ASX Announcement (ASX:NML) N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t 1 July 2019 P a g e | 1

==> picture [136 x 64] intentionally omitted <==

HIGH-GRADE GOLD UP TO 131 g/t IN EXPANSION DRILLING AT TANDARRA GOLD PROJECT, VICTORIA

  • Significant new high-grade gold results from 10,000m drilling program highlight potential for a large-scale gold system at the Tandarra Gold Project

  • The Tandarra Gold Project is located immediately south, on-strike of the Four Eagles Project, jointly owned by Hancock Prospecting Pty Ltd and Catalyst Metals Ltd and 50km northwest of Kirkland Lake Gold’s world-class Fosterville Gold Mine

  • New reverse circulation (RC) and air-core (AC) results include:

Tomorrow prospect

  • 3m @ 44.6 g/t gold from 111m, including 1m @ 131.0 g/t gold (RCT233)

  • 6m @ 14.3 g/t gold from within a broader zone of 24m @ 4.2 g/t gold from 100m (RCT249)

  • 8m @ 3.6 g/t gold from 149m, including 1m @ 22.1 g/t gold (RCT249)

  • 6m @ 2.7 g/t gold from 166m, including 1m @ 14.0 g/t gold (RCT249)

  • 10m @ 2.7 g/t gold from 79m, including 1m @ 10.3 g/t gold (RCT252)

  • 5m @ 4.7 g/t gold from 84m (ACT338)

  • Drilling expands strike length of gold mineralisation on the Tomorrow structure by 300m to approximately 1.1 kilometres, which remains open to the south

  • Results provide evidence of vertical repetition of shallowly plunging gold mineralisation

  • Diamond drilling program continues to test depth extensions on the Tomorrow prospect

Navarre Minerals Limited ( Navarre ; ASX: NML ) is pleased to report encouraging high-grade gold assay results from the Tomorrow and Macnaughtan prospects as part of an ongoing 10,000m AC, RC and diamond drilling program at the Company’s 49%-owned Tandarra Gold Project (RL006660), 40km north of the 22Moz Bendigo Goldfield and 50km northwest of the world-class Fosterville Gold Mine (Figure 1).

Significant new high-grade gold assays have been received from step-out RC drilling on the southern end of the Tomorrow prospect which have resulted in a 300m extension in the strike length of the mineralised quartz structure to approximately 1.1km, which remains open to the south (Figures 2 – 4).

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 2

New drill intersections returned to date from this latest phase of drilling include (see Table 1b & 1d):

  • 3m @ 44.6 g/t Au , including 1m @ 131.0 g/t Au , from 111m down hole in RCT233

  • 6m @ 14.3 g/t Au from within a broader zone of 24m @ 4.2 g/t Au from 100m down hole in RCT249

  • 8m @ 3.6 g/t Au , including 1m @ 22.1 g/t Au , from 149m down hole in RCT249

  • 6m @ 2.7 g/t Au , including 1m @ 14.0 g/t Au , from 166m down hole in RCT249

  • 1m @ 11.4 g/t Au from 33m down hole in RCT249

  • 1m @ 14.3 g/t Au from 144m down hole in RCT246

  • 10m @ 2.7 g/t Au , including 1m @ 10.3 g/t Au , from 79m down hole in RCT252

  • 6m @ 2.6 g/t Au from 34m down hole in RCT248

  • 5m @ 4.7 g/t Au from 84m down hole in ACT338

Drilling at the southern end of the Tomorrow prospect has also provided evidence for a vertical repetition or “stacking” of the shallowly plunging gold mineralisation in a pattern similar to that observed at both the Fosterville Gold Mine and numerous historical mines at Bendigo. The best example of “stacking” is recorded in drill hole RCT249 which contains four significant gold zones (see Figures 4, 5 & Table 1d).

The Tandarra Gold Project is operated under joint venture (JV) with operator, Catalyst Metals Limited (ASX:CYL) (Catalyst) who earned a 51%-interest in the project during 2018. In this ASX release Navarre has relied on information provided by the JV operator Catalyst, including drilling data and Figures 2 - 5.

The 2019 Tandarra exploration campaign commenced late in Q1 2019 and comprises a 10,000m AC, RC and diamond drilling program including:

  1. step-out and reconnaissance AC drilling targeting the southern and northern extensions of the Macnaughtan and Tomorrow gold mineralisation trends;

  2. RC drilling testing the southern and northern extensions of the Tomorrow prospect; and

  3. Diamond drilling testing for “stacked” quartz reef positions at depth on the Tomorrow prospect.

RC AND AC DRILLING: TOMORROW PROSPECT

The 2019 RC drilling program has concluded following completion of 24 holes for a total of 3,615m. RC drilling tested the northern and southern extensions of the Tomorrow gold structure as shown on Figures 2, 3, 4 and 5. Although the AC drilling program was focussed on the Macnaughtan prospect and regional targets, several holes complemented the RC program on the Tomorrow prospect.

The program has been successful in extending the strike length of the Tomorrow prospect to the south by about 300 metres with significant gold intersections recorded in two holes:

  • 3m @ 44.6 g/t Au, including 1m @ 131.0 g/t Au , from 111m in RCT233

  • 5m @ 4.7 g/t Au from 84m in ACT338

The RC drilling has also confirmed multiple zones or vertical “stacking” of gold mineralisation intersected previously in diamond hole DDT018, with one hole (RCT249) intersecting four separate zones of gold:

  • 1m @ 11.4 g/t Au from 33m

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 3

  • 24m @ 4.2 g/t Au, including 6m @ 14.3 g/t Au , from 100m

  • 8m @ 3.6 g/t Au, including 1m @ 22.1 g/t Au , from 149m

  • 6m @ 2.7 g/t Au , including 1m @ 14.0 g/t Au , from 166m

The potential for new gold shoots in the vicinity of DDT018 was also supported by other RC intersections:

  • 10m @ 2.7 g/t Au , including 1m @ 10.3 g/t Au , from 79m in RCT252

  • 6m @ 2.6 g/t Au from 34m in RCT248

  • 1m @ 5.3 g/t Au from 66m in RCT247

At the northern end of the Tomorrow prospect, drill hole RCT246 ( 1m @ 14.3 g/t Au from 144m) may have intersected the upper projection of a deeper zone of gold mineralisation present in DDT018 ( 2m @ 17.4 g/t Au). This is illustrated on the longitudinal projection in Figure 4.

Other than the intersection in RCT233, which has been confirmed by bulk cyanide leach assaying, all of the 2019 results quoted above are from 25-gram aqua regia assays. Bulk cyanide leach assays on larger 2-kilogram samples is expected to be carried out on all anomalous gold intervals to confirm the original aqua regia results.

Full location data on the RC blade and AC holes are shown in Appendix 1 on Tables 1a and 1c and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are also tabulated at the back of this release. Previous intersections shown on Figures 2, 3 and 4 have been reported under the 2004 JORC Code (see CYL’s ASX release of 1 July 2019). Maximum gold values in each hole are tabulated in Tables 1b and 1d of Appendix 1.

AC DRILLING AT MACNAUGHTAN PROSPECT AND REGIONAL TANDARRA GRAVITY TARGETS

The AC drilling program tested the southern extension of the Macnaughtan prospect as well as testing regional gravity targets and the northern extension of the Tomorrow Trend (Figure 2). In total, 36 AC holes for 4,563m were drilled (Tables 1a & 1b). The AC drilling program was concluded to coincide with the sowing of grain crops in May 2019.

The best AC results came from drill traverse 5971438N on the southern end of the Macnaughtan gold trend where two, one-metre samples assaying 3.9 g/t Au and 5.1 g/t Au were returned from drill hole ACT333. On the same drill traverse, drill hole ACT331 also returned anomalous gold results over a 3m interval from 129m within a range of 0.02 – 15.55 g/t Au . Follow-up re-assaying of the composite assay of 3m @ 15.55 g/t Au, using one-metre drill sample residues, was unable to replicate the original result. As a consequence, the range of gold assays results has been reported for this intercept (see Table 1b). Overall, these intersections are encouraging at this early stage of exploration and justify further AC drilling at the Macnaughtan prospect, which has considerable untested potential to the north as previous drilling is sparse on traverses that are nominally 500m apart.

Other regional AC holes in the recently completed program produced low-level anomalous gold values (see Table 1b).

Other than the intersections in ACT331, which has undergone bulk cyanide leach, all AC results contained in this release are derived from 25 gram aqua regia assays. Because AC samples are often wet and grab sampled at 3 metre intervals, aqua regia assays should be treated cautiously until more representative bulk cyanide leach assays based on 2 kilogram samples have been completed.

Overall the 2019 AC and RC drilling programs have highlighted the gold potential of the southern extensions of the Tomorrow and Macnaughtan trends which are untested over the next one kilometre of strike length (Figure 4). Further AC drilling will be necessary on the 1 kilometre of strike of the Macnaughtan trend, north of ACT331 and ACT333.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 4

DIAMOND DRILLING AT TOMORROW GOLD ZONE

A four hole (DDT019 to DDT022) diamond drilling program commenced at the Tomorrow prospect in mid-May 2019 with the objective of testing the potential for ‘stacked’ zones of gold mineralisation to the north and south of DDT018 as shown on Figure 4. Results from the diamond drilling are expected to become available in August 2019.

For further information, please visit www.navarre.com.au or contact:

Geoff McDermott Managing Director Navarre Minerals Limited

Colin Naylor Director & Company Secretary Navarre Minerals Limited

E: [email protected]

T: +61 (0)3 5358 8625

JORC Reporting of Tandarra JV Exploration Results

Exploration programs conducted at the Tandarra Gold Project are undertaken by manager and operator, Catalyst Metals Limited on behalf of the Joint Venture (JV) parties (Navarre 49%: Catalyst 51%). Navarre has had to make assumptions on how the exploration data was collected at the Tandarra Gold Project, based on the information provided by the JV operator, to comply with the JORC 2012 Code.

In this report Navarre has relied on information provided by JV operator Catalyst, including drilling data and Figures 2 - 5. Full location data on the Tandarra drill holes and a Summary of Sampling Techniques and Reporting of Exploration Results according to the JORC Code 2012 Edition are included in the Appendix at the back of this report.

Competent Person Declaration

The information in this release that relates to Exploration Targets, Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Geoff McDermott, who is a Member of the Australian Institute of Geoscientists and who is Managing Director of Navarre Minerals Limited. Mr McDermott has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr McDermott consents to the inclusion in the release of the matters based on his information in the form and context in which it appears.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 5

==> picture [456 x 672] intentionally omitted <==

Figure 1: Map showing location of Navarre’s 49%-owned Tandarra Gold Project (RL006660) relative to the Bendigo Goldfield and Fosterville Gold Mine

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 6

==> picture [354 x 664] intentionally omitted <==

Figure 2: Tandarra Gold Project Plan showing interpreted gold trends and location of 2019 air core drill holes (source: Catalyst Metals Limited).

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 7

==> picture [439 x 663] intentionally omitted <==

Figure 3: Plan View of Tomorrow and Macnaughtans Gold Zones showing location of 2019 air core and RC drill holes (source: Catalyst Metals Limited).

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

P a g e | 8

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t

==> picture [745 x 370] intentionally omitted <==

Figure 4: Longitudinal projection of the Tomorrow Gold Zone showing recent intersections and location of 2019 air core, RC and diamond drill holes (source: Catalyst Metals Limited) .

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 9

==> picture [407 x 671] intentionally omitted <==

Figure 5: Schematic cross-section through the Tomorrow prospect showing potential “stacking’ of gold mineralisation (source: Catalyst Metals Limited) .

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 10

APPENDIX 1: TANDARRA 2019 AC AND RC DRILL DATA

TABLE 1a: AC Drill Hole Collars

HOLE EASTING
GDA
NORTHING
GDA
RL DEPTH DIP GRID
AZIMUTH
COMMENT
ACT320 246112 5980243 105.0 101.0 -90 090 Tomorrow
ACT321 246001 5980237 105.0 115.0 -90 090 Tomorrow
ACT322 245603 5980226 105.0 96.0 -90 090 Tomorrow
ACT323 245501 5980223 105.0 141.0 -90 090 Tomorrow
ACT324 245398 5980235 105.0 91.0 -90 090 Tomorrow
ACT325 246894 5971724 105.0 141.0 -90 090 Macnaughtan
ACT326 246994 5971723 105.0 124.0 -90 090 Macnaughtan
ACT327 247094 5971724 105.0 116.0 -90 090 Macnaughtan
ACT328 247194 5971724 105.0 128.0 -90 090 Macnaughtan
ACT329 246954 5971478 105.0 111.0 -90 090 Macnaughtan
ACT330 247054 5971400 105.0 126.0 -90 090 Macnaughtan
ACT331 247154 5971438 105.0 142.0 -90 090 Macnaughtan
ACT332 247304 5971438 105.0 129.0 -90 090 Macnaughtan
ACT333 247204 5971438 105.0 156.0 -90 090 Macnaughtan
ACT334 247372 5971260 105.0 141.0 -90 090 Macnaughtan
ACT335 247272 5971254 105.0 114.0 -90 090 Macnaughtan
ACT336 247172 5971254 105.0 129.0 -90 090 Macnaughtan
ACT337 247072 5971252 105.0 138.0 -90 090 Macnaughtan
ACT338 247208 5971900 105.0 126.0 -90 090 Tomorrow South
ACT339 247258 5971900 105.0 129.0 -90 090 Tomorrow South
ACT340 247288 5971900 105.0 102.0 -90 090 Tomorrow South
ACT341 247386 5971900 105.0 136.0 -90 090 Tomorrow South
ACT342 247216 5973552 105.0 102.0 -90 090 Gravity 4
ACT343 247316 5973552 105.0 117.0 -90 090 Gravity 4
ACT344 247416 5973552 105.0 141.0 -90 090 Gravity 4
ACT345 247485 5973364 105.0 133.0 -90 090 Gravity 4
ACT346 247385 5973364 105.0 141.0 -90 090 Gravity 4
ACT347 247285 5973347 105.0 123.0 -90 090 Gravity 4
ACT348 245595 5977575 105.0 135.0 -90 090 Gravity 4
ACT349 247585 5973364 105.0 144.0 -90 090 Gravity 4
ACT350 Not drilled
ACT351 247556 5973552 105.0 131.0 -90 090 Gravity 4
ACT352 247286 5978400 105.0 138.0 -90 090 Prairie
ACT353 247186 5978400 105.0 141.0 -90 090 Prairie
ACT354 247086 5978400 105.0 138.0 -90 090 Prairie
ACT355 246986 5978400 105.0 137.0 -90 090 Prairie
ACT356 246886 5978400 105.0 110.0 -90 090 Prairie

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 11

TABLE 1b: AC Drill Assay Results using 25g Aqua Regia Method

HOLE FROM TO INTERVAL Au(ppm) COMMENTS
ACT320 - - - - Hole failed to reach basement
ACT321 - - - - Hole failed to reach basement
ACT322 84 85 1 0.00 Regional target – North Tomorrow
ACT323 107 108 1 0.04 Regional target – North Tomorrow
ACT324 66 69 3 0.00 Regional target – North Tomorrow
ACT325 111 114 3 0.00 West of Macnaughtan
ACT326 55 56 1 0.29 Macnaughtan
ACT327 44 45 1 0.28 Macnaughtan
ACT328 58 59 1 0.15 East of Macnaughtan
ACT329 81 84 3 0.03 West of Macnaughtan
ACT330 60 63 3 0.09 West of Macnaughtan
ACT331 129 132 3 0.02 - 15.55 Macnaughtan – Reported as a gold assay range.
Original 3m sample assayed 15.55 g/t in a bulk leach
assay. Subsequent bulk leach assays, based on one-
metre sub-samples, have produced a maximum
assayof [email protected]/t Au. Further drillingrequired.
ACT332 79 80 1 2.39 Tomorrow - Macnaughtan
ACT333 130 131 1 3.93 Macnaughtan
ACT333 137 138 1 5.07 Macnaughtan
ACT334 128 129 1 0.13 Tomorrow south
ACT335 66 69 3 0.05 Macnaughtan
ACT336 69 72 3 0.12 Macnaughtan
ACT337 107 108 1 0.01 West of Macnaughtan
ACT338 63 66 3 0.65 Tomorrow South
ACT338 84 89 5 4.73 Tomorrow South
ACT338 102 105 3 1.82 Tomorrow South
ACT338 123 126 3 0.72 Tomorrow South
ACT339 84 87 3 0.01 Tomorrow South
ACT340 69 72 3 0.01 East of Tomorrow South
ACT341 123 124 1 0.61 East of Tomorrow South
ACT341 133 134 1 0.66 East of Tomorrow South
ACT342 86 87 1 0.01 Regional target – Gravity4
ACT343 84 87 3 0.17 Regional target – Gravity4
ACT344 75 76 1 0.08 Regional target – Gravity4
ACT345 72 75 3 0.03 Regional target – Gravity4
ACT346 63 66 3 0.06 Regional target – Gravity4
ACT347 76 77 1 0.18 Regional target – Gravity4
ACT348 70 71 1 0.05 Regional target – Gravity4
ACT349 128 129 1 0.05 Regional target – Gravity4
ACT351 120 121 1 0.03 Regional target – Gravity4
ACT352 100 101 1 0.11 Prairie Zone
ACT353 123 126 3 0.10 Prairie Zone
ACT354 83 84 1 0.30 Prairie Zone
ACT355 98 99 1 0.01 Prairie Zone
ACT356 51 54 3 0.01 Prairie Zone

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 12

TABLE 1c: RC Blade/Hammer Drill Hole Collars

HOLE EASTING
GDA
NORTHING
GDA
RL DEPTH DIP GRID
AZIMUTH
RCT229 246750 5972860 105 163 -75 092
RCT230 246775 5972765 105 175 -60 091
RCT231 246822 5972655 105 169 -61 092
RCT232 247127 5972200 105 163 -61 270
RCT233 247177 5972200 105 163 -60 269
RCT234 247277 5972200 105 165 -60 269
RCT235 247213 5972000 105 149 -60 270
RCT236 247263 5972000 105 66 -61 270
RCT237 247313 5972000 105 66 -60 270
RCT238 246625 5973600 105 163 -60 271
RCT239 246665 5973600 105 163 -60 273
RCT240 246705 5973600 105 163 -61 268
RCT241 246690 5973400 105 90 -60 268
RCT242 246730 5973400 105 133 -60 271
RCT243 246770 5973400 105 163 -60 270
RCT244 246750 5973200 105 163 -61 269
RCT245 246786 5973200 105 163 -60 258
RCT246 246830 5973200 105 163 -60 269
RCT247 247054 5972470 105 163 -60 269
RCT248 247038 5972550 105 163 -60 268
RCT249 247062 5972550 105 193 -61 269
RCT250 246997 5972575 105 163 -60 268
RCT251 246995 5972650 105 163 -60 271
RCT252 247019 5972650 105 127 -60 270

Table 1d: RC Blade/Hammer Drill Assay Results using 25g Aqua Regia Method

HOLE FROM TO INTERVAL Au(ppm) COMMENTS
RCT229 157 158 1 0.77 West of Tomorrow
RCT230 68 69 1 0.05 West of Tomorrow
RCT231 81 82 1 0.08 West of Tomorrow
RCT232 135 136 1 1.34 Tomorrow prospect
RCT233 74 75 1 1.35 Tomorrow prospect
RCT233 80 81 1 0.78 Tomorrow prospect
RCT233 111 114 3 44.57 Tomorrow prospect
including 111 112 1 131.0
RCT234 122 123 1 1.79 East of Tomorrow
RCT234 126 127 1 0.90 East of Tomorrow
RCT234 132 133 1 0.52 East of Tomorrow
RCT234 134 135 1 0.77 East of Tomorrow
RCT234 143 144 1 1.89 East of Tomorrow
RCT234 153 154 1 1.10 East of Tomorrow
RCT235 58 59 1 2.10 Tomorrow south
RCT236 52 53 1 0.02 Tomorrow north

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 13

HOLE FROM TO INTERVAL Au(ppm) COMMENTS
RCT237 60 61 1 0.03 Tomorrow north
RCT238 68 69 1 0.54 Tomorrow north
RCT239 97 98 1 0.21 Tomorrow north
RCT240 90 91 1 0.18 Tomorrow north
RCT241 73 74 1 0.49 Tomorrow north
RCT242 76 77 1 0.15 Tomorrow north
RCT243 58 59 1 0.41 Tomorrow north
RCT244 56 57 1 0.42 Tomorrow north
RCT245 62 63 1 0.03 Tomorrow north
RCT246 144 145 1 14.30 Tomorrow north – lower reef
RCT247 53 55 2 0.85 Tomorrow prospect
RCT247 66 67 1 5.26 Tomorrow prospect
RCT247 78 79 1 0.79 Tomorrow prospect
RCT248 34 40 6 2.63 Tomorrow prospect
RCT248 74 75 1 0.61 Tomorrow prospect
RCT248 89 90 1 1.91 Tomorrow prospect
RCT249 33 34 1 11.40 Tomorrow prospect
RCT249 37 38 1 0.71 - Stacked mineralisation
RCT249 42 43 1 0.94 - Stacked mineralisation
RCT249 75 76 1 0.92 - Stacked mineralisation
RCT249 100 124 24 4.20 - Stacked mineralisation
including 108 114 6 14.30
RCT249 140 141 1 1.34 - Stacked mineralisation
RCT249 145 146 1 0.55 - Stacked mineralisation
RCT249 149 162 13 2.41 - Stacked mineralisation
Including 149 157 8 3.62
Including 154 155 1 22.10
RCT249 166 172 6 2.70 - Stacked mineralisation
including 170 171 1 14.0
RCT249 185 186 1 0.61 - Stacked mineralisation
RCT250 50 51 1 0.16
RCT251 33 34 1 3.05 Tomorrow prospect
RCT251 81 82 1 0.70 Tomorrow prospect
RCT251 85 86 1 1.74 Tomorrow prospect
RCT251 95 96 1 0.56 Tomorrow prospect
RCT252 61 63 2 1.06 Tomorrow prospect
RCT252 71 73 2 2.47 Tomorrow prospect
RCT252 76 89 13 2.33 Tomorrow prospect
including 79 89 10 2.71
including 85 86 1 10.25
RCT252 115 116 1 0.89 Tomorrow prospect
RCT252 124 126 2 1.22 Tomorrow prospect

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 14

JORC Code 2012 Edition – Table 1, Section 1: Sampling Techniques and Data

RC Sampling Techniques and
Data
Criteria
Explanation
Sampling techniques Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Samples from surface collected at cyclone at one-metre
intervals with no sub-sampling.

All material collected in individual numbered plastic bags; chip
trays collected by hand from bags (uncomposited).

Laboratory samples selected using Jones riffle splitter into
calico sample bags to a mass of >2kg (if sufficient sample is
available) and <3kg.

Cover sequence is understood to potentially contain alluvial
gold, and thus cover samples are occasionally submitted for
assay.
Drilling techniques Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Holes are initiated using 120mm AC drilling. This method
provides reverse-circulation face sampling of sufficiently soft
material.

On bit-refusal, a four-inch diameter RC hammer with 110mm
button bit was utilised to progress the hole to design depth or
where groundwater inflows compromise sample quality.

All drilling utilises three or six metre RC drill rods; truck-
mounted drill rig; 400psi 900cfm compressor and booster;
auxiliary compressor where dictated by water in-flows.

Holes were routinelycased to basement depth with PVC.
Drill sample recovery Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Where sample volumes at cyclone were unduly affected by
groundwater, holes are terminated (by inspection) where
sample quality is compromised.

Sample water content assessed by rig geologist as being dry or
wet.

Sample bags collected at the rig are weighed prior to sample
splitting. Sample weight is used to assess the splitting
requirements (number of riffles required) to deliver a sub-
sample to the desired mass constraints (>2kg and <3kg). Calico
bag masses recorded by laboratory contractor.

Geological control maintained at the drill site at all times, to
ensure drillingand samplingwas to standard.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 15

RC Sampling Techniques and
Data
Criteria
Explanation
Logging Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Chip samples are geologically logged at one-metre intervals for
lithology, alteration, quartz veining and to a standard
acceptable for subsequent interpretation for use in estimation.

Logging aspects are qualitative with exception of quartz vein
content which is estimated semi-quantitatively

All logged intervals represent entire one-metre sample
segregation intervals.
Sub-sampling techniques and
sample preparation
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Lab submission samples collected as described – any mass
reduction required for assay purposes performed by laboratory
contractor; consisting of drying and riffle-splitting.

Samples dispatched to commercial laboratory (Catalyst have
used ALS Pty Ltd exclusively); samples dried and pulverised in
entirety, with 25g aliquot split for analysis (laboratory repeat
splits historically demonstrate acceptable reproducibility and
hence accuracyfor this mineralisation).
Quality of assay data and
laboratory tests
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Gold assay determined by ICPMS via aqua regia digestion (ALS
code Au-OG43). Experience has shown this method to be
applicable for fine grained gold population of the mineralisation
due to the completion of digestion. There is a technical
constraint in that coarse-grained gold may not completely enter
solution resulting in a conservative assay.

Laboratory and client certified reference materials (3 x
standards)are implemented every30thsamples.
Verification of sampling and
assaying
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Data management procedures are under development. Data
management is performed by an experienced individual and
not by several individuals.

There has been no verification of significant intersections by
independent nor alternative company personnel.

Drill hole sampling and geological data logged onto paper in
preparation for database data entry.

There have been no adjustments to data as provided by the
commercial assaylaboratory.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 16

RC Sampling Techniques and
Data
Criteria
Explanation
Location of data points Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

All drill hole location coordinates are measured using
differential GPS to MGA94 Zone 55 and AHD estimated from
terrain model created from publicly-available land survey data.

Collar locations to within an estimated precision of 10mm
horizontally and 20mm vertically.

All drill holes are downhole surveyed. Drilling orientation
establishedprior to collaringwith clinometer and compass.
Data spacing and distribution Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

RC drill holes within the main cluster of mineralisation are
drilled on 25-metre spaced sections.

The sections consist of holes spaced at a nominal 25m interval.

Drill holes in this program were designed to complement
existing sections where there were information gaps or where
sections required step-out holes.

This spacing is designed to be of a sufficient density to
ultimately be included in the estimation of a mineral resource.

For the purpose of reporting, assays are aggregated to reflect
continuouslysampled zones of significant anomalism forgold.
Orientation of data in relation
to geological structure
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Drill hole sections are aligned approximately 112 degrees
clockwise from the strike of mineralisation. Holes are generally
inclined 60 degrees to the west to provide cross-strike
investigation within holes and to establish continuity of sub-
vertical mineralisation between holes.
Sample security Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

All samples are controlled by the responsible geologist and
stored in secured facility prior to despatch to laboratory.

Samples are transported directly to laboratory by a commercial
transportation contractor with chain-of-custody protocols in
place.

Sample number receipt information from laboratory cross-
referenced and rationalised against sample number dispatch
information.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 17

RC Sampling Techniques and
Data
Criteria
Explanation
Audits or reviews Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

No processes or data used in developing the release of
exploration results have been subject to audit or review by non-
company personnel or contractors so as to reduce costs and
timelines for reporting. Catalyst Metals Limited currently
reserve this process for release of Mineral Resource and Ore
Reserve estimates.
Air-core Sampling Techniques
and Data
Criteria
Explanation
Sampling techniques Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Samples collected at cyclone at one-metre intervals.

Cover sequence samples collected in buckets and arranged as
piles on the ground; basement material samples collected in
individual numbered plastic bags; chip trays collected by hand
from piles and bags (uncomposited).

Assay laboratory samples collected by hand from bags (no
routine cover sequence sampling) into calico sample bags to a
mass of <3kg (composited to three-metre intervals
corresponding with drill rods).

Cover sequence is understood to potentially contain alluvial
gold, and thus cover samples are occasionally submitted for
assay.
Drilling techniques Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Three-inch diameter AC blade drill bit; three-metre RC drill
rods; truck-mounted drill rig; 300psi 700cfm compressor.

All holes are uncased.

Penetration into basement to depth of bit refusal against quartz
or fresh rock.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 18

Air-core Sampling Techniques
and Data
Criteria
Explanation
Drill sample recovery Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

AC drilling provides a high variability sample recovery, due to
low pressures of equipment and common groundwater effects.

Sample water content assessed by rig geologist as being
dry/moist/wet

Calico bag masses recorded by commercial laboratory.

Geological control is maintained at the drill site at all times, to
ensure drillingand samplingstandards maintained.
Logging Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Chip samples are geologically logged at 1m intervals for
lithology, alteration, quartz veining and to a standard
acceptable for subsequent interpretation for use in estimation.

Logging aspects are qualitative with exception of quartz vein
content which is estimated semi-quantitatively.

All logged intervals represent entire one-metre sample
segregation intervals.
Sub-sampling techniques and
sample preparation
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Three metre samples selected (composited) by hand-grab at
drill site when materials were dry, moist, or wet; duplicate
samples taken approximately every 30 samples (one per drill
hole).

Samples dispatched to commercial laboratory (Catalyst have
used ALS Pty Ltd exclusively); samples dried and pulverised in
entirety, with 25g aliquot split for analysis (laboratory repeat
splits historically demonstrate acceptable reproducibility and
hence accuracy for this mineralisation).

Analysis of duplicate samples collected at the drill site provided
acceptable confidence that sampling was appropriate for the
level for the intended (non-resource estimation) use of the
assaydata.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 19

Air-core Sampling Techniques
and Data
Criteria
Explanation
Quality of assay data and
laboratory tests
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Gold assay determined by ICPMS via aqua regia digestion (ALS
code Au-TL43). Experience has shown this method to be
applicable for fine grained gold population of the mineralisation
due to the completion of digestion. There is a technical
constraint in that coarse-grained gold may not completely enter
solution resultingin conservative assay.
Verification of sampling and
assaying
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Data management procedures are under development. Data
management has been performed by an experienced individual
and not by several individuals.

There has been no verification of significant intersections by
independent or alternative company personnel.

There has been no drill hole twinning to verify results.

Drill hole sampling and geological data logged onto paper in
preparation for database data entry.

There have been no adjustments to data as provided by the
commercial assaylaboratory.
Location of data points Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Where available, drill hole location coordinates are measured
using differential GPS. In general, drill hole collars surveyed by
12-channel GPS to MGA94 Zone 55 and AHD estimated from
terrain model created from publicly available land survey data.

Collar locations to within an estimated precision of+5m.

No drill holes were downhole surveyed. Drilling orientation
establishedprior to collaringwith clinometer and compass.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 20

Air-core Sampling Techniques
and Data
Criteria
Explanation
Data spacing and distribution Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Air core drilling to the south of Macnaughtan was completed on
three sections spaced 180m and 280m. Spacing within sections
was 100 metres.

The Air core drilling south of Tomorrow was on a 100m step-
out section south of RC drill coverage. The holes on this section
were spaced nominally 50m.

A 100-metre hole spacing, it is not of sufficient density to allow
estimation of a mineral resource.

One-metre samples were composited to three-metre samples
for the purpose of submission to the laboratory. For the
purpose of reporting, assays have been aggregated to reflect
continuouslysampled zones of significant anomalism forgold.
Orientation of data in relation
to geological structure
Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

Drill hole sections are aligned approximately 112 degrees
clockwise from the strike of mineralisation. In general, holes
were vertical because of the reconnaissance nature of the
drilling.
Sample security Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

All samples are controlled by the responsible geologist and
stored in secured facility prior to despatch to laboratory.

Samples are transported directly to laboratory by a commercial
transportation contractor with chain-of-custody protocols in
place.

Sample number receipt information from laboratory cross-
referenced and rationalised against sample number dispatch
information.
Audits or reviews Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

No processes or data used in developing the release of
exploration results have been subject to audit or review by non-
company personnel or contractors so as to reduce costs and
timelines for reporting. Catalyst Metals Limited currently
reserves this process for release of Mineral Resource and Ore
Reserve estimates.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 21

Section 2 Reporting of Exploration Results - RC and Air Core Drilling

Reporting
of
Exploration
Results
Criteria
Explanation
Mineral tenement and land
tenure status

The Tandarra Gold Project is located within RL006660 in the
vicinity of Dingee Victoria, owned in joint venture by Navarre
Minerals Ltd (49%) and operator, Catalyst Metals Ltd (51%).

The Retention Licence was approved on 2 November 2018 for a
period of ten years. It replaced EL4897.

Exploration activities were confined to free-hold farmland and
road-side easements.
Exploration done by other
parties

None in the area drilled.
Geology
Gold-arsenic bearing narrow veins in Ordovician sandstone in
the vicinity of a regional-scale anticline.

Deposit assessed as being northern extension of Bendigo
Goldfield, with potential for post-mineralisation
influence/redistribution by proximal granitic intrusion.

Potential for some supergene gold enrichment in paleo-
weathering profile.
Drill hole Information
Appendix 1 Tables 1a and 1c: Collar location coordinates,
downhole depths, azimuths, declinations.

Appendix 1, Tables 1b and 1d: Downhole intervals of reported
goldgrades.
Data aggregation methods Although Navarre was not directly involved in the operation of the
Tandarra JV drilling program, it has made assumptions based on
information provided by manager and operator, Catalyst Metals.
Catalyst has provided the following comment:

AC and RC drill hole data were not composited.

AC drill hole samples are composited to three metres in the first
instance. Subsequent resampling of anomalous composites is
performed on a one-metre sample interval basis.

No top-cutting applied to assay data.

Zones of significance identified as those with assays in excess of
0.5g/t and internal dilution of two consecutive assays or less.

Reported zones are continuous,with no sample or assay gaps.
Relationship between
mineralisation widths and
intercept lengths

The strike of mineralisation is demonstrated to be generally 22
degrees west of grid north.

The dip of mineralisation is expected to be sub-vertical and sub-
parallel with bedding as was the case in the Bendigo Goldfield.

RC drill holes are orientated with a dip to the west to provide
effective geometry in the context of the eastern limb of an
anticline.

AC reconnaissance drill holes are vertical.

Due to the complexity of slate belt gold mineralisation, the true
width of mineralisation has not been resolved. As such,
significant mineralised intersections have been reported as
downhole intervals.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625 e [email protected] | w navarre.com.au

N a v a r r e M i n e r a l s L i m i t e d ( N M L ) A S X A n n o u n c e m e n t P a g e | 22

Reporting
of
Exploration
Results
Criteria
Explanation
Diagrams
Figures 2, 3 and 4 show position of key drill holes in plan and
longitudinal projection. Table 1a and 1c lists all hole collar
positions.
Balanced reporting
All drilling inclusive of holes which did not contain significant
intersections are included in Tables 1b and 1d.
Other substantive exploration
data

No other exploration results that have not previously been
reported,are material to this report.
Further work
DDH drilling is continuing at Tandarra but should be completed
in July2019.

Navarre Minerals Limited | ABN 66 125 140 105 40 - 44 Wimmera Street | PO Box 385 | Stawell VIC 3380 Australia t +61 3 5358 8625

e [email protected] | w navarre.com.au