AI assistant
Atlantic Lithium Limited — Investor Presentation 2024
Apr 15, 2024
10433_rns_2024-04-15_a95702b3-8d4b-4c5d-bc9c-3cc25f368142.pdf
Investor Presentation
Open in viewerOpens in your device viewer
16 April 2024
Investor Presentation – Battery Minerals Conference
Atlan�c Lithium Limited (AIM: ALL, ASX: A11, OTCQX: ALLIF, “Atlan�c Lithium” or the “Company”), the African-focused lithium explora�on and development company targe�ng to deliver Ghana’s first lithium mine, provides the following presenta�on that the Company’s Chief Execu�ve Officer, Keith Muller, will deliver at 11:25 am (local �me) today at the Paydirt Batery Minerals Conference in Perth.
A recording of the presenta�on will be shared on the Company’s website and social media channels once made available by the event organisers.
For any further informa�on, please contact:
Atlan�c Lithium Limited
Neil Herbert (Execu�ve Chairman)
Amanda Harsas (Finance Director and Company Secretary)
www.atlan�clithium.com.au
IR@atlan�clithium.com.au
Tel: +61 2 8072 0640
==> picture [126 x 4] intentionally omitted <==
==> picture [114 x 33] intentionally omitted <==
SP Angel Corporate Finance LLP Nominated Adviser Jeff Kea�ng Charlie Bouverat Tel: +44 (0)20 3470 0470
==> picture [69 x 43] intentionally omitted <==
Yellow Jersey PR Limited Charles Goodwin Bessie Elliot atlan�[email protected] Tel: +44 (0)20 3004 9512
==> picture [69 x 43] intentionally omitted <==
Canaccord Genuity Limited Financial Adviser: Raj Khatri (UK) / Duncan St John, Chris�an Calabrese (Australia)
Corporate Broking: James Asensio Tel: +44 (0) 20 7523 4500
,
16 April 2024
==> picture [90 x 21] intentionally omitted <==
Notes to Editors:
About Atlan�c Lithium
www.atlan�clithium.com.au
a significant lithium spodumene pegma�te discovery in Ghana, through to produc�on to become the country’s first lithium-producing mine.
year mine life, making it one of the largest spodumene concentrate mines in the world.
The Project, which was awarded a Mining Lease in October 2023, is being developed under an earn-in agreement with Piedmont Lithium Inc.
Atlan�c Lithium holds a por�olio of lithium projects within 509km[2] and 774km[2] of granted and under-applica�on tenure across Ghana and Côte d'Ivoire respec�vely, which, in addi�on to the Project, comprises significantly underexplored, highly prospec�ve licences.
==> picture [524 x 6] intentionally omitted <==
Investor Presenta�on – Batery Minerals Conference
Page 2 of 2
==> picture [240 x 64] intentionally omitted <==
ASX:A11 AIM:ALL OTCQX:ALLIF
==> picture [906 x 5] intentionally omitted <==
INVESTOR PRESENTATION
April 2024
1
IMPORTANT & CAUTIONARY STATEMENT
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
IMPORTANT NOTICE
These presentation slides (the “Slides”) have been prepared by Atlantic Lithium Limited (the “Company”) and provides a general overview of the Company and its strategy. These Slides do not comprise an admission document, listing particulars or a prospectus relating to the Company, do not constitute an offer or invitation to purchase or subscribe for any securities of the Company and should not be relied on in connection with a decision to purchase or subscribe for any such securities. The Slides and the accompanying verbal presentation do not constitute a recommendation regarding any decision to sell or purchase securities in the Company.
No reliance may be placed for any purpose whatsoever on the information contained in the Slides and the accompanying verbal presentation or the completeness or accuracy of such information. No representation or warranty, express or implied, is given by or on behalf of the Company, directors, officers, employees, agents or advisors or any other person as to the accuracy or completeness of the information or opinions contained in the Slides and the accompanying
verbal presentation, and no liability is accepted by such persons for any such information or opinions or otherwise arising in connection therewith (including in the case of negligence, but excluding any liability for fraud).
The Ewoyaa Lithium Project as described in the Slides is at the exploration and development stage, and potential investors should understand that mineral exploration, development and mining are high-risk undertakings.
The Slides contain statements which may be in the nature of forwardlooking statements.
CAUTIONARY STATEMENTS
The information in the Slides that relates to Ore Reserves, Mineral Resources and Production Targets for the Ewoyaa Lithium Project was reported by the Company in the Definitive Feasibility Study (“DFS”) announcement on 29 June 2023 and the updated Mineral Resource Estimate (“MRE”) announcement on 1 February 2023.
The Company confirms that all material assumptions and technical parameters underpinning the MRE and DFS continue to apply. Material assumptions for the Project have been revised on grant of the Mining Lease for the Project, announced by the Company on 20 October 2023.
The Company confirms that material assumptions and technical parameters underpinning the Mineral Resource estimates, Ore Reserve estimates, production targets and forecast financial information in the announcements and this presentation continue to apply and have not materially changed.
FORWARD-LOOKING STATEMENTS
The Slides contain certain statements and expressions of belief, expectation or opinion which contain ‘forward-looking information’, and which relate, inter alia, to feasibility studies, the Company’s proposed strategy, plans, objectives, performance, outlook, cash flow, projections, targets, and Mineral Resources and Ore Reserves or to the expectations or intentions of the Company’s directors.
Generally, this forward-looking information can be identified by the use of forward-looking information can be identified by the use of forward-looking terminology such as ‘outlook’, ‘anticipate’, ‘project’, ‘target’, ’likely’, ‘believe’, ‘estimate’, ‘expect’, ‘intend’, ‘may’, ‘would’, ‘could’, ‘should’, ‘scheduled’, ‘will’, ‘plan’, ‘forecast’, ‘evolve’, and
similar expressions. Persons reading the Slides are cautioned that such statements are only predictions, and that the Company’s actual future results or performance may be materially different.
Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to general business, economic, competitive, political and social uncertainties; the actual results of current exploration and development activities; conclusions of economic, competitive, political and social uncertainties; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; future prices of lithium; possible variations of ore grade or recovery rates; failure of equipment or processes to operate as anticipated; accident; labour disputes and other risks of the mining and exploration industry; and delays in obtaining government approvals or financing or in the completion of development activities.
This list is not exhaustive of the factors that may affect forwardlooking information. These and other factors should be considered carefully, and readers should not place undue reliance on such forward-looking information.
Accordingly, you should not rely on any forward-looking statements and neither the Company nor SP Angel accept any obligation to disseminate any updates or revisions to such forward-looking statements. Any statement as to the past activities of the Company’s directors should not be relied upon as being an indication of their future performance. Statements regarding plans with respect to the Company’s mineral properties may contain forward-looking statements in relation to future matters that can be only made where the Company has a reasonable basis for making those statements.
Page 2
==> picture [906 x 5] intentionally omitted <==
TABLE OF CONTENTS
04 CORPORATE SNAPSHOT 07 OUR PROJECT 15 OUR PARTNERS 20 CATALYSTS FOR GROWTH
==> picture [102 x 45] intentionally omitted <==
PRESENTER Keith Muller 3 Chief Executive Officer
==> picture [906 x 5] intentionally omitted <==
SNAPSHOT
4
4
CAPITAL STRUCTURE
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Shareholdings
Issued Capital: 649.7m
Top 20 Shareholders: 67.1%
==> picture [397 x 5] intentionally omitted <==
41.3m Options
9.3m 700.3m Performance Rights Fully-diluted share capital
==> picture [397 x 5] intentionally omitted <==
Assore Int. Holdings 27.6%
Piedmont Lithium Inc 5.0%
A$247m - GBP128m - US$160m
Market Capitalisation (A$0.38)[1]
Fidelity International Limited 3.7%
Minerals Income Investment Fund 3.0%
==> picture [397 x 5] intentionally omitted <==
US$9.6m Cash[2]
Board & Management 3.0%
Other 57.7%
==> picture [397 x 4] intentionally omitted <==
The Company has rejected two offers in Oct & Nov 2023 from major shareholder Assore to purchase the remaining shares in Atlantic Lithium at an offer price of £0.33 per share (A$0.63)
ASX: A11; AIM: ALL; OTCQX: ALLIF
1 ASX Share price at close of 12 April 2024 (Converted at 0.65 to USD and 0.52 to GBP) 2 As of 31 December 2023
Page 5
STRONG OUTLOOK FOR LITHIUM MARKET
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [516 x 291] intentionally omitted <==
Forecast Base Case and High Case Lithium Demand versus Forecast Supply[1]
==> picture [302 x 275] intentionally omitted <==
Li-ion battery demand is expected to grow by about 27 percent annually to reach 4,700 GWh by 2030[2]
ASX: A11; AIM: ALL; OTCQX: ALLIF
1 Source: Benchmark Lithium Forecast Report Q4 2023 2 Source: McKinsey, 2023
Page 6
==> picture [906 x 5] intentionally omitted <==
PROJECT
7
7
BUILDING GHANA’S FIRST LITHIUM MINE
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [46 x 41] intentionally omitted <==
==> picture [40 x 36] intentionally omitted <==
==> picture [40 x 40] intentionally omitted <==
Established pro-mining region
• Stable government and robust mining framework • Long-term gold producer
==> picture [738 x 283] intentionally omitted <==
----- Start of picture text -----
On Track to Deliver
•
Mining Lease granted
•
Funding - Offtake
Strong Project
partnerships
Credentials •
MIIF Strategic Project
•
Access to infrastructure
Investment
Excellent Project •
Minimal footprint •
Economics Ghana Stock Exchange listing
•
• A project for Ghana and • Permitting:
DFS - Strong commercial Ghanaians
Ewoyaa Mineral •
viability and exceptional Parliamentary
Resource Estimate
profitability potential Ratification
• 35.3Mt at 1.25% Li2O2OO • Early Modular DMS • EPA Permit
• revenue
79% Measured & •
• Licence to operate
Indicated Significant upside
• available
----- End of picture text -----*
• 35.3Mt at 1.25% Li2O2OO • 79% Measured & Indicated • 25.6Mt at 1.22% Li2O Ore Reserve**
- Refer to important and cautionary statement on Page 2 and MRE release dated 1 February 2023
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 8
** Based on DFS announcement; refer to important and cautionary statement on Page 2 and DFS release dated 29 June 2023
KEY METRICS*
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Economic outcomes place Ewoyaa as an industry-leading asset
365ktpa US$1.3bn 12-year Steady state production NPV8 Life of Mine
94%
IRR
==> picture [673 x 4] intentionally omitted <==
4.7Mt US$6.6bn LOM revenues Secondary Product (Low-grade Li2O)
US$185m US$675/t Capital Cost All in Sustaining Cost
Capital Cost
GHANA
Based on US$1,410/t long-term concentrate price, FOB Ghana
==> picture [53 x 31] intentionally omitted <==
3.6Mt
Spodumene concentrate
==> picture [40 x 41] intentionally omitted <==
US$377/t
C1 Cash Operating Costs FOB Ghana Port
Ewoyaa Lithium Project 35.3Mt @ 1.25% Li₂O spodumene pegmatite**
25.6Mt @ 1.22% Li₂O Ore Reserve*
- Based on DFS announcement, incorporating Mining Lease terms; refer to important and cautionary statement on Page 2, DFS release dated 29 June 2023 and ML release dated 20 October 2023
ASX: A11; AIM: ALL; OTCQX: ALLIF
** Refer to important and cautionary statement on Page 2 and MRE release dated 1 February 2023
Page 9
GLOBALLY SIGNIFICANT ASSET
==> picture [129 x 45] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [908 x 359] intentionally omitted <==
----- Start of picture text -----
Targeted spodumene concentrate production capacity (ktpa, 100% basis) []
Production
Development [+]
Exploration
3 [rd]
Largest anticipated production
Anticipated steady state capacity in Africa
production of 365ktpa
5 [th]
Largest developer by anticipated
production capacity
10 [th]
Largest anticipated production
capacity globally
365
Greenbushes Pilgangoora Grota do Cirilo Wodgina Manono Kathleen Valley Mt Marion Goulamina Mt Holland Ewoyaa Kamativi James Bay Bikita Carolina Lithium Nemaska Abitibi Hub Manna Mt Cattlin Rose Keliber Sabi Star Dome North Mina do Barroso Finniss Bald Hill Arcadia Mibra Bougouni Georgia Lake Wolfsberg Zulu
----- End of picture text -----*
-
Select hard rock spodumene projects which have conducted at least a Preliminary Economic Assessment / Scoping Study. Excludes projects where no formal study was released, or where no definitive spodumene production capacity figure was quoted in the study. Capacity refers to current installed production capacity, and where not available, average annual production. Where an existing producer or developer has planned expansions and a Final Investment Decision has been approved to proceed with the planned expansion, the expanded production capacity is used.
-
Developers include companies who have released a study to a level beyond Pre-Feasibility. Note: Based on DFS announcement; refer to important and cautionary statement on Page 2 and DFS release dated 29 June 2023; Source information in Appendix
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 10
METALLURGY DELIVERS PREMIUM PRODUCT
==> picture [129 x 45] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Two clearly defined geometallurgical domains :
==> picture [262 x 132] intentionally omitted <==
----- Start of picture text -----
Coarse grained
spodumene material
P1
(>20mm)
Coarse Grained P1 & fine P2 pegmatites
----- End of picture text -----
==> picture [226 x 50] intentionally omitted <==
----- Start of picture text -----
P2: Medium to fine grained
P2 spodumene material
(<20mm)
----- End of picture text -----
==> picture [142 x 184] intentionally omitted <==
==> picture [140 x 184] intentionally omitted <==
==> picture [436 x 191] intentionally omitted <==
----- Start of picture text -----
TONNAGE GRADE CONT. CONT.
LITHIUM LITHIUM
ORE TYPE
Mt % Li O kt %
2
P1 31.3 1.27 398 90
P2 4 1.06 42 10
Total 35.3 1.25 440 100
----- End of picture text -----
-
Simple gravity process flow sheet
-
Conventional DMS processing
-
Low contaminants; <1% Fe2O3, <3% combined Na2O & K2O
-
Battery-grade Li carbonate and Li hydroxide conversion successfully completed at ANSTO
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 11
COMPETITIVE OPERATIONAL COST
==> picture [129 x 45] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Competitively placed on the spodumene cost curve, supporting resilient operations through the price cycle
==> picture [670 x 357] intentionally omitted <==
----- Start of picture text -----
Spodumene concentrate 2025 cash cost curve [1]
800 Benchmark Mineral Intelligence Q3 2023, US$/t concentrate
700
600 Ewoyaa is expected to be one
of the lowest cost spodumene
500 concentrate projects globally
400
Ewoyaa C1 cash cost [2] : US$377/t
300
200
100
-
0- 1,000 2,000 3,000 4,000 5,000 6,000 7,000 -
Cumulative production (kt SC6)
ASX: A11; AIM: ALL; OTCQX: ALLIF
C1 cash cost (US$/t SC6)
----- End of picture text -----
Source: Benchmark Mineral Intelligence Q3 2023 Lithium Total Cost Model (2023); 1. C1 cash cost includes mining, processing, transportation, loading & storage, G&A, energy, labour and by-product credits; 2. 2. Ewoyaa cash cost includes mining, processing, transportation, and G&A, net the credit from secondary product sales.
Page 12
AVAILABLE LITHIUM PRODUCTS
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [908 x 415] intentionally omitted <==
----- Start of picture text -----
100%
Spodumene Assessing opportunities
Concentrate Available
Modular DMS
Pre-Production
1.6% Li2O 100% Assessing opportunities
Secondary Product Available
50% 180,000tpa (LOM)
Committed
Spodumene 30% 100,000tpa (3-5 years)
3.6Mt Near-term Offtake Partner
Concentrate Available
Main DMS
Plant
Production 20% 80,000tpa (LOM) Available – Auction,
Available contract or spot sales
4.7Mt 1.2% Li2O 100% Assessing opportunities
Secondary Product Available
ASX: A11; AIM: ALL; OTCQX: ALLIF
----- End of picture text -----
Page 13
PROJECT – PROCESS PLANT STRATEGY
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
| Aiming to deliver Ewoyaa as a | near-term, low-cost | producer | ||
|---|---|---|---|---|
| DFS | Value addition potential | |||
| Modular DMS | DMS Plant |
Flotation | Feldspar | Enhanced Ore |
| Plant | Recovery | |||
| Early revenue generation opportunity |
Conventional gravity-only plant |
Flotation circuit to run independent of |
Feldspar to be supplied into local Ghanaian ceramics |
Later stage opportunity to maximise ore |
| (H1 2025) | (H1 2026) | DMS Plant | market | recovery i.e. Ore |
| sorter |
==> picture [685 x 24] intentionally omitted <==
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 14
==> picture [906 x 5] intentionally omitted <==
PARTNERS
15
15
PIEDMONT FUNDING AND OFFTAKE AGREEMENT
==> picture [70 x 26] intentionally omitted <==
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Piedmont Lithium earn-in – Atlantic Lithium maintains operatorship
OTHER KEY ITEMS
Funding of Regional Exploration and DFS (>US25m)
-
Initial earn in of 22.5% of Atlantic’s Ghana portfolio now complete;
-
For regional exploration and to complete studies;
-
Investment spend completed – all expenditure now shared equally; and
-
Ghana Government approval for ownership transfer underway
Development expenditure funding (>US$120m):
- Sole funding: Initial US$70m of development expenditure Shared funding: 50% of additional development expenditure after initial US$70m(as indicated by the DFS)
Upon completion of funding:
-
Piedmont will earn a further 27.5% interest in Atlantic Lithium’s holding in the Ghana portfolio, taking its total interest to 50%
-
Offtake agreement enabled for 50% of annual spodumene concentrate production at market prices from Ghana Portfolio – feedstock for Piedmont’s planned Tennessee Plant
Cost savings and additional expenditure for project development will be shared equally between Atlantic Lithium and Piedmont
"DFS and mine delivery criteria" 1.5Mtpa to 2Mtpa run-ofmine ("ROM") operation; 10-year to 8-year of mine ("LOM") respectively
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 16
MIIF STRATEGIC INVESTMENT
==> picture [58 x 36] intentionally omitted <==
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
MIIF to support development of Ewoyaa and broader lithium portfolio in Ghana – Subscription completed; Ghana Portfolio investment to be completed
Subscription at listed US$5m company Level
==> picture [31 x 11] intentionally omitted <==
----- Start of picture text -----
TopCo
----- End of picture text -----
- 19,245,574 Atlantic Lithium shares at US$0.2598 per share
==> picture [468 x 146] intentionally omitted <==
----- Start of picture text -----
- MIIF granted 9,622,787 options
with an exercise price of US$0.3637
US$43.9m 6% contributing interest
MIIF total US$27.9m in Cape Coast Lithium
Portfolio subsidiaries
investment
Project level
----- End of picture text -----
- MIIF granted 9,622,787 options with an exercise price of US$0.3637
==> picture [205 x 75] intentionally omitted <==
----- Start of picture text -----
Funding of
US$11m development,
exploration and
studies expenditure
----- End of picture text -----
==> picture [37 x 37] intentionally omitted <==
==> picture [82 x 13] intentionally omitted <==
----- Start of picture text -----
COMPLETE
----- End of picture text -----
==> picture [137 x 30] intentionally omitted <==
----- Start of picture text -----
Subject to execution of
binding agreement
----- End of picture text -----
Key Ghanaian stakeholder on board as shareholder
Strengthens cash balance in the Holding Company
De-risks the Project through MIIF’s contribution towards exploration, development and studies expenditure
Note: Based on announcement dated 8 September 2023
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 17
COMPETITIVE OFFTAKE PARTNERING PROCESS UNDERWAY
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
- Attract funding offers to expediate Ewoyaa development and realise Project value
==> picture [245 x 29] intentionally omitted <==
----- Start of picture text -----
Preferred Terms
----- End of picture text -----
-
Secure well-credentialled partner
-
Enhance relationships across battery supply chain
3-5 year Pre-payment 500Mt Favorable pricing Considering potential broader strategic collaboration terms US$75-100M Spodumene mechanism based on offtake chemical price Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7
- Considering potential broader strategic collaboration
Preparation and engagement with interested parties
Stage 1
Bid evaluation and Stage 2 preparation
STAGE 2 UNDERWAY
Final negotiations Agree & announce
Note: Based on announcement dated 8 September 2023
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 18
FUNDING BREAKDOWN
==> picture [129 x 45] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [954 x 315] intentionally omitted <==
----- Start of picture text -----
Total Capex
Atlantic Lithium
funding requirement
----- End of picture text -----
Page 19
==> picture [906 x 5] intentionally omitted <==
GROWTH
20
20
EWOYAA RESOURCE GROWTH
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Grade maintained over Resource upgrades; MRE upgrade expected in H2 2024
==> picture [883 x 367] intentionally omitted <==
----- Start of picture text -----
40 Drilling
35.3 Mt
programme
35 1.26% Li2O underway
30.1 Mt
1.26% Li2O
30
25 21.3 Mt
13km [2]
1.31% Li2O drilled to
20
date
14.5 Mt
15 1.31% Li2O
10
5 97% of
portfolio
0 undrilled
Jan 2020 Dec 2021 Mar 2022 Feb 2023
Cumulative Metres 27,323m 51,904m 90,308m 137,153m
Drilled
Resource Tonnes 531 274 233 247
per Metre Drilled
ASX: A11; AIM: ALL; OTCQX: ALLIF
Resource (Mt)
----- End of picture text -----
Page 21
HIGHLY PROSPECTIVE, UNDER-EXPLORED PORTFOLIO
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [873 x 414] intentionally omitted <==
----- Start of picture text -----
Adjacent to grid power
and N1 highway
Within 100km of Accra
Mining Lease Area
Within 110km of
operational deep-sea port
of Takoradi
ASX: A11; AIM: ALL; OTCQX: ALLIF
----- End of picture text -----
Page 22
HIGH PRIORITY TARGETS CLOSE TO LEASE AREA
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [42 x 43] intentionally omitted <==
Drilling to-date focused on c. 2km radius from planned mine site
Further resource growth drilling planned
Awaiting assays from Dog-Leg target; potential to add significant near-surface tonnes to current MRE
==> picture [434 x 381] intentionally omitted <==
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 23
NEAR-TERM VALUE DRIVERS
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
Mining Lease ratification
Completion of MIIF Ghana Portfolio investment
Ghana Stock Exchange listing EPA Permit Licence to operate - Mine Operating Permit
Completion of Offtake Partnering Process Award key contracts (incl. EPCM, Mining, DMS unit) Final Investment Decision Breaking ground
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 24
==> picture [282 x 97] intentionally omitted <==
Appendix
RESERVES AND RESOURCES
==> picture [102 x 44] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [417 x 285] intentionally omitted <==
----- Start of picture text -----
Grade
Mineral Reserves* Tonnes (Mt)
(% Li2O)
Probable 25.6 1.22
Grade
Mineral Resources Tonnes (Mt)
(% Li2O)
Measured 3.5 1.37
Indicated 24.5 1.25
Inferred 7.4 1.16
Total 35.3 1.25
----- End of picture text -----**
==> picture [316 x 391] intentionally omitted <==
- Refer to important and cautionary statement on Page 2 and MRE release dated 1 February 2023
** Based on DFS announcement; refer to important and cautionary statement on Page 2 and DFS release dated 29 June 2023
ASX: A11; AIM: ALL; OTCQX: ALLIF
Page 26
TARGETED SPODUMENE PRODUCTION CAPACITY
==> picture [129 x 45] intentionally omitted <==
==> picture [906 x 5] intentionally omitted <==
==> picture [913 x 23] intentionally omitted <==
----- Start of picture text -----
Announcement Targeted production capacity
Company Company code Project name Development stage [] Asset location Announcement title
date (ktpa, 100% basis) []
----- End of picture text -----**
| IGO IGO(ASX) Greenbushes Production Australia Diggers and Dealers MiningForum Presentation 9-Aug-23 2,070 |
|
|---|---|
| Pilbara Minerals PLS(ASX) Pilgangoora Production Australia FY23 Full Year Results Presentation 25-Aug-23 1,000 |
|
| Sigma Lithium SGML(TSX) Grota do Cirilo Production Brazil Investor Presentation(August 2023) 5-Aug-23 766 |
|
| Mineral Resources MIN(ASX) Wodgina Production Australia Investor Site Tour Presentations 10-Oct-22 750 |
|
| AVZ Minerals AVZ(ASX) Manono Development DRC AGM Presentation 17-Nov-22 700 |
|
| Liontown Resources LTR(ASX) Kathleen Valley Development Australia EquityCapital RaisingPresentation 1-Jan-21 658 |
|
| Mineral Resources MIN(ASX) Mt Marion Production Australia Investor Site Tour Presentations 10-Oct-22 600 |
|
| Leo Lithium LLL(ASX) Goulamina Development Mali 121 Frankfurt Conference Presentation 16-Nov-22 506 |
|
| Wesfarmers WES(ASX) Mt Holland Development Australia 2023 Annual Report 25-Aug-23 380 |
|
| Atlantic Lithium A11(ASX) Ewoyaa Development Ghana Investor Presentation – July2023 Webinar 4-Jul-23 365** |
|
| ~~P1~~ Yahua 002497(SHE) Kamatavi Development Zimbabwe Press Release(MiningZimbabwe) 30-May-23 350 |
|
| Allkem AKE(ASX) James Bay Development Canada FY23 Results Presentation 22-Aug-23 321 |
|
| Sinomine 002738(SHE) Bikita Production Zimbabwe Press Release(MiningTechnology) 10-Jul-23 300 |
|
| Piedmont Lithium PLL(ASX) Carolina Lithium Development USA 2023 Macquarie Australia Conference Presentation 2-May-23 242 |
|
| Livent LTHM(NYSE) Nemaska Development Canada Q2 2023 Earnings Presentation 3-Aug-23 235 |
|
| Sayona Mining SYA(ASX) Abitibi Hub Production Canada Investor Presentation - Noosa MiningConference 20-Jul-23 226 |
|
| Global Lithium GL1(ASX) Manna Exploration Australia Manna Project Progresses after Robust ScopingStudyResults 14-Feb-23 221 |
|
| Allkem AKE(ASX) Mt Cattlin Production Australia NI 43-101 Technical Report 31-Mar-21 210 |
|
| Critical Elements CRE(TSX-V) Rose Development Canada Positive FeasibilityStudyfor the Rose Lithium Project 29-Aug-23 204 |
|
| Sibanye Stillwater SSW(JSE) Keliber Development Finland Sibanye-Stillwater CompanyWebsite(Keliber Lithium Project) 4-Sep-23 200 |
|
| Chengxin Lithium 002240(SHE) Sabi Star Production Zimbabwe Chengxin Lithium CompanyWebsite(Business) 4-Sep-23 200 |
|
| Essential Metals ESS(ASX) Dome North Exploration Australia Pioneer Dome ScopingStudy 7-Feb-23 194 |
|
| Savannah Resources SAV(AIM) Mina do Barroso Exploration Portugal Corporate Presentation(July2023) 31-Jul-23 191 |
|
| Core Lithium CXO(ASX) Finniss Production Australia EquityRaisingPresentation 30-Sep-23 160 |
|
| ~~P2~~ Alita Private Bald Hill Production Australia Bald Hill Pre-FeasibilityStudy 11-Jul-17 155 |
|
| Huayou Cobalt 603799(SHG) Arcadia Production Zimbabwe Direct OFS Presentation 14-Dec-21 147 |
|
| AMG Mineracao Private Mibra Production Brazil AMG Lithium CompanyWebsite 4-Sep-23 130 |
|
| Kodal Minerals KOD(AIM) Bougouni Development Mali Corporate Presentation 30-Mar-23 130 |
|
| Rock Tech Lithium RCK(TSX-V) Georgia Lake Exploration Canada Investor Presentation 15-Aug-23 100 |
|
| European Lithium EUR(ASX) Wolfsberg Development Austria WolfsbergProject Definitive FeasibilityStudy 8-Mar-23 69 |
|
| Premier African Minerals PREM(AIM) Zulu Development Zimbabwe Zulu Lithium Pilot Plant 24-Jun-22 48 |
|
| Page 27 Select hard rock spodumene projects which have conducted at least a Preliminary Economic Assessment / Scoping Study. Excludes projects with no formal study released, or where no definitive spodumene production capacity figure is quoted in a study. Capacity refers to current installed production capacity, and where not available, average annual production. Where an existing producer or developer has planned expansions and a Final Investment Decision has been approved to proceed with the planned expansion, the expanded production capacity is used. Targeted steady state production. ** Developers include companies who have released a study to a level beyond Pre-Feasibility. Note: Based on DFS announcement; refer to important and cautionary statement on Page 2 and DFS release dated 29 June 2023 ASX: A11; AIM: ALL; OTCQX: ALLIF |
==> picture [282 x 97] intentionally omitted <==
http://www.atlanticlithium.com.au/ [email protected]
==> picture [19 x 19] intentionally omitted <==
==> picture [17 x 18] intentionally omitted <==
==> picture [18 x 14] intentionally omitted <==