1 December 2022

Donald Rare Earth and Mineral Sands Project – Mining Licence Mineral Resource Update

HIGHLIGHTS

  • The Mineral Resource within Mining Licence MIN5532, the site of the proposed Phase 1 development of the Donald Rare Earth and Mineral Sands Project, has been updated

  • The Mineral Resource of 525Mt @ 4.0% total HM includes a Measured Resource of 394Mt @ 4.2% HM reported above a 1% total HM cut-off grade

  • Contained heavy minerals within MIN5532 increased by 25% to 21Mt with contained zircon increasing by 5% to 3.4Mt

  • Contained rare earth minerals within MIN5532 increased by 60% to 511,400t reflecting an 18% increase in the monazite resource and the addition of a 135,500t xenotime resource

  • Monazite contains the valuable light rare earth elements neodymium and praseodymium and xenotime contains the valuable heavy rare earth elements of dysprosium and terbium

Astron Corporation Limited (Astron, ASX: ATR) is pleased to announce an updated Mineral Resource Estimate (MRE) for Mining Licence MIN5532, which is the site of Phase 1 of the Donald Rare Earth and Mineral Sands Project (Donald or the Donald Project).

The Donald Project is an advanced, globally significant critical minerals project located 300km westnorthwest of Melbourne in the Wimmera Region of Victoria (see Figure 1).

The Donald Project comprises the Donald deposit (MIN5532 and RL2002) and the Jackson deposit (RL2003) and has the benefit of a favourably assessed Victorian Environmental Effects Statement (EES), a concluded Federal Environmental Protection and Biodiversity Conservation (EPBC) Licence and a granted Mining Licence (MIN5532).

It is proposed that Donald will be developed in a number of Phases. Phase 1 is centred on MIN5532 which represents only 17% of the total HM of the Donald Project Mineral Resource.

The MRE update for MIN5532 is shown in Table 1. The Mineral Resource Estimate is 525Mt @ 4.0% total heavy minerals (HM) containing 21Mt total HM and comprises a Measured Resource Estimate of 394Mt @ 4.2% total HM for 17Mt of contained total HM; an Indicated Resource Estimate of 110Mt @ 3.5% total HM for 4Mt of contained total HM; and an Inferred Resource Estimate of 20Mt @ 2.3% total HM for 0.5Mt of contained total HM.

The MRE is based on a 245 Reverse-Circulation Air Core (RCAC) drillhole program which was completed in March 2022[1] and covered 97% of MIN5532. Analysis included sizing, heavy liquid separation (HLS) and mineralogy and was completed in October 2022. The MRE is classified and reported in accordance with the guidelines of the JORC Code (2012 edition).

The March 2022 drilling and sampling program was designed to expand the resource estimation of valuable heavy minerals (VHM) within the known mineralisation of MIN5532 greater than 1% total HM in areas which had not been previously analysed for valuable heavy minerals. Analysis for xenotime and the 20 to 38 micron (µm) fine-grained fraction, which is known to contain rare earth minerals and zircon, was also included in the program. This work was carried out using industry accepted methods and practice for very fine mineral sands deposits and increases the confidence in the Mining Licence’s VHM content.

1 ASX announcement of 2 May 2022, “Quarterly Activities Report Ended 31 March 2022”

Registered Office: 31/F., 148 Electric Road North Point, Hong Kong

www.astronlimited.com

==> picture [128 x 54] intentionally omitted <==

The results from the 2022 program also led to an update of the previous Donald Project MRE which was determined in 2016. The 2016 MRE of 2.4Bt @ 4.8% total HM[2] is now updated to 2.6Bt @ 4.6% total HM.

==> picture [443 x 608] intentionally omitted <==

Figure 1: Location of the Donald Project and Mining Licence MIN5532

2 ASX announcement of 7 April, 2016, “Donald Mineral Sands Project – Mineral Resource Update – Table 2”

2

==> picture [128 x 54] intentionally omitted <==

Table 1: Donald Deposit MIN5532 – 2022 Mineral Resource above a 1% total HM cut-off

Classification Tonnes
Slimes
Oversize
HM
Zircon
Rutile
Leucoxene
Ilmenite
Monazite
Xenotime
(Mt)
(%)
(%)
(%)
(%HM)
(%HM)
(%HM)
(%HM)
(%HM)
(%HM)
Measured
Indicated
Inferred
394
16
10
4.2
16
7.4
24
21
1.8
0.66
110
24
11
3.5
15
5.9
18
19
1.7
0.61
20
22
14
2.3
13
6.9
20
19
1.4
0.55
Total 525
18
10
4.0
16
7.1
23
21
1.8
0.65

Notes:

1. Mineralisation reported above a cut-off grade of 1.0% total HM

2. The Donald deposit Mineral Resource has been classified and reported in accordance with the guidelines of the JORC Code (2012)

3. Total HM is from within the +20 µm to -250 µm size fraction and is reported as a percentage of the total material. Slimes is the -20 µm fraction and oversize is the +1 mm fraction

4. Estimates of the mineral assemblage (zircon, ilmenite, rutile, leucoxene, monazite and xenotime) are presented as percentages of the total HM component, as determined from grain counting, QEMSCAN, XRF and Laser Ablation-ICPMS analysis. QEMSCAN data was aligned with the grain counting data and the following breakpoints are used for used definition of the titania minerals: rutile >95% TiO2, leucoxene 50–95% TiO2, ilmenite 30–50% TiO2

5. An average bulk dry density has been assigned to LP1, LP2 and LP3 geological sub-units of the Loxton Sand (1.81 t/m[3] , 1.74 t/m[3] and 1.57 t/m[3] respectively

6. All tonnages and grades have been rounded to reflect the relative uncertainty of the estimate, thus sum of columns may not equal

Comparison with Previous Estimate

In 2016, AMC Consultants Pty Ltd (AMC) prepared the previous MRE within the VHM domain (for which composited samples were analysed for zircon, ilmenite, rutile/anatase, leucoxene and monazite) in MIN5532 based on a cut-off grade of 1% total HM.

A comparison of the 2022 MRE for MIN5532 with the 2016 MRE is shown in Table 2. The key features include:

  • Total Mineral Resource tonnage increased by 66% to 525Mt

  • Total in-situ heavy mineral (HM) resource increased by 25% to 21Mt, including increased in-situ valuable mineral resources of:

  • zircon increased by 5% to 3.4Mt

  • monazite increased by 18% to 376kt

  • maiden in-situ xenotime resource of 136kt

There are differences in the contained ilmenite, leucoxene and rutile, mainly due to different titania mineral grouping, with an overall increase in the combined titania minerals of 3%.

3

==> picture [128 x 54] intentionally omitted <==

Table 2: Comparison of 2016 and 2022 Mineral Resources within MIN5532 and the VHM domain reported above 1% total HM

2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain 2016 Mineral Resource within MIN5532 and VHM domain
Classification Tonnes Total Slimes
Oversize
% of total HM
(Mt) HM % % % Zirco Rutile/Anatase
Ilmenite
Leucoxene Monazite
Measured
264
5.4
14
12
Indicated
49
4.9
14
12
Inferred
5
4.2
14
11
18.7
7.0
31.3
22.3
1.8
20.3
7.1
33.3
21.7
2.0
22.0
7.2
35.8
19.5
2.7
Total
317
5.3
14
12
19.0
7.1
31.7
22.1
1.9
2022 Mineral Resource within MIN5532
Classification
Tonnes
(Mt)
Total
HM %
Slimes
%
Oversize
%
% of total HM
Zircon
Rutile
Ilmenite
Leucoxene
Monazite
Zircon
Rutile
Ilmenite
Leucoxene
Monazite
Measured
394
4.2
16
10
Indicated
110
3.5
24
11
Inferred
20
2.3
22
14
16.3
7.4
21.0
23.6
1.8
14.8
5.9
19.2
18.2
1.7
13.2
6.9
19.4
19.6
1.4
Total
525
4.0
18
10
16.0
7.1
20.6
22.5
1.8
% Difference in contained minerals
Measured
49%
17%
64%
23%
Indicated
125%
59%
294%
103%
Inferred
300%
122% 560%
429%
2%
24%
-22%
24%
18%
16%
33%
-8%
34%
37%
34%
114%
20%
123%
17%
Total
66%
25%
106%
42%
5%
26%
-19%
27%
18%

Note: for comparison with previous resource estimate, the tonnages and grades have not been rounded.

Donald Rare Earths & Mineral Sands Project

The Donald Project is a tier-1 rare earth and mineral sands project located in regional Victoria approximately 300 kilometres north-west of Melbourne. Given its resource size, the Donald Project has the potential to become a globally significant, long-life source of rare earth elements (including high value neodymium, praseodymium, dysprosium and terbium) as well as zirconium and titanium minerals.

Initially discovered by CRA around 1985, the Donald Project was acquired by Astron Corporation Limited in 2004. In 2016, Astron announced a comprehensive Mineral Resource update encompassing the entire Project, including Retention Licence areas of RL2002 and RL2003, this work cemented Donald’s position as one of the world’s largest undeveloped zircon resources and one of the world’s most significant rare earth resources.

Due to the size of the resource, it is envisioned that the Donald Project will be developed in three phases. The initial development (Phase 1) is planned for MIN5532, the area where further drilling and geological delineation was undertaken during 2022. The purpose of this further work was to quantify the 20 to 38µm fraction of the valuable heavy mineral (VHM) component of the deposit and to provide a more detailed analysis of the rare earth minerals (including xenotime) in the portion of the resource contained within MIN5532.

Astron is carrying out a Feasibility Study (FS) covering the development of Phase 1 of the Donald Project. The FS is expected to be completed around the end of the first quarter of 2023. Work currently underway includes updating Ore Reserves within MIN5532, mine planning studies and key plant and infrastructure design while also commencing discussions related to product off-take arrangements.

Donald Project Mineral Resource – Overview

The Mineral Resource estimate announced in 2016 was based on historical drilling data and sampling data reporting total HM and VHM only within the 38 to 90µm size range.

The 20 to 38µm fraction of VHM was not included in the 2016 Mineral Resource estimate as it was assumed not to be recoverable and was not assayed in earlier samples. Subsequent metallurgical test work, including pilot plant operation, has provided confidence in the recovery of this finer material as

4

==> picture [128 x 54] intentionally omitted <==

well as the valuable rare earth mineral, xenotime. The recovered xenotime will form part of the rare earth element concentrate (REEC) product stream.

During 2022, Astron conducted a drilling program to assay the total HM and VHM content in the 20 to 250µm range to enable re-estimation of the Mineral Resource incorporating the 20 to 38µm fraction.

In addition to an increase in Mineral Resources due to widening the product particle size range, drilling and sampling performed in 2022 also delineated additional Mineral Resources above and below the previously defined orebody. The new resource model now contains estimations for VHM throughout the entire Loxton Sand HM domain within the Mining Licence area which was not the case in previous Mineral Resource estimations.

The revised Mineral Resource Estimate interprets the drilling results and makes use of QEMSCAN, XRF and laser ablation ICPMS analysis of 53 composite samples to determine the mineral assemblage characteristics. These VHM mineralogy composites were compiled to represent the entire HM mineralised domain (>1% total HM), rather than a high-graded subset (1.5-2% total HM), which has resulted in lower VHM grades than previously reported but with higher overall contained VHM.

A summary table of contained Mineral Resources for the Donald Project area is seen in Table 3.

Table 3: Contained Mineral Resources within the VHM domain reported above 1% total HM (2022)

Resource Tonnes
Slimes
Oversize
HM
Zircon
Rutile
Leucoxene
Ilmenite
Monazite
Xenotime
(Mt)
(%)
(%)
(%)
(%HM)
(%HM)
(%HM)
(%HM)
(%HM)
(%HM)
MIN5532
RL2002
RL2003
525
18
10
4.0
16
7
23
21
1.8
0.65
1,286
16
9
4.8
18
8
33
18
2.0
N/A
823
18
5
4.8
32
17
9
19
2.0
N/A
Total 2,634
17
8
4.6
18
8
31
18
2.0
N/A

Note: for detailed breakdown of contained Mineral Resources see Appendix A Table B.

ASX Listing Rule 5.8.1 Summary

As per ASX report guidelines Section 5.8.1, information material to the reporting of the Donald deposit Mineral Resource estimate update is summarised below. More detail is included in the JORC 2012 Table 1 given in Appendix B.

Geology and Geological Interpretation

The Donald deposit is within the Murray Basin, which comprises flat-lying Cenozoic sediments that unconformably overlie Proterozoic and Palaeozoic basement rocks. The mineralisation is contained within the Tertiary aged Loxton Sand, a sequence of marine sands representing a range of environments including deep-water (offshore), near shore, tidal, beach and back dunal sediments.

The mineralisation at Donald is contained within the marine sequence of the Loxton Sand (Figs.2 and 3). The marine sequence of the Loxton Sand unit can be subdivided into three sub-units:

  • LP1 – fine to very coarse friable quartz sands and minor silty, clay and gravel beds representing dunal, foreshore and surf zone sediments;

  • LP2 – near-shore, very fine silty micaceous quartz sands, minor clays and gravels, representing sediments deposited below the wave base that show friable laminated and truncated HM mineralised beds. LP2 is the principal fine-grained heavy mineral target throughout the Murray Basin and contains the majority of the mineralisation in the Donald deposit.

  • LP3 – represents deep water sedimentation containing higher silt and clay material than LP2.

Within the Donald deposit area, the Loxton Sand is underlain by the Geera Clay. The Geera Clay typically consists of black, grey, green or yellow brown plastic clays, with minor silts and is interpreted to have formed in a shallow water, marginal marine, lagoonal or tidal flat environment.

5

==> picture [128 x 54] intentionally omitted <==

The Loxton Sand is overlain by the fluvio-deltaic Shepparton Formation which consists of clay and silt.

A typical east-west cross section of the geology and mineralisation is shown in Figure 2. The location of the cross section is shown in plan view (green line) in Figure 3.

==> picture [440 x 134] intentionally omitted <==

Figure 2: East-west cross section looking north through the deposit showing geological units and HM% grade based model domains

Geological logging

All Zirtanium (2000 to 2004), DMS (2010 to 2015) and Astron (2022) drillholes were logged in their entirety on 1 m intervals. Geological logging by Astron for the 2022 drilling recorded lithology, lithology proportion, grainsize, colour, induration (presence and strength), geological stratigraphical unit and heavy mineral type and content estimation. Zirtanium drill logs recorded lithology, colour, geological unit, induration (presence, type and strength), estimated total HM content and estimated HM grain size. Logging was performed by either Astron/DMS geologists or by trained contract geologists. Detailed geological data is not available for the historic CRA Exploration drillholes, with only the depth to the top and base of the host unit (LP2) recorded.

==> picture [251 x 316] intentionally omitted <==

Figure 3: Plan view showing location of cross section in Figure 2. MIN5532 boundary shown in Figure 1 and RCAC drill hole locations are shown as black dots

6

==> picture [128 x 54] intentionally omitted <==

Sampling and sub-sampling techniques

All sampling for total HM, slimes and oversize content has been carried out on 1m intervals down hole. Sampling from 2000 to 2015 was by collecting the entire 1m interval sample and later riffle splitting the dried sample down to size for analysis.

In 2022, subsamples were collected directly from a drill rig mounted rotary splitter netting on average 1.6kg (dry) with the remainder of the sample interval also being collected for recovery analysis.

Composite samples prior to 2022 were created by grouping samples’ HLS sink fractions down hole based on the presence of heavy mineral (>1.5% total HM) even though the MRE models were quoted using a 1% total HM cut-off grade. In 2022 mineralogy composites were created by grouping samples’ HLS sink fractions across multiple adjacent holes and also down hole within the same geological domain (where total HM is >1%). These composites were analysed by XRF, optical grain counting and QEMSCAN methods prior to 2022 and additionally by laser ablation ICP-MS in 2022.

Drilling

There have been multiple drilling campaigns conducted across the Donald deposit since the early 1980s (Table 4). All drilling since 1987 has been conducted by licensed and trained drillers from Wallis Drilling using the reverse circulation air core (RCAC) method and NQ rods with a nominal drill bit diameter of 82mm. Assay information from drilling prior to 2004 has not been used for the resource estimate, only for geological interpretation. The location of the drill holes from the different drilling campaigns in and around MIN5532 is shown in Figure 4.

Table 4: Summary of drilling information used for the Donald Resource estimate modelling

Company Year Number of
drillholes
Metres drilled Comment
CRA Exploration 1982-89 91 2,250 Used for geological
interpretation only.
Zirtanium 2000 1 19 Used for geological
interpretation only.
2002 14 327
2004 225 4,967 Used for geological
interpretation. Assay and
mineral assemblage data
used for Area 2 where total
HM data is from +38µm to
90µm fraction.
DMS 2010 167 3,969 Used for geological
interpretation. Assay data
(total HM, slimes and
oversize) used for grade
estimation in Area 2.
2015 102 2,777
Astron 2022 245 6,358 All geological, assay and
mineral assemblage data
used for Area 1.
Total 845 20,667

7

==> picture [128 x 54] intentionally omitted <==

==> picture [291 x 363] intentionally omitted <==

Note: The above diagram defines Area 1 as the blue shaded area and Area 2 as the grey shaded area.

Figure 4: Plan of Astron’s mining licence area MIN5532 (inset from Figure 1) showing the distribution of drill holes from historical drilling campaigns

Resource model domains and resource classification

Drilling and sampling conducted in 2022 sought to redefine the Mineral Resource within MIN5532 capturing the geological domains, xenotime and the 20 to 38µm fraction of HM content based on a 1% total HM cut-off grade. The 2022 drilling spacing covers the majority of MIN5532 with the exception of an area which was not able to be accessed at the time. The area of the resource model covered by drilling and sampling performed in 2022 is known as Area 1 and makes up approximately 97% of the MIN5532 resource. The remainder of the resource model area outside of Area 1 uses older historical drilling information and is known as Area 2 (see Appendix B Table 1 comments). The resource model estimation has also been constrained vertically within geological domains, primarily the interpreted layers of the Loxton Sand (LP1, LP2 and LP3), but also by grade within these domains (see Figure 2).

The MRE has been classified according to the guidelines of the JORC Code (2012) into Measured, Indicated and Inferred Mineral Resources, taking into account data quality, data density, geological continuity, grade continuity and confidence in the estimation of heavy mineral content and mineral assemblage.

The nominal drill spacing for the 2022 drilling is approximately 250 mE by 350 mN. In general, the historical drillhole spacing ranges from 125 mE by 400 mN to 250 mE by 500 mN.

Only a new MRE within MIN5532 is reported as the 2022 drilling and sampling data does not extend outside of the mining licence.

8

==> picture [128 x 54] intentionally omitted <==

Sample analysis method

All of the samples from the 2022 drilling program were prepared and analysed by Bureau Veritas Minerals Pty Ltd (BV) at their Adelaide laboratory. The samples were screened at 20µm, 250µm and 1 mm. Slimes is the -20µm fraction, oversize is the +1mm fraction and total HM was measured in the +20µm/-250µm fraction and reported as a percentage of the whole sample.

For assay analysis work done prior to 2022, different in-size fractions have been used for defining analysis of the total HM contents of the whole sample processed post break up and splitting:

  • Zirtanium 2000 and 2002 +38µm to -1mm for total HM% and mineralogy determined in +38µm to -90µm and then adjusted to % of whole sample.

  • Zirtanium 2004 +38µm to -1mm for HM% and mineralogy determined in +38µm to -90µm and then adjusted to % of whole sample.

  • DMS 2010 and 2015 +38µm to -90µm.

All samples used for the 2022 Mineral Resource estimate were analysed for total HM content within the stated size ranges by the heavy liquid separation technique (TBE 2.936 S.G.).

HLS analysis prior to 2022 was predominantly carried out by Western Geolabs Pty Ltd in Perth, WA and Titanatek Lab in Ballina, NSW.

Mineral Resource Estimation methodology

Snowdon Optiro was commissioned to carry out the 2022 MRE. Total HM, slimes and oversize block grades were estimated using ordinary kriging (OK). Mineral assemblage components were estimated using an inverse distance cubed technique. Variogram analysis was undertaken to determine the kriging estimation parameters used for OK estimation of total HM, slimes and oversize.

Block dimensions were selected from kriging neighbourhood analysis. Grade estimation was into parent blocks of 100 mE by 200 mN by 1 mRL. Sub-cells to a minimum dimension of 25 mE by 50 mN by 0.25 mRL were used to represent volume.

Geological interpretation and wireframe surface creation was performed using both Datamine Studio and Surpac software. The Mineral Resource estimation was completed using Datamine Studio software whilst geostatistical data analysis was performed using Snowden Supervisor software.

Modelling cut-off grades

Geological modelling surfaces were interpreted to define the top and base of the mineralisation within the Loxton Sand using a nominal 1% total HM cut-off grade from the total HM contained within the +20µm to -250µm fraction.

Examination of the cumulative probability plot of the total HM data (<5%) from the 2022 drilling indicates that there is a grade inflection at around 1% total HM (Figure 5) and a nominal grade of 1.0% total HM was used for definition of the mineralisation within the sediments.

9

==> picture [128 x 54] intentionally omitted <==

==> picture [281 x 282] intentionally omitted <==

Figure 5: Cumulative probability plot of the total HM data (<5%) from the 2022 HM data

Bulk Density

Bulk density and moisture content of the deposit’s geological domains was calculated from test work performed on undisturbed sonic drill core by ATC Williams Pty Ltd geotechnical engineering consultants (Appendix B– Section 3).

Mining and Metallurgical Modifying Factors

A conventional shallow dry mining approach will be used at the Donald Project, accessing ore from a single pit by use of excavators and haul trucks, similar to those commonly and currently in use in rare earth and mineral sands mining in both Australia and globally. Mining factors such as dilution and ore loss have not applied to the Mineral Resource Estimate. It is considered that there are no mining factors which likely to affect the assumption that the deposit has reasonable prospects for eventual economic extraction.

Metallurgical test work has determined recoveries for the final products based upon TiO2%, ZrO2+HfO2%, CeO2% and Y2O3%.

Metallurgical test work programs conducted by Astron/DMS through Mineral Technologies Pty Ltd have demonstrated commercial recovery of fine-grained HM sand products from the Donald deposit through conventional gravity separation processes. This test work includes recovery of mineral products down to a particle size of 20 µm. Test work has also demonstrated the ability to recover rare earth minerals via a monazite flotation process.

Rare Earths Interpretation

The 2022 drilling program undertaken at the Donald project incorporated xenotime in the MRE update. Analysis of drilling samples indicated that the rare earth elements of neodymium (Nd) and praseodymium (Pr) were present within monazite portion of the assemblage, whilst dysprosium (Dy) and terbium (Tb) were present within the xenotime portion of the assemblage.

Further, the ratio of monazite to xenotime of less than 3:1 indicates a highly favourable mineral assemblage when compared to other rare earth and mineral sands projects under development. As

10

==> picture [128 x 54] intentionally omitted <==

such, Astron has the opportunity to be a globally significant source of heavy rare earth elements outside of China.

Rare earth elements are critical minerals essential to the manufacturing of clean energy and high-end technology solutions. Specifically, Dy, Tb, Nd and Pr are used in the manufacture of permanent magnets used in electric vehicles, wind turbines and other power generation applications. Further, rare earth elements are critical in defense applications, metal alloys for batteries and fuel cells, ceramics for superconductors.

Initially, Astron intends to enter into off-take arrangements with rare earth processors for its production of rare earth concentrate. As this will be separated at the site of the Donald operation, the company has enhanced flexibility to consider both domestic and international processing options.

This announcement is authorised for release by the Managing Director of Astron.

Competent Persons Statement

The information in this report that relates to the MIN5532 Mineral Resource estimate is based on, and fairly reflects, information and supporting documentation compiled by Mrs Christine Standing, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mrs Standing is a full-time employee of Optiro Pty Ltd (Snowden Optiro) and is independent of Astron Corporation, the owner of the Mineral Resources. Mrs Standing has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

The information in this document that relates to the estimation of the RL2002 and RL2003 Mineral Resources is based on information compiled by Mr Rod Webster, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and Australian Institute of Geoscientists. Mr Webster is a full-time employee of AMC Consultants Pty Ltd and is independent of DMS, the owner of the Donald Project Mineral Resources. Mr Webster has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Persons’ findings are presented have not materially modified from the relevant original market announcement.

About Astron

Astron Corporation Limited (ASX: ATR) is an ASX listed company, with over 35 years of experience in mineral sands processing technology and downstream product development, as well as the marketing and sales of zircon and titanium dioxide products. Astron’s prime focus is on the development of its large, long-life and attractive zircon assemblage Donald Mineral Sands and Rare Earth Project in regional Victoria. Donald has the ability to represent a new major source of global supply in rare earths & mineral sands. The company conducts a mineral sands trading operation based in Shenyang, China and owns and operates a zircon and titanium chemicals and metals research and facility in Yingkou, China, which includes a mineral separation facility processing mineral concentrate products into final products. Astron also owns and has the rights to a dunal mineral sands deposit, the Niafarang Mineral Sands Project, in Senegal.

11

==> picture [128 x 54] intentionally omitted <==

Appendix A - Mineral Resources

Astron Corporation previously reported the Mineral Resource on 7[th] April 2016 in accordance with JORC 2012. The Mineral Resource estimate was reported in accordance with the JORC Code for the heavy minerals (HM) and valuable heavy minerals (VHM) Content for MIN5532 and RL 2002 of the Donald deposit and for RL2003, RLA2006 (since been amalgamated into RL2003) of the Jackson deposit.

The Mineral Resource estimate was reported in accordance with the JORC Code for the heavy minerals (HM) and valuable heavy minerals (VHM) content has been used for the preparation of the Ore Reserve. Only the resource containing valuable heavy minerals (VHM) content has been used for the preparation of the Ore Reserve.

Mineral Resources only using heavy liquid separation analysis estimated tonnes, HM, slimes and oversize were estimated in 2016 using a 1% total HM cut-off grade by AMC as shown in Table A below.

Table A: 2016 Mineral Resource above a 1% total HM cut-off

Classification Tonnes
(Mt)
Total HM
(%)
Slimes
(%)
Oversize
(%)
Within MIN5532
Measured
372
4.5
14.4
12.8
Indicated
75
4.0
13.8
13.1
Inferred
7
3.5
13.5
10.6
Subtotal
454
4.4
14.2
12.8
Within RL2002 outside of MIN5532
Measured
343
3.9
19.8
8.1
Indicated
833
3.3
16.2
13.5
Inferred
1,595
3.3
15.7
6.0
Subtotal
2,771
3.4
16.4
8.5
Total within Donald Deposit (RL2002)
Measured
715
4.2
17.0
10.6
Indicated
907
3.4
16.0
13.4
Inferred
1,603
3.4
15.7
6.0
Subtotal
3,225
3.6
16.1
9.1
Total within Jackson Deposit (RL2003)
Measured
-
-
-
-
Indicated
1,903
2.8
19.0
5.8
Inferred
584
2.9
16.7
3.3
Subtotal
2,487
2.9
18.5
5.2
Total Donald Project
Measured
715
4.3
18.1
11.1
Indicated
2,811
3.0
17.9
8.2
Inferred
2,187
3.3
16.4
5.5
Total
5,712
3.2
16.9
7.3

Notes:

1. MRE is based on heavy liquid separation (HLS) analysis only.

2. The total tonnes may not equal the sum of the individual resources due to rounding.

3. The cut-off grade is 1% HM.

4. The figures are rounded to the nearest: 10M for tonnes, one decimal for HM, slimes and oversize.

5. For further details including JORC Code, 2012 Edition – Table 1 and cross-sectional data, see previous announcements dated 7 April 2016, available at ASX’s website at www.asx.com.au/asxpdf/20160407/pdf/436cjyqcg3cf47.pdf

12

==> picture [128 x 54] intentionally omitted <==

The 2022 MIN5532 Mineral Resources are shown in Table B. They are combined with the 2016 Mineral Resource estimates using VHM data to update the total Donald Project Mineral Resources shown in Table B.

Table B: Mineral Resource where VHM data is available reported above a cut-off of 1% total HM

% of total HM % of total HM % of total HM % of total HM % of total HM % of total HM
Classification Tonnes HM Slimes Oversize Rutile/
Zircon Ilmenite Leucoxene Monazite Xenotime
(Mt) (%) (%) (%) Anatase
Within MIN5532
Measured
394
4.2
16
10
16
7
21
24
1.8
0.66
Indicated
110
3.5
24
11
15
6
19
18
1.7
0.61
Inferred
20
2.3
22
14
13
7
19
20
1.4
0.55
Subtotal
525
4.0
18
10
16
7
21
23
1.8
0.65
Within RL2002 outside of MIN5532
Measured
185
5.5
19
7
21
9
31
19
2.0
Indicated
454
4.2
16
13
17
7
33
19
2.0
Inferred
647
4.9
15
6
18
9
33
17
2.0
Subtotal
1,286
4.8
16
9
18
8
33
18
2.0
Total within Donald Deposit (RL2002)
Measured
579
4.6
17
9
18
8
25
22
1.9
Indicated
564
4.1
17
13
17
7
31
19
2.0
Inferred
667
4.8
15
6
18
9
33
17
2.0
Subtotal
1,811
4.6
16
9
18
8
30
19
1.9
Total within Jackson Deposit (RL2003)
Measured
-
-
-
-
-
-
-
-
-
Indicated
668
4.9
18
5
18
9
32
17
2.0
Inferred
155
4.0
15
3
21
9
32
15
2.0
Subtotal
823
4.8
18
5
19
9
32
17
1.0
Total Donald Project
Measured
579
4.6
17
9
18
8
25
22
1.9
Indicated
1232
4.5
18
9
17
8
31
18
2.0
Inferred
822
4.7
15
5
18
9
33
17
2.0
Total
2,634
4.6
17
8
18
8
31
18
2.0

Notes

1. MRE is based on heavy liquid separation analysis and where valuable heavy minerals (VHM) have been determined.

2. The total tonnes may not equal the sum of the individual resources due to rounding.

3. The cut-off grade is 1% HM.

4. The figures are rounded to the nearest: 1Mt for tonnes, one decimal for HM, monazite, whole numbers for slimes, oversize, zircon, rutile + anatase, ilmenite and leucoxene and two decimals for xenotime.

5. Zircon, ilmenite, rutile + anatase, leucoxene, monazite and xenotime percentages are reported as a percentage of the HM.

6. Rutile + anatase, leucoxene and monazite resource has been estimated using fewer samples than the other valuable heavy minerals outside MIN5532. The accuracy and confidence in their estimate is therefore lower.

7. For further details including JORC Code, 2012 Edition – Table 1 and cross-sectional data, see previous announcements dated 7 April 2016, available at ASX’s website at www.asx.com.au/asxpdf/20160407/pdf/436cjyqcg3cf47.pdf

13

==> picture [129 x 54] intentionally omitted <==

Appendix B: JORC Code, 2012 Edition – Table 1

The table below summaries the assessment and reporting criteria used for the Donald Deposit Mineral Resource estimate and reflects the guidelines in Table 1 of The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012).

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.

Air core drilling was used to take samples at 1 m intervals.

Samples collected prior to 2022 were approximately 7 kg in weight and
were riffle split down to 2 kg before analysis. From 2013 to 2016, samples
were rotary split.

For the 2022 drilling program, air core samples were split to approximately
1.6 kg (after drying) from a rig mounted rotary splitter.

The heavy mineral (HM) content was determined by the centrifugal heavy
liquid separation (HLS) method (TBE 2.96 SG) after removal of slimes and
oversize. The in-size range for HM for the 2022 assay work was from 20
µm to 250 µm. Prior to 2022, the in-size range was 38 µm to 90 µm.

Mineralogy content was assessed using grain counting for earlier data and
QEMSCAN techniques. Were used to determine the titania minerals. X-ray
fluorescence (XRF) was used to determine the ZrO2, TiO2 and CeO2 for
estimating zircon and monazite and laser ablation was used to determine
the Y2O3 content and xenotime. QEMSCAN was used to check the
mineralogy.
Drilling techniques Drill type (eg core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and
if so, by what method, etc).

All drillhole drilled by Donald Mineral Sands Pty Ltd (DMS) were RC Air
Core (RCAC) with NQ rods and a nominal drill bit diameter of 82 mm.

During 2022, Sonic drilling was used to drill a program of twin holes (6”
hole) for comparison with selected RC air core holes. the assay results
were not used in the Mineral Resource estimation.

Comparison of Sonic twin holes to air holes showed acceptable correlation
on HM grade, slimes, oversize and sample weight/recovery.

RCAC drilling technique used attempted to maximise recovery and
minimise water injection.

Sample was cleared from the rods and cyclone/splitter between each 3 m
drill rod.

14

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.

For holes drilled by DMS, sample recovery was visually checked.

Sample intervals with problematic recovery were noted.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.

Zirtanium Ltd (Zirtanium) reported in 2004 that their drilling had a
consistent sample weight recovery of 7.1 kg ±0.8 kg.

During the 2022 drilling for a set of selected holes samples, the residual
sample (the other part of the sample from the drill rig rotary splitter) was
collected and weighed to check overall drilling recovery. The average
recovered sample weight for samples tested was 6.5 kg (wet) or ~83% of a
theoretical maximum recovery weight. For comparison, the sonic twin holes
were estimated to have 95% recovery versus the theoretical hole volume
multiplied by density.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gainof fine/coarse material.

No relationship between recovery and grade has been observed.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
_metallurgical studies. _

All drillholes were logged for lithology, grain size, colour, stratigraphy,
induration and estimated HM content.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc) photography.

Logging is mostly qualitative with proportion of lithological types logged.
Interpretations of stratigraphic units were also made.

Every sample interval also had a small amount collected and stored in chip
trays which were subsequently photographed.
The total length and percentage of the relevant intersections
_logged. _

All RCAC holes were completely logged.
Subsampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all
core taken.

Prior to 2022, samples were dried and had the +4 mm oversize removed
before sending to the assay laboratory for sizing and heavy liquid
separation (HLS) assay. Samples were split down to 70 g of sample in the
laboratory for HLS.

During the 2022 work, samples were split off by a rig mounted cyclone
splitter resulting in an ~1.6 kg primary sample. These samples were dried
and riffle split to 500g for analysis.

The 2022 assay work used 100 g of sample for centrifugal heavy liquid
separation analysis.

15

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.

Riffle splits of dried sample were used for subsampling prior to 2013. After
2013, rotary splits were used. Rotary splits were done off the rig splitter
(wet) for the 2022 drilling work.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.

The sampling technique was deemed appropriate for mineral sands test
work.

RCAC is widely accepted for drilling deposits of this type.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.

Field duplicates (1 in 40) and laboratory duplicates (1 in 28) were taken to
assess the representivity and consistency of samples being taken.
Measures taken to ensure that the sampling is representative
of the in situ material collected, including for instance results
for field duplicate/second-half sampling.

Field duplicates at a rate of 1 in 40 samples were taken to assess the
repeatability of the rig sample splitting. Field duplicates weight averaged
115% of their corresponding primary sample even after adjusting the
splitter aperture.
Whether sample sizes are appropriate to the grain size of the
material being sampled.

The samples size and split quantity were deemed appropriate for the hole
size and sample geology.
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.

After the removal of slimes and oversize the (in-size) HM percentage
content of the samples was determined by the HLS technique with
centrifugal aid in separation.

The assay technique used is considered appropriate and conforms to or
exceed industry standards. Centrifugal HLS is considered preferable (as
opposed to gravity sink alone) where fine grained HM sand quantities are
being assayed.

Laboratory standards and duplicates were performed both at a rate of 1 in
28 samples.

All assay determination and QEMSCAN analysis was performed by Bureau
Veritas Minerals Pty Ltd (Bureau Veritas) at their Adelaide facility whilst
XRF and laser ablation ICPMS work was performed at their Perth facility.

Blanks were not submitted.

A second laboratory was not used.

16

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.

Al2O3, As2O3, BaO, CaO, CeO2, Cr2O3, Fe2O3, HfO2, K2O, La2O3, MgO,
MnO, Nb2O5, Nd2O3, P2O5, PbO, SiO2, SnO2, SO3, Th, TiO2, U, V2O5, ZnO,
ZrO2+HfO2have been determined by XRF spectrometry on oven dry
(105°C) sample unless otherwise stated.

Ag_LA, As_LA, Ba_LA, Be_LA, Bi_LA, Cd_LA, Ce_LA, Co_LA, Cr_LA,
Cs_LA, Cu_LA, Dy_LA, Er_LA, Eu_LA, Ga_LA, Gd_LA, Ge_LA , Hf_LA,
Ho_LA, In_LA, La_LA, Lu_LA, Mn_LA, Mo_LA, Nb_LA, Nd_LA, Ni_LA,
Pb_LA, Pr_LA, Rb_LA, Re_LA, Sb_LA, Sc_LA, Se_LA, Sm_LA, Sn_LA,
Sr_LA, Ta_LA, Tb_LA, Te_LA, Th_LA, Ti_LA, Tl_LA, Tm_LA, U_LA, V_LA,
W_LA, Y_LA, Yb_LA, Zn_LA, Zr_LA have been determined by laser
ablation inductively coupled plasma mass spectrometry (LA-ICPMS).
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.

Field and laboratory duplicates were both used to assess the assay
process work.

A company standard was inserted at a rate of 1 in 40 samples and
laboratory standards were also inserted at a rate of 1 in 28 samples.

Duplicate sample assay variability was deemed acceptable as was the
precision of both field and laboratory standards.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.

Drilling and analytical data for HM, slimes and oversize content has been
reviewed by Snowden Optiro (Mineral Resource consultants).
The use of twinned holes.
A selection of twin holes, using Sonic drilling, were used to assess the
recovery, geology and HM% of corresponding RCAC program holes. Twin
sample intervals were compared for consistency and found to be
acceptably comparable.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.

All geological and analytical data has been imported into a Microsoft
Access database.

The data for the 2022 drilling and analytical work has been validated
against the original logging records.
Discuss any adjustment to assay data.
Processing is expected to recover total HM from the +20µm/-250µm
fraction. Data used for resource estimation within Area 1 used this size
fraction for analysis. Historical data is from the +38µm/-90µm fraction and
data calibration equations (which diluted the grade) were used to align this
data to the expected recovery fraction

17

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Location of data
points
Accuracy and quality of surveys used to locate drillholes
(collar and down-hole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.

All drillhole collars for the 2022 drilling were surveyed for their final
locations by Fergusson Perry Surveyors using a Leica Captivate GS18 unit
and CS20 controller.

Earlier drillhole locations were marked out with handheld global positioning
systems (GPS) units.

The surface topography was obtained from LiDar data of the project area.
The 2022 drilling collar survey points were combined with this LiDar data to
create the top surface of the current block model.
Specification of the grid system used.
The MGA94 Zone 54 coordinate system was used.
Quality and adequacy of topographic control.
The quality and accuracy of the topographic model is considered good.
Newly surveyed drillhole collar from 2022 closely aligned with the LiDar
derived topography surface.
Data spacing and
distribution
Data spacing for reporting of Exploration Results.
The drillhole spacing of historical data for the total model area prior to the
2022 drilling was 100 mE by 400 mN. The 2022 drillholes were spaced on
a 250 mE by 350 mN spacing with drill lines designed to infill between the
400 mN, north-south spacing. For the model Area 1 only the 2022 drilling
has been used in this resource update. For the model Area 2 no extra
drilling has been performed since the previous resource estimate.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

The overall drilling spacing of 250 mE by 350 mN for Area 1 of the model
(using the 2022 drilling) is considered sufficient for a Measured resource
category considering that the previous resource estimate of this area was
also Measured. Geostatistical parameters support the 2022 Mineral
Resource category classifications, using only the 2022 drilling information.

For Area 2 of the model the drillhole spacing remains the same (100 mE by
400 mN) but as adjustments have been made to account for sample sizing
range data differences, an Indicated resource category has been applied.

18

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Whether sample compositing has been applied.
Sample compositing was only performed for the purposes of mineralogy
assay test work (XRF, laser ablation ICPMS and QEMSCAN). Composites
for the 2022 drilling were made up from adjacent or nearby drillholes HLS
sinks from within the same geological domain where samples showed >1%
HM and were not immediately next to a geological domain contact.

Mineralogy composites were made of up sequential samples downhole for
all other drilling campaign sampling.

Assays for HM, slimes and oversize were performed on individual 1 m
RCAC drilling samples only.
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.

The orientation of the mineralised horizon is generally flat and horizontal –
an undeformed sedimentary deposit. All holes were drilled vertically and as
such have no orientation bias.
Sample security The measures taken to ensure sample security.
Samples were securely stored on private property.

Samples were transported to the laboratory by courier with no loss.
Audits or reviews The results of any audits or reviews of sampling techniques
and data.

Only internal reviews were carried out.

Sample assay quality assurance and quality control (QAQC) – the
company standard and field duplicate results have been reviewed.

Laboratory standards and duplicate performance have also been reviewed.

19

==> picture [129 x 54] intentionally omitted <==

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.

This report covers the area of mining licence MIN5532 owned by DMS.

The new resource estimation model covers MIN5532.

There are no existing agreements or material issues, partnerships or joint
ventures pertinent to this resource.

There are no native title interests, wilderness or national park settings
relating to this resource area.

Heritage areas and other environmental settings are described in the
Donald project Environmental Effects Statement (EES) which was
positively assessed in 2008.

Land use is dominantly broad acre cropping and agriculture.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate
_inthe area. _

The tenement is in good standing and no known impediments exist.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other
parties.

Exploration work done by CRA Exploration in the 1980s and 1990s.

Zirtanium exploration work from 2000 to 2004.
Geology Deposit type, geological setting and style of mineralisation.
WIM style, fine-grained heavy mineral sand deposit within the Loxton
Sand.
Drillhole information A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drillholes:
easting and northing of the drillhole collar
elevation or RL (elevation above sea level in metres)
of the drillhole collar
dip and azimuth of the hole
downhole length and interception depth
hole length.

Diagrams in this announcement show the location of and distribution of
drillholes in relation to the Mineral Resource.
Data aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are usually
_Material and should be stated. _

Not relevant – exploration results are not being reported; a Mineral
Resource has been defined.

20

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and intercept
lengths
If the geometry of the mineralisation with respect to the
drillhole angle is known, its nature should be reported.
If it is not known and only the downhole lengths are reported,
there should be a clear statement to this effect (e.g.
_‘downhole length, true width not known’). _

Not relevant – exploration results are not being reported; a Mineral
Resource has been defined.
Diagrams Appropriate maps and sections (with scales) and tabulations
of intercepts should be included for any significant discovery
being reported These should include, but not be limited to a
plan view of drillhole collar locations and appropriate
_sectional views. _

A cross section and plan views have been included in this announcement.
Balanced reporting Where comprehensive reporting of all Exploration Results is
not practicable, representative reporting of both low and high
grades and/or widths should be practiced to avoid misleading
_reporting of Exploration Results. _

Not relevant – exploration results are not being reported; a Mineral
Resource has been defined.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological
observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment;
metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or
_contaminating substances. _

Where relevant, this information has been included or referred to
elsewhere in this Table.
Further work The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).

Grade control drilling before mining where deemed necessary.

Extensional drilling to be conducted around the boundaries of the resource
model and to cover areas where drilling was restricted in 2022 due to time
and access constraints.

21

==> picture [129 x 54] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation Commentary
Database integrity Measures taken to ensure that data has not been corrupted
by, for example, transcription or keying errors, between its
initial collection and its use for Mineral Resource estimation
purposes.

Drillhole data was extracted directly from Astron’s drillhole Microsoft
Access database, which includes internal data validation protocols.

Data was further validated by Snowden Optiro upon receipt, and prior to
use in the estimation.
Data validation procedures used.
Validation of the data was confirmed using mining software (Datamine)
validation protocols, and visually in plan and section views.
Site visits Comment on any site visits undertaken by the Competent
Persons and the outcome of those visits.

Mrs Christine Standing (Snowden Optiro, acting as Competent Person)
has not visited the site. She has visited similar WIM-style deposits in the
Murray Basin.
Geological
interpretation
Confidence in (or conversely, the uncertainty of the
geological interpretation of the mineral deposit.

There is good confidence in the geological interpretation of the overlying
Shepparton Formation and the LP1 and LP2 units within the Loxton Sand.
Confidence in the basal contact of the LP3 unit and the Geera Clay is
relatively good, but additional verification of the historical data is required.
Nature of the data used and of any assumptions made.
Both assay and geological data were used for the interpretation.

The mineralised horizon is defined by a nominal cut-off grade of 1% total
HM.
The effect, if any, of alternative interpretations on Mineral
Resource estimation.

No alternative interpretations were considered.

Any alternative interpretations are unlikely to significantly affect the
Mineral Resource estimate.
The use of geology in guiding and controlling Mineral
Resource estimation.

The geological units were defined using geological logging, slimes and
oversize contents, and sediment colour.
The factors affecting continuity both of grade and geology.
The mineralisation is contained within the Loxton Sand. Offshore-hosted
HM sand deposits are formed in a near-shore environment, are fine
grained and can extend laterally over several kilometres.

The confidence in the grade and geological continuity is reflected by the
assigned resource classification.
Dimensions The extent and variability of the Mineral Resource expressed
as length (along strike or otherwise), plan width, and depth
below surface to the upper and lower limits of the Mineral
Resource.

HM are concentrated within the full extent of MIN5532 and extends over
an area of area of 10 km north-south by 6 km east-west.

The overlying Shepparton Formation ranges in thickness from 3 m to 15 m
with an average thickness of 8.7 m.

The mineralised horizon ranges in thickness from 3 to 20 m and has an
average thickness of 9.8 m.

22

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Estimation and
modelling techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions, including
treatment of extreme grade values, domaining, interpolation
parameters and maximum distance of extrapolation from
data points. If a computer assisted estimation method was
chosen include a description of computer software and
parameters used.

Data analysis and estimation was undertaken using Snowden Supervisor
and Datamine software.

Total HM, slimes and oversize block grades were estimated using ordinary
kriging (OK). Mineral assemblage components were estimated using an
inverse distance cubed technique. Snowden Optiro considers these
methods to be an appropriate estimation technique for this type of
mineralisation.

Drilling is generally on a 250 m by 350 m spacing within MIN5532 and
ranges from 250 m to 500 m east-west and from 250 m to 500 m north-
south within the southern area of the deposit.

A maximum extrapolation distance of 250 m was applied north-south and
east-west

All data has been collected from downhole intervals of 1 m.

Variogram analysis was undertaken to determine the kriging estimation
parameters used for OK estimation of total HM, slimes and oversize.

Total HM has a maximum continuity range of 1,000 m to 3,460 m along
strike (005⁰ to 015⁰), 470 m to 1,800 m across strike and 2.4 m to 5 m
vertical. Maximum continuity ranges interpreted for the slimes are 2,150
m to 3,090 m along strike, 1,135 m to 1,600 m across strike and 3 m to 5
m vertical and are 1,410 m to 4,400 m along strike, 875 m to 2,270 m
across strike and 2.8 m to 7.8 m vertical for oversize. Kriging
neighbourhood analysis was performed to determine the block size,
sample numbers and discretisation levels.

Variogram analysis was undertaken to determine the search parameters
used for ID estimation of the mineral assemblage data.

Along strike (015⁰) ranges of 580 m to 1,010 m and across-strike ranges
(285⁰) of 480 m to 900 m were interpreted, with leucoxene having the
shorter ranges and monazite having the longest ranges. The zircon
variograms (selected as being the most robust) of 940 m along strike by
880 m across strike were used for the horizontal search ellipse
dimensions and a vertical search of 3.5 m was selected, which is about
half the average sampled interval used for the composite samples.

23

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Description of how the geological interpretation was used to
control the resource estimates.

All geological logging data (including historical drillholes), slimes content
and oversize content were used to define the geological units.

Hard boundary conditions were applied for all geological units and a
combination of soft and hard boundaries were applied for the
mineralisation domains.

The mineralised horizon was defined using a nominal cut-off grade of 1%
total HM (selected from statistical analysis).

The mineralised domain is considered geologically robust in the context of
the resource classification applied to the estimate.
Discussion of basis for using or not using grade cutting or
capping.

The distributions of the total HM, slimes and oversize data within each
geological unit and within the mineralised horizon are positively skewed;
however, the total HM, slimes and oversize all have low coefficients of
variation (less than 0.95). High-grade outliers are not present and so top-
cut grades (cap grades) were not applied.
The availability of check estimates, previous estimates
and/or mine production records and whether the Mineral
Resource estimate takes appropriate account of such data.

Mineral Resources for MIN5532 were prepared by AMC Consultants Pty
Ltd (AMC) in 2016.

There is a 16% increase in tonnes due to differences in the interpretation
and inclusion of mineralisation within the LP3 unit. The total HM grade
has decreased by 9% (from 4.4% to 4.0%) due to dilution caused by the
change in grain size fraction used for HM determination. The contained
HM tonnes has increased by 5%.

The 2016 Mineral Resource with assemblage data was reported
separately. Compared to this, the 2022 Mineral Resource tonnage has
increased by 66%, due to differences in the interpretation and inclusion of
mineralisation within the LP3 unit. The total HM grade has decreased by
25% and the mineral assemblage components have decreased by 0.4% to
17% due to dilution caused by the change in grain size fraction used for
HM determination.
The assumptions made regarding recovery of by-products.
Processing is expected to recover total HM from the +20µm/-250µm
fraction. Data used for resource estimation within Area 1 used this size
fraction for analysis. Historical data is from the +38µm/-90µm fraction and
data calibration equations (which diluted the grade) were used to align this
data to the expected recovery fraction
Estimation of deleterious elements or other non-grade
variables of economic significance (e.g. sulphur for acid mine
drainage characterisation).

Deleterious elements were not considered for the Mineral Resource
estimate.

24

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.

Grade estimation was into parent blocks of 100 mE by 200 mN by 1 mRL.

Block dimensions were selected from kriging neighbourhood analysis and
reflect the variability of the deposit as defined by the current drill spacing.

Sub-cells to a minimum dimension of 25 mE by 50 mN by 0.25 mRL were
used to represent volume.
Any assumptions behind modelling of selective mining units.
Selective mining units were not modelled.
Any assumptions about correlation between variables.
The majority of the total HM and slimes, total HM and oversize, and slimes
and oversize data is uncorrelated.

Correlation coefficients of the 2022 mineral assemblage data indicate:

a strong positive relationship between:
i.
zircon and monazite;
ii. zircon and xenotime; and
iii. monazite and xenotime

a moderate positive relationship between:
i.
rutile and the other mineral assemblage components; and
ii. xenotime and the other mineral assemblage components

a poor positive correlation between:
i.
leucoxene and ilmenite, zircon and monazite; and
ii. ilmenite and monazite.
The process of validation, the checking process used, the
comparison of model data to drillhole data, and use of
reconciliation data if available.

The total HM, slimes, oversize and mineral assemblage estimated block
model grades were visually validated against the input drillhole data and
comparisons were carried out against the de-clustered drillhole data and
by northing, easting and elevation slices.

No production has taken place and thus no reconciliation data is available.
Moisture Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the
moisture content.

Tonnages have been estimated on a dry basis.

Average moisture contents of 14% to 33% were recorded from density test
work.

25

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Cut-off parameters The basis of the adopted cut-off grade(s) or quality
parameters applied.

The Mineral Resource is reported above a cut-off grade of 1.0% total HM.
This cut-off grade was selected by Astron and Snowden Optiro following
comparison with mineral sands deposits currently being or recently having
been mined in Australia.

It is expected that the entire Donald Mineral Resource has reasonable
prospects for eventual economic extraction using open pit mining.

A mining study is currently being undertaken for technical and economic
assessment of open pit extraction of the heavy mineral sands at the
Donald deposit.
Mining factors or
assumptions
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential mining methods,
but the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not
always be rigorous.

Open pit mining methods will be used, similar to those commonly and
currently in use in HM mining operations both in Australia and globally.

Mining factors such as dilution and ore loss have not been applied.

It is considered that there are no mining factors which are likely to affect
the assumption that the deposit has reasonable prospects for eventual
economic extraction.
Metallurgical factors
or assumptions
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary as part of
the process of determining reasonable prospects for eventual
economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous.

Metallurgical test work has determined recoveries for the final products
based upon TiO2%, ZrO2+HfO2%, CeO2% and Y2O3%.

Metallurgical test work programs conducted by Astron/DMS through
Mineral Technologies Pty Ltd have demonstrated commercial recovery of
fine-grained HM sand products from the Donald deposit through
conventional gravity separation processes. This test work includes
recovery of mineral products down to a particle size of 20 µm. Test work
has also demonstrated the ability to recover rare earth minerals via a
monazite flotation process.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider the potential environmental
impacts of the mining and processing operation.

There are no known significant environmental impediments to the project’s
viability from the currently available information.

26

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Bulk density Whether assumed or determined. If assumed, the basis for
the assumptions. If determined, the method used, whether
wet or dry, the frequency of the measurements, the nature,
size and representativeness of the samples.
Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.

Bulk density test work was undertaken by ATC Williams Pty Ltd (ATC
Williams) during 2022. Moisture content and bulk density were measured
for 14 samples from the sonic drilling program.

The average dry bulk density values determined by ATC Williams were
assigned to the Shepparton Formation (1.45 t/m3) and to the LP1, LP2 and
LP3 units of the Loxton Sand (1.81 t/m3, 1.74 t/m3and 1.57 t/m3
respectively).
Classification The basis for the classification of the Mineral Resources into
varying confidence categories.
Whether appropriate account has been taken of all relevant
factors (i.e. relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology
and metal values, quality, quantity and distribution of the
data).

The Mineral Resource has been classified as Measured, Indicated and
Inferred taking into account data quality, data density, geological
continuity, grade continuity and confidence in the estimation of heavy
mineral content and mineral assemblage.

Measured and Indicated Mineral Resources have been defined within the
area covered by the 2022 drilling (on a nominal spacing of 250 m by 350
m) and where the mineral assemblage has been determined by
QEMSCAN, XRF and laser ablation ICPMS analysis. Measured Mineral
Resources are within the LP1 (Domains 210 and 211) and LP2 units
(Domains 220 and 221). The eastern area of Domain 210 and the LP3
unit (Domains 230 and 231), within the area of 2022 drilling are classified
as Indicated.

Within Area 2, the drilling data used for the resource estimate is on a
generally on a spacing of 250 m to 500 m east west and 250 m to 500 m
north-south. The historical nature of the data, and changes in the grain
size and data calibration have reduced confidence in the data used for
resource estimation. Mineral Resources within Area 2 are classified as
Indicated and Inferred. Data analysis concentrated on the LP2 unit and
the LP2 unit is classified as Indicated where mineral assemblage data was
obtained from the 2004 drilling. Mineral Resources are classified as
Inferred within all of the LP1 and LP3 units and where there is a lack of
mineral assemblage data within LP2.
Whether the result appropriately reflects the Competent
Person’s view of the deposit

The assigned classification of Measured, Indicated and Inferred reflects
the Competent Person’s assessment of the accuracy and confidence
levels in the Mineral Resource estimate.
Audits or reviews The results of any audits or reviews of Mineral Resource
estimates.

The Mineral Resource has been reviewed internally as part of normal
validation processes by Snowden Optiro.

No external audit or review of the current Mineral Resource has been
conducted.

27

==> picture [129 x 54] intentionally omitted <==

Criteria JORC Code explanation Commentary
Discussion of relative
accuracy/ confidence
Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an
approach or procedure deemed appropriate by the
Competent Person.

The assigned classification of Measured, Indicated and Inferred reflects
the Competent Person’s assessment of the accuracy and confidence
levels in the Mineral Resource estimate.
The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions
_made and the procedures used. _

The confidence levels reflect potential production tonnages on an annual
basis, assuming open pit mining.
These statements of relative accuracy and confidence of the
estimate should be compared with production data, where
_available. _

No production has occurred from the deposit.

28

==> picture [128 x 54] intentionally omitted <==

Appendix C – Resource Drill Hole Data

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS001 660999.507 5963000.1 127.18 27 - -90
DMS002 660749.913 5962999.8 127.11 25 - -90
DMS003 660505.917 5962999.8 126.90 24 - -90
DMS004 660250.345 5963000.1 126.49 26 - -90
DMS005 660000.305 5962999.8 124.70 25 - -90
DMS006 659749.406 5962999.6 124.51 24 - -90
DMS007 661000.614 5962750.2 126.67 24 - -90
DMS008 660750.446 5962750.1 126.43 25 - -90
DMS009 660499.977 5962749.6 126.63 23 - -90
DMS010 660249.81 5962750.2 126.67 26 - -90
DMS011 659999.714 5962749.9 125.23 24 - -90
DMS012 659749.967 5962749.5 124.47 23 - -90
DMS013 661000.502 5962497.6 126.56 23 - -90
DMS014 660749.585 5962497.8 126.46 24 - -90
DMS015 660500.308 5962500.2 127.13 27 - -90
DMS016 660250.425 5962500.2 126.42 26 - -90
DMS017 659999.805 5962500.0 125.73 25 - -90
DMS018 658599.411 5962500.1 127.48 26 - -90
DMS019 658349.308 5962500.1 127.63 26 - -90
DMS020 657659.97 5962500.0 129.13 29 - -90
DMS021 657470.921 5962500.1 128.75 25 - -90
DMS022 657249.907 5962500.0 127.06 26 - -90
DMS023 657000.799 5962500.2 126.08 24 - -90
DMS024 656750.788 5962500.2 125.03 22 - -90
DMS025 660999.78 5962250.2 126.97 24 - -90
DMS026 660749.992 5962250.1 126.65 23 - -90
DMS027 660501.068 5962250.1 126.72 24 - -90
DMS028 660249.74 5962250.3 125.71 25 - -90
DMS029 659999.713 5962250.1 125.21 25 - -90
DMS030 659751.152 5962249.9 125.16 24 - -90
DMS031 659459.964 5962250.2 126.65 25 - -90
DMS032 659250.564 5962249.8 127.28 26 - -90
DMS033 659000.05 5962250.2 127.74 25 - -90
DMS034 658829.885 5962250.0 127.85 26 - -90
DMS035 658659.789 5962250.2 128.11 26 - -90
DMS036 658078.944 5962149.5 128.78 27 - -90
DMS037 657749.816 5962249.9 129.71 27 - -90
DMS038 657500.424 5962250.0 129.06 27 - -90
DMS039 657249.39 5962249.9 127.99 27 - -90
DMS040 656999.748 5962249.8 127.05 25 - -90
DMS041 656749.622 5962250.0 125.60 25 - -90
DMS042 661000.604 5961999.6 127.54 26 - -90
DMS043 660750.466 5961999.9 126.92 24 - -90
DMS044 660499.228 5961999.7 126.97 25 - -90

29

==> picture [128 x 54] intentionally omitted <==

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS045 660249.562 5962000.3 126.20 25 - -90
DMS046 659999.986 5962000.0 125.36 23 - -90
DMS047 659749.313 5961999.8 124.70 25 - -90
DMS048 658249.908 5961999.9 129.40 27 - -90
DMS049 657749.414 5961999.9 129.15 27 - -90
DMS050 657500.102 5961999.9 129.13 25 - -90
DMS051 657249.321 5962000.2 128.46 27 - -90
DMS052 656999.678 5962000.2 127.70 27 - -90
DMS053 656749.83 5962000.1 127.26 24 - -90
DMS054 656500.262 5962000.1 126.18 23 - -90
DMS055 661749.383 5961750.7 128.89 26 - -90
DMS056 661538.813 5961838.5 128.92 26 - -90
DMS057 661546.4 5961528.1 128.95 26 - -90
DMS058 660999.703 5961750.0 127.81 25 - -90
DMS059 660749.314 5961750.5 127.68 25 - -90
DMS060 660249.336 5961750.1 126.42 24 - -90
DMS061 660000.21 5961750.3 125.92 24 - -90
DMS062 659750.586 5961759.9 123.88 23 - -90
DMS063 659455.145 5961749.9 124.72 23 - -90
DMS064 659250.435 5961749.8 126.93 24 - -90
DMS065 658914.376 5961812.0 128.17 26 - -90
DMS066 658600.425 5961450.0 129.78 27 - -90
DMS067 658454.076 5961749.7 130.11 27 - -90
DMS068 658249.63 5961750.1 129.95 27 - -90
DMS069 658000.407 5961750.2 129.13 26 - -90
DMS070 657749.879 5961749.6 128.43 26 - -90
DMS071 657430.341 5961750.0 128.24 25 - -90
DMS072 657230.866 5961749.9 128.63 26 - -90
DMS073 657000.637 5961750.1 127.40 25 - -90
DMS074 656750.512 5961749.9 127.42 24 - -90
DMS075 656499.74 5961750.0 126.75 24 - -90
DMS076 657251.149 5961499.8 127.90 25 - -90
DMS077 656999.234 5961499.8 127.64 24 - -90
DMS078 656750.366 5961499.9 127.25 25 - -90
DMS079 656501.07 5961499.8 127.18 26 - -90
DMS080 661749.609 5961249.5 129.39 26 - -90
DMS081 661500.033 5961249.9 129.17 27 - -90
DMS082 661309.91 5961249.7 129.34 27 - -90
DMS083 661070.479 5961037.1 129.19 26 - -90
DMS084 660701.795 5961345.7 128.65 26 - -90
DMS085 660499.343 5961249.6 128.37 25 - -90
DMS086 660214.732 5961251.1 128.42 26 - -90
DMS087 659999.726 5961249.9 127.45 26 - -90
DMS088 659750.613 5961250.0 125.81 23 - -90
DMS089 659455.898 5961252.4 125.03 20 - -90

30

==> picture [128 x 54] intentionally omitted <==

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS090 659249.809 5961254.4 128.30 25 - -90
DMS091 659123.896 5961445.3 127.34 25 - -90
DMS093 658499.51 5961249.8 129.92 26 - -90
DMS094 658265.036 5961250.4 130.16 27 - -90
DMS095 657999.464 5961250.2 129.69 27 - -90
DMS096 657750.317 5961250.4 128.30 26 - -90
DMS097 657500.115 5961250.2 128.16 27 - -90
DMS098 657250.072 5961250.3 129.14 27 - -90
DMS099 656999.305 5961249.9 128.07 26 - -90
DMS100 656750.241 5961247.1 128.31 24 - -90
DMS101 656500.085 5961250.0 127.83 26 - -90
DMS102 656750.782 5961000.1 129.52 26 - -90
DMS103 656499.723 5960999.8 128.27 26 - -90
DMS104 661750.134 5960750.1 129.29 27 - -90
DMS105 661501.019 5960750.3 129.18 27 - -90
DMS106 661311.001 5960750.2 129.15 27 - -90
DMS107 661094.912 5960749.7 129.16 26 - -90
DMS108 660633.573 5960878.8 128.07 25 - -90
DMS109 660664.234 5960607.9 128.13 26 - -90
DMS110 660239.697 5960749.7 128.15 26 - -90
DMS111 659999.278 5960750.4 127.81 25 - -90
DMS112 659751.075 5960750.2 127.38 25 - -90
DMS113 659500.117 5960749.5 125.39 23 - -90
DMS114 659250.204 5960750.6 127.71 25 - -90
DMS115 659249.779 5960980.6 128.15 26 - -90
DMS116 658749.751 5960750.6 129.95 27 - -90
DMS117 658499.473 5960750.2 130.49 27 - -90
DMS118 658250.139 5960749.6 130.82 27 - -90
DMS119 658000.703 5960749.8 131.32 27 - -90
DMS120 657750.309 5960749.8 130.03 26 - -90
DMS121 657500.62 5960749.6 129.72 27 - -90
DMS122 657249.857 5960749.9 129.93 27 - -90
DMS123 657000.104 5960749.8 129.48 27 - -90
DMS124 656749.16 5960750.1 129.48 26 - -90
DMS125 656500.619 5960750.1 128.90 25 - -90
DMS126 656498.877 5960499.6 129.56 25 - -90
DMS127 656248.901 5960500.1 129.35 26 - -90
DMS128 656000.374 5960499.8 129.76 26 - -90
DMS129 661749.787 5960320.7 129.27 26 - -90
DMS130 661500.346 5960250.4 130.35 27 - -90
DMS131 661250.104 5960250.4 130.01 26 - -90
DMS132 661056.138 5960362.9 129.51 26 - -90
DMS133 660890.59 5960162.5 129.80 26 - -90
DMS134 660492.874 5960392.9 127.92 25 - -90
DMS135 660250.333 5960249.9 129.18 28 - -90

31

==> picture [128 x 54] intentionally omitted <==

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS136 660000.261 5960250.0 127.94 26 - -90
DMS137 659751.026 5960250.2 127.31 25 - -90
DMS138 659500.4 5960249.8 125.92 23 - -90
DMS139 659250.661 5960249.8 126.20 24 - -90
DMS140 658760.012 5960509.5 131.03 27 - -90
DMS141 658749.277 5960249.8 130.82 28 - -90
DMS142 658501.66 5960252.6 130.67 27 - -90
DMS143 658249.812 5960251.3 131.36 27 - -90
DMS144 657999.431 5960250.1 130.79 27 - -90
DMS145 657750.115 5960250.2 130.75 29 - -90
DMS146 657499.638 5960250.2 130.91 27 - -90
DMS147 657249.914 5960250.2 129.62 27 - -90
DMS148 656999.891 5960250.1 129.68 27 - -90
DMS149 656499.822 5960250.0 130.05 27 - -90
DMS150 656250.424 5960250.4 130.43 27 - -90
DMS151 656000.425 5960250.3 129.91 27 - -90
DMS152 656499.75 5959948.9 130.20 27 - -90
DMS153 656249.967 5959950.4 131.93 29 - -90
DMS154 656000.563 5959999.0 130.66 27 - -90
DMS155 661498.988 5959749.9 130.32 27 - -90
DMS156 661249.285 5959750.1 132.41 28 - -90
DMS157 661000.627 5959750.6 130.09 27 - -90
DMS158 660800.067 5959594.8 130.19 26 - -90
DMS159 660811.408 5959945.7 130.03 27 - -90
DMS160 660239.692 5959750.8 129.19 26 - -90
DMS161 660000.19 5959749.8 130.50 27 - -90
DMS162 659750.235 5959750.4 127.74 25 - -90
DMS163 659499.464 5959750.2 128.31 26 - -90
DMS164 659249.477 5959749.8 126.27 22 - -90
DMS165 659000.113 5959860.4 128.81 27 - -90
DMS166 658920.934 5959580.1 128.81 25 - -90
DMS167 658500.692 5959749.8 130.14 29 - -90
DMS168 658249.91 5959818.9 130.63 27 - -90
DMS169 657999.438 5959750.0 130.72 28 - -90
DMS170 657750.24 5959750.1 130.17 27 - -90
DMS171 657498.729 5959750.0 130.26 27 - -90
DMS172 657250.026 5959750.0 130.36 28 - -90
DMS173 656999.789 5959750.3 130.48 27 - -90
DMS174 656748.327 5959749.8 130.24 26 - -90
DMS175 656499.327 5959749.9 130.01 28 - -90
DMS176 656249.782 5959749.6 130.31 28 - -90
DMS177 655999.742 5959750.1 130.51 28 - -90
DMS178 656750.097 5959480.2 130.29 26 - -90
DMS179 656498.654 5959479.0 130.34 28 - -90
DMS180 655999.151 5959501.1 130.32 28 - -90

32

==> picture [128 x 54] intentionally omitted <==

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS181 661499.968 5959250.0 130.39 26 - -90
DMS182 661250.077 5959250.0 130.20 26 - -90
DMS183 660999.854 5959250.0 130.66 26 - -90
DMS184 660806.039 5959250.3 130.27 25 - -90
DMS185 660360.021 5959515.4 128.87 24 - -90
DMS186 660224.741 5959274.4 128.93 25 - -90
DMS187 659997.645 5959250.7 129.98 26 - -90
DMS188 659750.333 5959249.9 129.23 26 - -90
DMS189 659499.876 5959250.1 127.07 23 - -90
DMS190 659000.234 5959250.1 128.04 24 - -90
DMS191 659505.079 5958995.0 126.87 23 - -90
DMS192 659249.641 5959000.3 127.01 24 - -90
DMS193 659000.528 5959029.9 128.15 24 - -90
DMS194 661714.695 5958947.8 130.84 26 - -90
DMS195 661500.089 5958770.0 130.20 25 - -90
DMS196 661249.364 5958770.0 130.67 26 - -90
DMS197 661000.655 5958772.0 130.81 26 - -90
DMS198 660750.485 5958780.3 130.69 26 - -90
DMS199 660500.371 5958785.3 129.84 25 - -90
DMS200 660000.447 5958999.9 130.10 26 - -90
DMS201 659999.215 5958749.6 130.12 26 - -90
DMS202 659750.105 5958749.9 129.88 25 - -90
DMS203 659500.69 5958749.5 128.10 24 - -90
DMS204 659250.283 5958750.1 127.23 24 - -90
DMS205 659000.263 5958750.1 125.99 23 - -90
DMS206 660000.206 5958499.7 129.27 25 - -90
DMS207 659749.947 5958499.9 129.32 25 - -90
DMS208 659499.199 5958501.3 128.11 24 - -90
DMS209 657749.742 5959249.8 130.34 26 - -90
DMS210 657499.991 5959249.4 130.24 25 - -90
DMS211 657249.882 5959247.8 130.12 27 - -90
DMS212 656998.331 5959250.1 130.53 28 - -90
DMS213 656517.262 5959245.7 130.50 28 - -90
DMS214 657759.726 5958500.8 130.44 26 - -90
DMS215 657615.772 5958920.5 130.12 26 - -90
DMS216 656999.653 5959000.2 131.02 27 - -90
DMS217 657250.001 5958749.7 130.31 26 - -90
DMS218 656999.779 5958750.0 130.87 28 - -90
DMS219 656749.707 5958750.1 130.47 27 - -90
DMS220 656258.557 5958752.7 130.70 28 - -90
DMS221 656999.601 5958500.3 131.39 27 - -90
DMS222 656749.672 5958500.1 135.18 31 - -90
DMS223 656500.841 5958500.0 130.57 27 - -90
DMS224 656998.823 5958249.8 130.57 29 - -90
DMS225 656749.131 5958249.8 131.37 28 - -90

33

==> picture [128 x 54] intentionally omitted <==

Hole_ID Easting Northing RL(m) Depth (m) **Azimuth ** Dip
DMS226 656497.642 5958250.1 131.36 28 - -90
DMS227 656248.425 5958250.1 130.98 27 - -90
DMS228 656001.756 5958250.2 131.18 29 - -90
DMS229 656946.951 5958012.3 131.21 28 - -90
DMS230 656749.42 5958000.0 131.29 28 - -90
DMS231 656500.653 5958000.0 131.22 29 - -90
DMS232 656250.312 5958000.0 131.42 28 - -90
DMS233 655999.495 5958000.0 131.30 28 - -90
DMS234 657500.279 5957719.8 130.26 25 - -90
DMS235 657254.063 5957720.0 130.33 25 - -90
DMS236 657118.637 5957472.2 130.43 27 - -90
DMS237 656749.079 5957749.9 130.92 28 - -90
DMS238 656501.223 5957750.0 130.97 29 - -90
DMS239 656247.534 5957750.0 131.14 27 - -90
DMS240 656001.063 5957750.2 131.29 27 - -90
DMS241 656660.42 5957499.5 131.00 28 - -90
DMS242 657500.004 5957249.3 130.76 27 - -90
DMS243 657251.39 5957250.1 130.61 27 - -90
DMS244 657030.22 5957251.6 130.77 28 - -90
DMS245 656388.625 5957377.3 131.57 27 - -90
DMS246 656123.367 5957383.1 131.69 28 - -90

34