Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Artemis Resources Limited Capital/Financing Update 2026

Jan 20, 2026

10429_rns_2026-01-20_ba86b636-7444-4fe9-ba6a-4252fac0c193.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [128 x 54] intentionally omitted <==

ASX Announcement | 21 January 2026

Diamond Drilling Recommences at Titan East Gold Discovery

HIGHLIGHTS

  • Diamond drilling has recommenced at the Titan East gold discovery within Artemis’ Carlow Gold– Copper Project

  • Recent drilling has confirmed a new gold-bearing structure beneath shallow cover, including:

  • 19m @ 1.6g/t Au from 127m in 25ARRC025[1 ] (discovery intersection within the Titan East shear zone); and

  • 5m @ 13.1g/t Au from 132m in 25ARRC006[2] (previously reported high-grade intercept).

  • Titan East is located ~1.5km from the Carlow deposit (Inferred Resource: 374koz Au and 64kt Cu)[3]

  • Drilling underway ( 2 holes for ~ 450 m) targeting geometry and continuity ahead of a broader follow-up program.

  • Assays remain pending from the December 2025 drilling program, with results expected during the March quarter 2026 (timing subject to laboratory turnaround).

  • Titan East represents the first new structurally controlled gold zone identified outside the Carlow Resource corridor and highlights the broader mineralised footprint within the Carlow-Titan trend.

Artemis Resources Limited (ASX: ARV) (Artemis or the Company) is pleased to advise that diamond drilling has recommenced at the Titan East prospect, located within the Company’s Carlow Gold–Copper Project in Western Australia’s Pilbara region. The program is an immediate follow-up to December quarter drilling that identified a coherent gold-bearing shear zone beneath shallow cover.

==> picture [305 x 229] intentionally omitted <==

Figure 1 – Diamond drilling underway at Titan East.

1 Refer to Artemis ASX announcement dated 19 December 2025

2 Refer to Artemis ASX announcement dated 29 October 2025

3 Refer to Artemis ASX announcement dated 13 October 2022

Artemis Resources Limited ABN: 80 107 051 749 | Email: [email protected] Level 2, 10 Ord Street WEST PERTH WA 6005 |

1

www.artemisresources.com.au

==> picture [128 x 54] intentionally omitted <==

Artemis Executive Director, Jozsef Patarica, commented:

“Titan East has moved quickly from a conceptual target under shallow cover to an emerging gold zone with genuine scale potential. The commencement of diamond drilling is the next step in tightening our geological understanding of the shear zone and positioning Artemis to execute a larger, targeted followup program. With Titan East only 1.5 kilometres from Carlow, success here has a clear pathway to nearterm value creation.”

Diamond Drill Program – Titan East

The Titan East diamond drilling program will comprise two holes for approximately 450 metres , targeting the interpreted north-east trending shear zone that hosts the recent gold intersections. Key objectives include:

  • Structural definition : obtain oriented core (where applicable) to confirm shear orientation, controls on mineralisation, and vein/alteration architecture.

  • Continuity testing: step-out drilling to assess the extent of mineralisation along strike and downdip from the discovery area.

  • Sampling: generate high-quality core for detailed logging, structural measurements and representative assay sampling.

==> picture [415 x 294] intentionally omitted <==

Figure 2 – Titan East location plan (Carlow–Titan Project).

Artemis Resources Limited ABN: 80 107 051 749 | Email: [email protected] Level 2, 10 Ord Street WEST PERTH WA 6005 |

2

www.artemisresources.com.au

==> picture [128 x 54] intentionally omitted <==

==> picture [429 x 278] intentionally omitted <==

Figure 3 – Planned diamond drill collars and interpreted Titan East shear zone.

Background – Titan East Discovery Context

December quarter RC drilling at Titan East confirmed a previously untested mineralised structure beneath shallow cover, including a high-grade intercept in 25ARRC006[4] and a subsequent discovery intersection in 25ARRC025[5] . Artemis also completed a diamond hole in December to support geological interpretation, with further assays pending. These results are expected to underpin a substantial followup drilling campaign in early 2026.

This ASX announcement has been authorised for release by the Board of Artemis Resources Limited.

For further information, please contact:

Jozsef Patarica

Executive Director Artemis Resources Limited +61 8 6261 5463 [email protected]

4 Refer to Artemis ASX announcement dated 29 October 2025 5 Refer to Artemis ASX announcement dated 19 December 2025

Artemis Resources Limited ABN: 80 107 051 749 | Email: [email protected] Level 2, 10 Ord Street WEST PERTH WA 6005 |

3

www.artemisresources.com.au

==> picture [128 x 54] intentionally omitted <==

About Artemis Resources

Artemis Resources (ASX/AIM: ARV) is an exploration company advancing a highly prospective portfolio of gold, copper and critical minerals projects in Western Australia.

In the underexplored North Pilbara province, Artemis holds the Carlow Gold-Copper Project and the Titan and Thorpe prospects. Carlow hosts an Inferred Mineral Resource of 374,000 ounces of gold and 64,000 tonnes of copper (refer ASX release dated 13 October 2022). Artemis also owns the fully permitted Radio Hill processing facility near Karratha.

In the South-East of Western Australia, Artemis holds the large-scale Cassowary IOCG project, located approximately 440km east of Kalgoorlie.

The Company continues to advance high-impact exploration programmes across these assets with the objective of defining new discoveries and unlocking value for shareholders.

Competent Person Statement

The information in this report that relates to exploration results was prepared by Mr Oliver Hirst M.Sci (Hons), a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (MAusIMM). Mr Hirst is a technical consultant to Artemis Resources. Mr Hirst has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hirst consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

No New Information

To the extent that this announcement contains references to prior exploration results which have been cross referenced to previous market announcements made by the Company, unless explicitly stated, no new information is contained. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed.

Forward Looking Statements

This announcement contains historical facts, interpretations and statements relating to the Company’s current exploration projects, drill targets, plans, estimates, objectives, and strategies which are forwardlooking statements. Such forward-looking statements involve known and unknown risks, uncertainties and other important factors beyond the Company's control that could cause the actual results, performance, or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such forward-looking statements. Accordingly, any reliance you place on such forward-looking statements will be at your sole risk and the Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward-looking statements contained in this announcement to reflect any changes in its expectations with regard thereto or any change in events, conditions or circumstances on which any statement is based. The information contained in this announcement is subject to change without notice. No representation or warranty, express or implied, is given as to the accuracy, completeness or fairness of the information or opinions contained in this announcement and no liability is accepted by the Company or any of its directors, members, officers, employees, agents, or advisers for any such information or opinions.

Artemis Resources Limited ABN: 80 107 051 749 | Email: [email protected] Level 2, 10 Ord Street WEST PERTH WA 6005 | www.artemisresources.com.au

4

==> picture [128 x 54] intentionally omitted <==

APPENDIX – Carlow Mineral Resource

==> picture [489 x 219] intentionally omitted <==

Artemis Resources Limited ABN: 80 107 051 749 | Email: [email protected] Level 2, 10 Ord Street WEST PERTH WA 6005 |

5

www.artemisresources.com.au