ASX/Media Announcement 16 April 2012
ELAINE COPPER ZONES EXTENDED
-
MKED007: 144m @ 0.55% Cu, 307ppm Co and 0.10g/t Au from 505m inc. 14m @ 0.74% Cu, 407ppm Co and 0.22g/t Au from 518m inc. 36m @ 0.77% Cu, 321ppm Co and 0.08g/t Au from 543m inc. 17m @ 0.86% Cu, 284ppm Co and 0.14g/t Au from 599m
-
MKED007: 23m @ 2391ppm TREO, 0.02kg/t U3O8 and 0.13kg/t ThO2 from 671m
inc. 2m @ 9094ppm TREO, 0.02kg/t U3O8 and 0.62kg/t ThO2 from 671m 48m @ 2124ppm TREO, 0.04kg/t U3O8 and 0.08kg/t ThO2 from 731m inc. 1m @ 16189ppm TREO, 0.38kg/t U3O8 and 0.12kg/t ThO2 from 754m
-
MKED021: 33m @ 0.60% Cu, 528ppm Co and 0.16g/t Au from 633m inc. 20m @ 0.71% Cu, 478ppm Co and 0.22g/t Au from 642m
-
Mineralisation now intersected along strike and down dip from current resource definition area. The Elaine mineralisation within and adjoining the regional Mary Kathleen shear is open to the east and west.
Chinalco Yunnan Copper Resources (CYU) and Goldsearch Limited (GSE) are pleased to provide an update on the current definition and extensional diamond drill program at the Elaine prospect that forms part of the Mary Kathleen Joint Venture Project ( Figure 1 ) at Mt Isa, Queensland. CYU hold 70%, GSE hold 30% interests in the Mary Kathleen Joint Venture.
Final assay results have been returned for 5 drill holes completed since January 2012 ( Figure 2 ). Drilling has consisted of combination of extension of previous drill holes that terminated in mineralisation with a deeper penetrating rig and new drill holes stepping out to the northeast of the mineralised trend. Drill hole collar and survey information is provided in Table 1 . A summary of significant intersections is provided in Table 2 .
MKED007 was extended from its initial depth of 607.9m to a final depth of 825.9m to close off the 2011 reported open intersection of 122.9m @ 0.56% Cu, 317ppm Co from 487m OPEN (0.1% Cu lower cut) contained within a broader mineralised envelope of 346.7m @ 0.28% Cu, 220ppm Co 0.03g/t Au from 263m OPEN.
Final assays returned for MKED007 have extended this mineralized envelope to 557m @ 0.23% Cu, 182ppm Co and 0.03g/t Au from 263m including 144m @ 0.55% Cu, 307ppm Co and 0.10g/t Au from 505m ( equating to 162m @ 0.53% Cu, 325ppm Co 0.09g/t Au from 487m at a 0.1% Cu lower cut ) ( Figure 3 ).
Several significant zones of copper mineralisation at a 0.5% Cu lower cut have also been returned, highlighted by 20m @ 0.71% Cu, 478ppm and 0.22g/t Au, MKED021 from 642m, 1 4m @ 0.74% Cu,
1
==> picture [42 x 42] intentionally omitted <==
407ppm Co, 0.22g/t Au , MKED007 from 518m and 17m @ 0.86% Cu, 284ppm Co and 0.14g/t Au MKED007 from 599m .
Significant broad (>20m) low-grade (>1,500ppm) intersections of total rare earth oxide ( TREO = >90% Ce, La, Nd), uranium and thorium mineralisation have also been returned in MKED007. Spot intersections >250ppm U3O8 are highlighted by 1m @ 4,868ppm TREO, 0.65kg/t U3O8, 0.96kg/t ThO2 from 717m, 1 m @ 16,189ppm TREO, 0.38kg/t U3O8, 0.12kg/t ThO2 from 754m ( Table 3 ).
The on-going resource evaluation has been postponed to include this latest round of drilling. On the completion of MKED023 and a proposed extension to MKED016, the drill rigs will be removed from Elaine to work on other regional targets.
CYU CHILE AND LAOS PROJECTS UPDATE
Chile
Copper is targeted at the Rio Tinto joint ventures in Chile at the Candelabro, Caramasa and Palmani porphyry properties. Surface mapping, sampling and geophysical surveys indicate these targets are highly prospective. Another CYU Chile project is the Humitos Copper Porphyry in the Copiapo District of north Chile. Drilling at Candelabro is near completion. No significant assays were returned from top 300m of drill hole CAND005 (reported 27[th] March). The remaining 200m sample submitted to ALS - Antofagasta with assays pending. Drilling is still underway on CAN006. Track and pad construction has been completed at Caramasa, which will be drilled after Candelabro. Road permitting has been completed at Palmani, preparations underway for drill road and pad construction.
Laos
First phase of diamond drilling at the Jiuzhai project, Northern Laos (Sanmu Mining - CYU is earning 51% equity), is continuing with the second diamond drill hole currently at a depth of 223m. Assay results have been returned from the Yunnan Nonferrous Metals Geology and Test Centre, Kunming, China for two drill holes completed at the Jiuzhai project and Xinzhai project, Northern Laos, respectively. Results are currently being reviewed and compiled.
About Chinalco Yunnan Copper Resources
Chinalco Yunnan Copper Resources Limited (CYU) explores and develops minerals in Australia, Chile and Laos. CYU is supported by cornerstone shareholder Yunnan Copper Industry (Group) Co Ltd (YCI); China's third largest copper producer. CYU acts as YCI's international investment arm and mining house.
Competent Person’s Statement
The information regarding the Exploration Activities on the Elaine Copper Prospect (EPM 14022) is based on information compiled by Mr Richard Hatcher, who is a Member of the Australian Institute of Geologists and is the Exploration Manager of Chinalco Yunnan Copper Resources Ltd. Mr Hatcher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results and Mineral Resources". Mr Hatcher consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Enquiries:
Mr Jason Beckton Managing Director CYU 0438 888 612 www.cycal.com.au
Rudi Michelson Monsoon Communications 03 9620 3200
2
==> picture [42 x 42] intentionally omitted <==
Table 1: Elaine 2012 Diamond Drill Program – Holes to date
| HOLE ID | EAST* | NORTH* | RL (m) | AZIMUTH** | DIP | DEPTH |
|---|---|---|---|---|---|---|
| MKED021 MKED022 MKED023(2) |
398,498 398,496 398,226 |
7,699,639 7,699,645 7,699,571 |
397 397 450 |
295 312 333 |
-60 -62 -73 |
711.98 725.90 800.00 |
| MKED007(1) MKED018(1) MKED019(1) |
398,203 398,225 398,120 |
7,699,552 7,699,570 7,699,443 |
448 450 402 |
332 354 334 |
-75 -60 -69 |
216.20 123.30 555.20 |
| * Datum is UTM MGA9 (1) Extensio 679.1m – (2) MKED02 |
4 Zone 54 ** Azimuth is UTM Grid North (MGA94 Zone 54) n of drill hole from previous depth: MKED007 from 609.7m – 825.9m, MKE 822.7m. 3 currently drilling |
D018 from 630.3m – 753.3m, MKED019 from | 3,132.58 |
Table 2: Elaine 2012 Diamond Drilling - Summary of significant copper-cobalt-gold intersections at a nominal 0.2% Cu lower cut with a max 3m internal dilution.
| Hole_ID | From (m) | To (m) | Width (m) | Au (g/t) | Cu (%) | Co (ppm) | CuEq (%) |
|---|---|---|---|---|---|---|---|
| MKED007 (Min Zone) |
263 | 820 | 557 | 0.23 | 182 | 0.03 | 0.32 |
| MKED007 | 309 | 322 | 13 | 0.02 | 0.23 | 295 | 0.36 |
| MKED007 inc. (0.5%) |
355 359 |
368 366 |
13 7 |
0.09 0.14 |
0.55 0.77 |
631 652 |
0.84 1.10 |
| MKED007 inc. (0.5%) |
489 489 |
501 500 |
12 11 |
0.05 0.05 |
0.60 0.61 |
598 645 |
0.85 0.88 |
| MKED007 inc. (0.5%) inc. (0.5%) inc. (0.5%) |
505 518 543 599 |
649 532 579 616 |
144 14 36 17 |
0.10 0.22 0.08 0.14 |
0.55 0.74 0.77 0.86 |
307 407 321 284 |
0.72 1.03 0.94 1.06 |
| MKED018 MKED018 |
148 189 |
149 190 |
1 1 |
0.10 0.02 |
0.20 0.20 |
22 125 |
0.27 0.26 |
| MKED019 inc. (0.5%) MKED019 MKED019 inc. (0.5%) MKED019 MKED019 |
33 48 307 322 324 668 686 |
34 57 317 356 344 669 703 |
29 9 10 34 20 5 17 |
0.02 0.04 0.01 0.03 0.04 0.06 0.05 |
0.36 0.55 0.24 0.54 0.75 0.38 0.38 |
154 178 291 258 318 132 129 |
0.43 0.64 0.35 0.66 0.90 0.46 0.46 |
| MKED021 inc. (0.5%) |
633 642 |
666 662 |
33 20 |
0.16 0.22 |
0.60 0.69 |
528 479 |
0.89 1.01 |
| MKED022 MKED022 |
343 407 |
345 408 |
2 1 |
0.01 -0.01 |
0.26 0.48 |
25 134 |
0.27 0.52 |
| MKED023 | A/P = Assays Pending |
* Cu equivalent calculations represent the total metal value for each metal, multiplied by the conversion factor, summed and expressed in equivalent copper percentage. These results are exploration results only and no allowances are made for recovery losses that may occur should mining eventually result. However it is the company’s opinion that elements considered here have a reasonable potential to be recovered. Long-term price assumptions and copper equivalent conversion factors are summarized below: Cu equivalent formula = Cu (%) + (Co (ppm) x 0.0004) + (Au (g/t) x 0.6279)**
Price assumptions – Cu (US$3.8902/lb.), Co (US$14.65/lb.), Au (US$1675.1/oz.), Market prices as at 3pm EPST 13/03/2012
3
==> picture [42 x 42] intentionally omitted <==
Table 3: Elaine 2012 Diamond Drilling - Summary of significant TREO-uranium-thorium intersections at a nominal 1500ppm TREO lower cut with a max 3m internal dilution.
| Hole_ID | From (m) | To (m) | Width (m) | TREO (ppm) | U3O8 (kg/t) | ThO2 (kg/t) | LREO (%) | HREO (%) |
|---|---|---|---|---|---|---|---|---|
| MKED007 inc |
633 634 |
635 635 |
2 1 |
4674 7619 |
0.14 0.27 |
0.42 0.81 |
97 98 |
3 2 |
| MKED007 | 643 | 647 | 4 | 1856 | 0.07 | 0.19 | 94 | 6 |
| MKED007 | 657 | 658 | 1 | 2223 | 0.01 | 0.04 | 96 | 4 |
| MKED007 | 663 | 664 | 1 | 1847 | 0.01 | 0.08 | 87 | 13 |
| MKED007 inc inc inc |
671 671 678 685 |
694 673 680 694 |
23 2 2 9 |
2391 9094 3654 1843 |
0.02 0.02 0.02 0.03 |
0.13 0.62 0.05 0.09 |
92 96 97 93 |
8 4 3 7 |
| MKED007 | 717 | 718 | 1 | 4868 | 0.65 | 0.96 | 98 | 2 |
| MKED007 inc inc inc inc inc |
731 731 735 750 754 765 |
779 746 736 760 755 773 |
48 15 1 10 1 8 |
2124 2090 5288 3492 16189 2333 |
0.04 0.04 0.06 0.06 0.38 0.03 |
0.08 0.08 0.07 0.07 0.12 0.09 |
93 94 98 96 99 94 |
7 6 2 4 1 6 |
| MKED007 | 804 | 814 | 10 | 1693 | 0.01 | 0.05 | 94 | 6 |
4
==> picture [42 x 42] intentionally omitted <==
==> picture [452 x 334] intentionally omitted <==
Figure 1. Tenement and prospect location plan of the Mary Kathleen and Mount Frosty Joint Venture projects. The Elaine prospect is located approximately 60km east of Mount Isa and is situated along the 6.5km long Mary Kathleen Shear zone.
==> picture [452 x 288] intentionally omitted <==
Figure 2. Simplified map showing north side of the Elaine garnet hill. Mineralisation is expected to continue down the western side and on the southern side of the hill and merge with the U-REO resource where untested copper outcrops occur.
5
==> picture [42 x 42] intentionally omitted <==
==> picture [440 x 640] intentionally omitted <==
Figure 3. MKED007 extended to 825.9m with new drill rig after mineralisation left open due to reaching drilling capacity of previous drill rig. Assays returned confirm continuation of mineralisation at depth.
6