Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Artemis Resources Limited Capital/Financing Update 2019

Feb 10, 2019

10429_rns_2019-02-10_b36179c0-3b83-46e8-8885-406b61ada297.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX AND MEDIA RELEASE ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

11 February 2019

CARLOW CASTLE Au-Cu-Co METALLURGICAL UPDATE

  • Objective of programme was to determine amenability of Carlow Castle Au-Cu-Co Project to conventional gravity, leach and flotation processes

  • Results confirm effective separation and high recoveries of Gold, Copper and Cobalt via conventional process routes

  • Preliminary test work on two composite samples indicates:

  • Total recovered gold of 98-99% - with significant coarse, gravity recoverable gold up to 48%

  • Total recovered copper of 77-85% - with flotation producing premium grade concentrates of 30% Cu

  • Total recovered cobalt of 73-79% - with flotation producing concentrates of 2.3 – 5.3% Co

  • Gold not recovered via flotation amenable to cyanide leach process

  • Results provide a strong basis for further flowsheet optimisation and geometallurgical test work

Artemis Resources Limited (“Artemis” or “the Company”) (ASX:ARV, Frankfurt: ATY, US OTCQB: ARTTF) is pleased to provide this metallurgical update on the company’s Carlow Castle Au-Cu-Co Project in the Pilbara region of Western Australia.

Laboratory scale gravity gold, cyanide leach and flotation processes were adopted with a view to gain an insight into the metallurgical behaviour and recoverability of gold, copper and cobalt. Two drill hole composites were generated and tested at ALS Metallurgy in Western Australia. Table 1 summarises metallurgical results from optimised tests from a 50test suite.

Table 1: Carlow Castle Au-Cu-Co Project – Summary of Optimised Results

Metal Recovery Concentrate Concentrate Grade
Comp Metallurgical Process Gold Silver Copper Cobalt Gold Silver Copper Cobalt Arsenic
% % % % g/t g/t % % %
Gravity recoverable 46 4 - - - - - - -
COM
01
Cyanide in leach(CIL) 4 2 - - - - - - -
Copper concentrate 22 64 81 6 19.3 84.0 30.0 0.5 0.7
Cobalt concentrate 26 26 3 73 20.1 29.8 3.4 5.3 7.2
Total recovered metal 98 96 85 79 - - - - -
Gravity recoverable 48 4 - - - - - - -
Cyanide in leach 7 10 - - - - - - -
COM
02
Copper concentrate 25 66 75 5 21.5 84.0 29.6 0.2 0.3
Cobalt concentrate 19 16 2 68 12.2 15.5 2.2 2.3 3.1
Total recovered metal 99 96 77 73 - - - - -

Artemis Chief Executive Officer Wayne Bramwell commented;

“Artemis is encouraged by the amenability of the deposit to conventional processing options and the excellent recoveries of the three key minerals. Gold and high-grade copper concentrates will be the primary value drivers at Carlow Castle with cobalt representing a third and valuable product stream that should appeal to many potential off-take partners.”

==> picture [595 x 15] intentionally omitted <==

----- Start of picture text -----

Artemis Resources Limited (ABN: 80 107 051 749) Follow us
----- End of picture text -----

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

ASX AND MEDIA RELEASE

ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

DETAILS OF THE METALLURGICAL TEST WORK PROGRAMME

Artemis has completed preliminary metallurgical test work on the Carlow Castle Au-Cu-Co Project at ALS Metallurgy in Western Australia. The programme focussed on metallurgical amenability on selected samples from the Carlow Castle deposit employing conventional gravity gold, cyanide leach and flotation processes. Outcomes specific to the metallurgical response and recovery for three target commodities (gold, copper and cobalt) are proposed to be used for further project development evaluations.

Sample Selection

Two 100 kg HQ diamond core metallurgical composites, sampled from drill holes CCAD001 to CCAD012 (refer ASX release 15 October 2018 and Figure 1 ), were used for this programme.

==> picture [503 x 266] intentionally omitted <==

----- Start of picture text -----

N
----- End of picture text -----

Figure 1 – Drill Hole locations at Carlow Castle sampled for COM-01 and COM-02

Table 2 summarises the composite head grades with COM-01 selected as a high-grade sample to more readily discern its metallurgical characteristics.

Table 2 – Carlow Castle Metallurgical Composite Samples – Head Grade

Sample ID Gold Silver Copper Cobalt
g/t g/t % %
COMPOSITE 01 (COM-01) 5.0 7.5 2.1 0.46
COMPOSITE 02 (COM-02) 2.2 3.3 1.0 0.12

22

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

2

ASX AND MEDIA RELEASE ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Scope of Test work

The metallurgical test work scope was focused on recovery of:

  • Gold – from both gravity recovery and cyanide leaching processes to produce a gold product suitable for on-site smelting and production of gold dore; and

  • Copper and Cobalt – via conventional flotation to produce separate copper and cobalt concentrates.

The metallurgical test flowsheet utilises typical processing pathways for precious and base metal ores.

Each composite was crushed and ground with coarse gold removed using conventional gravity devices. The ground-gravity tailing is then subjected to a series of sulphide flotation stages. The flotation stages employ mineral specific reagents to selectively recover copper and cobalt minerals. Copper flotation is performed first with the tailings sent for selective cobalt flotation.

Copper and Cobalt mineral rougher concentrates may require a light regrind to release any locked minerals and improve the final grades of the respective cleaned concentrates.

Tailings from the flotation process containing fine or non-floating gold is subjected to conventional cyanide leach and carbon adsorption processes.

Figure 2 presents the test work flowsheet and forms the basis of results presented.

==> picture [488 x 264] intentionally omitted <==

Figure 2: Carlow Castle Au-Cu-Co Project metallurgical test work flowsheet

Test Results

More than 50 metallurgical tests have been conducted at ALS Metallurgy to date with encouraging metallurgical response and reproducibility for all commodities. The collective metallurgical response for the two composites tested to date is presented in Table 3 .

33

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

3

ASX AND MEDIA RELEASE ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Test results present indicative metallurgical behaviour for both composites and comprise the following tests:

  • Optimised gravity gold and copper flotation results from ALS Test 4407 and 4406 (COM-01 and COM-02 respectively);

  • Cobalt flotation results from ALS Test 4403 and 4406 (COM-01 and COM-02 respectively); and

  • Cyanide leach results from ALS Test 1574 and 1575 (COM-01 and COM-02 respectively).

Table 3: Carlow Castle Au-Cu-Co Project – Summary of Optimised Results

Metal Recovery Metal Recovery Concentrate Grade Concentrate Grade Concentrate Grade
Comp Metallurgical Process Gold Silver Copper Cobalt Gold Silver Copper Cobalt Arsenic
% % % % **g/t ** **g/t ** % % %
COM
01
Gravity recoverablegold 46 4 - - - - - - -
Cyanide in leach(CIL) 4 2 - - - - - - -
Copper concentrate 22 64 81 6 19.3 84.0 30.0 0.5 0.7
Cobalt concentrate 26 26 3 73 20.1 29.8 3.4 5.3 7.2
Total recovered metal 98 96 85 79 - - - - -
Gravity recoverablegold 48 4 - - - - - - -
COM
02
Cyanide in leach 7 10 - - - - - - -
Copper concentrate 25 66 75 5 21.5 84.0 29.6 0.2 0.3
Cobalt concentrate 19 16 2 68 12.2 15.5 2.2 2.3 3.1
Total recovered metal 99 96 77 73 - - - - -

The results to date confirm amenability for gold, copper and cobalt processing with excellent recoveries. Analysis of the metallurgical results indicate:

Gold

  • Significant gravity recoverable gold component - ranging up to 48% and suitable for on-site processing into gold doré;

  • The balance of the non-gravity gold is expected to be recovered into flotation concentrates - as a byproduct credit or recovered by a cyanide leach process; and

  • Cyanide leach test work confirms amenability to conventional low-cost gold recovery processes - with exceptional final tailings grades 0.03 to 0.10 g/t.

Copper

  • Fast floating copper minerals produce high-grade, premium copper concentrate – of approximately 30% Cu;

  • Key deleterious elements including arsenic are easily managed with a light polishing regrind or blend control - COM-01 is considered a high-grade sample and therefore comes with elevated arsenic linked to the cobalt mineral; arsenic levels are expected to return in line with COM-02 (0.3% As) and as such, will be well below smelter penalty limits of circa 0.5% As; and

  • Recoveries in line with mineralogy realising 77–85% copper recovery - unrecovered copper minerals are predominantly represented by non-floating silicates or secondary copper minerals.

44

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

4

ASX AND MEDIA RELEASE ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Cobalt

  • Cobalt recoveries ranging 73-79% - considered exceptional for the preliminary nature of the current metallurgical test work programme;

  • Cobalt concentrate grades ranging 2.3–5.3% Co are saleablewith circa 3% Co concentrates being typical smelter feed and >5% Co being considered high grade – it should be noted that concentrate grades as high as 19% Co were achieved in several tests conducted. Mineralogy conducted on cobalt concentrates from COM-01 and COM-02 indicate well liberated minerals (cobaltite and gangue) and are amenable to significant further upgrade. Test work continues to improve cobalt concentrate grades and ultimately aims to maintain optimal recovery and reduce shipping / smelter treatment charges; and

  • Cobaltite (CoAsS) is the dominant cobalt bearing mineral - and is therefore intrinsically linked to arsenic. Targeting lower specification Co concentrates will minimise processing capital and if high specification Co concentrates are targeted a higher capital, hydrometallurgical flowsheet will be required. As such and with a view to optimising returns, a trade-off study of capital and operating expense versus revenue from differing grade product streams will be evaluated prior to final flowsheet selection.

LOOKING FORWARD

The Carlow Castle Au-Cu-Co process flowsheet currently targets conventional, low cost processes with the copper and gold process routes essentially proven. Options exist to refine the cobalt concentrate quality with the next phase of the geometallurgical programme to support the optimal process scale and flowsheet selection.

The results of the metallurgical test work programme and forthcoming resource update will provide Artemis with a basis to plan and advance project development activities including:

  • Resource and pit optimisation;

  • Structural and geotechnical drilling;

  • Generation of a representative metallurgical master composites;

  • Continue to metallurgically characterise existing and alternative low-cost process flowsheets including:

  • Expanding knowledge of cobalt flotation chemistry and optimisation,

  • Maximising gold recovered via cyanide leach (i.e. to Dore);

  • Engage smelters and offtake partners;

  • Detailed geo-metallurgical test programme;

  • Engineering trade-off studies to attain the optimal process flowsheet and major equipment selections;

  • Project economics and project viability; and

  • Engineering and Feasibility Studies.

A detailed development timeline for Carlow Castle is being currently reviewed.

55

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

5

ASX AND MEDIA RELEASE ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

For further information on this announcement or the Company generally, please visit our website at www.artemisresources.com.au or contact:

Wayne Bramwell David Tasker Chief Executive Officer Chapter One – Media Advisors [email protected] [email protected] T: +61 417 953 073 T: +61 433 112 936

BACKGROUND INFORMATION ON ARTEMIS RESOURCES

Artemis Resources Limited is an exploration and development company focussed on its large (~2,400 km[2] ) and prospective base, battery and precious metals assets in the Pilbara region of Western Australia. Artemis owns 100% of the 500,000 tpa Radio Hill processing plant and infrastructure, located approximately 35 km south of the city of Karratha. The Company is evaluating 2004 and 2012 JORC Code compliant resources of gold, nickel, copper-cobalt, PGE’s and zinc, all situated within a 40 km radius of the Radio Hill plant.

Artemis have signed Definitive Agreements with Novo Resources Corp. (“Novo”), which is listed on Canada’s TSX Venture Exchange (TSXV:NVO), and pursuant to the Definitive Agreements, Novo has satisfied its expenditure commitment, and earned 50% of gold (and other minerals necessarily mined with gold) in conglomerate and/or paleoplacer style mineralization in Artemis’ tenements within 100 km of the City of Karratha, including at Purdy’s Reward (“the Gold Rights”). The Gold Rights do not include:

  • (i) gold disclosed in Artemis’ existing (at 18 May 2017) JORC Code Compliant Resources and Reserves; or

  • (ii) gold which is not within conglomerate and/or paleoplacer style mineralization; or

  • (iii) minerals other than gold.

Artemis’ Mt Oscar tenement is excluded from the Definitive Agreements. The Definitive Agreements cover 34 tenements / tenement applications that are 100% owned by Artemis.

Pursuant to Novo’s successful earn-in, two 50:50 joint ventures have been formed between Novo’s subsidiary, Karratha Gold Pty Ltd (“Karratha Gold”) and two subsidiaries of Artemis (KML No 2 Pty Ltd and Fox Radio Hill Pty Ltd). The joint ventures are managed as one by Karratha Gold with Artemis and Novo contributing to further exploration and any mining of the Gold Rights on a 50:50 basis.

FORWARD LOOKING STATEMENTS AND IMPORTANT NOTICE

This report contains forecasts, projections and forward-looking information. Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will be achieved. Expectations and estimates and projections and information provided by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Artemis’ control.

Actual results and developments will almost certainly differ materially from those expressed or implied. Artemis has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this announcement. To the maximum extent permitted by applicable laws, Artemis makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and without prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.

Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.

66

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

6

ASX AND MEDIA RELEASE

ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

JORC Code, 2012 Edition – Table 1 (extracted from AM&A resource estimate report)

SECTION 1 SAMPLING TECHNIQUES AND DATA

SECTION 1 SAMPLING TECHNIQUES AND DATA
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases, more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.

All drilling was RC drilling performed by Three
Rivers Drilling during 2017 and Topdrill in 2017
and 2018.

RC samples from each metre were collected
through a rig-mounted cyclone and split using
a rig-mounted static cone splitter and
submitted to an independent laboratory for
chemical analysis.

Drilling
included
comprehensive
QA/QC
protocols including the use of certified
standards, blanks and duplicate samples.

To assist the site geologist, all samples were
analysed using a portable XRF instrument
(Niton & Innovex) at drill site.

All the diamond core was cut by trained
technicians along the long-axis using a
diamond saw between intervals marked up by
the geologist. The sampling intervals were
nominally
1
m
adjusted
to
match
lithological/mineralisation boundaries.
• The aim of the metallurgical test work
programme was to prepare a preliminary flow
sheet that may form the basis of a more
detailed future test work programme from
representative drill core samples when a
resource update is available. This initial test
work focused on attempting to identify a
possible simple beneficiation technique to
recover
a
gold,
copper
and
cobalt.
Two metallurgical composites were generated
based on 122 half core drill hole intervals,
selected from mineralised sections of twelve
diamond drill holes (18CCAD01 to 18CCAD02).
• The metallurgical core samples were placed in
sealed plastic trays before being shipped to
ALS Metallurgy, Perth, WA for compositing
and metallurgical test work.
• The two 100kg composites were crushed to
minus 3.35mm before sub-splitting for
exploratory test work.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,

Reverse Circulation drilling at Carlow Castle
South was completed by a truck-mounted
Schramm 685 RC drilling rig using a 5¼ inch
diameter face sampling hammer.

The HQ3 diamond drilling was completed using
a truck mounted Evolution FH3000 Diamond

77

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

7

ASX AND MEDIA RELEASE

ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
etc). Drill.
Drill sample Method of recording and assessing core and Sample recoveries were recorded by the field
recovery chip sample recoveries and results assessed.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
geologist in the field during logging and
sampling.
If poor sample recovery is encountered during
drilling, the supervising geologist and driller
endeavour to rectify the problem to ensure
Whether a relationship exists between sample maximum sample representative nature of
recovery and grade and whether sample bias the recovery.
may have occurred due to preferential
loss/gain of fine/coarse material.
Logging Whether core and chip samples have been All RC drill chip samples were appropriately
geologically and geotechnically logged to a geologically logged at 1m intervals from
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
surface to the bottom of each drill hole. It is
considered
that
geological
logging
is
completed at an adequate level to allow
appropriate
future
Mineral
Resource
Whether logging is qualitative or quantitative estimation.
in nature. Core (or costean, channel, etc) All
diamond
core
was
appropriately
photography. geologically and geotechnically logged in
The total length and percentage of the detail on site by geologist.
relevant intersections logged. Geological logging is considered
semi-
quantitative due to the limited geological
information available from the Reverse
Circulation method of drilling.
All RC and diamond drill holes completed by
Artemis during the current program have
been logged in full.
Sub-sampling If core, whether cut or sawn and whether The RC drilling rig was equipped with a rig-
techniques quarter, half or all core taken. mounted cyclone and static cone splitter,
sample
preparation
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
which
provided
one
bulk
sample
of
approximately
20-30
kilograms,
and
a
representative sub-sample of approximately
2-4 kilograms for every metre drilled.
For all sample types, the nature, quality and The sample size of 2-4 kilograms is considered
appropriateness of the sample preparation to be appropriate and representative of the
technique. grain size and mineralisation style of the
Quality control procedures adopted for all deposit, duplicate samples were collected and
sub-sampling stages to maximise
representivity of samples.
submitted for analysis confirming subsample
representation.
The majority of samples were dry. Where wet
Measures taken to ensure that the sampling is sample was encountered, the cleanliness of
representative of the in-situ material the cyclone and splitter were closely
collected, including for instance results for monitored by the supervising geologist, and
field duplicate/second-half sampling. maintained to a satisfactory level to avoid
Whether sample sizes are appropriate to the
grain size of the material being sampled.
contamination and ensure representative
samples were being collected.
The HQ3 diamond drill core was cut by trained
technicians along the long-axis using a
diamond saw between intervals marked up by
the geologist. The sampling intervals were
nominally
1
m
adjusted
to
match

88

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

8

ASX AND MEDIA RELEASE

ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Criteria
JORC Code explanation
Commentary

lithological/mineralisation boundaries.

Duplicate
samples
were
collected
and
submitted for analysis. Reference standards
inserted during drilling.

The sample and particle sizes are appropriate
for the grainsize of the material being sampled.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of
the assaying and laboratory procedures used
and whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
• More than 50 metallurgical tests have been
conducted at ALS Metallurgy to date with
encouraging
metallurgical
response
and
reproducibility for all commodities.
• The nature and quality of assaying is considered
appropriate for the metallurgical test work.
Verification
sampling
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
• Multiple head assays for each sub-sample of each
metallurgical composite were carried out. Grade
data was also reconciled for each sub-sample
tested from the metallurgical composites.
• No adjustments of assay data are considered
necessary.
Location
of
d
points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.

A Garmin GPSMap62 hand-held GPS was used
to define the location of the drill hole collars.
Standard practice is for the GPS to be left at
the site of the collar for a period of 5 minutes
to obtain a steady reading. Collar locations are
considered to be accurate to within 5m. The
collars of all the completed holes were
subsequently picked up with DGPS with an
accuracy of within 1 cm.

Downhole surveys were captured at 30 metre
intervals for the drill holes.

The grid system used for all Artemis drilling is
GDA94 (MGA 94 Zone 50)

Land Surveys out of Karratha surveyed the
topography using drone photogrammetry
(0.035m resolution) in January 2018.
Data spacing
and distribution
Data spacing for reporting of Exploration
Results.
• Not Applicable. Samples were for metallurgical test
work and will not be used for Mineral Resource

99

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us

9

ASX AND MEDIA RELEASE

ASX: ARV | OTCQB: ARTFF | Frankfurt: ATY

==> picture [38 x 34] intentionally omitted <==

Criteria JORC Code explanation Commentary
Whether the data spacing and distribution is estimations.
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Whether sample compositing has been
applied.
Orientation of Whether the orientation of sampling achieves • The aim of the metallurgical test work programme
data in relation
to
geolog
structure
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
was to prepare a preliminary flow sheet that may
form the basis of a more detailed future test work
programme from representative drill core samples
when a resource update is available. This initial test
work focused on attempting to identify a possible
orientation and the orientation of key simple beneficiation technique to recover a gold,
mineralised structures is considered to have copper
and
cobalt.
introduced a sampling bias, this should be Best endeavours have been made, using drill hole
assessed and reported if material. assays and statistical analysis to generate two
metallurgical composites (COM-02) and high grade
(COM-01) samples to test the mineralisation
amenability to low cost processing techniques.
Sample security The measures taken to ensure sample • Core samples were collected by employees of
security. Artemis from core situated at the company’s core
farm located in Karratha.
Samples were then transported from Karratha to
Perth before being submitted to ALS Metallurgy in
Perth, WA for sample preparation and
metallurgical test work.
Audits or reviews The results of any audits or reviews of • No audits completed.
sampling techniques and data.

1010

==> picture [22 x 14] intentionally omitted <==

Artemis Resources Limited (ABN: 80 107 051 749) Suite 1, 11 Ventnor Avenue, West Perth, WA, Australia, 6005 | Telephone: +61 8 6319 0000 Email: [email protected] | www.artemisresources.com.au

Follow us