 4: Longitudinal projection of the Tomorrow Gold Zone showing recent intersections and location of 2019 air core, RC and diamond drill holes (source: Catalyst Metals Limited) .
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 9
==> picture [407 x 671] intentionally omitted <==
Figure 5: Schematic cross-section through the Tomorrow prospect showing potential “stacking’ of gold mineralisation (source: Catalyst Metals Limited) .
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 10
APPENDIX 1: TANDARRA 2019 AC AND RC DRILL DATA
TABLE 1a: AC Drill Hole Collars
| HOLE | EASTING GDA |
NORTHING GDA |
RL | DEPTH | DIP | GRID AZIMUTH |
COMMENT |
|---|---|---|---|---|---|---|---|
| ACT320 | 246112 | 5980243 | 105.0 | 101.0 | -90 | 090 | Tomorrow |
| ACT321 | 246001 | 5980237 | 105.0 | 115.0 | -90 | 090 | Tomorrow |
| ACT322 | 245603 | 5980226 | 105.0 | 96.0 | -90 | 090 | Tomorrow |
| ACT323 | 245501 | 5980223 | 105.0 | 141.0 | -90 | 090 | Tomorrow |
| ACT324 | 245398 | 5980235 | 105.0 | 91.0 | -90 | 090 | Tomorrow |
| ACT325 | 246894 | 5971724 | 105.0 | 141.0 | -90 | 090 | Macnaughtan |
| ACT326 | 246994 | 5971723 | 105.0 | 124.0 | -90 | 090 | Macnaughtan |
| ACT327 | 247094 | 5971724 | 105.0 | 116.0 | -90 | 090 | Macnaughtan |
| ACT328 | 247194 | 5971724 | 105.0 | 128.0 | -90 | 090 | Macnaughtan |
| ACT329 | 246954 | 5971478 | 105.0 | 111.0 | -90 | 090 | Macnaughtan |
| ACT330 | 247054 | 5971400 | 105.0 | 126.0 | -90 | 090 | Macnaughtan |
| ACT331 | 247154 | 5971438 | 105.0 | 142.0 | -90 | 090 | Macnaughtan |
| ACT332 | 247304 | 5971438 | 105.0 | 129.0 | -90 | 090 | Macnaughtan |
| ACT333 | 247204 | 5971438 | 105.0 | 156.0 | -90 | 090 | Macnaughtan |
| ACT334 | 247372 | 5971260 | 105.0 | 141.0 | -90 | 090 | Macnaughtan |
| ACT335 | 247272 | 5971254 | 105.0 | 114.0 | -90 | 090 | Macnaughtan |
| ACT336 | 247172 | 5971254 | 105.0 | 129.0 | -90 | 090 | Macnaughtan |
| ACT337 | 247072 | 5971252 | 105.0 | 138.0 | -90 | 090 | Macnaughtan |
| ACT338 | 247208 | 5971900 | 105.0 | 126.0 | -90 | 090 | Tomorrow South |
| ACT339 | 247258 | 5971900 | 105.0 | 129.0 | -90 | 090 | Tomorrow South |
| ACT340 | 247288 | 5971900 | 105.0 | 102.0 | -90 | 090 | Tomorrow South |
| ACT341 | 247386 | 5971900 | 105.0 | 136.0 | -90 | 090 | Tomorrow South |
| ACT342 | 247216 | 5973552 | 105.0 | 102.0 | -90 | 090 | Gravity 4 |
| ACT343 | 247316 | 5973552 | 105.0 | 117.0 | -90 | 090 | Gravity 4 |
| ACT344 | 247416 | 5973552 | 105.0 | 141.0 | -90 | 090 | Gravity 4 |
| ACT345 | 247485 | 5973364 | 105.0 | 133.0 | -90 | 090 | Gravity 4 |
| ACT346 | 247385 | 5973364 | 105.0 | 141.0 | -90 | 090 | Gravity 4 |
| ACT347 | 247285 | 5973347 | 105.0 | 123.0 | -90 | 090 | Gravity 4 |
| ACT348 | 245595 | 5977575 | 105.0 | 135.0 | -90 | 090 | Gravity 4 |
| ACT349 | 247585 | 5973364 | 105.0 | 144.0 | -90 | 090 | Gravity 4 |
| ACT350 | Not drilled | ||||||
| ACT351 | 247556 | 5973552 | 105.0 | 131.0 | -90 | 090 | Gravity 4 |
| ACT352 | 247286 | 5978400 | 105.0 | 138.0 | -90 | 090 | Prairie |
| ACT353 | 247186 | 5978400 | 105.0 | 141.0 | -90 | 090 | Prairie |
| ACT354 | 247086 | 5978400 | 105.0 | 138.0 | -90 | 090 | Prairie |
| ACT355 | 246986 | 5978400 | 105.0 | 137.0 | -90 | 090 | Prairie |
| ACT356 | 246886 | 5978400 | 105.0 | 110.0 | -90 | 090 | Prairie |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 11
TABLE 1b: AC Drill Assay Results using 25g Aqua Regia Method
| HOLE | FROM | TO | INTERVAL | Au(ppm) | COMMENTS |
|---|---|---|---|---|---|
| ACT320 | - | - | - | - | Hole failed to reach basement |
| ACT321 | - | - | - | - | Hole failed to reach basement |
| ACT322 | 84 | 85 | 1 | 0.00 | Regional target – North Tomorrow |
| ACT323 | 107 | 108 | 1 | 0.04 | Regional target – North Tomorrow |
| ACT324 | 66 | 69 | 3 | 0.00 | Regional target – North Tomorrow |
| ACT325 | 111 | 114 | 3 | 0.00 | West of Macnaughtan |
| ACT326 | 55 | 56 | 1 | 0.29 | Macnaughtan |
| ACT327 | 44 | 45 | 1 | 0.28 | Macnaughtan |
| ACT328 | 58 | 59 | 1 | 0.15 | East of Macnaughtan |
| ACT329 | 81 | 84 | 3 | 0.03 | West of Macnaughtan |
| ACT330 | 60 | 63 | 3 | 0.09 | West of Macnaughtan |
| ACT331 | 129 | 132 | 3 | 0.02 - 15.55 | Macnaughtan – Reported as a gold assay range. Original 3m sample assayed 15.55 g/t in a bulk leach assay. Subsequent bulk leach assays, based on one- metre sub-samples, have produced a maximum assayof [email protected]/t Au. Further drillingrequired. |
| ACT332 | 79 | 80 | 1 | 2.39 | Tomorrow - Macnaughtan |
| ACT333 | 130 | 131 | 1 | 3.93 | Macnaughtan |
| ACT333 | 137 | 138 | 1 | 5.07 | Macnaughtan |
| ACT334 | 128 | 129 | 1 | 0.13 | Tomorrow south |
| ACT335 | 66 | 69 | 3 | 0.05 | Macnaughtan |
| ACT336 | 69 | 72 | 3 | 0.12 | Macnaughtan |
| ACT337 | 107 | 108 | 1 | 0.01 | West of Macnaughtan |
| ACT338 | 63 | 66 | 3 | 0.65 | Tomorrow South |
| ACT338 | 84 | 89 | 5 | 4.73 | Tomorrow South |
| ACT338 | 102 | 105 | 3 | 1.82 | Tomorrow South |
| ACT338 | 123 | 126 | 3 | 0.72 | Tomorrow South |
| ACT339 | 84 | 87 | 3 | 0.01 | Tomorrow South |
| ACT340 | 69 | 72 | 3 | 0.01 | East of Tomorrow South |
| ACT341 | 123 | 124 | 1 | 0.61 | East of Tomorrow South |
| ACT341 | 133 | 134 | 1 | 0.66 | East of Tomorrow South |
| ACT342 | 86 | 87 | 1 | 0.01 | Regional target – Gravity4 |
| ACT343 | 84 | 87 | 3 | 0.17 | Regional target – Gravity4 |
| ACT344 | 75 | 76 | 1 | 0.08 | Regional target – Gravity4 |
| ACT345 | 72 | 75 | 3 | 0.03 | Regional target – Gravity4 |
| ACT346 | 63 | 66 | 3 | 0.06 | Regional target – Gravity4 |
| ACT347 | 76 | 77 | 1 | 0.18 | Regional target – Gravity4 |
| ACT348 | 70 | 71 | 1 | 0.05 | Regional target – Gravity4 |
| ACT349 | 128 | 129 | 1 | 0.05 | Regional target – Gravity4 |
| ACT351 | 120 | 121 | 1 | 0.03 | Regional target – Gravity4 |
| ACT352 | 100 | 101 | 1 | 0.11 | Prairie Zone |
| ACT353 | 123 | 126 | 3 | 0.10 | Prairie Zone |
| ACT354 | 83 | 84 | 1 | 0.30 | Prairie Zone |
| ACT355 | 98 | 99 | 1 | 0.01 | Prairie Zone |
| ACT356 | 51 | 54 | 3 | 0.01 | Prairie Zone |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 12
TABLE 1c: RC Blade/Hammer Drill Hole Collars
| HOLE | EASTING GDA |
NORTHING GDA |
RL | DEPTH | DIP | GRID AZIMUTH |
|---|---|---|---|---|---|---|
| RCT229 | 246750 | 5972860 | 105 | 163 | -75 | 092 |
| RCT230 | 246775 | 5972765 | 105 | 175 | -60 | 091 |
| RCT231 | 246822 | 5972655 | 105 | 169 | -61 | 092 |
| RCT232 | 247127 | 5972200 | 105 | 163 | -61 | 270 |
| RCT233 | 247177 | 5972200 | 105 | 163 | -60 | 269 |
| RCT234 | 247277 | 5972200 | 105 | 165 | -60 | 269 |
| RCT235 | 247213 | 5972000 | 105 | 149 | -60 | 270 |
| RCT236 | 247263 | 5972000 | 105 | 66 | -61 | 270 |
| RCT237 | 247313 | 5972000 | 105 | 66 | -60 | 270 |
| RCT238 | 246625 | 5973600 | 105 | 163 | -60 | 271 |
| RCT239 | 246665 | 5973600 | 105 | 163 | -60 | 273 |
| RCT240 | 246705 | 5973600 | 105 | 163 | -61 | 268 |
| RCT241 | 246690 | 5973400 | 105 | 90 | -60 | 268 |
| RCT242 | 246730 | 5973400 | 105 | 133 | -60 | 271 |
| RCT243 | 246770 | 5973400 | 105 | 163 | -60 | 270 |
| RCT244 | 246750 | 5973200 | 105 | 163 | -61 | 269 |
| RCT245 | 246786 | 5973200 | 105 | 163 | -60 | 258 |
| RCT246 | 246830 | 5973200 | 105 | 163 | -60 | 269 |
| RCT247 | 247054 | 5972470 | 105 | 163 | -60 | 269 |
| RCT248 | 247038 | 5972550 | 105 | 163 | -60 | 268 |
| RCT249 | 247062 | 5972550 | 105 | 193 | -61 | 269 |
| RCT250 | 246997 | 5972575 | 105 | 163 | -60 | 268 |
| RCT251 | 246995 | 5972650 | 105 | 163 | -60 | 271 |
| RCT252 | 247019 | 5972650 | 105 | 127 | -60 | 270 |
Table 1d: RC Blade/Hammer Drill Assay Results using 25g Aqua Regia Method
| HOLE | FROM | TO | INTERVAL | Au(ppm) | COMMENTS |
|---|---|---|---|---|---|
| RCT229 | 157 | 158 | 1 | 0.77 | West of Tomorrow |
| RCT230 | 68 | 69 | 1 | 0.05 | West of Tomorrow |
| RCT231 | 81 | 82 | 1 | 0.08 | West of Tomorrow |
| RCT232 | 135 | 136 | 1 | 1.34 | Tomorrow prospect |
| RCT233 | 74 | 75 | 1 | 1.35 | Tomorrow prospect |
| RCT233 | 80 | 81 | 1 | 0.78 | Tomorrow prospect |
| RCT233 | 111 | 114 | 3 | 44.57 | Tomorrow prospect |
| including | 111 | 112 | 1 | 131.0 | |
| RCT234 | 122 | 123 | 1 | 1.79 | East of Tomorrow |
| RCT234 | 126 | 127 | 1 | 0.90 | East of Tomorrow |
| RCT234 | 132 | 133 | 1 | 0.52 | East of Tomorrow |
| RCT234 | 134 | 135 | 1 | 0.77 | East of Tomorrow |
| RCT234 | 143 | 144 | 1 | 1.89 | East of Tomorrow |
| RCT234 | 153 | 154 | 1 | 1.10 | East of Tomorrow |
| RCT235 | 58 | 59 | 1 | 2.10 | Tomorrow south |
| RCT236 | 52 | 53 | 1 | 0.02 | Tomorrow north |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 13
| HOLE | FROM | TO | INTERVAL | Au(ppm) | COMMENTS |
|---|---|---|---|---|---|
| RCT237 | 60 | 61 | 1 | 0.03 | Tomorrow north |
| RCT238 | 68 | 69 | 1 | 0.54 | Tomorrow north |
| RCT239 | 97 | 98 | 1 | 0.21 | Tomorrow north |
| RCT240 | 90 | 91 | 1 | 0.18 | Tomorrow north |
| RCT241 | 73 | 74 | 1 | 0.49 | Tomorrow north |
| RCT242 | 76 | 77 | 1 | 0.15 | Tomorrow north |
| RCT243 | 58 | 59 | 1 | 0.41 | Tomorrow north |
| RCT244 | 56 | 57 | 1 | 0.42 | Tomorrow north |
| RCT245 | 62 | 63 | 1 | 0.03 | Tomorrow north |
| RCT246 | 144 | 145 | 1 | 14.30 | Tomorrow north – lower reef |
| RCT247 | 53 | 55 | 2 | 0.85 | Tomorrow prospect |
| RCT247 | 66 | 67 | 1 | 5.26 | Tomorrow prospect |
| RCT247 | 78 | 79 | 1 | 0.79 | Tomorrow prospect |
| RCT248 | 34 | 40 | 6 | 2.63 | Tomorrow prospect |
| RCT248 | 74 | 75 | 1 | 0.61 | Tomorrow prospect |
| RCT248 | 89 | 90 | 1 | 1.91 | Tomorrow prospect |
| RCT249 | 33 | 34 | 1 | 11.40 | Tomorrow prospect |
| RCT249 | 37 | 38 | 1 | 0.71 | - Stacked mineralisation |
| RCT249 | 42 | 43 | 1 | 0.94 | - Stacked mineralisation |
| RCT249 | 75 | 76 | 1 | 0.92 | - Stacked mineralisation |
| RCT249 | 100 | 124 | 24 | 4.20 | - Stacked mineralisation |
| including | 108 | 114 | 6 | 14.30 | |
| RCT249 | 140 | 141 | 1 | 1.34 | - Stacked mineralisation |
| RCT249 | 145 | 146 | 1 | 0.55 | - Stacked mineralisation |
| RCT249 | 149 | 162 | 13 | 2.41 | - Stacked mineralisation |
| Including | 149 | 157 | 8 | 3.62 | |
| Including | 154 | 155 | 1 | 22.10 | |
| RCT249 | 166 | 172 | 6 | 2.70 | - Stacked mineralisation |
| including | 170 | 171 | 1 | 14.0 | |
| RCT249 | 185 | 186 | 1 | 0.61 | - Stacked mineralisation |
| RCT250 | 50 | 51 | 1 | 0.16 | |
| RCT251 | 33 | 34 | 1 | 3.05 | Tomorrow prospect |
| RCT251 | 81 | 82 | 1 | 0.70 | Tomorrow prospect |
| RCT251 | 85 | 86 | 1 | 1.74 | Tomorrow prospect |
| RCT251 | 95 | 96 | 1 | 0.56 | Tomorrow prospect |
| RCT252 | 61 | 63 | 2 | 1.06 | Tomorrow prospect |
| RCT252 | 71 | 73 | 2 | 2.47 | Tomorrow prospect |
| RCT252 | 76 | 89 | 13 | 2.33 | Tomorrow prospect |
| including | 79 | 89 | 10 | 2.71 | |
| including | 85 | 86 | 1 | 10.25 | |
| RCT252 | 115 | 116 | 1 | 0.89 | Tomorrow prospect |
| RCT252 | 124 | 126 | 2 | 1.22 | Tomorrow prospect |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 14
JORC Code 2012 Edition – Table 1, Section 1: Sampling Techniques and Data
| RC Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Sampling techniques | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Samples from surface collected at cyclone at one-metre intervals with no sub-sampling. • All material collected in individual numbered plastic bags; chip trays collected by hand from bags (uncomposited). • Laboratory samples selected using Jones riffle splitter into calico sample bags to a mass of >2kg (if sufficient sample is available) and <3kg. • Cover sequence is understood to potentially contain alluvial gold, and thus cover samples are occasionally submitted for assay. |
| Drilling techniques | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Holes are initiated using 120mm AC drilling. This method provides reverse-circulation face sampling of sufficiently soft material. • On bit-refusal, a four-inch diameter RC hammer with 110mm button bit was utilised to progress the hole to design depth or where groundwater inflows compromise sample quality. • All drilling utilises three or six metre RC drill rods; truck- mounted drill rig; 400psi 900cfm compressor and booster; auxiliary compressor where dictated by water in-flows. • Holes were routinelycased to basement depth with PVC. |
| Drill sample recovery | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Where sample volumes at cyclone were unduly affected by groundwater, holes are terminated (by inspection) where sample quality is compromised. • Sample water content assessed by rig geologist as being dry or wet. • Sample bags collected at the rig are weighed prior to sample splitting. Sample weight is used to assess the splitting requirements (number of riffles required) to deliver a sub- sample to the desired mass constraints (>2kg and <3kg). Calico bag masses recorded by laboratory contractor. • Geological control maintained at the drill site at all times, to ensure drillingand samplingwas to standard. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 15
| RC Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Logging | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Chip samples are geologically logged at one-metre intervals for lithology, alteration, quartz veining and to a standard acceptable for subsequent interpretation for use in estimation. • Logging aspects are qualitative with exception of quartz vein content which is estimated semi-quantitatively • All logged intervals represent entire one-metre sample segregation intervals. |
| Sub-sampling techniques and sample preparation |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Lab submission samples collected as described – any mass reduction required for assay purposes performed by laboratory contractor; consisting of drying and riffle-splitting. • Samples dispatched to commercial laboratory (Catalyst have used ALS Pty Ltd exclusively); samples dried and pulverised in entirety, with 25g aliquot split for analysis (laboratory repeat splits historically demonstrate acceptable reproducibility and hence accuracyfor this mineralisation). |
| Quality of assay data and laboratory tests |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Gold assay determined by ICPMS via aqua regia digestion (ALS code Au-OG43). Experience has shown this method to be applicable for fine grained gold population of the mineralisation due to the completion of digestion. There is a technical constraint in that coarse-grained gold may not completely enter solution resulting in a conservative assay. • Laboratory and client certified reference materials (3 x standards)are implemented every30thsamples. |
| Verification of sampling and assaying |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Data management procedures are under development. Data management is performed by an experienced individual and not by several individuals. • There has been no verification of significant intersections by independent nor alternative company personnel. • Drill hole sampling and geological data logged onto paper in preparation for database data entry. • There have been no adjustments to data as provided by the commercial assaylaboratory. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 16
| RC Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Location of data points | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • All drill hole location coordinates are measured using differential GPS to MGA94 Zone 55 and AHD estimated from terrain model created from publicly-available land survey data. • Collar locations to within an estimated precision of 10mm horizontally and 20mm vertically. • All drill holes are downhole surveyed. Drilling orientation establishedprior to collaringwith clinometer and compass. |
| Data spacing and distribution | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • RC drill holes within the main cluster of mineralisation are drilled on 25-metre spaced sections. • The sections consist of holes spaced at a nominal 25m interval. • Drill holes in this program were designed to complement existing sections where there were information gaps or where sections required step-out holes. • This spacing is designed to be of a sufficient density to ultimately be included in the estimation of a mineral resource. • For the purpose of reporting, assays are aggregated to reflect continuouslysampled zones of significant anomalism forgold. |
| Orientation of data in relation to geological structure |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Drill hole sections are aligned approximately 112 degrees clockwise from the strike of mineralisation. Holes are generally inclined 60 degrees to the west to provide cross-strike investigation within holes and to establish continuity of sub- vertical mineralisation between holes. |
| Sample security | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • All samples are controlled by the responsible geologist and stored in secured facility prior to despatch to laboratory. • Samples are transported directly to laboratory by a commercial transportation contractor with chain-of-custody protocols in place. • Sample number receipt information from laboratory cross- referenced and rationalised against sample number dispatch information. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 17
| RC Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Audits or reviews | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • No processes or data used in developing the release of exploration results have been subject to audit or review by non- company personnel or contractors so as to reduce costs and timelines for reporting. Catalyst Metals Limited currently reserve this process for release of Mineral Resource and Ore Reserve estimates. |
| Air-core Sampling Techniques and Data Criteria |
Explanation |
| Sampling techniques | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Samples collected at cyclone at one-metre intervals. • Cover sequence samples collected in buckets and arranged as piles on the ground; basement material samples collected in individual numbered plastic bags; chip trays collected by hand from piles and bags (uncomposited). • Assay laboratory samples collected by hand from bags (no routine cover sequence sampling) into calico sample bags to a mass of <3kg (composited to three-metre intervals corresponding with drill rods). • Cover sequence is understood to potentially contain alluvial gold, and thus cover samples are occasionally submitted for assay. |
| Drilling techniques | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Three-inch diameter AC blade drill bit; three-metre RC drill rods; truck-mounted drill rig; 300psi 700cfm compressor. • All holes are uncased. • Penetration into basement to depth of bit refusal against quartz or fresh rock. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 18
| Air-core Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Drill sample recovery | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • AC drilling provides a high variability sample recovery, due to low pressures of equipment and common groundwater effects. • Sample water content assessed by rig geologist as being dry/moist/wet • Calico bag masses recorded by commercial laboratory. • Geological control is maintained at the drill site at all times, to ensure drillingand samplingstandards maintained. |
| Logging | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Chip samples are geologically logged at 1m intervals for lithology, alteration, quartz veining and to a standard acceptable for subsequent interpretation for use in estimation. • Logging aspects are qualitative with exception of quartz vein content which is estimated semi-quantitatively. • All logged intervals represent entire one-metre sample segregation intervals. |
| Sub-sampling techniques and sample preparation |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Three metre samples selected (composited) by hand-grab at drill site when materials were dry, moist, or wet; duplicate samples taken approximately every 30 samples (one per drill hole). • Samples dispatched to commercial laboratory (Catalyst have used ALS Pty Ltd exclusively); samples dried and pulverised in entirety, with 25g aliquot split for analysis (laboratory repeat splits historically demonstrate acceptable reproducibility and hence accuracy for this mineralisation). • Analysis of duplicate samples collected at the drill site provided acceptable confidence that sampling was appropriate for the level for the intended (non-resource estimation) use of the assaydata. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 19
| Air-core Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Quality of assay data and laboratory tests |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Gold assay determined by ICPMS via aqua regia digestion (ALS code Au-TL43). Experience has shown this method to be applicable for fine grained gold population of the mineralisation due to the completion of digestion. There is a technical constraint in that coarse-grained gold may not completely enter solution resultingin conservative assay. |
| Verification of sampling and assaying |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Data management procedures are under development. Data management has been performed by an experienced individual and not by several individuals. • There has been no verification of significant intersections by independent or alternative company personnel. • There has been no drill hole twinning to verify results. • Drill hole sampling and geological data logged onto paper in preparation for database data entry. • There have been no adjustments to data as provided by the commercial assaylaboratory. |
| Location of data points | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Where available, drill hole location coordinates are measured using differential GPS. In general, drill hole collars surveyed by 12-channel GPS to MGA94 Zone 55 and AHD estimated from terrain model created from publicly available land survey data. • Collar locations to within an estimated precision of+5m. • No drill holes were downhole surveyed. Drilling orientation establishedprior to collaringwith clinometer and compass. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 20
| Air-core Sampling Techniques and Data Criteria |
Explanation |
|---|---|
| Data spacing and distribution | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Air core drilling to the south of Macnaughtan was completed on three sections spaced 180m and 280m. Spacing within sections was 100 metres. • The Air core drilling south of Tomorrow was on a 100m step- out section south of RC drill coverage. The holes on this section were spaced nominally 50m. • A 100-metre hole spacing, it is not of sufficient density to allow estimation of a mineral resource. • One-metre samples were composited to three-metre samples for the purpose of submission to the laboratory. For the purpose of reporting, assays have been aggregated to reflect continuouslysampled zones of significant anomalism forgold. |
| Orientation of data in relation to geological structure |
Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • Drill hole sections are aligned approximately 112 degrees clockwise from the strike of mineralisation. In general, holes were vertical because of the reconnaissance nature of the drilling. |
| Sample security | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • All samples are controlled by the responsible geologist and stored in secured facility prior to despatch to laboratory. • Samples are transported directly to laboratory by a commercial transportation contractor with chain-of-custody protocols in place. • Sample number receipt information from laboratory cross- referenced and rationalised against sample number dispatch information. |
| Audits or reviews | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • No processes or data used in developing the release of exploration results have been subject to audit or review by non- company personnel or contractors so as to reduce costs and timelines for reporting. Catalyst Metals Limited currently reserves this process for release of Mineral Resource and Ore Reserve estimates. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 21
Section 2 Reporting of Exploration Results - RC and Air Core Drilling
| Reporting of Exploration Results Criteria |
Explanation |
|---|---|
| Mineral tenement and land tenure status |
• The Tandarra Gold Project is located within RL006660 in the vicinity of Dingee Victoria, owned in joint venture by Navarre Minerals Ltd (49%) and operator, Catalyst Metals Ltd (51%). • The Retention Licence was approved on 2 November 2018 for a period of ten years. It replaced EL4897. • Exploration activities were confined to free-hold farmland and road-side easements. |
| Exploration done by other parties |
• None in the area drilled. |
| Geology | • Gold-arsenic bearing narrow veins in Ordovician sandstone in the vicinity of a regional-scale anticline. • Deposit assessed as being northern extension of Bendigo Goldfield, with potential for post-mineralisation influence/redistribution by proximal granitic intrusion. • Potential for some supergene gold enrichment in paleo- weathering profile. |
| Drill hole Information | • Appendix 1 Tables 1a and 1c: Collar location coordinates, downhole depths, azimuths, declinations. • Appendix 1, Tables 1b and 1d: Downhole intervals of reported goldgrades. |
| Data aggregation methods | Although Navarre was not directly involved in the operation of the Tandarra JV drilling program, it has made assumptions based on information provided by manager and operator, Catalyst Metals. Catalyst has provided the following comment: • AC and RC drill hole data were not composited. • AC drill hole samples are composited to three metres in the first instance. Subsequent resampling of anomalous composites is performed on a one-metre sample interval basis. • No top-cutting applied to assay data. • Zones of significance identified as those with assays in excess of 0.5g/t and internal dilution of two consecutive assays or less. • Reported zones are continuous,with no sample or assay gaps. |
| Relationship between mineralisation widths and intercept lengths |
• The strike of mineralisation is demonstrated to be generally 22 degrees west of grid north. • The dip of mineralisation is expected to be sub-vertical and sub- parallel with bedding as was the case in the Bendigo Goldfield. • RC drill holes are orientated with a dip to the west to provide effective geometry in the context of the eastern limb of an anticline. • AC reconnaissance drill holes are vertical. • Due to the complexity of slate belt gold mineralisation, the true width of mineralisation has not been resolved. As such, significant mineralised intersections have been reported as downhole intervals. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au
N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 22
| Reporting of Exploration Results Criteria |
Explanation |
|---|---|
| Diagrams | • Figures 2, 3 and 4 show position of key drill holes in plan and longitudinal projection. Table 1a and 1c lists all hole collar positions. |
| Balanced reporting | • All drilling inclusive of holes which did not contain significant intersections are included in Tables 1b and 1d. |
| Other substantive exploration data |
• No other exploration results that have not previously been reported,are material to this report. |
| Further work | • DDH drilling is continuing at Tandarra but should be completed in July2019. |
Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625
e [email protected] | w navarre.com.au