Creating and delivering shareholder value – The Donald Mineral Sands Project Tier 1 Resource - Globally significant new source of mineral sands supply
Investor Presentation – Jul 2021
Astron Corporation ASX:ATR
1
Disclaimer
CAUTIONARY STATEMENT
This presentation has been prepared by Astron Corporation Limited (Astron or the “Company”). The information contained in this presentation is for information purposes only and has been prepared for use in conjunction with a verbal presentation and should be read in that context. The information contained in this presentation is not investment or financial product advice and is not intended to be used as the basis for making an investment decision. Please note that, in providing this presentation, Astron has not considered the objectives, financial position or needs of any particular recipient. Astron strongly suggests that investors consult a financial advisor prior to making an investment decision. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. To the maximum extent permitted by law, none of Astron, its related bodies corporate or its shareholders nor their respective directors, officers, employees, agents nor advisors, nor any other person, accepts any liability, including, without limitation, any liability arising out of fault or negligence for any loss arising from the use or application of information contained in this presentation.
This presentation may include “forward looking statements” within the meaning of securities laws of applicable jurisdictions. Forward looking statements can generally be identified by the use of the words “anticipate”, “believe”, “expect”, “project”, “forecast”, “estimate”, “likely”, “intend”, “should”, “could”, “may”, “target”, “plan”, “guidance” and other similar expressions. Indications of, and guidance on, future earning or dividends and financial position and performance are also forward-looking statements. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Astron and its related bodies corporate, together with their respective directors, officers, employees, agents or advisers, that may cause actual results to differ materially from those expressed or implied in such statement. Actual results, performance or achievements may vary materially from any forward looking statements and the assumptions on which those statements are based. Readers are cautioned not to place undue reliance on forward looking statements and Astron assumes no obligation to update such information. Specific regard should be given to the risk factors outlined in this presentation (amongst other things) . This presentation is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities and neither this presentation nor anything contained in it forms the basis of any contract or commitment.
This presentation is not, and does not constitute, an offer to sell or the solicitation, invitation or recommendation to purchase any securities and neither this presentation nor anything contained in it forms the basis of any contract or commitment. Certain financial data included in this presentation is not recognised under the Australian Accounting Standards and is classified as 'non-IFRS financial information' under ASIC Regulatory Guide 230 'Disclosing non-IFRS financial information' (RG 230). This non-IFRS financial information provides information to users in measuring financial performance and condition. The non-IFRS fancial information does not have standardised meanings under the Australian Accounting Standards and therefore may not be comparable to similarly titled measures presented by other entities, nor should they be interpreted as an alternative to other financial measures determined in accordance with the Australian Accounting Standards. No reliance should therefore be placed on any financial information, including nonIFRS financial information and ratios, included in this presentation. All financial amounts contained in this presentation
==> picture [141 x 61] intentionally omitted <==
are expressed in Australian dollars and rounded to the nearest $0.1 million unless otherwise stated. Any discrepancies between totals and sums of components in tables contained in this presentation may be due to rounding.
COMPETENT PERSONS STATEMENT
The information in this document that relates to Exploration Results and Mineral Resources for the Donald Project is based on information first reported in previous ASX announcements by the Company, as listed in this notice. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the original announcements continuing to apply and have not materially changed. The information in this notice that relates to the estimation of the Ore Reserves is based on information compiled by Mr Pier Federici, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and Australian Institute of Geoscientists. Mr Federici is a full-time employee of AMC Consultants Pty Ltd and is independent of Donald Mineral Sands Pty Ltd (DMS) (being the Company’s wholly owned subsidiary) and the Company, the owner of the Donald Project Mineral Resources. Mr Federici has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
The information in this document that relates to the estimation of the Mineral Resources is based on information compiled by Mr Rod Webster, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and Australian Institute of Geoscientists. Mr Webster is a full-time employee of AMC Consultants Pty Ltd and is independent of the Company and DMS, the owner of the Donald Project Mineral Resources. Mr Webster has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not materially modified from the relevant original market announcement.
The information in this document that relates to the metallurgical performance and outcomes of testwork is based on information compiled by Mr Ross McClelland, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr McClelland is the principal metallurgist and director of Metmac Services Pty Ltd. Mr McClelland has been involved with the metallurgical development of the Wimmera-style mineral sands resources for more than 30 years. He has provided metallurgical consultation services to DMS for more than 7 years. He qualifies as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not been prematurely modified from the relevant original market announcement.
Astron Corporation ASX:ATR
2
Astron Corporation
==> picture [141 x 61] intentionally omitted <==
Astron Corporation Limited (ASX:ATR) has received shareholder approval to demerge its downstream minerals processing business to focus exclusively on the development of mineral sands projects and primarily on the Donald project in Victoria, Australia
Extensive experience Focus on creating in mineral sands and delivering downstream and shareholder value marketing sectors
Material, long-life, source of new supply
Donald project – at advanced evaluation and approvals stage
Commitment to Favourable market become a high demand/supply quality resource conditions investment
3
Astron Corporation ASX:ATR
Astron Corporation’s Attributes
VALUE PROPOSITION
-
Following receiving securityholder approval for the demerger of Astron’s downstream minerals processing business, Astron will focus on the development and commercialisation of the Donald mineral sands project.
-
The Donald Minerals Sands project based in Victoria, Australia:
-
A tier-1 globally significant mineral sands resource
-
One of the largest undeveloped zircon reserves globally
-
Contains valuable rare earths component
-
D.F.S to be completed by early 2022.
-
Clear stages of value delivery over the next 12-18 months - customer offtake arrangements; detailed engineering; final regulatory approvals and capital approval.
-
Robust project economics (based on initial analyses): material NPV, attractive IRR and short payback period.
-
Competitive industry positioning: attractive R:CC ratio [revenue: cash cost ratio]; margin structure, reflecting zircon assemblage, plus co-product revenue benefits from REE stream.
-
Internal cash-flow generation expected to underpin subsequent stage 2 development.
==> picture [141 x 61] intentionally omitted <==
| ASX Code | ASX:ATR | |
|---|---|---|
| Shares/CDIs on Issue | 122.48M | |
| Share Price1 | A$ 0.44 | |
| Market Capitalisation1 | A$ 53.9 M | |
| Net Assets (Post-demerger)2 | A$ 85.0 M | |
| Project Location | Minyip, Victoria, Australia | |
| Donald Mine Life | > 40 years | |
| Products | Zircon, Titania, Rare Earths | |
| Zircon: 5.4Mt | ||
| Ore Reserves3 | Hi-Ti: 8.0Mt Ilmenite: 9.2Mt |
|
| Rare Earths: 491kt |
-
Share price and Market Capitalisation as at 29 Jul 2021
-
Net asset based upon Pro-forma accounts dated 31 Mar 2021, released as a part of the demerger notice of meeting on 2 Jul 2021, page 21.
-
Measured in accordance with the JORC code 2012. See Ore Reserves Update, ASX release on 18 Feb 2021 for further information.
4
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Astron’s Board of Directors
==> picture [140 x 175] intentionally omitted <==
Gerard King Chairman
Former partner of Lavan & Walsh, which became Phillips Fox Perth. Experienced in commercial contracting, mining law and corporate and ASX compliance. A former member of the Australian Mining & Petroleum Lawyers Association Served as a non-executive director for several companies.
==> picture [140 x 175] intentionally omitted <==
Tiger Brown Managing Director
Commenced working with Astron in 2018, holding various business development planning and executive roles in China and Australia. Director of Astron in December 2019.
==> picture [140 x 175] intentionally omitted <==
Kang Rong Executive Director
Joined Astron in 1995 and has
been a key contributor to the establishment of Astron’s downstream processing and global marketing and sales activities, with a deep knowledge of the mineral sands product market and its key participants. Board member since 2012.
==> picture [140 x 175] intentionally omitted <==
Dr. Mark Elliot Non-executive Director
27 years experience in corporate roles, both as Chairman and Managing Director on a number of ASXlisted and private companies. Associated with identifying and securing resource projects, capital raisings, marketing and completing commercial agreements, feasibility studies, mine development and project execution.
==> picture [140 x 175] intentionally omitted <==
George Lloyd Non-executive Director
Thirty years’ resource industry and corporate business development and finance experience, including with RGC limited, as well as serving as a senior executive and director of a number of listed and unlisted companies with interests in industrial minerals, base and precious metals, as well as energy sectors.
5
Astron Corporation ASX:ATR
Mineral Sands Products – Array of Applications
Titanium applications
Zirconium applications
==> picture [198 x 132] intentionally omitted <==
==> picture [198 x 132] intentionally omitted <==
==> picture [199 x 132] intentionally omitted <==
Ceramics, kitchen and sanitaryware
Paint and pigment production
Solar panels, construction and commercial
==> picture [199 x 133] intentionally omitted <==
==> picture [198 x 133] intentionally omitted <==
==> picture [187 x 133] intentionally omitted <==
Casting and foundry applications
Healthcare and medical applications
Aerospace and industrial applications
==> picture [141 x 61] intentionally omitted <==
Rare Earth applications
==> picture [196 x 134] intentionally omitted <==
Wind turbines and permanent magnets
==> picture [201 x 133] intentionally omitted <==
Electric vehicles and batteries
6
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Donald Project – A Tier 1 Mineral Sands Deposit
Astron holds the Donald project, which includes the Donald and Jackson deposits, representing one of the largest undeveloped zircon resources.
Located ~300kms NW of Melbourne, Donald compromises of a total licenced area of 506 km[2] , consisting of the Donald deposit (RL2002, including MIN5532), the Jackson deposit (RL2003) and EL5186.
Donald also represents a potential new and significant source of Rare Earth elements.
Project features include:
-
Close to existing infrastructure, power, export facilities;
-
Water rights sufficient for project requirements (stage 1 & stage 2);
-
Mainly freehold, arable land used for cropping and grazing;
-
Advanced regulatory approvals (including EES);
-
Strong local community support.
==> picture [405 x 367] intentionally omitted <==
7
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Donald Project – Globally significant source of zircon
With the depletion of existing major zircon supply sources and limited, identified new material production sources, the project - with zircon reserves equivalent to 5 years of global demand - has the potential to be a pivotal source of global zircon supply both short and long-term (40 year+).
==> picture [183 x 104] intentionally omitted <==
----- Start of picture text -----
Total Resource (VHM)
2.4B tonnes
@ 4.8% Heavy Minerals (HM%)
using 1%HM cut-off and VHM where appliable
----- End of picture text -----
==> picture [169 x 103] intentionally omitted <==
----- Start of picture text -----
Zircon resource (VHM)
22.1M
One of the largest sources of zircon globally
----- End of picture text -----
==> picture [50 x 44] intentionally omitted <==
----- Start of picture text -----
tonnes [1]
tonnes [1]
----- End of picture text -----
==> picture [40 x 10] intentionally omitted <==
----- Start of picture text -----
tonnes [1]
----- End of picture text -----
==> picture [180 x 102] intentionally omitted <==
----- Start of picture text -----
Total Reserves
602M
@ 4.8% Heavy Minerals (HM)
310Mt of proved reserves and 292 Mt probable
----- End of picture text -----
==> picture [133 x 23] intentionally omitted <==
----- Start of picture text -----
Zircon reserves
----- End of picture text -----
==> picture [51 x 46] intentionally omitted <==
----- Start of picture text -----
tonnes [1]
tonnes [1]
----- End of picture text -----
5.4M Equivalent to 5 years of total global demand
==> picture [40 x 10] intentionally omitted <==
----- Start of picture text -----
tonnes [1]
----- End of picture text -----
==> picture [460 x 318] intentionally omitted <==
----- Start of picture text -----
7.00
Astron
6.00
5.00
4.00
3.00
2.00
1.00
0.00
Reserves In-Situ Zircon (MT)
----- End of picture text -----
-
See Astron Corporation’s ASX announcement on 18 Feb, 2021, “Donald Project Ore Reserves Update”
-
The chart has been prepared based on publicly released information by Astron. It does not include all the mineral sands deposits globally, such as the smaller operations in Hainan Island, China, in Indonesia, more titanium di-oxide focused mineral sands productions such as various China-owned projects in Mozambique, and projects where ore reserve data is not publicly available.
8
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Donald Project – extensive evaluation and de-risking
The Donald project has been extensively delineated with a total of 2,789 drill holes. The mining lease area consists of 387 drill holes closely spaced. An Ore Reserve statement was issued on 18 February 2021 based on the 2016 Mineral Resource estimates. The results were prepared independently by AMC consultants.
Summary of Ore Reserves and Mineral Resource VHM
| Deposit (License | Tonnes | Slimes | Oversize |
HM | Ilmenite | Leucoxene | Rutile | Zircon | Monazite | Monazite |
|---|---|---|---|---|---|---|---|---|---|---|
| Area) | (mt) | (%) | (%) | (%) | (%HM) | (%HM) | (%HM) | (%HM) | (%HM) | |
| Summary of Ore Reserves (Proved and Probable) | ||||||||||
| Donald Deposit (ML5532) |
194 | 14.1 | 12.0 |
5.3 |
31.6 | 22.0 | 7.0 | 19.0 | 1.9 | |
| Donald Deposit (RL2002) |
408 | 16.9 | 11.9 |
4.5 |
13.8 31 |
19.0 | 8.4 | 18.8 | 1.7 | |
| Total | 602 | 16.0 | 11.9 |
4.8 |
31.7 | 20.1 | 7.9 | 18.8 | 1.7 | |
| Summary of VHM Mineral Resources (Measured, Indicated & Inferred) | ||||||||||
| Donald Deposit (ML5532) |
317 | 14.2 | 12.2 |
5.3 |
32 | 22 | 7 | 19 | 2 | |
| Donald Deposit (RL2002) |
1,286 | 16.0 | 8.6 |
4.8 |
33 | 18 | 8 | 18 | 2 | |
| Jackson Deposit (RL2003) |
823 | 17.7 | 5.0 |
4.8 |
32 | 17 | 9 | 19 | 2 | |
| Total | 2,427 | 16.3 | 7.9 |
4.8 |
32 | 18 | 8 | 19 | 2 |
Notes
-
The ore tonnes have been rounded to the nearest 1 Mt and grades have been rounded to one decimal point in the Ore Reserves and nearest percentage in VHM Mineral Resources.
-
VHM is reported as a percentage of HM.
-
The Ore Reserve is based on indicated and Measured Mineral Resource contained within mine designs above an economic cut-off. The economic cut-off is defined as the value of the products less the cost of processing.
-
A 95% Mining recovery, 5% dilution and 1% cut-off grade have been applied to the figures above.
-
Total tonnes may not equal to the sum of the individual resources due to rounding
-
Valuable Heavy Mineral (VHM) is calculated where information is available, cut-off grade is at 1%HM for Mineral Resources
==> picture [339 x 382] intentionally omitted <==
9
Astron Corporation ASX:ATR
Project Concept and Delivery
Pit-to-final product operating model
Astron’s Donald operating model encompasses the mining of ore, the gravity concentrating to heavy mineral concentrate (HMC), and the processing to final products of zircon, titania, and rare earth mixed concentrate (REMC).
==> picture [49 x 49] intentionally omitted <==
==> picture [49 x 49] intentionally omitted <==
==> picture [49 x 49] intentionally omitted <==
Mining Concentrating Separation
-
Stage 1 - Approximately 120kt p.a. of zircon & zircon concentrates, >200kt of titania product, ~16kt of rare earth concentrates;[1]
-
Stage 2 - Subject to regulatory approvals and dependent on market factors, planned to double production volumes.
Astron intends to undertake all aspects of the mineral sands operation in Australia to:
-
ensure a high degree of control and certainty over final outcomes and markets (product recoveries and specifications), thereby de-risk the operating model.
-
• quickly adapt production settings to changing market conditions.
-
For further information see Astron’s announcement on 14 May 2021, “Clarify Donald Mineral Separation Metallurgical Testwork”.
==> picture [141 x 61] intentionally omitted <==
Simplified Process Flow Diagram
==> picture [413 x 361] intentionally omitted <==
----- Start of picture text -----
Ore Mining Unit Plant
Wet Concentrator
Products
Plant
Heavy Mineral Concentrate (HMC)
Rare Earth
Flotation Plant Rare Earth Mixed
Concentrate
Float - sinks
Wet Magnetic Magnetic Titania
Separation Plant Product
Non-Magnetics Titania Product
(Blended)
Non-Magnetic Hi-Titania (Hi-Ti)
Upgrade Plant Product
Premium Zircon
Zircon Upgrade
Plant Zircon 60
----- End of picture text -----
10
Astron Corporation ASX:ATR
Donald Mineral Sands Project
==> picture [141 x 61] intentionally omitted <==
Advanced stage of evaluation and regulatory approvals
| Approval Requirement | Completed | Date | Expiry |
|---|---|---|---|
| Environmental Effects Statement | ✓ | 2008 | N/A |
| Environmental protection & bio-diversity conversation approval | ✓ | Mar-09 | 2034 |
| Cultural Heritage Management Plan | ✓ | Jan-14 | Life of mine |
| Water Rights* | ✓ | Jan-12 | Jan-41 (with option to renew) |
| Radiation Licence | ✓ | Dec-14 | Dec-23 |
| Export Permit | ✓ | Dec-19 | Dec-22 |
| Work Plan | Pending | Pending | Life of mine |
Geology Mining, concentrating & processing Metallurgy Market
Extensively drilled, JORC compliant reserves
Conventional methods, low strip ratio, adoption of known technology
Extensive, evaluation, incl pilot test work. Product samples to customers Favourable demand dynamics, emerging systemic supply issues
- Water Rights include a 6.9GL water entitlement
11
Astron Corporation ASX:ATR
Fine Minerals Processing
Astron’s extensive test-work confirms commercial product recoveries
Extensive metallurgical test work, utilising a range of industry specialist consulting firms, involving bench scale and pilot scale test work, has provided confidence in the commercial scale recovery of fine minerals to both HMC and final product. Metallurgical test work, including pilot plant operations carried out by Mineral Technologies – the global expert in mineral sands.
The test work provides confidence that planned hybrid process using mainly conventional separation techniques as well as adapting well-understood technologies achieves attractive product assemblages at high (commercial) recoveries.
| Recoveries of in-size and in-SG Valuable Heavy Minerals (VHM) 1 | ZrO2 1 |
CeO2 1 |
TiO2 1 |
|---|---|---|---|
| Feed Preparation Plant Recoveries2 | 96.9% | 97.9% | 98.1% |
| Wet Concentrator Plant Recoveries to HMC2 | 93.8% | 94.3% | 88.5% |
| Mineral Separation Plant Recoveries to final products3 | 90.8% | 94.6% | - 3 |
-
In-size and in-SG heavy minerals (VHM) refers to the -250+20μm, +4.05SG fraction, the recovery of ZrO2 is used as a tracker for zircon recovery, CeO2 is used as a tracker for Rare Earth recovery, and TiO2 is used as a tracker for titanium recovery
-
For further information see Astron’s announcement on 15 May 2020, “Completion of wet concentrator piloting works” and on pg. 2 of Astron’s “Quarterly Activities Report” announced on 29 Jan 2021.
-
For further information see Astron’s announcement on 14 May 2021, “Clarify Donald Mineral Separation Metallurgical Testwork”. Astron continues to investigate the final anticipated TiO2 recoveries to final product through its planned pilot scale test work.
==> picture [141 x 61] intentionally omitted <==
==> picture [151 x 114] intentionally omitted <==
----- Start of picture text -----
DMS Drilling Programme 2010
----- End of picture text -----
==> picture [152 x 114] intentionally omitted <==
----- Start of picture text -----
Pilot Plant in operation - 2019
----- End of picture text -----
==> picture [151 x 192] intentionally omitted <==
----- Start of picture text -----
Testpit - 2018
----- End of picture text -----
==> picture [152 x 114] intentionally omitted <==
----- Start of picture text -----
Pilot Plant trommel - 2019
----- End of picture text -----
==> picture [152 x 70] intentionally omitted <==
----- Start of picture text -----
Pilot Plant table - 2019
----- End of picture text -----
==> picture [306 x 103] intentionally omitted <==
----- Start of picture text -----
HMC over spirals, rougher, mid, scavenger spirals respectively - 2019
----- End of picture text -----
12
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Final Products and Attributes
Zircon whiteness testing has confirmed the high quality of Donald zircon – suitable for premium market applications, including ceramics Products samples are being made available to key customers for product testing and market acceptance and ultimately for commercial off-take agreements.
Premium Zircon Product CIE Whiteness Test Results
Fine-grained, Premium ZrO2 > 66% Low impurities, high Zircon brightness/ whiteness[1] Chemical & other Zircon 60 ZrO2 ~ 60% applications; value-add opportunities Suitable for feed to slag Titania TiO2 ~ 60% plants for chlorinator feedstock Attractive Rare Earth NdPr > 10% RE Assemblage; high Concetrate value component
-
U/Th levels from product samples exportable to main markets (China). Acid leaching and other options available, if required for other markets.
-
For further information see Astron’s announcement on 12 May 2021, “Updated Donald Project Premium Zircon Test Results.
==> picture [352 x 158] intentionally omitted <==
Competitor 1
Competitor 2 Competitor 3
| Donald Project | Competitor 1 | Competitor 2 | Competitor 3 | |
| Product | L - Brightness | A – Red-Green Scale |
B Yellow-Blue Scale |
|
| Donald Premium Zircon | 94.84 | 0.12 | 3.86 | |
| Competitor Zircon 1 Competitor Zircon 2 Competitor Zircon 3 |
94.39 93.57 94.32 |
1.02 0.86 0.23 |
4.08 3.82 4.22 |
Note
-
Results are measured on the CIE whiteness scale, L represents ‘brightness’, A represents ‘red-to-green’ scale, B represents ‘yellow-to-blue’ scale.
-
The CIE system is used to characterise colour by a luminance parameter and two colour co-ordinates. 3. Results were produced using a calibrated ‘brightness tester’ and standard deviation error can be expected
13
Astron Corporation ASX:ATR
Rare Earth Opportunity
Assisting in the transition to a greener economy
Rare Earth elements have become increasingly important given their wide and expanding range of high-tech applications, including:
-
high tech consumer goods – illuminated screens of electronic devices,
-
low carbon technologies – permanent magnets: electric vehicle engines, wind turbines. (average wind turbine, 1MW, uses approx. 200kg of pure Nd/Pr Oxide).
-
smart phones, computers, x-rays, medical lasers, plastics, catalytic converters, fibre optics, rechargeable batteries, hybrid cars and military applications use REEs.
The Donald project presents a sizeable, new rare earth source:
-
Reserves of 491kt.
-
~ 16ktpa tonnes of rare earth mixed concentrate during first stage production
-
REMC product expected to have attractive characteristics: over 90% rare earth phosphates, and 14.1% of rare earth content made up of heavy rare earth elements.
-
High value components of Nd, Pr represent 17% & 5% of the rare earth elements in the rare earth concentrate respectively.
Astron’s production approach aligned with the Australian Government’s critical minerals initiative.
==> picture [141 x 61] intentionally omitted <==
Various Applications of Rare Earth Elements
==> picture [185 x 122] intentionally omitted <==
==> picture [185 x 121] intentionally omitted <==
==> picture [185 x 123] intentionally omitted <==
==> picture [185 x 122] intentionally omitted <==
==> picture [185 x 123] intentionally omitted <==
==> picture [185 x 123] intentionally omitted <==
14
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Key Work Streams
==> picture [353 x 394] intentionally omitted <==
Metallurgical test work and evaluation, including pilot scale mineral processing trials Project & organisational management resourcing – project planning and implementation and operational stages Continued community/ stakeholder engagement Definitive Feasibility Study scheduled for completion – Early 2022 Progression of further regulatory approvals – including Work Plan Product testing and sample provision to customers to facilitate commercial off-take arrangements Engagement with rare earth processors for commercialisation of low volume/ high value rare earths component Progression to detailed engineering and funding stages
Astron Corporation ASX:ATR
15
==> picture [141 x 61] intentionally omitted <==
Favourable Long-Term Zircon Market Dynamics
Stable Demand with limited new supply opportunities at a time where existing supply sources are maturing
Donald is expected to commence production at a time when market conditions are favourable in the mineral sands industry, with existing supplies maturing, and material new sources of supply limited. Donald represents one of the few large, well-delineated and advanced new sources of supply at a time when traditional production sources (from Australia and South Africa) are mature or challenged.
Premium zircon price over last 5 years
==> picture [407 x 197] intentionally omitted <==
----- Start of picture text -----
3000
2500
Zircon 66
2000
1500
1000
500
0
May-11 Nov-11 May-12 Nov-12 May-13 Nov-13 May-14 Nov-14 May-15 Nov-15 May-16 Nov-16 May-17 Nov-17 May-18 Nov-18 May-19 Nov-19 May-20 Nov-20
----- End of picture text -----
Note: Historic pricing graph is based on Astron’s recently commissioned RuiDow report and based on publicly available data from ruidow.com, the indicative price is reflective of premium zircon prices (USD) as defined by zircon products with ZrO2 > 66%.
==> picture [386 x 209] intentionally omitted <==
----- Start of picture text -----
In development Suspended
5% 15%
Suspended
Maturing
Existing production
Existing production
40% In development
Maturing
40%
----- End of picture text -----
-
Suspended operations refer to Rio Tinto’s Richard Bay Minerals (RBM), which has suspended its operations following recent local unrest in the region. Maturing deposits are defined as projects with a mine-life of 5 years or less. These have been calculated based on reserves and annual production figures and forecasts publicly available.
-
The chart is intended to include production volumes of active mineral sands deposits. The data is collected from publicly available information and market reports by Astron.
-
The chart does not include all zircon projects globally, such as the smaller operations in Hainan Island, China, in Indonesia, and more titanium di-oxide focused mineral sands productions such as various China-owned projects in Mozambique.
16
Astron Corporation ASX:ATR
==> picture [141 x 61] intentionally omitted <==
Mineral Sands Mining – low environmental impact mining
Astron plans to minimise environmental impact using sustainable mining and rehabilitation techniques
-
Astron intends to conduct mining operations on mixed use pastoral, mainly cleared land and will take steps to ensure minimal impact on native vegetation, flora and fauna through mine-planning.
-
Australia has an extensive history of successful mineral sands rehabilitations, with over 50 years of experience across the country. Nature of mineral sands mining (relatively shallow, open pit), enables progressive rehabilitation back to original landform usage.
-
In mineral sands mining, the topsoil, subsoil and overburden are stockpiled and stored separately to ensure best rehabilitation outcomes. Rehabilitation of agricultural land can be monitored for crop yield characteristics, which has been shown to be superior after mining and rehabilitation.
-
Astron has undertaken excavation of a test-pit which has since been rehabilitated back to its original landform. Astron will continue to monitor its progress through soil testing and crop yield data analysis, as well as best practice agronomy support.
-
A key focus is placed on the social license to operate and Astron is commited to high level of community and stakeholder engagement, with open and substantive communication at each stage of the project’s development.
==> picture [186 x 126] intentionally omitted <==
==> picture [186 x 123] intentionally omitted <==
==> picture [187 x 121] intentionally omitted <==
==> picture [186 x 126] intentionally omitted <==
==> picture [186 x 123] intentionally omitted <==
==> picture [186 x 122] intentionally omitted <==
17
Astron Corporation ASX:ATR
Contact Us
==> picture [141 x 61] intentionally omitted <==
Tiger Brown Managing Director
Tel: +61 3 5385 7088 Email: [email protected]
Joshua Theunissen Company Secretary - Australia Tel: +61 3 5385 7088 Email: [email protected]