Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Artemis Resources Limited Capital/Financing Update 2021

Feb 3, 2021

10429_rns_2021-02-03_249f9c45-a179-47f7-8f22-d75f58d8dbb0.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [363 x 34] intentionally omitted <==

4th February 2021

==> picture [138 x 52] intentionally omitted <==

ASX Announcement

Up to 2.62% Cobalt and 7.44% Copper compliment excellent Gold results from drilling at Carlow Castle

Highlights

Further assays received from the 2020 42-hole, multi-rig drilling campaign at the Carlow Castle Gold Copper Cobalt Project.

New Carlow Deeps “Feeder Zone” drill holes 20CCAD007 and 008W

  • 7m @ 1.08g/t Au, 0.92% Cu, 1.03% Co from 618m in 20CCAD008W, including 2m @ 3.18g/t Au, 2.04% Cu, 2.62% Co from 619m.

  • 3m @ 0.74g/t Au, 0.14% Cu, 1.25% Co from 575m.

  • 4m @ 2.27g/t Au, 1.27% Cu, 0.38% Co from 504m in 20CCAD007, including 1m @ 8.07g/t Au, 3.56% Cu, 0.80% Co from 505m.

Resource area infill diamond hole 20CCAD010

  • 8m @ 5.63g/t Au, 3.87% Cu, 0.21% Co from 122m in 20CCAD010, including 3m @ 11.62g/t Au, 7.44% Cu, 0.35% Co from 127m; and

  • 17m @ 2.13g/t Au, 1.16% Cu, 0.36% Co from 141m, including 5m @ 5.05g/t Au, 1.25% Cu, 1.25% Co from 150m.

These latest drill results demonstrate that high grade gold, copper and cobalt is being routinely discovered at Carlow Castle, with exceptional combined metal content at Carlow Deeps.

The Carlow Castle 10,000m 2021 RC drill campaign is approximately 50% complete (23 of 35 planned holes), targeting step-out, new discovery zones, and resource extensions.

==> picture [472 x 49] intentionally omitted <==

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 1 of 16

==> picture [472 x 32] intentionally omitted <==

Artemis Resources Limited (“Artemis” or “the Company”) (ASX:ARV, Frankfurt: ATY, US OTCQB: ARTTF) is pleased to provide an update on drill programmes currently underway at its 100%-owned Carlow Castle Gold and Copper Project in the west Pilbara region of Western Australia.

==> picture [428 x 190] intentionally omitted <==

Figure 1: Uncut diamond drill core from hole 20CCAD008W targeting Carlow Deeps. Logged matrix to semi-massive Chalcopyrite, Cobaltite and Pyrrhotite and Pyrite. Final assay results and interval overlain.

Alastair Clayton, Executive Director commented : “Given the strength of the Gold grades being reported from our drill campaign, it is sometimes easy to overlook the exceptional Copper and Cobalt grades at Carlow.

“With Copper trading near 5-year highs at ~US$7,850/t and Cobalt fetching ~US$41,250/t, more than twice that of Nickel, the possible economic contribution of these metals to any future development at Carlow has the potential to be significant.

“As both metals are keenly sought after to support the booming global electric vehicle (EV) market, Carlow may present itself as a Western Australian supplier of Copper and Cobalt to global markets.

“At Carlow Deeps, all three holes targeting mineralisation up to 250m vertically below the existing resource shells to extend known mineralisation from surface to nearly 500mRL were successful.

“Carlow Deeps is a large target area comprising a near vertical E-W striking panel of mineralisation interpreted to be a chilled or feeder zone beneath the 1.2km strike of the Carlow resource area.

“Thus far we have two holes on section 507540E and another 120m to the west. We intend to keep drilling Carlow Deeps vertically to 500mRL and along strike to the east and west with the goal of proving up a substantial resource.

“There are still more assays from our Q4 2020 programme due soon and our 10,000m, as our 2021 RC drill programme nears the halfway point.”

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 2 of 16

Summary of Drilling at Carlow Castle

Drilling at Carlow Castle remains ongoing, with results from the 2020 RC and diamond drilling continuing to come in. Most recent results are highlighted in Figures 4 , 5 and Table 1 , which highlights significant intercepts to date and the number of pending assays.

These assay results clearly confirm the Carlow mineralised system continues to depth with multiple intersections over approximately 150m of strike length 500m below surface. Figure 3 shows a simple scatterplot of gold values >0.5g/t Au (yellow) and >1g/t Au (red).

Significantly the intersections at depth show major high-grade Cobalt values, especially in 20CCA008W, highlighting the continued variation/zonation within the deposit.

The sections in Figures 4 & 5 show the deep intersections are in the appropriate downdip position to form a continuous zone of mineralisation with shallow drilling; this will require significant intermediate drilling from the south to better define the intervening zone.

~5,000m of the 10,000m RC drilling programme has been completed, targeting step out drilling, the new Discovery Zone and resource extension (23 of 35 planned holes). A portion of this programme is allotted to test targets generated from the IP survey currently in process. Both IP survey and the drilling programme have been placed on hold until the current weather event passes and conditions improve.

Once RC drilling resumes several holes will be repurposed to test the Discovery Zone on an NW-SE orientation; the traverses will be extended to investigate the secondary target zone to the west. This zone potentially explains the presence of several minor mineralised zones intersected in drilling to the east of Quod Est and the presence of several historical pits and shafts along the trend.

Once the diamond drilling and assaying is completed, consultants CSA Global will complete an updated structural model for the Carlow Castle deposit and resource estimation.

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 3 of 16

==> picture [462 x 324] intentionally omitted <==

Figure 2: Carlow Castle current drilling programme map showing current reverse circulation (RC) hole locations, with previous drill and 2019 inferred Mineral Resource Estimate (MRE) schematic outline (as released to the ASX on 20 November 2019), with the location schematic drill cross sections 507390mE and 507540mE +/-10m shown, and as cross ecttions in Figures 4 and 5 below. The outlined areas show the new Northern Discovery Zone and new target zone.

==> picture [461 x 290] intentionally omitted <==

Figure 3: Carlow Castle 2D Longitudinal section with all gold point values projected orthogonally. Values>0.5g/t Au yellow, values>1g/t Au red. Pit outlines are from the 2019 inferred Mineral Resource Estimate (MRE) schematic outline (as released to the ASX on 20 November 2019). The long-section highlights extent of open potential between the current resource and the Carlow Deeps program.

==> picture [472 x 36] intentionally omitted <==

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 4 of 16

==> picture [472 x 86] intentionally omitted <==

==> picture [400 x 543] intentionally omitted <==

Figure 4: Carlow Castle current programme interpretive drill section 507390mE +/-10m showing recent intercepts from the Nov2020 RC drilling and deep diamond hole 20CCAD008W.

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 5 of 16

==> picture [400 x 542] intentionally omitted <==

Figure 5: Carlow Castle current programme interpretive drill section 507540mE +/-10m showing recent intercepts from the Dec2020 Resource Infill diamond drilling and deep diamond holes 20CCAD003 and 20CCAD007.

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 6 of 16

COMPETENT PERSONS STATEMENT:

The information in this announcement that relates to Exploration Results and Exploration Targets is based on information compiled or reviewed by Allan Younger, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Younger is an employee of Artemis Resources Limited. Mr Younger has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Younger consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

About Artemis Resources

Artemis Resources (ASX: ARV; FRA: ATY; US: ARTTF) is a Perth-based exploration and development company, led by an experienced team that has a singular focus on delivering shareholder value from its Pilbara gold projects – the Greater Carlow Gold Project in the West Pilbara and the Paterson Central exploration project in the East Pilbara.

For more information, please visit www.artemisresources.com.au

This announcement was approved for release by the Board.

==> picture [479 x 90] intentionally omitted <==

For further information contact:

Alastair Clayton Executive Director [email protected]

Boyd Timler Executive Director [email protected]

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 7 of 16

Table 1: Recent Carlow Castle drilling assay results averaged over significant drill intercept intervals bases on 1m assay samples, intersections defined by >0.5g/t Au, max 3m internal dilution. NSI = no significant intercept.

Hole_ID Comments mFrom mTo m Au g/t Co % Cu %
ARC223 NSI
ARC224 NSI
ARC225 28 33 5 0.42 0.07 0.66
ARC225 58 61 3 0.35 0.38 0.07
ARC225 86 88 2 2.28 0.51 0.57
ARC226 32 37 5 4.36 0.49 2.67
ARC226 Including 33 35 2 9.26 0.98 4.94
ARC226 48 50 2 0.27 0.07 0.92
ARC226 52 53 1 3.03 0.3 3.3
ARC226 60 61 0.65 0.65 0.54 0.78
ARC227 68 71
ARC227 80 81
ARC228 73 77 4 0.19 0.27 0.35
ARC229 NSI
ARC230 NSI
ARC231 35 36 1 0.24 137 2.9
ARC232 11 12 0.97 0.01 0.33
ARC233 48 50 2 0.62 0.104 1.09
ARC233 71 82 11 4.24 0.03 1.58
ARC233 Including 72 74 2 18.15 0.07 5.56
ARC234 102 108 6 2.72 0.22 3.03
ARC235 NSI
ARC236 NSI
ARC237 NSI
ARC238 NSI
ARC239 NSI
ARC240 NSI
ARC241 NSI
ARC242 NSI
ARC243 87 92 5 0.11 0.06 0.47
ARC244 75 76 2 1.57 0.01 0.01
ARC244 113 114 1 7.43 0.04 0.05
ARC245 NSI
ARC246 3 6 3 1.52 0.05 2.79
ARC246 43 45 2 1.06 0.05 0.11
ARC247 Pending
ARC248 113 114 1 1.03 0.08 1.00
ARC249 121 123 1 0.55 0.01 1.05
ARC249 174 179 5 0.46 0.04 0.54
ARC250 Pending
ARC251 58 60 2 0.69 0.02 0.3
ARC252 82 87 5 2.4 0.09 0.63
ARC253 60 61 1 1.52 0.01 0.1
ARC253 132 176 44 2.00 0.15 0.71
ARC253 including 144 145 1 10.4 0.32 2.49
ARC253 including 155 156 1 10.9 0.2 0.8
ARC254 134 135 1 1.24 0.01 0.2
ARC254 221 230 9 1.11 0.03 0.47
20CCAD001 6 14 8 0.61 0.07 0.52
20CCAD001 31 32 1 1.04 0.29 1.17
20CCAD001 36 44 8 0.58 0.04 0.57
20CCAD002 56 60 4 0.63 0.05 0.23
20CCAD002 69 74 5 1.86 0.1 0.43
20CCAD002 84 91 7 1.49 0.22 0.7
20CCAD002 94 98 4 0.67 0.05 0.39
20CCAD002 102 104 2 0.17 0.01 1.08
20CCAD002 112 114 2 0.15 0.07 1.9
20CCAD002 121 131 10 0.48 0.06 0.62

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 8 of 16

Hole_ID Comments mFrom mTo m Au g/t Co % Cu %
20CCAD003 178 180 2 5.71 0.01 0.48
20CCAD003 245 246 2 1.53 0.01 0.48
20CCAD003 544 545 2 0.7 0.00 0.39
20CCAD003 634 635 2 1.31 0.00 0.36
20CCAD003 639 643 4 11.1 0.18 2.01
20CCAD003 including 639 640 1 33.7 0.14 1.32
20CCAD003 648 649 1 1.57 0.14 1.09
20CCAD003 708 709 1 0.51 0.13 0.07
20CCAD003 712 713 1 0.61 0.36 0.27
20CCAD003 763 766 3 0.78 0.10 0.24
20CCAD003 796 798 2 0.85 0.17 0.57
20CCAD003 797 798 1 1.11 0.25 0.85
20CCAD003 801 802 1 0.83 0.01 0.24
20CCAD004 120 134 14 4.92 0.14 1.04
20CCAD004 144 152 8 7.34 1.03 1.18
20CCAD004 Including 147 149 2 17.93 2.36 1.48
20CCAD004 155 174 19 1.59 0.15 1.06
20CCAD005 27 30 3 1.11 0.002 0.0065
20CCAD005_5A 177 183 6 3.42 0.43 0.64
20CCAD005_5A including 177 179 2 7.17 0.93 1.43
20CCAD005_5A 190 211 21 1.05 0.06 0.49
20CCAD005_5A 190 203 13 1.15 0.06 0.56
20CCAD005_5A 206 211 5 1.28 0.06 0.53
20CCAD006 50 62 12 1.18 0.13 1.19
20CCAD006 including 50 56 4 1.9 0.22 2.01
20CCAD007 400 401 1 0.53 0.02 1.32
20CCAD007 432 433 1 0.8 0.01 0.22
20CCAD007 438 439 1 1.25 0.01 0.09
20CCAD007 504 508 4 2.27 0.38 1.27
20CCAD007 Including 505 506 1 8.07 0.8 3.56
20CCAD008 429 430 1 3.56 0.01 0.17
20CCAD008W 444 445 1 1.14 0.07 0.06
20CCAD008W 451 453 2 0.98 0.16 0.26
20CCAD008W 575 578 3 0.74 1.25 0.14
20CCAD008W 618 625 7 1.08 0.92 1.03
20CCAD008W Including 619 621 2 3.18 2.62 2.04
20CCAD009 49 58 9 1.79 0.39 0.94
20CCAD009 including 49 53 4 3.14 0.75 1.83
20CCAD009 74 83 9 2.12 0.39 1.63
20CCAD009 Including 75 78 3 4.04 0.75 0.97
20CCAD009 101 111 10 0.92 0.1 1.14
20CCAD010 94 95 1 1.87 0.02 1.05
20CCAD010 112 113 1 2.26 0.47 4.84
20CCAD010 122 130 8 5.63 0.21 3.87
20CCAD010 Including 127 130 3 11.62 0.35 7.44
20CCAD010 141 158 17 2.13 0.36 1.16
20CCAD010 Including 150 154 4 5.05 1.05 1.25

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 9 of 16

Table 2: Carlow Castle drill collar information.

Hole Id Type Z50MGA East Z50MGA North RL (m) Depth (m) Dip Azimuth Date
ARC001 RC 506929.95 7698920.09 40.28 72 -60 270 Mar-17
ARC002 RC 506959.14 7698916.27 39.75 90 -60 270 Mar-17
ARC003 RC 506909.93 7698896.80 39.14 54 -60 270 Mar-17
ARC004 RC 506925.68 7698896.50 39.24 78 -60 270 Mar-17
ARC005 RC 506888.51 7698919.80 40.25 60 -60 90 Mar-17
ARC006 RC 506947.24 7698894.26 39.03 90 -60 270 Mar-17
ARC007 RC 506911.18 7698937.79 41.59 48 -60 270 Mar-17
ARC008 RC 506933.10 7698937.94 41.14 78 -60 270 Mar-17
ARC009 RC 506904.79 7698960.57 42.71 48 -60 270 Mar-17
ARC010 RC 506922.98 7698961.93 42.84 78 -60 270 Mar-17
ARC011 RC 506917.24 7698917.58 40.60 48 -60 270 Mar-17
ARC012 RC 506902.24 7698878.73 38.33 48 -60 270 Mar-17
ARC013 RC 506922.61 7698879.32 38.36 72 -60 270 Mar-17
ARC014 RC 506944.97 7698880.09 38.84 90 -60 270 Mar-17
ARC015 RC 506899.23 7698837.97 38.58 48 -60 270 Mar-17
ARC016 RC 506919.31 7698838.32 41.38 78 -60 270 Mar-17
ARC017 RC 506869.79 7698799.07 36.64 48 -60 270 Mar-17
ARC018 RC 506887.95 7698799.83 37.70 48 -60 270 Mar-17
ARC019 RC 506906.80 7698800.96 39.10 60 -60 270 Mar-17
ARC020 RC 506927.68 7698801.91 41.30 90 -60 270 Apr-17
ARC021 RC 506868.38 7698761.99 35.54 48 -60 270 Apr-17
ARC022 RC 506887.74 7698761.44 36.24 48 -60 270 Apr-17
ARC023 RC 506907.53 7698760.64 37.49 78 -60 270 Apr-17
ARC024 RC 506579.85 7698699.77 34.80 60 -60 180 Apr-17
ARC025 RC 506619.19 7698698.13 34.79 66 -60 180 Apr-17
ARC026 RC 506659.40 7698699.29 34.97 60 -60 180 Apr-17
ARC027 RC 506699.06 7698699.67 34.80 60 -60 180 Apr-17
ARC028 RC 506742.04 7698701.18 34.55 60 -60 180 Apr-17
ARC029 RC 506944.14 7698957.64 42.43 84 -60 270 Apr-17
ARC030 RC 506952.30 7698938.33 40.81 90 -60 270 Apr-17
ARC031 RC 506973.27 7698916.87 39.68 102 -60 270 Apr-17
ARC032 RC 506969.77 7698896.34 39.26 108 -60 270 Apr-17
ARC033 RC 506895.77 7698937.59 41.27 23 -60 90 Apr-17
ARC033a RC 506893.23 7698937.48 41.35 90 -60 90 Apr-17
ARC034 RC 506973.31 7698940.16 40.47 137 -60 270 Apr-17
ARC036 RC 506579.18 7698677.42 34.66 60 -60 180 Oct-17
ARC037 RC 506579.80 7698718.95 35.06 84 -60 180 Oct-17
ARC038 RC 506579.56 7698740.73 35.44 120 -60 180 Oct-17
ARC039 RC 506777.66 7698676.15 34.67 60 -60 180 Oct-17
ARC040 RC 506778.78 7698700.75 34.92 84 -60 180 Oct-17
ARC041 RC 506779.34 7698720.74 35.06 120 -60 180 Oct-17
ARC042 RC 506780.18 7698740.84 35.26 150 -60 180 Oct-17
ARC043 RC 506897.41 7698636.05 33.75 60 -60 180 Oct-17
ARC044 RC 506898.75 7698660.97 34.02 84 -60 180 Oct-17
ARC045 RC 506899.47 7698682.47 34.15 126 -60 180 Oct-17
ARC046 RC 506900.75 7698701.73 34.15 162 -60 180 Oct-17
ARC047 RC 507477.90 7698581.08 29.79 60 -60 180 Oct-17
ARC048 RC 507478.81 7698623.51 30.78 114 -60 180 Oct-17
ARC049 RC 507478.89 7698663.21 30.84 144 -60 180 Oct-17
ARC050 RC 507321.28 7698921.04 35.26 120 -60 0 Oct-17
ARC051 RC 507237.30 7699007.97 37.79 136 -60 0 Oct-17
ARC052 RC 507119.90 7698982.04 38.80 162 -60 0 Oct-17
ARC053 RC 507120.27 7699027.22 41.43 126 -60 0 Oct-17
ARC054 RC 507239.93 7698930.55 36.32 102 -60 0 Oct-17
ARC055 RC 506536.05 7698688.90 34.65 78 -60 180 Oct-17
ARC056 RC 506537.23 7698708.54 34.91 90 -60 180 Oct-17
ARC057 RC 506538.58 7698729.57 35.07 120 -60 180 Oct-17
ARC058 RC 506619.04 7698677.50 34.60 60 -60 180 Oct-17
ARC059 RC 506619.96 7698720.27 34.95 120 -60 180 Oct-17
ARC060 RC 506659.80 7698720.78 35.00 84 -60 180 Oct-17
ARC061 RC 506660.86 7698740.46 35.30 126 -60 180 Oct-17
ARC062 RC 506700.16 7698720.64 35.02 84 -60 180 Oct-17
ARC063 RC 506700.76 7698738.61 35.31 120 -60 180 Oct-17
ARC064 RC 506741.50 7698676.08 34.75 60 -60 180 Oct-17
ARC065 RC 506742.69 7698719.49 35.01 102 -60 180 Oct-17
ARC066 RC 506743.53 7698738.36 35.25 126 -60 180 Oct-17

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 10 of 16

Hole Id Type Z50MGA East Z50MGA North RL (m) Depth (m) Dip Azimuth Date
ARC067 RC 506817.45 7698682.40 34.68 84 -60 180 Oct-17
ARC068 RC 506818.23 7698698.12 34.79 120 -60 180 Oct-17
ARC069 RC 506819.53 7698717.79 35.00 24 -60 180 Oct-17
ARC069a RC 506821.17 7698740.74 35.24 162 -59 180 Oct-17
ARC070 RC 506859.97 7698659.95 34.30 60 -60 180 Oct-17
ARC071 RC 506860.65 7698679.67 34.44 84 -60 180 Oct-17
ARC072 RC 506861.28 7698695.73 34.57 126 -60 180 Oct-17
ARC073 RC 506935.81 7698638.23 33.73 60 -60 180 Oct-17
ARC074 RC 506937.98 7698657.32 33.72 84 -60 180 Oct-17
ARC075 RC 506941.87 7698698.15 33.99 150 -60 180 Oct-17
ARC076 RC 507400.58 7698609.30 30.48 66 -60 180 Oct-17
ARC077 RC 507400.50 7698650.77 31.23 162 -60 180 Oct-17
ARC078 RC 506815.36 7698661.73 34.44 60 -60 180 Oct-17
ARC079 RC 507478.02 7698559.54 29.86 108 -60 0 Oct-17
ARC080 RC 507262.21 7698939.00 35.53 84 -60 270 Oct-17
ARC081 RC 506781.50 7698779.75 36.00 264 -60 180 Oct-17
ARC082 RC 506620.49 7698740.67 35.31 150 -60 180 Apr-18
ARC083 RC 506934.49 7698679.81 33.85 150 -60 180 Apr-18
ARC084 RC 506979.13 7698619.15 33.21 72 -60 180 Apr-18
ARC085 RC 506979.64 7698641.44 33.61 112 -60 180 Apr-18
ARC086 RC 506980.15 7698660.88 33.67 142 -60 180 Apr-18
ARC087 RC 506980.26 7698682.07 33.58 196 -60 180 Apr-18
ARC088 RC 507016.43 7698621.50 33.25 70 -60 180 Apr-18
ARC089 RC 507017.15 7698642.72 33.28 112 -60 180 Apr-18
ARC090 RC 507018.63 7698663.13 33.48 150 -60 180 Apr-18
ARC091 RC 507019.24 7698682.15 33.39 192 -60 180 Apr-18
ARC092 RC 507056.17 7698600.99 32.85 72 -60 180 Apr-18
ARC093 RC 507056.24 7698620.13 32.91 114 -60 180 Apr-18
ARC094 RC 507057.26 7698639.31 33.03 150 -60 180 Apr-18
ARC095 RC 507058.55 7698659.65 33.05 204 -60 180 Apr-18
ARC096 RC 507399.31 7698630.48 30.83 168 -60 180 Apr-18
ARC097 RC 507398.34 7698593.01 30.44 108 -60 180 Apr-18
ARC098 RC 507476.26 7698602.49 29.74 96 -60 180 Apr-18
ARC099 RC 506534.82 7698675.09 34.35 66 -60 180 Apr-18
ARC100 RC 506533.66 7698649.43 34.61 42 -60 180 Apr-18
ARC101 RC 506744.20 7698758.65 35.66 156 -60 180 May-18
18CCAD001 DDH 506701.45 7698757.33 35.65 151.9 -60 180 Mar-18
18CCAD002 DDH 506778.93 7698694.92 34.86 128.1 -60 180 Mar-18
18CCAD003 DDH 506698.19 7698680.96 34.86 119.7 -75 0 Mar-18
18CCAD004 DDH 506819.62 7698709.68 34.97 141 -60 180 Mar-18
18CCAD005 DDH 506863.16 7698712.42 34.65 123 -60 180 Apr-18
18CCAD006 DDH 506901.24 7698720.42 34.82 168.2 -60 180 Apr-18
18CCAD007 DDH 506857.87 7698633.28 33.98 117.3 -60 0 Apr-18
18CCAD008 DDH 506932.99 7698937.93 41.15 81.2 -60 270 Apr-18
18CCAD009 DDH 506942.27 7698937.24 41.00 79.5 -60 270 Apr-18
18CCAD010 DDH 507480.50 7698641.39 30.88 171 -60 180 Apr-18
18CCAD011 DDH 507476.27 7698549.65 30.03 100.4 -50 0 Apr-18
18CCAD012 DDH 506935.00 7698900.00 41.00 122.9 -60 270 Apr-18
ARC102 RC 507479.97 7698492.34 30.12 186 -60 360 Jul-18
ARC103 RC 507140.08 7698638.94 32.47 66 -60 360 Jul-18
ARC104 RC 507138.77 7698619.69 32.23 100 -60 360 Jul-18
ARC105 RC 507178.05 7698631.01 32.15 66 -60 360 Jul-18
ARC106 RC 507179.40 7698611.33 31.75 100 -60 360 Jul-18
ARC107 RC 507020.40 7698703.17 33.95 200 -60 180 Jul-18
ARC108 RC 507060.44 7698681.49 33.40 180 -60 180 Jul-18
ARC109 RC 507094.07 7698618.31 32.60 60 -60 180 Jul-18
ARC110 RC 507094.96 7698637.99 32.89 100 -60 180 Jul-18
ARC111 RC 507097.26 7698658.11 32.80 140 -60 180 Jul-18
ARC112 RC 507098.84 7698678.28 33.79 192 -60 180 Jul-18
ARC113 RC 507223.16 7698598.49 31.26 60 -60 180 Jul-18
ARC114 RC 507220.82 7698618.44 31.74 100 -60 180 Jul-18
ARC115 RC 507219.45 7698638.04 31.98 174 -60 180 Jul-18
ARC116 RC 507219.21 7698659.19 32.03 198 -60 180 Jul-18
ARC117 RC 507265.20 7698598.10 31.05 126 -60 180 Jul-18
ARC118 RC 507262.90 7698618.54 31.55 126 -60 180 Jul-18
ARC119 RC 507260.44 7698637.96 31.79 180 -60 180 Jul-18
ARC120 RC 507258.82 7698658.86 31.83 222 -60 180 Jul-18
ARC121 RC 507297.44 7698590.75 30.89 108 -60 180 Jul-18
ARC122 RC 507297.49 7698610.02 31.04 144 -60 180 Jul-18
ARC123 RC 507298.51 7698629.51 31.13 180 -60 180 Jul-18

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 11 of 16

Hole Id Type Z50MGA East Z50MGA North RL (m) Depth (m) Dip Azimuth Date
ARC124 RC 507299.36 7698651.48 31.63 234 -60 180 Jul-18
ARC125 RC 507337.15 7698610.00 30.86 144 -60 180 Jul-18
ARC126 RC 507337.06 7698629.99 30.91 180 -60 170 Jul-18
ARC127 RC 507337.99 7698651.49 31.21 234 -60 180 Jul-18
ARC128 RC 507338.98 7698669.59 31.51 240 -60 180 Jul-18
ARC129 RC 507440.31 7698580.64 30.10 108 -60 180 Jul-18
ARC130 RC 507438.51 7698601.02 30.07 102 -60 180 Jul-18
ARC131 RC 507436.87 7698618.95 30.38 156 -60 180 Jul-18
ARC132 RC 507436.29 7698640.15 30.91 204 -60 180 Jul-18
ARC133 RC 507435.33 7698660.76 31.04 228 -60 180 Jul-18
ARC134 RC 507401.86 7698670.28 31.51 204 -60 180 Jul-18
ARC135 RC 507520.18 7698581.17 29.61 100 -60 180 Jul-18
ARC136 RC 507520.37 7698600.39 29.77 108 -60 180 Jul-18
ARC137 RC 507519.26 7698620.81 30.16 168 -60 180 Jul-18
ARC138 RC 507519.31 7698639.04 30.47 228 -60 180 Jul-18
ARC139 RC 507518.47 7698659.64 30.58 240 -60 180 Jul-18
ARC140 RC 506458.87 7698639.22 34.32 150 -60 180 Jul-18
ARC141 RC 506458.53 7698679.20 34.50 120 -60 180 Aug-18
ARC142 RC 506458.47 7698720.23 34.81 120 -60 180 Aug-18
ARC143 RC 506457.91 7698760.55 35.38 120 -60 180 Aug-18
ARC144 RC 506540.10 7698600.73 34.52 120 -60 360 Aug-18
ARC145 RC 506579.86 7698638.21 34.62 120 -60 360 Aug-18
ARC146 RC 506578.83 7698620.55 34.42 162 -60 360 Aug-18
ARC147 RC 507559.44 7698601.35 29.30 114 -60 180 Aug-18
ARC148 RC 507559.35 7698620.40 29.53 192 -60 180 Aug-18
ARC149 RC 507559.90 7698639.73 29.80 192 -60 180 Aug-18
ARC150 RC 507559.33 7698661.84 30.00 179 -60 180 Aug-18
ARC151 RC 506620.28 7698760.51 35.54 144 -60 180 Aug-18
ARC152 RC 506620.98 7698780.26 35.91 174 -60 180 Aug-18
ARC153 RC 506658.93 7698761.24 35.63 162 -60 180 Aug-18
ARC154 RC 506660.45 7698782.15 36.06 198 -60 180 Aug-18
ARC155 RC 506698.20 7698781.25 36.02 192 -60 180 Aug-18
ARC156 RC 506743.89 7698779.09 35.86 210 -60 180 Aug-18
ARC157 RC 506779.69 7698758.49 35.55 180 -60 180 Aug-18
ARC158 RC 506821.59 7698757.99 35.51 198 -60 180 Aug-18
ARC159 RC 506862.77 7698729.18 34.78 160 -60 180 Aug-18
ARC160 RC 506941.80 7698719.90 35.28 180 -60 180 Aug-18
ARC161 RC 506980.51 7698702.55 34.08 180 -60 180 Aug-18
ARC162 RC 507600.15 7698629.93 29.29 90 -60 180 Aug-18
ARC163 RC 507600.96 7698609.92 29.02 90 -60 360 Aug-18
ARC164 RC 507601.33 7698588.60 29.43 120 -60 360 Aug-18
ARC165 RC 507267.14 7698578.07 30.96 90 -60 360 Aug-18
ARC166 RC 507296.25 7698571.22 30.83 150 -60 180 Aug-18
ARC167 RC 507334.40 7698590.07 30.70 90 -60 180 Aug-18
ARC168 RC 507014.61 7698941.39 39.07 114 -60 270 Aug-18
ARC169 RC 507048.86 7698941.57 38.16 120 -60 270 Aug-18
ARC170 RC 507088.67 7698941.13 37.69 120 -60 270 Aug-18
ARC171 RC 507129.79 7698977.82 38.67 102 -60 270 Aug-18
ARC172 RC 507639.72 7698638.41 29.10 84 -60 360 Aug-18
ARC173 RC 507642.44 7698617.75 29.00 114 -60 360 Aug-18
ARC174 RC 507643.99 7698599.74 28.90 130 -60 360 Aug-18
ARC175 RC 507602.60 7698567.75 29.47 138 -60 360 Aug-18
ARC176 RC 507179.52 7698602.41 31.70 150 -60 180 Aug-18
ARC177 RC 507176.30 7698621.93 32.26 144 -60 180 Aug-18
ARC178 RC 507175.39 7698643.09 32.40 186 -60 180 Aug-18
ARC179 RC 507174.97 7698661.71 33.13 200 -60 180 Aug-18
ARC180 RC 507645.43 7698579.89 29.17 114 -60 360 Aug-18
ARC181 RC 507678.56 7698651.72 28.72 72 -60 360 Aug-18
ARC182 RC 507679.90 7698630.58 28.96 90 -60 360 Aug-18
ARC183 RC 507679.21 7698611.67 29.02 114 -60 360 Aug-18
ARC184 RC 507517.08 7698421.77 30.67 330 -60 360 Aug-18
ARC185 RC 507640.80 7698723.54 29.45 102 -60 360 Aug-18
ARC186 RC 507640.13 7698703.37 29.33 114 -60 360 Aug-18
ARC187 RC 507639.70 7698683.63 29.31 126 -60 360 Aug-18
ARC188 RC 507638.81 7698664.55 29.01 102 -60 360 Aug-18
ARC189 RC 507480.18 7698418.86 30.14 330 -60 360 Aug-18
ARC190 RC 505597.89 7698459.26 30.19 102 -60 180 Mar-20
ARC191 RC 505597.56 7698498.15 30.41 102 -60 180 Mar-20
ARC192 RC 505597.72 7698538.71 30.46 108 -60 180 Mar-20
ARC193 RC 505598.35 7698578.08 31.45 96 -60 180 Mar-20

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 12 of 16

Hole Id Type Z50MGA East Z50MGA North RL (m) Depth (m) Dip Azimuth Date
ARC194 RC 505599.13 7698618.80 32.58 96 -60 180 Mar-20
ARC195 RC 505998.22 7698699.11 33.06 102 -60 180 Mar-20
ARC196 RC 505998.31 7698740.52 33.95 96 -60 180 Mar-20
ARC197 RC 505999.01 7698779.66 35.26 102 -60 180 Mar-20
ARC198 RC 505998.58 7698818.62 36.63 114 -60 180 Mar-20
ARC199 RC 506096.57 7698451.15 32.09 102 -60 180 Mar-20
ARC200 RC 506098.36 7698488.64 32.13 108 -60 180 Mar-20
ARC201 RC 506278.74 7698700.08 34.17 102 -60 180 Mar-20
ARC202 RC 506278.76 7698739.96 34.45 102 -60 180 Mar-20
ARC203 RC 506278.79 7698783.46 34.85 102 -60 180 Mar-20
ARC204 RC 506277.79 7698820.49 35.19 120 -60 180 Mar-20
ARC205 RC 506339.04 7698500.84 33.08 48 -60 180 Mar-20
ARC206 RC 506338.15 7698540.51 33.43 60 -60 180 Mar-20
ARC207 RC 506338.18 7698579.33 33.90 90 -60 180 Mar-20
ARC208 RC 506378.52 7698619.50 34.17 80 -60 180 Mar-20
ARC209 RC 506365.12 7698639.77 34.26 96 -60 180 Mar-20
ARC210 RC 506577.70 7698560.35 34.28 48 -60 180 Mar-20
ARC211 RC 506577.92 7698599.71 34.46 48 -60 180 Mar-20
ARC214 RC 506978.94 7698559.98 33.05 156 -60 180 Mar-20
ARC215 RC 506978.39 7698599.97 32.81 114 -60 180 Mar-20
ARC216 RC 507257.45 7698459.80 31.66 246 -60 0 Mar-20
ARC217 RC 507297.79 7698670.69 31.58 282 -60 180 Mar-20
ARC218 RC 507338.14 7698478.57 31.17 276 -70 0 Mar-20
ARC219 RC 507479.71 7698460.18 30.24 270 -60 0 Mar-20
ARC220 RC 507598.54 7698527.51 29.49 60 -60 0 Mar-20
ARC221 RC 507598.73 7698549.84 29.45 150 -60 0 Mar-20
ARC222 RC 506573.34 7698642.27 34.54 138 -60 180 Mar-20
ARC223 RC 507156.74 7698981.23 38.04 102 -60 270 Nov-20
ARC224 RC 507197.60 7698981.29 37.08 100 -60 270 Nov-20
ARC225 RC 507235.47 7698980.93 37.04 102 -60 270 Nov-20
ARC226 RC 507276.55 7698981.44 37.30 102 -60 270 Nov-20
ARC227 RC 507316.39 7698980.90 36.51 102 -60 270 Nov-20
ARC228 RC 507356.68 7698982.38 36.07 102 -60 270 Nov-20
ARC229 RC 507395.57 7698980.96 35.30 102 -60 270 Nov-20
ARC230 RC 507238.64 7698899.72 36.72 80 -60 270 Nov-20
ARC231 RC 507281.81 7698900.10 35.08 102 -60 270 Nov-20
ARC232 RC 507317.41 7698900.47 34.72 102 -60 270 Nov-20
ARC233 RC 507356.66 7698900.32 34.71 102 -60 270 Nov-20
ARC234 RC 507400.78 7698899.93 33.87 108 -60 270 Nov-20
ARC235 RC 507778.11 7699021.45 31.66 120 -60 0 Nov-20
ARC236 RC 507777.74 7698981.95 30.40 120 -60 0 Nov-20
ARC237 RC 507777.56 7698943.33 30.51 120 -60 0 Nov-20
ARC238 RC 507777.64 7698900.10 30.03 120 -60 0 Nov-20
ARC239 RC 507777.35 7698862.17 29.54 120 -60 0 Nov-20
ARC240 RC 507777.06 7698823.61 29.06 120 -60 0 Nov-20
ARC241 RC 507776.99 7698781.52 28.57 120 -60 0 Nov-20
ARC242 RC 507777.13 7698740.44 28.39 120 -60 0 Nov-20
ARC243 RC 507777.14 7698698.65 28.43 120 -60 0 Nov-20
ARC244 RC 507777.18 7698659.53 29.54 120 -60 0 Nov-20
ARC245 RC 507778.07 7698620.67 29.76 100 -60 0 Nov-20
ARC246 RC 507625.78 7698638.78 29.06 80 -60 0 Nov-20
ARC247 RC 507625.21 7698599.48 29.08 120 -60 0 Nov-20
ARC248 RC 507625.13 7698559.76 29.29 160 -60 0 Nov-20
ARC249 RC 507625.29 7698520.43 30.01 210 -60 0 Nov-20
ARC250 RC 507651.24 7698539.99 29.80 150 -60 0 Nov-20
ARC251 RC 507382.98 7698569.96 30.40 100 -60 0 Nov-20
ARC252 RC 507382.38 7698531.21 30.71 160 -60 0 Nov-20
ARC253 RC 507381.76 7698489.48 30.95 210 -60 0 Nov-20
ARC254 RC 507436.73 7698678.37 31.11 260 -60 180 Nov-20
20CCAD001 DDH 507501.70 7698571.22 29.56 100 -60 0 Oct-20
20CCAD002 DDH 507500.54 7698531.47 30.00 160 -60 0 Oct-20
20CCAD003 DDH 507560.17 7698898.69 32.34 840.1 -60 180 Oct-20
20CCAD004 DDH 507499.35 7698490.78 30.04 210 -60 0 Nov-20
20CCAD005 DDH 507498.30 7698452.16 30.23 270 -60 0 Nov-20
20CCAD006 DDH 507538.43 7698588.26 29.49 100 -60 0 Nov-20
20CCAD007 DDH 507557.34 7698845.69 31.20 551.3 -55 180 Nov-20
20CCAD008 RC/DDH 507441.86 7698884.65 32.90 450 -60 180 Nov-20
20CCAD008W Wedge 422 -60 180 Dec-20
20CCAD009 DDH 507538.53 7698549.06 29.84 207.4 -60 0 Nov-20
20CCAD010 DDH 507538.95 7698508.58 29.84 250 -60 0 Nov-20

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 13 of 16

JORC Code, 2012 Edition – Table 1

SECTION 1 SAMPLING TECHNIQUES AND DATA

(Criteria in this section apply to all succeeding sections.)

Criteria Commentary
Sampling Reverse circulation drilling was used to obtain 1 m samples.
techniques Samples were collected on a 1m basis and stockpiled.
The single metre samples of any composite sample reporting greater than 0.1g/t
Au were retrieved and assayed.
Allsampleswere pulverized produce a 50 g chargefor fire assay.
Drilling Reverse Circulation drilling by KTE Drilling.
techniques Diamond drilling by Topdrill.
Drill sample Drilling recoveries for Reverse circulation drilling were excellent, with all
recovery samples dry.
Logging Artemis Reverse Circulation drilling has been logged;
Diamond coreprocessingis ongoing
Sub-sampling The RC drilling rig was equipped with a rig-mounted cyclone and static cone
techniques and splitter, which provided one bulk sample of approximately 20-30 kilograms, and
sample a representative sub-sample of approximately 2-4 kilograms for every metre
preparation drilled.
The sample size of 2-4 kilograms is appropriate and representative of the grain
size and mineralisation style of the deposit.
Quality of assay ALS (Perth) were used for all analysis of drill samples submitted by Artemis.
data and
laboratory tests
The laboratory techniques below are for all samples submitted to ALS and are
considered appropriate for the style of mineralisation defined within the Carlow
Castle Project area:
Samples above 3Kg riffle split.
Pulverise to 95% passing 75 microns
50-gram Fire Assay (Au-AA26) with ICP finish - Au.
4 Acid Digest ICP-AES Finish (ME-ICP61) – Ag, Al, As, Ba, Be, Bi, Ca, Cd, Co,
Cr, Cu, Fe, Ga, K, La, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc, Sr, Th, Ti, Tl, U, V,
W, Zn.
Ore Grade 4 Acid Digest ICP-AES Finish (ME-OG62)
Standards were used for external laboratory checks by Artemis.
Duplicates were used for external laboratory checks by Artemis.
Verification of Electronic data capture, storage and transfer as .csv. Routine QC checks
sampling and
assaying
performed by contractor and independent geophysical consultant. Data were
found to be of high quality and in accordance with contract specifications
Laboratory standards and blank samples were inserted at regular intervals and
some duplicate samples were taken for QC checks.
Location of A Garmin GPSMap62 hand-held GPS was used to define the location of the drill
data points hole collars. Standard practice is for the GPS to be left at the site of the collar
for a period of 5 minutes to obtain a steady reading. Collar locations are
considered to be accurate to within 5m.
Hole collars surveyed by licensed surveyors on completion of the drilling.
Zone 50 (GDA 94).
Data spacing Current drill hole spacing is variable and dependent on specific geological, and
and distribution geochemical targets.
No sample compositing has been used for drilling completed by Artemis. All
results reported are the result of 1 metre downhole sample intervals.
Orientation of data in Drill holes were designed to be perpendicular to the strike of known
relation to geological mineralisation. Due to the structural and geological complexity of the area, it is
structure mineralisation of unknown orientation can be intersected.
Sample security The chain of custody is managed by the supervising geologist who places calico
sample bags in polyweave sacks. Up to 10 calico sample bags are placed in
each sack. Each sack is clearly labelled with:
o Artemis Resources Ltd

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 14 of 16

Criteria Commentary
o Address of laboratory
o Sample range
Samples were delivered by Artemis personnel to the transport company in
Karratha and shrink wrapped onto pallets.
The transport companythen delivers the samples directlyto the laboratory.
Audits or reviews Data is validated upon up-loading into the master database. Any validation
issues identified are investigated prior to reporting of results.

SECTION 2 REPORTING OF EXPLORATION RESULTS

(Criteria listed in the preceding section also apply to this section.)

Criteria Commentary
Mineral tenement and •Drilling by Artemis was carried out on E47/1797 – 100% owned by Artemis
land tenure status Resources Ltd. This tenement forms a part of a broader tenement package that
comprises the West Pilbara Project.
•This tenement is in good standing.
Exploration done by The most significant work to have been completed historically in the Carlow Castle
other parties area, including the Little Fortune and Good Luck prospects, was completed by Open
Pit Mining Limited between 1985 and 1987, and subsequently Legend Mining NL
between 1995 and 2008.
Work completed by Open Pit consisted of geological mapping, geophysical surveying
(IP), and RC drilling and sampling.
Work completed by Legend Mining Ltd consisted of geological mapping and further
RC drilling.
Legend also completed an airborne ATEM survey over the project area, with follow
up ground-based FLTEM surveying. Re-processing of this data was completed by
Artemis and was critical in developing drill targets for the completed RC drilling.
Compilation and assessment of historic drilling and mapping data completed by both
Open Pit and Legend has indicated that this data is compares well with data collected
to date by Artemis. Validation and compilation of historic data is ongoing.
All exploration and analysis techniques conducted by both Open Pit and Legend are
considered to have been appropriate for the style of deposit.
Geology The Carlow Castle Co-Cu-Au prospect includes a number of mineralised shear
zones, located on the northern margin of the Andover Intrusive Complex.
Mineralisation is exposed in numerous workings at surface along numerous quartz
rich shear zones. Both oxide and sulphide mineralisation are evident at surface
associated with these shear zones.
Sulphide mineralisation appears to consist of Chalcopyrite, chalcocite, cobaltite,
pyrrhotite andpyrite
Drill hole Information Drill hole information is contained within this release.
Data aggregation All intervals reported are composed of 1 metre down hole intervals for Reverse
methods Circulation drilling, and sample intervals are used for Diamond core are 1m intervals
only and not length weighted.
No upper or lower cut-off grades have been used in reporting results.
No metal equivalent calculations are used in this report.
Relationship between
True widths of mineralisation have not been calculated for this report, and as such
mineralisation widths
and intercept lengths

all intersections reported are down-hole thicknesses.
A better understanding of the deposit geometry will be achieved on thorough
interpretation of the data. True thicknesses may be reported at a later date if
warranted. Due to the moderately to steeply dipping nature of the mineralised zones,
it is expected that true thicknesses will be less than the reported down-hole
thicknesses.
Diagrams Appropriate plans are shown in the text.

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 15 of 16

Criteria Commentary
Balanced reporting Reporting of results in this report is considered balanced.
Other substantive Targeting for the RC drilling completed by Artemis was based on compilation of
exploration data historic exploration data, and the surface expression of the targeted mineralised
shear zones and associated historic workings.
Further work The results at the Carlow Castle Co-Cu-Au project warrant further drilling. The drill
programme results to date are considered excellent.
An IP programme and detailed low level aeromagnetic survey are scheduled to be
completed in the coming weeks.

==> picture [49 x 19] intentionally omitted <==

ARTEMIS RESOURCES ASX:ARV FRA:ATY US:ARTTF W www.artemisresources.com.au

Page 16 of 16