ASX/Media Announcement 25 May 2012

- ELAINE COPPER GOLD ZONES EXTENDED

Chinalco Yunnan Copper Resources (CYU) and Goldsearch Limited (GSE) are pleased to provide an update on the current definition and extensional diamond drill program at the Elaine prospect that forms part of the Mary Kathleen Joint Venture Project ( Figure 1 ) at Mt Isa, Queensland. CYU hold 70%, GSE hold 30% interests in the Mary Kathleen Joint Venture.

Final assay results have been returned for 2 drill holes (MKED023 and MKED016) completed in the area identified to use for work on the initial resource definition for the project ( Figure 2 ). Drilling has consisted of combination of extension of previous drill holes that terminated in mineralisation with a deeper penetrating rig and new drill holes stepping out to the northeast – southwest of the mineralised trend. Drill hole collar and survey information is provided in Table 1 . A summary of significant intersections is provided in Table 2 .

Highlights from MKE023 ( Figures 3 and 4 ) include the following:

  • MKED023: 21m @ 0.61% Cu, 772ppm Co and 0.65g/t Au from 464m inc. 4m @ 2.40% Cu, 237ppm Co and 0.24g/t Au from 464m inc. 10m @ 0.11% Cu, 709ppm Co and 1.08g/t Au from 468m (0.5g/t Au cut-off)

  • MKED023: 120m @ 0.56% Cu, 272ppm Co and 0.08g/t Au from 505m inc. 24m @ 0.70% Cu, 369ppm Co and 0.08g/t Au from 544m inc. 23m @ 0.85% Cu, 275ppm Co and 0.19g/t Au from 572m inc. 7m @ 1.00% Cu, 149ppm Co and 0.07g/t Au from 611m

  • MKED023: 13m @ 0.95% Cu, 771ppm Co and 0.21g/t Au from 643m

  • MKED023: 16m @ 2,278ppm TREO, 0.09kg/t U3O8 and 0.31kg/t ThO2 from 874m

  • Mineralisation now intersected along strike and up dip from current resource definition area. The Elaine mineralisation within and adjoining the regional Mary Kathleen shear is open to the east and west.

MKED023 was drilled to test a 100m step out to the significant gold intersection reported for MKED009 of 109m @ 0.50% Cu, 482ppm Co and 1.98g/t Au from 491m.

Final assays returned for MKED023 have extended the previous intersected high grade gold zone in MKED009 with a broad zone of 21m @ 0.61% Cu, 772ppm Co and 0.65g/t Au from 464m including 10m @ 0.11% Cu, 709ppm Co and 1.08g/t Au from 468m (0.5g/t Au cut-off). This intersection is approximate 100m along strike and approximately 50m up dip from MKED009.

Several significant zones of copper mineralisation have also been returned from MKED023, highlighted by 4m @ 2.40% Cu, 237ppm Co and 0.24g/t Au from 464m, 120m @ 0.56% Cu, 272ppm Co and 0.08g/t Au from 505m including 23m @ 0.85% Cu, 275ppm Co and 0.19g/t Au from 572m and 13m @ 0.95% Cu, 771ppm Co and 0.21g/t Au from 643m.

Significant broad (>20m) low-grade (>1,500ppm) intersections of total rare earth oxide ( TREO = >90% Ce, La, Nd), uranium and thorium mineralisation have also been returned in MKED023. Spot intersections >250ppm U3O8 are highlighted by 2m @ 6,283ppm TREO, 0.34kg/t U3O8, 1.0kg/t ThO2 from 878m, 1 m @ 4,681ppm TREO, 0.36kg/t U3O8, 0.97kg/t ThO2 from 889m ( Table 3 ).

1

==> picture [42 x 42] intentionally omitted <==

MKED016 was extended from its initial depth of 642.4m to a final depth of 762.4m to close off the 2011 open intersected mineralisation contained within a broader mineralised envelope.

Assays results are pending for MKED026 and MKED029. In addition regional targets of Elaine 2 and Elaine 3 situated 1 – 2km southeast of the Elaine resource area have been tested with drill holes MKED024, MKED025, MKED027, MKED028 and MKED030. Assays are pending for all these holes.

The initial resource evaluation work has been delayed to incorporate the results from the latest round of drilling. Drill data and results up to and including MKED023 have now been supplied for inclusion in the initial resource evaluation. All drill holes after MKED023 will not be used in the resource calculation.

CYU CHILE AND LAOS PROJECTS UPDATE

Chile

Drilling at the Candelabro project is near completion. No significant assays were returned from top 300m of drill hole CAND005 (reported 27[th] March). The remaining 200m of samples have been submitted to ALS - Antofagasta with assays pending. An update on visual results from drilling of CAND0007 will be provided shortly. The final hole for this campaign CAND0008 is currently underway. The track and pad construction has been completed at the Caramasa project, which will be drilled after Candelabro. Road permitting has been completed at the Palmani project with preparations underway for drill road and pad construction.

Laos

The first phase of exploration program at the Jiuzhai Zn-Pb-Ag project and the Xinzhai Cu-Ag project has been completed including mapping, geochemical, geophysical and diamond drilling programs), Northern Laos (Sanmu Mining - CYU is earning 51% equity), All the samples have been prepared and delivered to Yunnan Nonferrous Metals Geology and Test Centre in Kunming, China. Partial assay results have been returned and the data and results to date are currently being compiled and reviewed.

About Chinalco Yunnan Copper Resources

Chinalco Yunnan Copper Resources Limited (CYU) explores and develops minerals in Australia, Chile and Laos. CYU is supported by cornerstone shareholder Yunnan Copper Industry (Group) Co Ltd (YCI); China's third largest copper producer. CYU acts as YCI's international investment arm and mining house.

Competent Person’s Statement

The information regarding the Exploration Activities on the Elaine Copper Prospect (EPM 14022) is based on information compiled by Mr Richard Hatcher, who is a Member of the Australian Institute of Geologists and is the Exploration Manager of Chinalco Yunnan Copper Resources Ltd. Mr Hatcher has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results and Mineral Resources". Mr Hatcher consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Enquiries: Mr Jason Beckton Managing Director CYU 0438 888 612 www.cycal.com.au

Rudi Michelson Monsoon Communications 03 9620 3200

2

==> picture [42 x 42] intentionally omitted <==

Table 1: Elaine 2012 Diamond Drill Program – current as of 23 May 2012

HOLE ID EAST* NORTH* RL(m) AZIMUTH** DIP DEPTH
MKED0161 398,057 7,699,618 391 306 -75 762.4
MKED023 398,227 7,699,573 459 328 -73 891.7
MKED026 398,057 7,699,621 399 310 -60 294.6
MKED0292 398,120 7,699,443 402 285 -70 478.0
MKED024 399,012 7,698,874 423 205 -60 150.6
MKED025 399,263 7,698,527 441 0 -90 114.8
MKED027 398,962 7,698,719 465 0 -90 114.6
MKED028 398,695 7,698,938 446 180 -60 156.4
MKED0302 399,267 7,698,882 468 236 -60 26.0
*Datum is UTM MGA94 Zone 54 ** Azimuth is UTM Grid North (MGA94 Z54) 2,989.1m

1 - Extension from 642.4m 2 - Currently Drilling

Table 2: Elaine 2012 Diamond Drilling - Summary of significant copper-cobalt-gold intersections, in drill hole MKED023, at a nominal 3m minimum width at a 0.2% Cu lower cut, with max 3m internal dilution.

HOLE ID From(m) To(m) Width(m) Au(g/t) Cu(%) Co(ppm) CuEq (%)
MKED016 81 95 14 0.01 0.20 130 0.20
MKED016 514 533 19 0.01 0.25 35 0.25
MKED016 550 553 3 0.04 0.38 125 0.40
MKED016 569 572 3 <0.01 0.30 78 0.30
MKED016 604 614 10 <0.01 0.25 165 0.25
MKED023 121 128 7 0.05 0.30 52 0.33
MKED023 390 393 3 0.12 <0.01 414 0.09
MKED023 436 439 3 0.11 0.33 253 0.40
MKED023
inc.
inc.
464
464
468
485
468
478
21
4
10
0.65
0.24
1.08
0.61
2.40
0.11
772
237
709
1.01
2.55
0.79
MKED023
inc.
inc.
inc.
505
544
572
611
625
568
595
618
120
24
23
7
0.08
0.08
0.19
0.07
0.56
0.70
0.85
1.00
272
369
275
149
0.61
0.75
0.97
1.04
MKED023 643 656 13 0.21 0.95 771 1.08
MKED023 661 696 35 0.06 0.39 251 0.43
MKED023 705 709 4 0.19 0.49 109 0.61

* Cu equivalent calculations represent the total metal value for each metal, multiplied by the conversion factor, summed and expressed in equivalent copper percentage. These results are exploration results only and no allowances are made for recovery losses that may occur should mining eventually result. However it is the company’s opinion that elements considered here have a reasonable potential to be recovered. Long-term price assumptions and copper equivalent conversion factors are summarized below: Cu equivalent formula = Cu (%) + (Co (ppm) x 0.0004) + (Au (g/t) x 0.6279) Price assumptions – Cu (US$3.8902/lb.), Co (US$14.65/lb.), Au (US$1675.1/oz.), Market prices as at 3pm EPST 13/03/2012**

3

==> picture [42 x 42] intentionally omitted <==

Table 3: Elaine 2012 Diamond Drilling - Summary of significant TREO-uranium-thorium intersections, in MKED016 and MKED023, at a nominal 1500ppm TREO lower cut with a max 3m internal dilution.

Width
(m)
TREO
(ppm)
U3O8
(kg/t)
ThO2
(kg/t)
LREO
(%)
HREO
(%)
HOLE ID From (m) To (m)
MKED016 689 693 4 1559 0.03 0.09 95 5
MKED016 698 702 4 2025 0.08 0.28 95 5
MKED016 757 762 5 1650 0.09 0.21 94 6
MKED023 313 316 3 2160 0.10 0.20 96 4
MKED023 620 634 14 2060 0.05 0.19 95 5
MKED023 687 700 13 1975 0.03 0.06 95 5
MKED023 710 720 10 2574 0.04 0.09 95 5
MKED023 738 741 3 2688 0.14 0.37 94 6
MKED023 747 756 9 2335 0.05 0.19 94 6
MKED023 760 778 18 2149 0.05 0.21 92 8
MKED023 785 793 8 1470 0.05 0.18 89 11
MKED023 802 815 13 1613 0.04 0.21 91 9
MKED023 821 832 11 1732 0.06 0.26 93 7
MKED023 837 848 11 1599 0.05 0.18 88 12
MKED023
inc.
inc.
874
878
889
890
880
890
16
2
1
2278
6283
4681
0.09
0.34
0.36
0.31
1.00
0.97
93
97
96
7
3
4

4

==> picture [42 x 42] intentionally omitted <==

==> picture [452 x 334] intentionally omitted <==

Figure 1. Tenement and prospect location plan of the Mary Kathleen and Mount Frosty Joint Venture projects. The Elaine prospect is located approximately 60km east of Mount Isa and is situated along the 6.5km long Mary Kathleen Shear zone.

==> picture [452 x 289] intentionally omitted <==

Figure 2. Simplified map showing north side of the Elaine garnet hill. Mineralisation is expected to continue down the western side and on the southern side of the hill and merge with the U-REO resource where untested copper outcrops occur.

5

==> picture [42 x 42] intentionally omitted <==

==> picture [452 x 658] intentionally omitted <==

Figure 3. MKED023 drill section, demonstrating the strongly mineralised Elaine Cu-Co-Au zone.

6

==> picture [42 x 42] intentionally omitted <==

==> picture [452 x 653] intentionally omitted <==

Figure 4. Long Projection of the Elaine mineralisation, looking south. Intersection for MKED023 (located 100m to north) is projected onto long projection.